FA820215R1000_______0003.pdf
PDF 39 KB Posted
- Solicitation number
- FA8202-15-R-1000
About this file
AMDT 03
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JA_HMCS_ICS_Redacted.pdf | ||
| HMCSICS_Pricing_Attachment.xlsx | XLSX spreadsheet | |
| INSTRUCTIONS_FOR_COST_PROPOSAL_ADEQUACY_AND_STRUCTURE.pdf | ||
| FA820215R1000_______0002.pdf | ||
| FA820215R1000_______0001.pdf | ||
| HMCSICS_PWS.pdf | ||
| HMCSICS_CDRLS.pdf | ||
| HMCSICS_PWS.pdf | ||
| HMCSICS_Pricing_Attachment.xlsx | XLSX spreadsheet | |
| HMCSICS_GFP.pdf | ||
| FA820215R1000.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
J
2. AMENDMENT/MODIFICATION NO.
FA8202-15-R-1000-0003
3. EFFECTIVE DATE
11 FEB 2015
4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO (If applicable)
6. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, DIRECTORATE OF CONTRACTING
AFLCMC WWAK
6072 FIR AVENUE BLDG 1233
HILL AIR FORCE BASE UT 84056-5820
BUYER: Stephanie Rearick/AFLCMC stephanie.rearick@us.af.mil Phone: (801) 777- 7580 No Collect Calls
7. ADMINISTERED BY (If other than item 6) CODEFA8202
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
CODE
X
9A. AMENDMENT OF SOLICITATION NO.
FA820215R1000
9B. DATED (SEE ITEM 11)
15-JAN-2015
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods. ( a ) By completing Items 8 and 15, and returning copies of the amendment; ( b ) By acknowledging receipt of this amendment on each copy of the offer submitted; or ( c ) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
ROUTINE
15A. NAME AND TITLE OF SIGNER (Type or print)
15B. CONTRACTOR/OFFEROR
BY ________________________________________________________
(Signature of person authorized to sign)
15C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16B. UNITED STATES OF AMERICA
BY ____________________________________________________
(Signature of Contracting Officer)
16C. DATE SIGNED
FACILITY CODE
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105 STANDARD FORM 30 (REV. 10-83)
PRESCRIBED BY GSA
FAR (48 CFR) 53.243
X
X X
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
Amendment/Modification FA8202-15-R-1000-0003
Continuation of block 14. DESCRIPTION OF AMENDMENT/MODIFICATION
The purpose of this amendment is to make changes to the following CLINS in both Section B of the Solicitation and the Pricing Attachment:
a. CLIN 0004: Inspect and Repair ICU - (Core Mod 800, Baseboard, Front Panel-Backlit, Input Filter Assembly are listed under separate CLINS)
b. CLINs 0013, 0014, and 0016 are changed to "RESERVED". The offeror may use these CLINS and/or create additional CLINS to propose further breakout and pricing details of other CLINS already listed (ie CLIN 0019).
c. CLIN 0020: The delivery, estimated quantities and unit pricing information have been changed to To Be Determined (TBD) or Do Not Propose (DNP).
No further changes are made by this amendment.
Request for Proposal FA8202-15-R-1000-0003
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Inspect and Test Equipment - No Fault Found HVI
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA See Pricing Attachment
To be Determined
J010 Inspect and Test Equipment - No Fault Found HVI Contractor shall inspect and test HVI equipment. If no fault is found, equipment will be documented and returned to the government IAW PWS paragraph 2. This CLIN will not be used if repair/replacement actions are required. The contractor shall receive payment for those services rendered and accepted by the government.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
+ TBD EA TBD
Proposed Period of Performance
+ TBD EA
Inspect and Test Equipment - No Fault Found BBA
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA See Pricing Attachment
To be Determined
J010 Inspect and Test Equipment - No Fault Found BBA Contractor shall inspect and test BBA equipment. If no fault is found, equipment will be documented and returned to the government IAW PWS paragraph 2. This CLIN will not be used if repair/replacement actions are required. The contractor shall receive payment for those services rendered and accepted by the government.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspect and Test Equipment - No Fault Found BBA
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
+ TBD EA TBD
Proposed Period of Performance
+ TBD EA
Inspect and Test Equipment - No Fault Found ICU
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA See Pricing Attachment
To be Determined
J010 Inspect and Test Equipment - No Fault Found ICU Contractorshall inspect and test ICU equipment. If no fault is found, equipment will be documented and returned to the government IAW PWS paragraph 2. This CLIN will not be used if repair/replacement actions are required. The contractor shall receive payment for those services rendered and accepted by the government.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
+ TBD EA TBD
Proposed Period of Performance
+ TBD EA
Inspect and Repair ICU
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
Inspect and Repair ICU
EA See Pricing Attachment
To be Determined
J010 Inspect and Repair ICU Inspect, repair and test ICU equipment (Core Mod 800, Baseboard, Front Panel-Backlit, Input Filter Assembly are listed under separate CLINS)-- part #A1301-5 IAW PWS paragraph 2 . The contractor shall receive payment for those services rendered and accepted by the government.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
+ TBD EA TBD
Proposed Period of Performance
+ TBD EA
Inspect and Repair BBA - HRC to Helmet
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA See Pricing Attachment
To be Determined
J010 Inspect and Repair BBA - HRC to Helmet Inspect, repair and test BBA-HRC to Helmet equipment -- part #A13092-1 IAW PWS paragraph 2 . The contractor shall receive payment for those services rendered and accepted by the government.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
+ TBD EA TBD
Proposed Period of Performance
Inspect and Repair HVI-HRC to Helmet
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA See Pricing Attachment
To be Determined
J010 Inspect and Repair HVI-HRC to Helmet Inspect, repair and test HVI-HRC to Helmet equipment -- part #V14032-401 IAW PWS paragraph 2 . The contractor shall receive payment for those services rendered and accepted by the government.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) To be determined _ Req No / Pri
Required Period of Performance
+ TBD EA TBD
Proposed Period of Performance
+ TBD EA
Inspect and Repair HVI - ICU to IRC
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA See Pricing Attachment
To be Determined
J010 Inspect and Repair HVI - ICU to IRC Inspect, repair and test HVI-ICU to IRC equipment -- part #A13089-R-042 IAW PWS paragraph 2 . The contractor shall receive payment for those services rendered and accepted by the government.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
+ TBD EA TBD
Proposed Delivery
Inspect and Repair HVI - ICU to IRC
+ TBD EA
Inspect and Repair HVI - IRC to QDC
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA See Pricing Attachment
To be Determined
J010 Inspect and Repair HVI - IRC to QDC Inspect, repair and test HVI - IRC to QDC equipment -- part #A13090-1 IAW PWS paragraph 2 . The contractor shall receive payment for those services rendered and accepted by the government.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
+ TBD EA TBD
Proposed Delivery
+ TBD EA
Inspect and Repair HVI - QDC to HRC
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA See Pricing Attachment
To be Determined
J010 Inspect and Repair HVI - QDC to HRC Inspect, repair and test HVI-QDC to HRC equipment -- part #A1309-5 IAW PWS paragraph 2 . The contractor shall receive payment for those services rendered and accepted by the government.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required
Inspect and Repair HVI - QDC to HRC
+ TBD EA TBD
Proposed Delivery
+ TBD EA
Inspect and Repair BBA-PD-14
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA See Pricing Attachment
Not Separately Priced
J010 Inspect and Repair BBA-PD-14 Inspect, repair and test BBA-PD-14 equipment -- part #A12920-2 IAW PWS paragraph 2 . The contractor shall receive payment for those services rendered and accepted by the government.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
+ TBD EA TBD
Proposed Delivery
+ TBD EA
Inspect and Repair ICU-Core Module 800
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA See Pricing Attachment
Not Separately Priced
J010 Inspect and Repair ICU-Core Module 800 Inspect, repair and test ICU-Core Module 800 equipment -- part #13022-1 IAW PWS paragraph 2 . The contractor shall receive payment for those services rendered and accepted by the government.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
Inspect and Repair ICU-Core Module 800
Type / Ship To Quantity (U/I) To be determined _ Req No / Pri Required Delivery
+ TBD EA TBD
Proposed Delivery
+ TBD EA
Inspect and Repair ICU-Baseboard
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA See Pricing Attachment
Not Separately Priced
J010 Inspect and Repair ICU-Baseboard Inspect, repair and test ICU-Baseboard equipment -- part #13044-1 IAW PWS paragraph 2 . The contractor shall receive payment for those services rendered and accepted by the government.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
+ TBD EA TBD
Proposed Delivery
+ TBD EA
RESERVED
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA
J010
RESERVED
RESERVED
Limitations of Liability: Other Than High Value Item
RESERVED
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
+ TBD EA TBD
Proposed Delivery
+ TBD EA
RESERVED
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA See Pricing Attachment
Not Separately Priced
J010
RESERVED
RESERVED
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
+ TBD EA TBD
Proposed Delivery
+ TBD EA
Inspect and Repair ICU-Front Panel, Backlit
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA See Pricing Attachment
Not Separately Priced
J010 Inspect and Repair ICU-Front Panel, Backlit Inspect, repair and test ICU-Front Panel, Backlit equipment -- part #A13278-1 IAW PWS paragraph 2 . The contractor shall receive payment for those services rendered and accepted by the government.
Inspect and Repair ICU-Front Panel, Backlit
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
+ TBD EA TBD
Proposed Delivery
+ TBD EA
RESERVED
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA
J010
RESERVED
RESERVED
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
+ TBD EA TBD
Proposed Delivery
+ TBD EA
Inspect and Repair ICU - Input Filter Assembly
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA See Pricing Attachment
Not Separately Priced
J010 Inspect and Repair ICU - Input Filter Assembly
Inspect and Repair ICU - Input Filter Assembly
Inspect, repair and test Input Filter Assembly equipment -- part #A12920-1 IAW PWS paragraph 2 . The contractor shall receive payment for those services rendered and accepted by the government.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
+ TBD EA TBD
Proposed Delivery
+ TBD EA
Inspect and Repair Calibration-SAT
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA See Pricing Attachment
Not Separately Priced
J010 Inspect and Repair Calibration-SAT Inspect, repair and test Calibration-SAT equipment -- part #A13890-1 IAW PWS paragraph 2 . The contractor shall receive payment for those services rendered and accepted by the government.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
+ TBD EA TBD
Proposed Delivery
+ TBD EA
Inspect and Repair BBA-Future J-Box Configuration
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
Inspect and Repair BBA-Future J-Box Configuration
EA See Pricing Attachment
Not Separately Priced
J010 Inspect and Repair BBA-Future J-Box Configuration Inspect, repair and test BBA-Future J-Box Configuration equipment IAW PWS paragraph 2 . The contractor shall receive payment for those services rendered and accepted by the government.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
+ TBD EA TBD
Proposed Delivery
+ TBD EA
Inspect and Repair BBA-FutureHObIT Configuration
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA To be Determined To be Determined
J010 Inspect and Repair BBA-Future HObIT Configuration Inspect, repair and test BBA-Future HObiT Configuration equipment IAW PWS paragraph 2 . The contractor shall receive payment for those services rendered and accepted by the government.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
+ TBD EA TBD
Proposed
Inspect and Repair - Minor Repairs/Replacements
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA See Pricing Attachment
Not Separately Priced
J010 Inspect and Repair - Minor Repairs/Replacements Inspect, repair and test equipment not previously listed IAW PWS paragraph 2 . The contractor shall receive payment for those services rendered and accepted by the government.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
+ TBD EA TBD
Proposed Delivery
+ TBD EA
MICAP - Priority
Item No.
J010 MICAP - Priority This CLIN is to be used for expedited service for assets identified as MICAP priority. These assets will be given precedence over all other repairs. The contractor shall receive payment for those services rendered and accepted by the government.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) To be determined _ Req No / Pri
Required Delivery
+ TBD EA TBD
Proposed
DATA
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA Not Separately Priced Not Separately Priced
DATA
DATA IAW DD 1423-1
DATA - CDRLS IAW PWS paragraph 6.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) *ARO applicable
DD Form 1423 _ Req No / Pri
Required Delivery
+ IAW1423 1 LO
Proposed Delivery
+ IAW1423 1 LO
SHIP TO / PLACE OF PERFORMANCE
TYPE/CODE: + IAW1423
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
TYPE/CODE: + TBD
MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)
AWARD NUMBER:
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J
LIST OF ATTACHMENTS
Form Number Description/File Name Date Number of Pages HMCSICS_Pricing_Attachment.xlsx 1
File details come from the government source that posted it. Updated .