SOW_Mobile Crane_09-12-2024.pdf
PDF 249 KB Posted
- Attached to
- Crane Rental for Hill AFB Utah
- Solicitation number
- FA820124R0006
About this file
This document is a Statement of Work (SOW) for mobile crane rental to support the Rocket Systems Launch Program (RSLP) at Hill Air Force Base and the Utah Training & Test Range.
The key details are:
- The vendor must provide two mobile cranes capable of lifting a combined load of up to 172,000 pounds to support various motor move activities including cross-loading, proof loading, and demilitarization.
- The vendor must comply with Air Force requirements for crane usage and provide certified operators/riggers.
- The lift operations will take place over a period of up to 6 days, with 7-day advance notice provided to the vendor.
- The government will provide various support items such as rigging, utilities, facilities access, and security.
- Vendors must submit a lift plan, certifications, equipment list, and pricing for the first order by the due date of September 17, 2024.
- The contracting agency is the Department of the Air Force Materiel Command Air Force Sustainment Center.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pricing for Ordering Periods 9-12-24.xlsx | XLSX spreadsheet | |
| Solicitation Amendment FA820124R00060002 SF 30.pdf | ||
| Solicitation Amendment - FA820124R00060002.pdf | ||
| Q and A Crane Rentals 9-12-24.xlsx | XLSX spreadsheet | |
| Q and A Crane Rentals.xlsx | XLSX spreadsheet | |
| Pricing for Ordering Periods.xlsx | XLSX spreadsheet | |
| Solicitation Amendment - FA820124R00060001.pdf | ||
| Solicitation Amendment FA820124R00060001 SF 30.pdf | ||
| Wage Determination 7-22-24.pdf | ||
| Pricing for First Order.xlsx | XLSX spreadsheet | |
| Solicitation - FA820124R0006.pdf | ||
| SOW_Mobile Crane_08272024.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work Mobile Crane Rental at Hill Air Force Base and Utah Training & Test Range for Rocket Systems Launch Program
12 September 2024
1.0 BACKGROUND
The fixed Gantry Crane in the MAMMS has been deemed unserviceable due to age and the significant number of deficiencies and the refurbishment effort has stalled. A mobile crane solution is required to meet RSLP mission needs for the foreseeable future.
2.0 OBJECTIVES
The vendor shall supply two mobile cranes on request over the life of the contract to support motor moves. The dual crane solution shall be capable of lifting a maximum combined load of 172,000 pounds. Vendor shall comply with AFI 6.3.6.2. “Mobile cranes used for critical lifts shall be derated to 50% of their original load capacity. The total weight of the load shall not exceed 50% of the crane rated capacity for the given lift radius and load line reeving configuration of the crane.” The lift task involves tandem cross load of rocket motors on to type II trailers, and associated equipment from the type II trailer to the Commercial Heavy Hauler, and post mission from the heavy hauler back to the type II trailers and the ground. The vendor’s cranes and operators/riggers must be ordinance certified and qualified for lifting live, explosive loads. The Proof Loads will be a lift and hold operation involving only inert loads. The De- Militarization lifts will be a straight up straight down explosive load lift with the trailer moving out from under the load and the load set directly onto the prepared ground.
3.0 DECRIPTION OF WORK
3.1 Cross Load
o Pre-Mission the vendor shall provide 2 cranes, operators/riggers, capable of lifting a combined load of up to a 172,000 lb. of explosive. The cranes will be used for lifting three types of rocket motors (one at a time) in their shipping containers and holding them in place while the type II trailer is driven out and the heavy hauler is back under the load. The load will be set down on the ISO fittings chained to the heavy hauler trailer.
The same cranes will also load the type II trailers onto heavy haulers o Post-mission, the containers will be empty (3 ea.) and weigh approximately 30,000 lbs.
Post Mission the Type II trailer lifts will be the same as pre-mission o Vendor shall provide a Hill AFB safety approved lift plan including dimensions, drawings, equipment description and footprint, etc.
All lifts are expected to be straight up and down with the conveyances moving in and out under the load.
o Vendor shall provide proper grounding of all equipment to prevent the buildup of static electricity.
o Vendor must provide all rigging (not otherwise provided by the gov) and proof load certifications for any contractor rigging used o Vendor will be provided at minimum a 7-day notice with date of work start to ensure the solution is operational and ready.
o Vendor will provide 2 crane operators and a rigger. Operators/rigger must hold valid certifications, and a copy of the certifications shall accompany the bid.
Note: Hill AFB Safety Approved Lift Plan required in 3.1 and 3.2 the same plan if all required elements are accounted for in a single plan.
3.2 Proof Load
o The vendor shall provide 2 cranes capable, operators/riggers, of lifting up to a combined load of 172,000 lb. of explosive. The cranes will be used for lifting rocket motors in their shipping containers and holding them in place and then set back down in place.
3.3 De-Militarization (De-Mil) Support with Operators/Riggers o The vendor shall provide 2 cranes, with operators/riggers, capable of lifting a combined load of up to a 150,000 lb. explosive. The cranes will be used for lifting rocket motors (1 at a time) from an open bed trailer and setting them down on the ground.
o The location of these operation will be at Utah Training and Test Range approximately 80 miles west of Hill AFB.
o All lifts are expected to be straight up and down with the conveyances moving out from under the load.
o For these operations all rigging below the hook will be supplied by the government and will be proof load tagged
3.4 De-Militarization (De-Mil) Support without Operators/Rigger o The vendor shall provide 2 cranes capable of lifting a combined load of up to a 150,000 lb. explosive to be operated by qualified government personnel. The cranes will be used for lifting rocket motors (1 at a time) from an open bed trailer and setting them down on the ground.
o The location of these operation will be at Utah Training and Test Range approximately 80 miles west of Hill AFB.
o All lifts are expected to be straight up and down with the conveyances moving out from under the load.
o For these operations all rigging below the hook will be supplied by the government and will be proof load tagged
3.5 Removal
o Vendor is responsible for removing all equipment following termination of operations.
3.6 Supplied Items
o Vendor will supply all equipment, hardware, labor, materials, pickup and delivery.
o All equipment shall be UL/ETL approved.
4.0 SKILLS AND KNOWLEDGE
• Vendor shall have knowledge of crane operations and rigging for explosive payloads.
• Vendor should have knowledge and ability to comply with federal, state, Air Force, local, and county laws and regulations governing the work requested in this statement.
5.0 PERIOD OF PERFORMANCE
• The vendor shall deliver all equipment between 0800-1700 PST 1-3 days before the lift operation, exact date TBD.
• The Vendor will support up to 6 days of mission ops (1-2 days are expected) starting within 10 days of order award. Notification of exact dates will be given at least 7 days prior to expected lift operations.
o Events will be as needed with a 10-day notification to the vendor.
• The vendor shall enter Hill Air Force Base through the Roy Gate.
5.1 GOVERNMENT FURNISHED ITEMS
• Government Technicians will be required to attach GFE rigging between the containers and the hooks.
5.2 GOVERNMENT FURNISHED EQUIPMENT
• Qty 4 Toe Fitting adapters for rocket motor shipping containers
• Qty 4 10-ft 50-ton slings
• Qty 8 35-ton shackles
Note: the government will provide the rigging from the hook down and the contractor will provide all rigging from the hook up including the hook.
5.3 GOVERNMENT FURNISHED SERVICES
• Utilities: The Government will furnish electricity.
Facilities: The Government will provide necessary access to the MAMMs area of Hill AFB via the Roy gate.
• Refuse Collection: The Government will provide dumpsters for refuse. The Government will provide containers and collection of recycling materials.
• Protection Services: The Government will provide Security Forces and Fire Protection.
5.4 SECURITY REQUIREMENTS: The contractor shall obtain the necessary vehicle, personnel passes, and identification as required from the contracting/Security office prior to commencing performance. RSLP Personnel will meet the vendor at the Roy gate and escort them to the lift site once the pass and ID requirements have been met.
6.0 POINTS OF CONTACT.
6.1 Customer Representative (CR)
The following person has been designated the CR by the Contracting Officer:
Martin Moore RSLP PK IPT Lead Kirtland AFB NM 1-505-350-7157
Jeff Williams RSLP Program Manager Hill AFB UT 1-801-777-1906 Work 1-801-391-9793 Cell