This document contains questions and answers related to Solicitation FA820124R0006 for Crane Rental services at Hill AFB and the Utah Test and Training Range (UTTR). The key details are:

The solicitation requires vendors to provide mobile cranes to support rocket motor moves, with locations at both Hill AFB and the UTTR. Vendors must submit a lift plan, required certifications, and a list of equipment meeting the lift requirements. Pricing is requested for the base period of 5 years with a 1-year option. Vendors should bid for 6 days per event, with the expectation of only using 2-3 days. Vendors must provide separate pricing for weekend work and daily rates, as the number of days used may be adjusted. The maximum weight of the load is 172,000 lbs, and the crane capacity must be derated to 50% of the original load capacity. The contractor may be required to perform physical proof load testing. The government will not typically provide an inspector or weights for the proof load.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Question and Answers to Solicitation FA820124R0006
QuestionAnswer
What is the requried Radius?Vendor shall comply with AFI 6.3.6.2. Mobile cranes used for critical lifts shall be derated to 50% of their original load capacity. The total weight of the load shall not exceed 50% of the crane rated capacity for the given lift radius and load line reeving configuration of the crane.
What is the dimensions of the load?Length 412In, Width 120In, Height 116In
What is the weight?As per SOW, the max weight is 172,000 lbs
Where are the picking points?Pick points are on the end of the loaded container length wise and in the center of the load width wise
How will the contractors be doing the proof load?Lifting straight up and holding for an allotted time (usually 5 minutes)
Do the contractors supply an inspector and weights?The contractor could provide weights in an unusual circumstance but no inspector
Is it a physical proof load or just load chart inspection?They are physical proof loads
How far off the highway is the job site location?The CLINs for Hill (0001, 0002) are less than a mile off the highway. The UTTR CLINs (0004, 0005) are about 15 miles off of I80 all on paved roads
How many days should we bid for each event?Please bid for 6 days with the understanding that the expectation is to only use 2-3 days. When filling in the pricing for ordering periods, please provide the daily rates, as pricing may be ajusted on the days used
Do you want a quote for SOW 3.1-3.4 and the option year?Yes, please provide pricing for all CLINS and ordering years
Does the 6 days include weekend work?Yes, please provide separate weekend pricing as shown on the pricing on the spreadsheet
How many hours a day is expected?10 hours
How long is the period of performance?As per the delieveries or performance section the base period is 5 years with 1 option year (Total of 6 years). Pricing is requested for all years