Attachment_1_-_Firing_Range_BPA_SOW.pdf
PDF 349 KB Posted
- Attached to
- 75 SFS CATM Range
- Solicitation number
- FA8201-19-Q-JH01
About this file
SOW
View the file
Other files
| File | Type | Posted |
|---|---|---|
| AMENDMENT_0001_TO_REQUEST_FOR_PROPOSAL.pdf | ||
| Attachment_2-_PTAC.pdf | ||
| RFP_.pdf | ||
| Attachment_3_-_AFMAN_36-2655.pdf | ||
| Attachment_4_-_ETL_11-18.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Gun Range Use by Hill AFB Dated 25 June 2019
1. Scope of Work - The Contractor shall provide a local firearms range and facility containing
14 shooting lanes or more for the 75 Security Forces Squadron, SFS, to train personnel on firearms proficiency. The contractor shall perform to the standards in this Statement of Work.
2. Contractor – The contractor agrees to provide a facility to the 75 SFS in accordance with the basic ordering period.
3. Requirements – The Contractor shall provide, as a minimum:
3.1 25 Meter range facility that must be within 40 minutes of Hill AFB.
3.2 First priority to the 75 SFS.
3.3 A firing range facility with no less than 14 lanes that can be used to qualify personnel with the following ammunition – 5.56MM (M4), 9MM (M9/M18), 12GA (M870).
3.4 The lanes, to include target area, must be covered from weather.
3.5 Range surface must be permissible to allow shooters to have numerous shooting positions with no interference for the courses of fire outlined in AFMAN 36-2655.
3.6 The range must have the ability to be used for day time, low light, and night time fire.
3.7 The range must meet the specifications outlined in ETL 11-18.
3.8 Onsite covered storage area of no less than 10 ft by 20 ft.
3.9 Restrooms must be available on site.
4. Transportation – All transportation for personnel/equipment will be provided by 75 SFS &
75 LRS.
5. Notification – The contractor will be notified at a minimum of 24 hours prior.
6. CLIN Structure
CLIN Description Pricing Arraignment
0001 Hourly rate per lane Per hour per lane
0002 Rate per day per lane. The day will not exceed
12 hours.
Per day per lane
0003 Rate per week for ALL lanes IAW section 3.3.
The week will consist of 7 days a week with each day not exceeding 12 hours.
Per week ALL lanes
0004 Rate per month for ALL lanes IAW section
3.3. The month will consist of all days in the
month regardless of month length. The each day in the month will not exceed 12 hours.
Per month ALL lanes
7. Range Certification – The government intends to certify the range IAW ETL 11-18 and AFI
36-2654 before the award of a Blanket Purchase Agreement resulting from this SOW
8. Government Contractor – The contractor and its employees will perform services under this contract in accordance with the terms and conditions of this contract including the SOW, as a contractor and not as a Government Agent, employee, or joint venture. The Contractor and its employees are employed to provide a facility IAW section 3 of this SOW only, and any payments made by the Government are compensation solely for such services rendered.
File details come from the government source that posted it.