Ogden Air Logistics Complex
Multiple Award Construction
Contract (MACC)
III
75th Civil Engineering Group (CEG)
Industry Day
09 October 2014
Built Right, Ready to Fight
O G D E N A I R L O G I S T I C S C O M P L E X
Agenda
Purpose Industry Day Rules of Engagement MACC III Program Overview Q & A – Open Discussions Lunch One-on-One Sessions
Purpose
Acquisition Planning Provide interested bidders with an overview of
MACC
Describe the basic strategy for this acquisition Opportunity for industry to provide input and/or recommendations to the Request for Proposal
(RFP)
Ground Rules
Open forum seeking industry input on requirements and processes Ideas and information presented may be recorded and publicized Not appropriate for proprietary disclosures No agreements, promises or other commitments are made or implied Government chairpersons will conduct the briefing One-on-One sessions
Timed 15 minute sessions Government will answer questions Contractor recommendations encouraged
Discussions will not venture into classified information
Hill Air Force Base MACC III Program
Overview
Jim Ingold Program Office
75 CEG/CENME
801-777-2288 james.ingold@us.af.mil
Overview
Background Requirements Submittals Example Projects Safety & Security Q&A
Background
Multiple Award Construction Contract (MACC) Task Orders awarded for each project
Typically between $60K - $5M Quick, Executable, Contract Vehicle
Types of Projects Structural, Electrical, Mechanical, Architectural
Project Locations Hill Air Force Base, Little Mountain, Utah Test and
Training Range, and Pinedale, WY
Code Requirements
Built Right, Ready to Fight
International Building Code International Mechanical Code International Plumbing Code International Energy Conservation Code International Fuel Gas Code Fire Safety Code, NFPA 1 Life Safety Code, National Fire Protection
Association, NFPA 101 National Electric Code, NFPA 70 National Electric Safety Code, ANSI C2
Standard Requirements
Built Right, Ready to Fight
Base Facility Design Standard Base Architectural Compatibility Standard Tab K, Telecommunications Installation Criteria for Facility Design and Renovation Air Installation Compatible Use Zone (AICUZ), Hill AFB, Amended
April 1982 ASCE/SEI 7-05 Minimum Design Loads for Buildings and Other
Structures ASHRAE Standard 62.1-2013, Ventilation for Acceptable Indoor Air
Quality ASHRAE Standard 90.1-2010, Energy Standard for Buildings Except
Low Rise Residential Buildings Illuminating Engineering Society of North America, Reference and
Application Lighting Handbook, 2008 ICSSC RP6 - Standards of Seismic Safety for Existing Federally
Owned and Leased Buildings Architectural Barriers Act (ABA) Accessibility Standard for
Department of Defense Facilities
Other Requirements
Built Right, Ready to Fight
Air Force Design Guides (AFDG), Unified Facilities Criteria (UFC) and Engineering Technical Letters (ETL), found on: http://www.wbdg.org
Regulations 10 CFR 435 Energy Conservation Voluntary
Performance Standards for New Buildings (Mandatory for Federal Buildings)
Energy Policy Act Air Force Instruction (AFI)
AFI 32-10141, “Planning and Programming Fire Safety Deficiency Correction Projects”
Basis of Design / Engineering Calculations Concept, 30%, 60%, 90%, 100% (Final)
Drawings & Specifications Material and Equipment Cut Sheets Quality Control Plans Maintenance Plans Sub-Contracting Plans Project Schedules
Design Submittals
Construction Submittals
Safety Plan Tailored to Task Order Material Submittals Progress Schedules and Reports Red Line/As-Built Drawings & Specifications
AutoCAD, pdf, paper Test Reports
Includes Test & Balance, Fire Suppression, etc.
Commissioning Report
Independent Commissioning Contractor Maintenance Manuals
Custom and Off the Shelf Transfer and Acceptance of DoD Real Property (DD
1354)
Example MACC Projects Example 1 - 309th Clean Room ~$1M Completed
MACC I
Tight Mechanical Requirements
Example 2 - ABW Chapel Completed MACC I Architectural
Example 3 - Remote Site - Little Mountain Completed MACC I Electrical Substation
Example 4 - 388th Hangar 43 ~$5M In Process
MACC II
Fire Suppression and Structural Upgrades
Ex 1 - Clean Room
Design & Build 4000 ft^2 clean room 100,000 class Temp: 68°F ± 1°F, Relative Humidity: 20% ± 5% Includes
Demolition of old office area and HVAC equipment 6 small dark rooms & 20’ X 20’ modular room 100 class Sealed lights, gasketed ceiling, vapor barrier Provide particle counter, dark room monitors, nitrogen lines, comm & power raceways for work benches, etc Modification of existing fire protection system Refurbishment of existing floor & application of anti-static coating Commissioning, Reports, As-Built drawings, Op
Manuals
Design & Build 2200 ft^2 addition onto the existing Base Chapel & renovate approximately 3600 ft^2 of existing chapel sanctuary & nave space.
Included:
Mezzanine level in new addition Baptismal font (with side prep area), Brides room
(with prep area), Cry room (with viewable to sanctuary) and storage spaces
Complete new finishes – carpet, pews, wood paneling and lighting
Electrical infrastructure for sound system
Ex 2 - Chapel
Ex 2 – Chapel (Con’t)
Ex 2 – Chapel (Con’t)
Ex 3 - Little Mountain
Demolish old 4,160 volt electrical substation, underground feeders, overhead feeders, all 4,160 volt distribution transformers.
Construct new 12,470 volt substation to include 5 MVA transformer, metering, voltage regulation, switchgear, capacitor bank, 1000KW emergency generator and 6000 gallon diesel tank.
Construct new 12,470 volt distribution system to include underground and overhead conductors, distribution transformers, distribution switches.
Construct new 480 volt and 120 volt secondary services as required to distribute new voltage
Ex 3 - Little Mountain (Con’t)
Ex 4 - Hangar 43
Built Right, Ready to Fight
Renovate ~ 22,000 SF fuel cell maintenance facility Complete architectural renovation of office space including new handicapped accessible restrooms and men’s/women’s locker room New structural steel upgrades to hold new hangar doors Replace existing fire suppression with high expansion foam Construct new lightning protection system
Safety
Built Right, Ready to Fight
All Contractors Must Comply With OSHA Requirement - 29 CFR Part 1926
Safety and Health Regulations for Construction
US Army Corps of Engineers - EM 385-1-1 Safety and Health Requirements Manual Safety Plan Tailored to Task Order Always provide required Personal Protective
Equipment (PPE)
Security
Positive Access Control Unescorted Access Requirements
Visitor Authorization List (VAL) Common Access Card (CAC) Defense Biometrics ID Sys (DBIDS)
•AFMC Form 496 Criminal background history
Access to Secure Areas Escorts Controlled Area Badges Free zone
Security (Con’t)
Disqualifiers Espionage, sabotage, treason or terrorism Criminal homicide in all forms to include murder, manslaughter and/or negligent homicide Kidnapping, hostage taking, human trafficking / smuggling Mayhem Maiming Rape, forcible sodomy, sexual abuse or sexual assault Any sexual offense involving a minor or child including child molestation or child pornography Child abuse Any active want or warrant Any conspiracy to commit any of the above acts
Security (Con’t)
Disqualifiers Any felony involving any type of assault Any felony involving any type of arson Any felony involving any type of burglary or robbery Any felony involving possession or distribution of stolen property Any felony involving any type of willful destruction of property Any felony involving violence at an airport Any felony involving any type of threat or disruption to the public Any type of extortion or bribery Any type of theft, deception, fraud or falsehood Importation or manufacture of a controlled substance Distribution of or intent to distribute a controlled substance Illegal possession or use of a controlled substance Any conspiracy to commit any of the criminal acts listed above
Questions
Hill Air Force Base MACC III Program
Acquisition Strategy
TSgt Esteban Bedoya
Contracting Officer
OL:H/PZIEB
801-775-2387 esteban.bedoya_hernandez@us.af.mil
Acquisition Strategy
Multiple Award Fixed-Price IDIQ Contract One year base with four one-year options Five – six awardees Task Orders awarded for each project
•Must propose on all orders up to $5M Small Business Set-aside NAICS Code: 236220 “Commercial and
Institutional Building Construction” Size Standard of $36.5M
Estimated RFP Release - Spring 2015
Acquisition Strategy (Con’t)
Basic Contract $110M ceiling including options Award based on best value –
•Lowest Price Technically Acceptable (LPTA)
• Technical Proposal Acceptable/Unacceptable
•A&E Qualifications & Experience •A&E Partnering Agreement •Seed Project (Sample Task) •Fire Protection Engineering Plan •Construction Quality Control Plan •Bonding Capability
• Past Performance
• Price
Acquisition Strategy (Con’t)
Task Order awards will be based on PPT, LPTA, or Low Price (Fair Opportunity)
Past task order performance may be used during future task order selection
Tentative CLIN Structure 0001: Base Year – FFP 1001: Option Year One – FFP 2001: Option Year Two – FFP 3001: Option Year Three – FFP 4001: Option Year Four – FFP
Post-Award Management
Management of the contract AFSC OL:H/PZIOC contract administration 75 CEG/CEN Program Office
Questions
| Multiple Award Construction Contract (MACC) III |
| Agenda |
| Purpose |
| Ground Rules |
| Ogden Air Logistics Complex |
| Overview |
| Background |
| Code Requirements |
| Standard Requirements |
| Other Requirements |
| Design Submittals |
| Construction Submittals |
| Example MACC Projects |
| Ex 1 - Clean Room |
| Slide Number 15 |
| Ex 2 – Chapel (Con’t) |
| Ex 2 – Chapel (Con’t) |
| Ex 3 - Little Mountain |
| Ex 3 - Little Mountain (Con’t) |
| Ex 4 - Hangar 43 |
| Safety |
| Security |
| Security (Con’t) |
| Security (Con’t) |
| Questions |
| Hill Air Force Base MACC III Program Acquisition �Strategy ��TSgt Esteban Bedoya�Contracting Officer�OL:H/PZIEB�801-775-2387�esteban.bedoya_hernandez@us.af.mil � |
| Acquisition Strategy |
| Acquisition Strategy (Con’t)� |
| ����Acquisition Strategy (Con’t) |
| Post-Award Management |
| Questions |
File details come from the government source that posted it. Updated .