UFGS_31_10_00_Clearing_for_Civil_Works.doc

DOC document 37 KB Posted

Attached to
Fencing IDIQ Contract
Solicitation number
FA8201-13-B-0001
Issued by

About this file

Clearing for Civil Works

View the file

Other files

File Type Posted
FA8201-13-B-0001-0003_Fence_IDIQ_Amendment_3.doc DOC document
PROPOSAL_SUBMISSION_INSTRUCTIONS_-_0003.docx DOCX document
Schedule_B.xlsx XLSX spreadsheet
PROPOSAL_SUBMISSION_INSTRUCTIONS.docx DOCX document
FA8201-13-B-0001-0002.doc DOC document
pd21FB.doc DOC document
BASE_FACILITY_DESIGN_STANDARD.doc DOC document
UFGS_12_93_00_Site_Furnishings_-_Bollards _Wood_Fence.doc DOC document
ufc_1_300_02.pdf PDF
01_32_00_Project_Schedule.doc DOC document
Schedule_B.xlsx XLSX spreadsheet
UFGS_28_20_01.00_10_Electronic_Security_System_-_Vindicator.doc DOC document
MIL_HDBK_1013_10.pdf PDF
UFGS_32_31_13_Chain_Link_Fences_and_Gates.doc DOC document
FA8201-13-B-0001.pdf PDF
UFGS_31_00_00_Earthwork.doc DOC document
UFGS_01_62_35_Recycled_-_Recovered_Materials.doc DOC document
Drawing_1 _Cable _deadman _bollard.pdf PDF
UFGS_32-13-13.06PCC.doc DOC document
01_35_26_Government_Safety_Requirements.doc DOC document
01_00_00_General_Requirements.doc DOC document
UFGS_01_20_00.00_20_Price_and_Payment_Procedures.doc DOC document
UFGS_32_16_13_Concrete_Sidewalks _Curb _Gutter.doc DOC document
UFGS_02_41_00_Demolition_and_Deconstruction.doc DOC document
Basic_SOW_23_Jul.docx DOCX document
UFGS_32-12-16HMA.doc DOC document
UFGS_32_31_13.53_High-Security_Chain_Link_Fences_and_Gates.doc DOC document
Fencing_SYNOPSIS_-_final.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION TABLE OF CONTENTS DIVISION 31 - EARTHWORK SECTION 31 10 00

CLEARING FOR CIVIL WORKS

08/08

PART 1

GENERAL

1.1

UNIT PRICES

1.1.1 Clearing Brush 1.1.1.1 Payment 1.1.1.2 Unit of Measure 1.2

DEFINITIONS

1.2.1 Brush 1.3

PROJECT/SITE CONDITIONS

1.3.1 Aesthetics and Pollution Control 1.3.1.1 Ground Areas 1.3.1.2 Construction Roads 1.3.2 Existing Conditions 1.3.2.1 Boundaries 1.3.2.2 Markings of Zones 1.3.2.3 Zones 1.3.2.4 Fences

PART 2

PRODUCTS

PART 3

EXECUTION

3.1

CLEARING REQUIREMENTS

3.1.1 Brush 3.1.2 Equipment 3.2

DISPOSAL OF MATERIAL

3.2.1 General 3.2.2 Burning 3.2.3 Burial 3.2.4 Removal from Site 3.3

DEBRIS

3.4

MARKETABLE MATERIALS

3.5

LOCATIONS

-- End of Section Table of Contents --

SECTION 31 10 00

CLEARING FOR CIVIL WORKS

08/08

PART 1

GENERAL

1.1

UNIT PRICES

1.1.1 Clearing Brush 1.1.1.1 Payment Payment will be made for costs associated with furnishing plant, labor, materials and equipment, and performing all operations necessary for clearing brush as specified.

1.1.1.2 Unit of Measure Unit of measure:

lump sum.

1.2

DEFINITIONS

1.2.1 Brush Brush is that growth which is less than 2 inches in diameter measured 6 inches from the ground on the uphill side and is less than 6 feet in height measured from the ground on the uphill side.

1.3

PROJECT/SITE CONDITIONS

1.3.1 Aesthetics and Pollution Control 1.3.1.1 Ground Areas All ground areas in the zone of normal pool level fluctuations which are disturbed by clearing operations and which would become subject to erosion will be protected or restored.

1.3.1.2 Construction Roads All construction roads proposed for use by the Contractor for access to the work area shall be approved, as to location and alignment, prior to construction. Where such roads are determined to be of no value to project operation or will not serve recreational access needs after project construction, the areas occupied by these roads will be restored as nearly as possible to pre-construction conditions by reasonable grading and seeding as directed along with the planting of seedling trees if in a tree cover area.

1.3.2 Existing Conditions 1.3.2.1 Boundaries The area to be cleared under this section is the zone having the general limits as indicated on the aerial photographs, which form a part of each individual task order Statement of Work under this contract.

1.3.2.2 Markings of Zones The contour lines have been established in the field by the Government. The property lines or contour lines may be requested to be identified by stakes on the lines. Other boundaries are marked by identifiable topographical features or by section or fractional section lines.

1.3.2.3 Zones The boundaries of the zone are as described in paragraph BOUNDARIES.

1.3.2.4 Fences All fences shall be cleared as shown in each individual task order Statement of Work.

PART 2

PRODUCTS

Not used

PART 3

EXECUTION

3.1

CLEARING REQUIREMENTS

3.1.1 Brush The cutting of brush may be required.

3.1.2 Equipment Necessary equipment to clear brush may be used at the option of the Contractor in all brush clearing operations.

3.2

DISPOSAL OF MATERIAL

3.2.1 General The material cleared from the areas shall be completely removed by transporting from the Government property as approved by the Contracting Officer. In no case shall cleared material be thrown into or left in any creeks or rivers. The cutting of brush and debris remaining after clean-up, in order to avoid removal, will not be permitted.

3.2.2 Burning Burning will not be permitted.

3.2.3 Burial Burial of debris will not be permitted.

3.2.4 Removal from Site Haul concrete debris to the Class IV base landfill as shown in Basic Contract Statement of Work, unless otherwise stated in task Statement of Work. Haul asphalt debris to the Class IV base landfill as shown in Basic Contract Statement of Work, unless otherwise stated in each individual task order Statement of Work. Haul other debris to Class I, II, III, V, or VI landfill off base.

3.3

DEBRIS

Debris shall include trash of all kinds.

3.4

MARKETABLE MATERIALS

Any of the cleared materials which the Contractor considers marketable shall become its property and shall be removed from the project area.

3.5

LOCATIONS

The locations of brush and debris to be cleared are along the fence lines as shown in the task specific Statement of Work.

-- End of Section --

File details come from the government source that posted it. Updated .