FA8201-13-B-0001.pdf
PDF 154 KB Posted
- Attached to
- Fencing IDIQ Contract
- Solicitation number
- FA8201-13-B-0001
About this file
Solicitation
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fence IDIQ for Hill AFB, Little Mountain and UTTR See Schedule
Note: Limited to HUB ZONE certif ied companies. You must submit the SBA issued HUBZONE certif ication w ith your bid or you w ill be considered non-responsive
A pre-Bid conference w ill be held on 7 August 2013. See the Pre-proposal Clause in section L for further details.
The magnitude for the contract is betw een $1,000,000.00 and $5,000,000.00 over f ive years.
Payment and performance bonding of $500,000 are required.
X
MICHAEL ZACK 801-777-1341
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
29-Jul-2013
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________1825 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.210-12
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specified in Item 8 by ___________ local time ______________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______90 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
OL:H/PZIOC
MICHAEL ZACK 6038 ASPEN AVE B1289NE
HILL AFB UT 84056-5805
FA8201
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
(hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: 801-777-1341 TEL: FAX:
FA8201-13-B-0001 43
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
FA8201-13-B-0001
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 1 Lump Sum
Fencing Hill AFB
FFP
Provide all Fencing materials, equipment, manpower, and supervision to accomplish individual fencing tasks at Hill AFB Utah, issued during the life of this contract IAW the attached SOW dated 23 Jul 2013 and the attached specifications. Contractor shall submit all pricing on attached Final Supplemental Schedule B dated 9 May 2013. Each delivery order will be negotiated utilizing Schedule of Items, dated 9 May 2013. The contractor shall use the following Wage determination for all projects at Hill AFB: UT130028 03/15/2013 - Heavy - Davis and Weber Counties FOB: Destination
MAX
NET AMT
FSC CD: 5660
UNIT UNIT PRICE MAX AMOUNT
0002 1 Lump
Fencing Little Mountain
Provide all Fencing materials, equipment, manpower, and supervision to accomplish individual fencing tasks at Little Mountain Utah, issued during the life of this contract IAW the attached SOW dated 23 Jul 2013 and the attached specifications. Contractor shall submit all pricing on attached Final Supplemental Schedule B dated 9 May 2013. Each delivery order will be negotiated utilizing Schedule of Items, dated 9 May 2013. The contractor shall use the following Wage determination for all projects at Little Mountain:
UT130028 03/15/2013 - Heavy - Davis and Weber Counties
UNIT UNIT PRICE MAX AMOUNT
0003 1 Lump
Fencing Utah Test and Training Range
Provide all Fencing materials, equipment, manpower, and supervision to accomplish individual fencing tasks at the Utah Test and Training Range (UTTR), issued during the life of this contract IAW the attached SOW dated 23 Jul 2013 and the attached specifications. Contractor shall submit all pricing on attached Final Supplemental Schedule B dated 9 May 2013. Each delivery order will be negotiated utilizing Schedule of Items, dated 9 May 2013. The contractor shall use the following Wage determination for all projects at Hill AFB: UT130039 01/04/2013 - Heavy - Box Elder County
UNIT UNIT PRICE MAX AMOUNT
0004 UNDEFINED Lot Emergency Fence Repair
COST
Contractor will supply materials and personnel sufficient to perform emergency fence repair. Per the Statement of Work, dated 23 Jul 2013, in section 1.1 and section 1.2.1.2, the contractor must have personnel capable of mobilizing and arriving on site for emergency requirements within 2 hours of initial contact.
Additionally, the contractor must supply an emergency contact to call in case of emergency.
MAX COST
UNIT UNIT PRICE MAX AMOUNT
1001 1 Lump
OPTION Fencing Hill AFB
Provide all Fencing materials, equipment, manpower, and supervision to accomplish individual fencing tasks at Hill AFB Utah, issued during the life of this contract IAW the attached SOW dated 23 Jul 2013 and the attached specifications. Contractor shall submit all pricing on attached Final Supplemental Schedule B dated 9 May 2013. Each delivery order will be negotiated utilizing Schedule of Items, dated 9 May 2013. The current wage determination will be incorporated when this option is exercised.
UNIT UNIT PRICE MAX AMOUNT
1002 1 Lump
OPTION Fencing Little Mountain
Provide all Fencing materials, equipment, manpower, and supervision to accomplish individual fencing tasks at Little Mountain Utah, issued during the life of this contract IAW the attached SOW dated 23 Jul 2013 and the attached specifications. Contractor shall submit all pricing on attached Final Supplemental Schedule B dated 9 May 2013. Each delivery order will be negotiated utilizing Schedule of Items, dated 9 May 2013. The current wage
UNIT UNIT PRICE MAX AMOUNT
1003 1 Lump
OPTION Fencing Utah Test and Training Range
Provide all Fencing materials, equipment, manpower, and supervision to accomplish individual fencing tasks at the Utah Test and Training Range (UTTR), issued during the life of this contract IAW the attached SOW dated 23 Jul 2013 and the attached specifications. Contractor shall submit all pricing on attached Final Supplemental Schedule B dated 9 May 2013. Each delivery order will be negotiated utilizing Schedule of Items, dated 9 May 2013. The current wage determination will be incorporated when this option is exercised.
UNIT UNIT PRICE MAX AMOUNT
1004 UNDEFINED Lot OPTION Emergency Fence Repair
COST
Contractor will supply materials and personnel sufficient to perform emergency fence repair. Per the Statement of Work, dated 23 Jul 2013, in section 1.1 and section 1.2.1.2, the contractor must have personnel capable of mobilizing and arriving on site for emergency requirements within 2 hours of initial contact.
Additionally, the contractor must supply an emergency contact to call in case of
UNIT UNIT PRICE MAX AMOUNT
2001 1 Lump
Provide all Fencing materials, equipment, manpower, and supervision to accomplish individual fencing tasks at Hill AFB Utah, issued during the life of this contract IAW the attached SOW dated 23 Jul 2013 and the attached specifications. Contractor shall submit all pricing on attached Final Supplemental Schedule B dated 9 May 2013. Each delivery order will be negotiated utilizing Schedule of Items, dated 9 May 2013. The current wage
UNIT UNIT PRICE MAX AMOUNT
2002 1 Lump
Provide all Fencing materials, equipment, manpower, and supervision to accomplish individual fencing tasks at Little Mountain Utah, issued during the life of this contract IAW the attached SOW dated 23 Jul 2013 and the attached specifications. Contractor shall submit all pricing on attached Final Supplemental Schedule B dated 9 May 2013. Each delivery order will be negotiated utilizing Schedule of Items, dated 9 May 2013. The current wage
UNIT UNIT PRICE MAX AMOUNT
2003 1 Lump
Provide all Fencing materials, equipment, manpower, and supervision to accomplish individual fencing tasks at the Utah Test and Training Range (UTTR), issued during the life of this contract IAW the attached SOW dated 23 Jul 2013 and the attached specifications. Contractor shall submit all pricing on attached Final Supplemental Schedule B dated 9 May 2013. Each delivery order will be negotiated utilizing Schedule of Items, dated 9 May 2013. The
UNIT UNIT PRICE MAX AMOUNT
2004 UNDEFINED Lot OPTION Emergency Fence Repair
COST
Contractor will supply materials and personnel sufficient to perform emergency fence repair. Per the Statement of Work, dated 23 Jul 2013, in section 1.1 and section 1.2.1.2, the contractor must have personnel capable of mobilizing and arriving on site for emergency requirements within 2 hours of initial contact.
Additionally, the contractor must supply an emergency contact to call in case of
UNIT UNIT PRICE MAX AMOUNT
3001 1 Lump
Provide all Fencing materials, equipment, manpower, and supervision to accomplish individual fencing tasks at Hill AFB Utah, issued during the life of this contract IAW the attached SOW dated 23 Jul 2013 and the attached specifications. Contractor shall submit all pricing on attached Final Supplemental Schedule B dated 9 May 2013. Each delivery order will be negotiated utilizing Schedule of Items, dated 9 May 2013. The current wage
UNIT UNIT PRICE MAX AMOUNT
3002 1 Lump
Provide all Fencing materials, equipment, manpower, and supervision to accomplish individual fencing tasks at Little Mountain Utah, issued during the life of this contract IAW the attached SOW dated 23 Jul 2013 and the attached specifications. Contractor shall submit all pricing on attached Final Supplemental Schedule B dated 9 May 2013. Each delivery order will be negotiated utilizing Schedule of Items, dated 9 May 2013. The current wage
UNIT UNIT PRICE MAX AMOUNT
3003 1 Lump
Provide all Fencing materials, equipment, manpower, and supervision to accomplish individual fencing tasks at the Utah Test and Training Range (UTTR), issued during the life of this contract IAW the attached SOW dated 23 Jul 2013 and the attached specifications. Contractor shall submit all pricing on attached Final Supplemental Schedule B dated 9 May 2013. Each delivery order will be negotiated utilizing Schedule of Items, dated 9 May 2013. The
UNIT UNIT PRICE MAX AMOUNT
3004 UNDEFINED Lot OPTION Emergency Fence Repair
COST
Contractor will supply materials and personnel sufficient to perform emergency fence repair. Per the Statement of Work, dated 23 Jul 2013, in section 1.1 and section 1.2.1.2, the contractor must have personnel capable of mobilizing and arriving on site for emergency requirements within 2 hours of initial contact.
Additionally, the contractor must supply an emergency contact to call in case of
UNIT UNIT PRICE MAX AMOUNT
4001 1 Lump
Provide all Fencing materials, equipment, manpower, and supervision to accomplish individual fencing tasks at Hill AFB Utah, issued during the life of this contract IAW the attached SOW dated 23 Jul 2013 and the attached specifications. Contractor shall submit all pricing on attached Final Supplemental Schedule B dated 9 May 2013. Each delivery order will be negotiated utilizing Schedule of Items, dated 9 May 2013. The current wage
UNIT UNIT PRICE MAX AMOUNT
4002 1 Lump
Provide all Fencing materials, equipment, manpower, and supervision to accomplish individual fencing tasks at Little Mountain Utah, issued during the life of this contract IAW the attached SOW dated 23 Jul 2013 and the attached specifications. Contractor shall submit all pricing on attached Final Supplemental Schedule B dated 9 May 2013. Each delivery order will be negotiated utilizing Schedule of Items, dated 9 May 2013. The current wage
UNIT UNIT PRICE MAX AMOUNT
4003 1 Lump
Provide all Fencing materials, equipment, manpower, and supervision to accomplish individual fencing tasks at the Utah Test and Training Range (UTTR), issued during the life of this contract IAW the attached SOW dated 23 Jul 2013 and the attached specifications. Contractor shall submit all pricing on attached Final Supplemental Schedule B dated 9 May 2013. Each delivery order will be negotiated utilizing Schedule of Items, dated 9 May 2013. The
UNIT UNIT PRICE MAX AMOUNT
4004 UNDEFINED Lot OPTION Emergency Fence Repair
COST
Contractor will supply materials and personnel sufficient to perform emergency fence repair. Per the Statement of Work, dated 23 Jul, in section 1.1 and section 1.2.1.2, the contractor must have personnel capable of mobilizing and arriving on site for emergency requirements within 2 hours of initial contact.
Additionally, the contractor must supply an emergency contact to call in case of
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
250.00 200,000.00
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN
MINIMUM
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
CLAUSES INCORPORATED BY FULL TEXT
FOREIGN OBJECT DAMAGE PREVENTION PROGRAM
ALL CONTRACTORS WORKING IN AND AROUND THE FLIGHT LINE AREA ON HAFB MUST COMPLY
WITH AFMC 21-122, FOREIGN OBJECT DAMAGE PREVENTION PROGRAM. PRIOR TO STARTING
WORK IN THESE AREAS, THE CONTRACTOR SHALL CONTACT THE ASSIGNED PROJECT MANAGER
FOR SCHEDULING OF CONTRACTOR PERSONNEL FOR REQUIRED TRAINING.
CLAUSES AND PROVISIONS
(a) CLAUSES AND PROVISIONS FROM THE FEDERAL ACQUISITION REGULATION (FAR) AND
SUPPLEMENTS THERETO ARE INCORPORATED IN THIS DOCUMENT BY REFERENCE AND IN
FULL TEXT. THOSE INCORPORATED BY REFERENCE HAVE THE SAME FORCE AND EFFECT
AS IF THEY WERE GIVEN IN FULL TEXT.
(b) CLAUSES AND PROVISIONS IN THIS DOCUMENT WILL BE NUMBERED IN SEQUENCE, BUT
WILL NOT NECESSARILY APPEAR IN CONSECUTIVE ORDER.
SECTIONS K, L AND M WILL BE PHYSICALLY REMOVED FROM ANY RESULTANT AWARD.
SECTION K WILL BE DEEMED TO BE INCORPORATED BY REFERENCE IN THAT AWARD.
DELIVERY INFORMATION:
1. Delivery to Utah Test and Training Range (UTTR) Oasis Complex 388 RANS Compound (North Range) I-80 West to Exit 62 (Military Area), then 17 Miles North.
Take Interstate 80 west to Exit 62 (Military Area/Lakeside) Turn North, (follow paved road west then it curves north) for approximately 15.5 miles. Follow signs for “Explosive Ordinance Vehicle Check Area.”
Use the phone call box to contact “Oasis Security” – they will check your vehicle and direct you from there.
NOTE: If you have made arrangements with the POC’s listed below at least 24 hours in advance,, you will avoid delays while securiity tries to determine your delivery destination.
24 Hours Advance Notice Required Deliveries must be made Monday – Thursday, 0700-1600 (4 P.M.) ONLY. Government personnel will unload at destinatin point.
NO WEEKENDS (FIRDAY, SATURDAY, SUNDAY) AND NO HOLIDAY DELIVERIES WILL BE
ACCEPTED.
2. GENERAL INFORMATION: SEA containers are used on UTTR to construct target and there must be a supply on on hand at al times.
3. SPECIAL CONSIDERATIONS: A point-of-contact (POC) to sign for deliveries and be responsible to receive invoices will be made available on delivery dates Monday – Thursday, 0700-1600 (4 P.M.) ONLY. POC’s responsible for actual deliveries are Greg Cicconi 801-777-1523(gregory.cicconi@hill.af.mil), Jon Thomas, and Dave Ferris, also 801-777-1523.
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 1003 Destination Government Destination Government 1004 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 2003 Destination Government Destination Government 2004 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 3003 Destination Government Destination Government 3004 Destination Government Destination Government 4001 Destination Government Destination Government 4002 Destination Government Destination Government 4003 Destination Government Destination Government 4004 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.246-12 Inspection of Construction AUG 1996
Section F - Deliveries or Performance
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 POP 22-AUG-2013 TO
21-AUG-2014
N/A N/A
0002 POP 22-AUG-2013 TO
21-AUG-2014
0003 POP 22-AUG-2013 TO
21-AUG-2014
0004 POP 22-AUG-2013 TO
21-AUG-2018
1001 POP 22-AUG-2014 TO
21-AUG-2015
1002 POP 22-AUG-2014 TO
1003 POP 22-AUG-2014 TO
1004 POP 22-AUG-2013 TO
2001 POP 22-AUG-2015 TO
21-AUG-2016
2002 POP 22-AUG-2015 TO
2003 POP 22-AUG-2015 TO
2004 POP 22-AUG-2013 TO
3001 POP 22-AUG-2016 TO
21-AUG-2017
3002 POP 22-AUG-2016 TO
3003 POP 22-AUG-2016 TO
3004 POP 22-AUG-2013 TO
4001 POP 22-AUG-2017 TO
4002 POP 22-AUG-2017 TO
4003 POP 22-AUG-2017 TO
21-MAY-2018
4004 POP 22-AUG-2013 TO
Section G - Contract Administration Data
52.222-4 Contract Work Hours and Safety Standards Act - Overtime
Compensation
JUL 2005
CONTRACT HOLIDAYS (APR 2003)
(a) The prices/costs in Section B of the contract include holiday observances; accordingly, the Government will not be billed for such holidays, except when services are required by the Government and are actually performed on a holiday. Holidays in addition to those reflected in this contract, which are designated by the Government, will be billable provided the assigned Contractor employee was available for performance and was precluded from such performance.
(b) The following days are contract holidays:
New Years Day Martin Luther King Jr. Day Presidents’ Day Memorial Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day
Section I - Contract Clauses
52.214-7 Late Submissions, Modifications, and Withdrawals of Bids NOV 1999 52.214-6 Explanation To Prospective Bidders APR 1984 52.214-5 Submission Of Bids MAR 1997 52.214-4 False Statements In Bids APR 1984 52.214-3 Amendments To Invitations For Bids DEC 1989 52.202-1 Definitions JAN 2012 52.203-3 Gratuities APR 1984 52.203-5 Covenant Against Contingent Fees APR 1984 52.203-6 Restrictions On Subcontractor Sales To The Government SEP 2006 52.203-7 Anti-Kickback Procedures OCT 2010 52.203-8 Cancellation, Rescission, and Recovery of Funds for Illegal or Improper Activity
JAN 1997
52.203-10 Price Or Fee Adjustment For Illegal Or Improper Activity JAN 1997 52.203-12 Limitation On Payments To Influence Certain Federal
Transactions
OCT 2010
52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper
MAY 2011
52.204-7 Central Contractor Registration DEC 2012 52.209-6 Protecting the Government's Interest When Subcontracting
With Contractors Debarred, Suspended, or Proposed for Debarment
DEC 2010
52.211-18 Variation in Estimated Quantity APR 1984 52.214-19 Contract Award-Sealed Bidding-Construction AUG 1996 52.214-29 Order Of Precedence--Sealed Bidding JAN 1986 52.214-34 Submission Of Offers In The English Language APR 1991 52.214-35 Submission Of Offers In U.S. Currency APR 1991 52.215-2 Audit and Records--Negotiation OCT 2010 52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.215-10 Price Reduction for Defective Certified Cost or Pricing Data AUG 2011 52.215-11 Price Reduction for Defective Certified Cost or Pricing Data--
Modifications
AUG 2011
52.215-12 Subcontractor Certified Cost or Pricing Data OCT 2010 52.215-13 Subcontractor Certified Cost or Pricing Data--Modifications OCT 2010 52.215-15 Pension Adjustments and Asset Reversions OCT 2010 52.215-17 Waiver of Facilities Capital Cost of Money OCT 1997 52.215-18 Reversion or Adjustment of Plans for Postretirement Benefits
(PRB) Other than Pensions
JUL 2005
52.215-21 Requirements for Certified Cost or Pricing Data or Information Other Than Certified Cost or Pricing Data-- Modifications
OCT 2010
52.217-5 Evaluation Of Options JUL 1990 52.217-6 Option For Increased Quantity MAR 1989 52.217-8 Option To Extend Services NOV 1999 52.217-9 Option To Extend The Term Of The Contract MAR 2000 52.219-4 Notice of Price Evaluation Preference for HUBZone Small
Business Concerns
JAN 2011
52.219-8 Utilization of Small Business Concerns JAN 2011 52.219-14 Limitations On Subcontracting NOV 2011
52.222-1 Notice To The Government Of Labor Disputes FEB 1997 52.222-3 Convict Labor JUN 2003 52.222-4 Contract Work Hours and Safety Standards Act - Overtime
Compensation
JUL 2005
52.222-6 Davis Bacon Act JUL 2005 52.222-7 Withholding of Funds FEB 1988 52.222-8 Payrolls and Basic Records JUN 2010 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) JUL 2005 52.222-12 Contract Termination-Debarment FEB 1988 52.222-13 Compliance with Davis-Bacon and Related Act Regulations. FEB 1988 52.222-14 Disputes Concerning Labor Standards FEB 1988 52.222-15 Certification of Eligibility FEB 1988 52.222-21 Prohibition Of Segregated Facilities FEB 1999 52.222-26 Equal Opportunity MAR 2007 52.222-27 Affirmative Action Compliance Requirements for
Construction
FEB 1999
52.222-30 Davis-Bacon Act--Price Adjustment (None or Separately Specified Method)
DEC 2001
52.222-50 Combating Trafficking in Persons FEB 2009 52.223-3 Hazardous Material Identification And Material Safety Data JAN 1997 52.223-4 Recovered Material Certification MAY 2008 52.223-5 Pollution Prevention and Right-to-Know Information MAY 2011 52.223-6 Drug-Free Workplace MAY 2001 52.223-9 Estimate of Percentage of Recovered Material Content for
EPA-Designated Items
MAY 2008
52.223-10 Waste Reduction Program MAY 2011 52.225-9 Buy American Act--Construction Materials SEP 2010 52.227-1 Authorization and Consent DEC 2007 52.227-2 Notice And Assistance Regarding Patent And Copyright
Infringement
DEC 2007
52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-2 Additional Bond Security OCT 1997 52.228-2 Additional Bond Security OCT 1997 52.228-3 Worker's Compensation Insurance (Defense Base Act) APR 1984 52.228-5 Insurance - Work On A Government Installation JAN 1997 52.228-11 Pledges Of Assets JAN 2012 52.228-12 Prospective Subcontractor Requests for Bonds OCT 1995
52.228-13 ALTERNATIVE PAYMENT PROTECTIONS (JULY 2000)
(a) The Contractor shall submit one of the following payment protections:
Performance bonds Payment bonds
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 10 days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
(End of clause)
52.228-14 Irrevocable Letter of Credit DEC 1999 52.232-5 Payments under Fixed-Price Construction Contracts SEP 2002 52.232-5 Payments under Fixed-Price Construction Contracts SEP 2002 52.232-16 Progress Payments APR 2012 52.232-17 Interest OCT 2010 52.232-18 Availability Of Funds APR 1984 52.232-23 Assignment Of Claims JAN 1986 52.232-27 Prompt Payment for Construction Contracts OCT 2008 52.232-33 Payment by Electronic Funds Transfer--Central Contractor
Registration
OCT 2003
52.232-33 Payment by Electronic Funds Transfer--Central Contractor Registration
OCT 2003
52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-1 Performance of Work by the Contractor APR 1984 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-6 Superintendence by the Contractor APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
52.236-10 Operations and Storage Areas APR 1984 52.236-11 Use and Possession Prior to Completion APR 1984 52.236-12 Cleaning Up APR 1984 52.236-13 Accident Prevention NOV 1991 52.236-14 Availability and Use of Utility Services APR 1984 52.236-15 Schedules for Construction Contracts APR 1984 52.236-17 Layout of Work APR 1984 52.236-26 Preconstruction Conference FEB 1995 52.242-13 Bankruptcy JUL 1995
52.243-5 Changes and Changed Conditions APR 1984 52.244-6 Subcontracts for Commercial Items DEC 2010 52.246-1 Contractor Inspection Requirements APR 1984 52.246-21 Warranty of Construction MAR 1994 52.248-3 Value Engineering-Construction OCT 2010 52.249-2 Termination For Convenience Of The Government (Fixed-
Price)
APR 2012
52.249-2 Alt I Termination for Convenience of the Government (Fixed- Price) (Apr 2012) - Alternate I
SEP 1996
52.249-10 Default (Fixed-Price Construction) APR 1984 52.252-2 Clauses Incorporated By Reference FEB 1998 52.252-6 Authorized Deviations In Clauses APR 1984 252.225-7012 Preference For Certain Domestic Commodities FEB 2013 252.225-7031 Secondary Arab Boycott Of Israel JUN 2005 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
JUN 2012
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall--
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index:
Title File No. Pgs.
Statement of Work Basic SOW FINAL 22 Base Facility Design Standard Base Facility Design Standard 83 Summary of Work UFGS 01 11 00 Summary of Work 5 Price and Payment UFGS 01 20 00.00 20 Price and Payment 5 Recycled – Recovered Materials UFGS 01 62 35 Recycled – Recovered Materials 5 Demolition and Deconstruction UFGS 02 41 00 Demolition and Deconstruction 13 Site Furnishings - Bollards, Wood Fence UFGS 12 93 00 Site Furnishings - Bollards, … 14 Electronic Security System – Vindicator UFGS 28 20 01.00 10 Electronic Security … 19 Earthwork UFGS 31 00 00 Earthwork 15 Clearing for Civil Works UFGS 31 10 00 Clearing for Civil Works 4 Military Handbook MIL_HDBK_1013_10 73 Unified Facilities Criteria ufc_1_300_02 20 Concrete Sidewalks, Curb, Gutter UFGS 32 16 13 Concrete Sidewalks, … 14 Chain Link Fences and Gates UFGS 32 31 13 Chain Link Fences and Gates 14 High-Security Chain Link Fences and … UFGS 32 31 13.53 High-Security Chain Link … 12 Unified Facilities Guide Specifications UFGS 32-12-16HMA 31 UFGS Portland Cement and Concrete … UFGS 32-13-13.06PCC 25 General Requirements 01 00 00 General Requirements 25 Project Schedule 01 32 00 Project Schedule 5 Government Safety Requirements 01 35 26 Government Safety Requirements 23 Environmental Protection 01 57 20 Environmental Protection 19 Drawing 1, Cable, deadman, bollard Drawing 1, Cable, deadman, bollard 1
252.236-7005 Airfield Safety Precautions DEC 1991 252.236-7006 Cost Limitation JAN 1997 252.236-7007 Additive or Deductive Items DEC 1991 252.243-7001 Pricing Of Contract Modifications DEC 1991 252.243-7002 Requests for Equitable Adjustment DEC 2012 252.247-7023 Transportation of Supplies by Sea MAY 2002
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than (cited on individual task orders). The time stated for completion shall include final cleanup of the premises.
*The Contracting Officer shall specify either a number of days after the date the contractor receives the notice to proceed, or a calendar date.
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of $184 for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
52.216-19 ORDER LIMITATIONS. (OCT 1995)
(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $250.00 (insert dollar figure or quantity), the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.
(b) Maximum order. The Contractor is not obligated to honor:
(1) Any order for a single item in excess of $200,000.00;
(2) Any order for a combination of items in excess of $500,000 ; or
(3) A series of orders from the same ordering office within 7 days that together call for quantities exceeding the limitation in subparagraph (1) or (2) above.
(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) above.
(d) Notwithstanding paragraphs (b) and (c) above, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 5 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons.
Upon receiving this notice, the Government may acquire the supplies or services from another source.
52.219-3 NOTICE OF HUBZONE SET-ASIDE OR SOLE SOURCE AWARD (NOV 2011)
(a) Definitions. See 13 CFR 125.6(e) for definitions of terms used in paragraph (c).
(b) Applicability. This clause applies only to--
(1) Contracts that have been set aside or reserved for, or awarded on a sole source basis to, HUBZone small business concerns;
(2) Part or parts of a multiple-award contract that have been set aside for HUBZone small business concerns; and
(3) Orders set-aside for HUBZone small business concerns under multiple-award contracts as described in 8.405-5 and 16.505(b)(2)(i)(F).
(c) General. (1) Offers are solicited only from HUBZone small business concerns. Offers received from concerns that are not HUBZone small business concerns will not be considered.
(2) Any award resulting from this solicitation will be made to a HUBZone small business concern.
(c) Agreement. A HUBZone small business concern agrees that in the performance of the contract, in the case of a contract for--
(1) Services (except construction), at least 50 percent of the cost of personnel for contract performance will be spent for employees of the concern or employees of other HUBZone small business concerns;
(2) Supplies (other than acquisition from a nonmanufacturer of the supplies), at least 50 percent of the cost of manufacturing, excluding the cost of materials, will be performed by the concern or other HUBZone small business concerns;
(3) General construction. (i) At least 15 percent of the cost of contract performance to be incurred for personnel will be spent on the HUBZone prime contractor's employees;
(ii) At least 50 percent of the cost of the contract performance to be incurred for personnel will be spent on the HUBZone prime contractor's employees or on a combination of the HUBZone prime contractor's employees and employees of HUBZone small business concern subcontractors; and
(iii) No more than 50 percent of the cost of contract performance to be incurred for personnel will be subcontracted to concerns that are not HUBZone small business concerns; or
(4) Construction by special trade contractors. (i) At least 25 percent of the cost of contract performance to be incurred for personnel will be spent on the HUBZone prime contractor's employees;
(ii) At least 50 percent of the cost of the contract performance to be incurred for personnel will be spent on the HUBZone prime contractor's employees or on a combination of the HUBZone prime contractor's employees and employees of HUBZone small business concern subcontractors;
(iii) No more than 50 percent of the cost of contract performance to be incurred for personnel will be subcontracted to concerns that are not HUBZone small business concerns.
(e) A HUBZone joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph (d) of this clause will be performed by the aggregate of the HUBZone small business participants.
(f)(1) When the total value of the contract exceeds $25,000, a HUBZone small business concern nonmanufacturer agrees to furnish in performing this contract only end items manufactured or produced by HUBZone small business concern manufacturers.
(2) When the total value of the contract is equal to or less than $25,000, a HUBZone small business concern nonmanufacturer may provide end items manufactured by other than a HUBZone small business concern manufacturer provided the end items are produced or manufactured in the United States.
(3) Paragraphs (f)(1) and (f)(2) of this section do not apply in connection with construction or service contracts.
(g) Notice. The HUBZone small business offeror acknowledges that a prospective HUBZone awardee must be a HUBZone small business concern at the time of award of this contract. The HUBZone offeror shall provide the Contracting Officer a copy of the notice required by 13 CFR 126.501 if material changes occur before contract award that could affect its HUBZone eligibility. If the apparently successful HUBZone offeror is not a HUBZone small business concern at the time of award of this contract, the Contracting Officer will proceed to award to the next otherwise successful HUBZone small business concern or other offeror.
52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States.
The Contracting Officer will return bid guarantees, other than bid bonds, (1) to unsuccessful bidders as soon as practicable after the opening of bids, and (2) to the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.-
(c) The amount of the bid guarantee shall be 20 percent of the bid price
(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.-
(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.
(End of provision)
52.228-15 PERFORMANCE AND PAYMENT BONDS--CONSTRUCTION (OCT 2010)
(a) Definitions. As used in this clause--
Original contract price means the award price of the contract; or, for requirements contracts, the price payable for the estimated total quantity; or, for indefinite-quantity contracts, the price payable for the specified minimum quantity. Original contract price does not include the price of any options, except those options exercised at the time of contract award.
(b) Amount of required bonds. Unless the resulting contract price is $150,000 or less, the successful offeror shall furnish performance and payment bonds to the Contracting Officer as follows:
(1) Performance bonds (Standard Form 25). The penal amount of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bonds (Standard Form 25-A). The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(3) Additional bond protection. (i) The Government may require additional performance and payment bond protection if the contract price is increased. The increase in protection generally will equal 100 percent of the increase in contract price.
(ii) The Government may secure the additional protection by directing the Contractor to increase the penal amount of the existing bond or to obtain an additional bond.
(c) Furnishing executed bonds. The Contractor shall furnish all executed bonds, including any necessary reinsurance agreements, to the Contracting Officer, within the time period specified in the Bid Guarantee provision of the solicitation, or otherwise specified by the Contracting Officer, but in any event, before starting work.
(d) Surety or other security for bonds. The bonds shall be in the form of firm commitment, supported by corporate sureties whose names appear on the list contained in Treasury Department Circular 570, individual sureties, or by other acceptable security such as postal money order, certified check, cashier's check, irrevocable letter of credit, or, in accordance with Treasury Department regulations, certain bonds or notes of the United States. Treasury Circular 570 is published in the Federal Register or may be obtained from the U.S. Department of the Treasury, Financial Management Service, Surety Bond Branch, 3700 East West Highway, Room 6F01, Hyattsville, MD 20782. Or via the internet at http://www.fms.treas.gov/c570/.
(e) Notice of subcontractor waiver of protection (40 U.S.C. 3133(c)). Any waiver of the right to sue on the payment bond is void unless it is in writing, signed by the person whose right is waived, and executed after such person has first furnished labor or material for use in the performance of the contract.
52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)
The Contractor shall perform on the site, and with its own organization, work equivalent to at least 50 percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.
52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997) - ALTERNATE II
(APR 1984).
(a) The Contractor shall keep on the work site a copy of the drawings and specifications and shall at all times give the Contracting Officer access thereto. Anything mentioned in the specifications and not shown on the drawings, or shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both. In case of difference between drawings and specifications, the specifications shall govern. In case of discrepancy in the figures, in the drawings, or in the specifications, the matter shall be promptly submitted to the Contracting Officer, who shall promptly make a determination in writing. Any adjustment by the Contractor without such a determination shall be at its own risk and expense. The Contracting Officer shall furnish from time to time such detailed drawings and other information as considered necessary, unless otherwise provided.
(b) Wherever in the specifications or upon the drawings the words "directed", "required", "ordered", "designated", "prescribed", or words of like import are used, it shall be understood that the "direction", "requirement", "order", "designation", or "prescription", of the Contracting Officer is intended and similarly the words "approved", "acceptable", "satisfactory", or words of like import shall mean "approved by," or "acceptable to", or "satisfactory to" the Contracting Officer, unless otherwise expressly stated.
(c) Where "as shown," as indicated", "as detailed", or words of similar import are used, it shall be understood that the reference is made to the drawings accompanying this contract unless stated otherwise. The word "provided" as used herein shall be understood to mean "provide complete in place," that is "furnished and installed".
(d) Shop drawings means drawings, submitted to the Government by the Contractor, subcontractor, or any lower tier subcontractor pursuant to a construction contract, showing in detail (1) the proposed fabrication and assembly of structural elements, and (2) the installation (i.e., fit, and attachment details) of materials or equipment. It includes drawings, diagrams, layouts, schematics, descriptive literature, illustrations, schedules, performance and test data, and similar materials furnished by the contractor to explain in detail specific portions of the work required by the contract. The Government may duplicate, use, and disclose in any manner and for any purpose shop drawings delivered under this contract.
(e) If this contract requires shop drawings, the Contractor shall coordinate all such drawings, and review them for accuracy, completeness, and compliance with contract requirements and shall indicate its approval thereon as evidence of such coordination and review. Shop drawings submitted to the Contracting Officer without evidence of the Contractor's approval may be returned for resubmission. The Contracting Officer will indicate an approval or disapproval of the shop drawings and if not approved as submitted shall indicate the Government's reasons therefor.
Any work done before such approval shall be at the Contractor's risk. Approval by the Contracting Officer shall not relieve the Contractor from responsibility for any errors or omissions in such drawings, nor from responsibility for complying with the requirements of this contract, except with respect to variations described and approved in accordance with (f) below.
(f) If shop drawings show variations from the contract requirements, the Contractor shall describe such variations in writing, separate from the drawings, at the time of submission. If the Contracting Officer approves any such variation, the Contracting Officer shall issue an appropriate contract modification, except that, if the variation is minor or does not involve a change in price or in time of performance, a modification need not be issued.
(g) The Contractor shall submit to the Contracting Officer for approval four copies (unless otherwise indicated) of all shop drawings as called for under the various headings of these specifications. Three sets (unless otherwise indicated) of all shop drawings, will be retained by the Contracting Officer and one set will be returned to the Contractor. Upon completing the work under this contract, the Contractor shall furnish 1 set of prints of all shop drawings as finally approved. These drawings shall show changes and revisions made up to the time the equipment is completed and accepted.
52.243-4 CHANGES (JUN 2007)
(a) The Contracting Officer may, at any time, without notice to the sureties, if any, by written order designated or indicated to be a change order, make changes in the work within the general scope of the contract, including changes--
(1) In the specifications (including drawings and designs);
(2) In the method or manner of performance of the work;
(3) In the Government-furnished property or services; or
(4) Directing acceleration in the performance of the work.
(b) Any other written or oral order (which, as used in this paragraph (b), includes direction, instruction, interpretation, or determination) from the Contracting Officer that causes a change shall be treated as a change order under this clause; provided, that the Contractor gives the Contracting Officer written notice stating
(1) the date, circumstances, and source of the order and
(2) that the Contractor regards the order as a change order.
(c) Except as provided in this clause, no order, statement, or conduct of the Contracting Officer shall be treated as a change under this clause or entitle the Contractor to an equitable adjustment.
(d) If any change under this clause causes an increase or decrease in the Contractor's cost of, or the time required for, the performance of any part of the work under this contract, whether or not changed by any such order, the Contracting Officer shall make an equitable adjustment and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .