Pricing worksheet.xls
XLS spreadsheet 39 KB Posted
- Solicitation number
- FA8201-11-R_0009
About this file
Pricing Worksheet FA8201-11-R-0009
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA8201-11-R-0009 Solicitation.doc | DOC document | |
| WD 05-2531 06172011.pdf | ||
| PWS_Emergency Response_July2011 Final.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ER Inventory
| Emergency Spill Response | |||||||||||
| Solicitation Number FA8201-11-R-0006 | |||||||||||
| Attachment 1 "Pricing" | |||||||||||
| 7/22/11 | |||||||||||
| Year 1 (Base YR) | Year 2 (Option YR) | Year 3 (Option YR) | Three Yr Total | ||||||||
| Description | Unit of Measure | Usage | Costs | Total | Usage | Costs | Total | Usage | Costs | Total | |
| Response Manager - Straight Time | HR | 20 | 20 | 20 | |||||||
| Response Manager - Overtime | HR | 5 | 5 | 5 | |||||||
| Senior Response Manager | HR | 0.5 | 0.5 | 0.5 | |||||||
| Project Supervisor - Straight Time | HR | 7 | 7 | 7 | |||||||
| Project Supervisor - Overtime | HR | 0.5 | 0.5 | 0.5 | |||||||
| Hazmat Technician - Straight Time | HR | 25.5 | 25.5 | 25.5 | |||||||
| Hazmat Technician - Overtime | HR | 7.5 | 7.5 | 7.5 | |||||||
| Hazmat Equipment Operator - Straight Time | HR | 26.5 | 26.5 | 26.5 | |||||||
| Hazmat Equipment Operator - Overtime | HR | 7.5 | 7.5 | 7.5 | |||||||
| Chemist - Straight Time | HR | 0.5 | 0.5 | 0.5 | |||||||
| Chemist - Overtime | HR | 0.5 | 0.5 | 0.5 | |||||||
| Health & Safety Officer - Straight Time | HR | 1 | 1 | 1 | |||||||
| Health & Safety Officer - Overtime | HR | 0.5 | 0.5 | 0.5 | |||||||
| Explosives Specialist - Straight Time | HR | 0.5 | 0.5 | 0.5 | |||||||
| Explosives Specialist - Overtime | HR | 0.5 | 0.5 | 0.5 | |||||||
| Hydrologist - Straight Time | HR | 0.5 | 0.5 | 0.5 | |||||||
| Hydrologist - Overtime | HR | 0.5 | 0.5 | 0.5 | |||||||
| Geologist - Straight Time | HR | 0.5 | 0.5 | 0.5 | |||||||
| Geologist - Overtime | HR | 0.5 | 0.5 | 0.5 | |||||||
| Industrial Hygienist - Certified - Straight Time | HR | 0.5 | 0.5 | 0.5 | |||||||
| Industrial Hygienist - Certified - Overtime | HR | 0.5 | 0.5 | 0.5 | |||||||
| Mechanic/Welder - Certified | HR | 0.5 | 0.5 | 0.5 | |||||||
| Administration - Document & Preparation | HR | 2 | 2 | 2 | |||||||
| Excavation Equipment | UOM | ||||||||||
| Excavation - Excavator - Mini | HR | 2 | 2 | 2 | |||||||
| Excavation - Excavator - Medium | HR | 2 | 2 | 2 | |||||||
| Pressure - Washers | UOM | ||||||||||
| Washer - High-Pressure - 5000 PSI | HR | 6.5 | 6.5 | 6.5 | |||||||
| Compressor - Generators - Lighting | UOM | ||||||||||
| Compressor - 185 CFM - Trailer Mounted | HR | 1 | 1 | 1 | |||||||
| Compressor - 200 PSI - Portable | HR | 1 | 1 | 1 | |||||||
| Pumps | UOM | ||||||||||
| Pump - Diaphragm - 1 Inch | HR | 1 | 1 | 1 | |||||||
| Pump - Diaphragm - 1 Inch | Day | 0.5 | 0.5 | 0.5 | |||||||
| Pump - Transfer - 300 GPM | HR | 1 | 1 | 1 | |||||||
| Water Deployment | UOM | Rate | Rate | Rate | |||||||
| Oil Skimmer - Floatable - 35 to 75 BL/HR Deep Groove | Day | 1 | 1 | 1 | |||||||
| Safety Package - Personal - Life Vest - Tether - Beacon | Person | 1 | 1 | 1 | |||||||
| Testing Equipment | UOM | Rate | Rate | Rate | |||||||
| Atmospheric - Mini Rae 2000 - PID | Day | 1 | 1 | 1 | |||||||
| Atmospheric - Personal - Multi Rae Plus - 4 - Gas | Day | 1 | 1 | 1 | |||||||
| Atmospheric - Personal - MSA Altair 4X - 4 - Gas | Day | 1 | 1 | 1 | |||||||
| Transportation | UOM | Rate | Rate | Rate | |||||||
| Response - Standard Response Van | HR | 5.5 | 5.5 | 5.5 | |||||||
| Response - Heavy Duty Hazmat Response Truck | HR | 4 | 4 | 4 | |||||||
| Response - Mobile Vehicle Command Truck | HR | 7.5 | 7.5 | 7.5 | |||||||
| Response Vehicle - Personnel & Equipment Transport | HR | 25 | 25 | 25 | |||||||
| Vacuum Truck - 5500 to 6500 GA / 120 BL | HR | 16.5 | 16.5 | 16.5 | |||||||
| Roll Off - Straight Truck | HR | 4 | 4 | 4 | |||||||
| End Dump Unit - 22 Tons | HR | 1 | 1 | 1 | |||||||
| Trailer - Boom Deployment - 18 FT | HR | 4.5 | 4.5 | 4.5 | |||||||
| Trailer - Response - 22 FT | HR | 2 | 2 | 2 | |||||||
| Trailer - Cargo - Tools & Supplies - 12FT | HR | 2 | 2 | 2 | |||||||
| Trailer - Van 48 FT with Lift Gate | HR | 2 | 2 | 2 | |||||||
| Personal Protection Equipment | UOM | Rate | Rate | Rate | |||||||
| Fluid Replacement - Personnel | Person | 1 | 1 | 1 | |||||||
| OSHA Defined Level C PPE with Full-Face Respirator | Person | 1 | 1 | 1 | |||||||
| OSHA Defined Level D PPE | Person | 11 | 11 | 11 | |||||||
| Coverall - Tyvek - Disposable | Each | 1 | 1 | 1 | |||||||
| Drums & Totes | UOM | Rate | Rate | Rate | |||||||
| Drum 1A2 - Metal 55 GA - Reconditioned | Drum | 2 | 2 | 2 | |||||||
| Drum - Salvage - Poly - 85 GA | Drum | 1 | 1 | 1 | |||||||
| Liners | UOM | Rate | Rate | Rate | |||||||
| Liner - Drum - Polyethylene | Each | 5 | 5 | 5 | |||||||
| Liner - Roll Off - Polyethylene - 5 ml | Each | 1 | 1 | 1 | |||||||
| Liner - Roll -Polyethylene - 10 ml | Each | 1 | 1 | 1 | |||||||
| Liner - Ground Barrier - 20 ml | Each | 2 | 2 | 2 | |||||||
| Absorbents & Surfactants (Biodegradable) | UOM | Rate | Rate | Rate | |||||||
| Absorbent - Diatomaceous Earth - Granular | Bag | 3 | 3 | 3 | |||||||
| Absorbent - Petroleum - Boom 8' x 10' | Each | 16 | 16 | 16 | |||||||
| Absorbent - Petroleum - Pad - Bundle - 100ct | Bundle | 2 | 2 | 2 | |||||||
| Absorbent - Cotton - Box or Roll | Box | 1 | 1 | 1 | |||||||
| Miscellaneous Response Reimbursable | UOM | Cost + % | Rate | Cost + % | Rate | Cost + % | Rate | ||||
| Sand Bag 50LB | Each | 10 | 10 | 10 | |||||||
| Orange Construction Fence | Foot | 15 | 15 | 15 | |||||||
| Metal Fence Post | Each | 5 | 5 | 5 | |||||||
| CLIN 001 Total | CLIN 0101 Total | CLIN 0102 Total |
File details come from the government source that posted it. Updated .