This document is an Asbestos Inspection Report for Building 3202 at Tinker Air Force Base, revealing significant asbestos contamination in the roofing materials. The inspection, conducted on February 20, 2024, by Civil Engineering Environmental (CEIE), identified asbestos-containing material (ACM) in the black/gray roofing across five sampled locations. Laboratory analysis by QuantTEM Laboratories confirmed 15% chrysotile asbestos presence in each sample, with the roof described as antiquated, damaged, and even featuring a small tree growing on the southwest corner.

The report recommends Class II asbestos work for the non-friable Category II material when the roof is replaced or repaired. The building, constructed in 1942, shows significant roof damage, with samples taken from north, south, west, east, and center locations all testing positive for asbestos. The findings align with the broader federal contract opportunity (Solicitation Number FA813725R0037) for replacing the valve and fuel tank at Building 3202, which involves major upgrades to civil, architectural, structural, mechanical, and electrical systems, with a projected construction cost between $1,000,000 and $5,000,000.

View the file

Other files

File Type Posted
WWYK230053 B3202 Replace Vault and Fuel Tank RFI log COR Signed.pdf PDF
Wage Determination OK.pdf PDF
Solicitation - FA813725R0037.pdf PDF
2023 TAFB Fire Protection Standard.pdf PDF
2024 TAFB Electrical Standards.pdf PDF
03202A1.pdf PDF
03202A2.pdf PDF
03202A7.pdf PDF
20080290.pdf PDF
03202A6.pdf PDF
03202A8.pdf PDF
03202A3.pdf PDF
03202A4.pdf PDF
230053_Submittal_Register.pdf PDF
230053 - Drawings - 30MAY2025.pdf PDF
230053_STATEMENT OF WORK.pdf PDF
230053_Design Narrative.pdf PDF
Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

72 ABW/CEIE

ASBESTOS INSPECTION REPORT PAGE 1 OF 5

Project Information

Project Name Engineering Evaluation Project ID 14043285

Project Building 3202 Year Constructed 1942

Room/Post Location Roof Historical Samplings No

Requestor Joe Uhl Inspector(s) Michael Green; Laura Duck

Inspection Date 20 Feb 2024 Prepared By

Sampling Information:

Sample ID - Location Material Classification Condition Hazard Friable Analysis Results

RMB320201

North

Black/Gray Roof Material Misc Significant Damage

ACM NF PLM Asbestos Present

Chrysotile 15%

RMB320202

South

Black/Gray Roof Material Misc Significant Damage

ACM NF PLM Asbestos Present

Chrysotile 15%

RMB320203

West

Black/Gray Roof Material Misc Significant Damage

ACM NF PLM Asbestos Present

Chrysotile 15%

RMB320204

East

Black/Gray Roof Material Misc Significant Damage

ACM NF PLM Asbestos Present

Chrysotile 15%

RMB320205

Center

Black/Gray Roof Material Misc Significant Damage

ACM NF PLM Asbestos Present

Chrysotile 15%

Photos:

Page | 2

Condition:

Surfacing/Misc. Materials:

• Good Condition: Material with no visible damage or deterioration or showing only very limited damage or deterioration.

• Some Damage: Material crumbling, blistered, water-stained, gouged, marred, or abraded covering less than one tenth of the surface if the damage is evenly distributed (one quarter if the damage is localized).

• Significant Damage: Material crumbling, blistered, hanging from surface, deteriorated, adhesive failure, water-stained, gouged, marred, or abraded covering more than one tenth if the damage is evenly distributed (one quarter if the damage is localized).

Hazard:

• ACM = Asbestos Containing Material; defined by the EPA as any material containing more than 1 percent asbestos.

Friable:

• Friable = Material, when dry, may be crumbled, pulverized, or reduced to powder by hand pressure, and includes previously nonfriable material that becomes damaged to the extent that it is now friable.

• NF = Nonfriable; Material, when dry may not be crumbled, pulverized, or reduced to powder by hand pressure.

Analysis/Results:

• PLM = Polarized Light Microscopy; Asbestos Present or Asbestos Not Present

• PACM = Presumed Asbestos Containing Material; TSI and SM found in buildings constructed no later than 1980.

Inspection Observations:

• Civil Engineering Environmental (CEIE) conducted an inspection of the roofing materials located on bldg. 3202. The roof appears to be antiquated and damaged. The roof also has a small tree growing on the southwest corner.

Findings:

• Black and Gray roofing/flashing contains asbestos.

Recommendations:

• Class II asbestos work for Cat II NF material when roof is replaced/repaired.

PLM and CoC Page 3-5

Page | 3

Page | 4

Page | 5

Scanned from a Xerox Multifunction Printer.pdf
Inspection Report - B3202 Roof - EVAL 14043285.pdf
Asbestos inspection report Page 1 of 5
Project Information
Sampling Information:
Photos:
Condition:
Hazard:
Friable:
Analysis/Results:
Inspection Observations:
Findings:
Recommendations:
PLM and CoC Page 3-5
Project ID
Project Name
Year Constructed
Project Building
Historical Samplings
Room/Post Location
Inspector(s)
Requestor
Prepared By
Inspection Date
Results
Analysis
Friable
Condition
Classification
Material
Sample ID - Location

File details come from the government source that posted it. Updated .