P26-004 F107 Cleaning Tank- item description_Redacted.pdf
PDF 247 KB Posted
- Attached to
- F107 Cleaning Tank
- Solicitation number
- FA813225Q0036
About this file
This document is an Item Description for a F107 Cleaning Tank, issued by the Department of the Air Force's Oklahoma City Air Logistics Complex at Tinker Air Force Base. The 76 PMXG is requesting a specialized cleaning tank with specific technical requirements, including minimum internal dimensions of 46 inches length by 21 inches front to back, and 18 inches in height. The tank must accommodate components without stacking, feature two distinct sections (a solution tank and rinse tank), and be constructed of corrosion-resistant material compatible with cleaning chemicals like J-84A alkaline mist remover and Super Bee 300LF Degreaser.
Key specifications include a heating system capable of maintaining a 200°F solution temperature, a solution agitation mechanism for uniform distribution, safety features like polyethylene guards, and power requirements of 460V, 3-phase electrical supply. The procurement includes comprehensive on-site installation services, operational training, equipment calibration, a 1-year warranty on parts and labor, and requirements for OEM documentation. The tank is designed to ensure effective decontamination and residue removal, with precise temperature control and an efficient drainage system to facilitate rapid solution changes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
• Power Requirements: 460V, 3 phase electrical power supply, voltage is 115V, 60 Hz and Full load current is 28 amps.
• Installation and Training: Comprehensive on-site installation services and operational training are required to ensure the proper setup, commissioning, and effective utilization of the new tank. These services shall encompass, but not be limited to, equipment calibration, process optimization, and thorough operator instruction on all relevant functionalities, safety protocols, and management of the rinse tank solution.
• Warranty Period: Add a standard 1-year warranty clause on all parts and labor.
• Spare Parts: Consider requesting a parts list or starter kit (e.g., heating elements, seals).
• Documentation: Include requirement for OEM manuals (digital and hardcopy).
• Removal of the Current System
File details come from the government source that posted it. Updated .