QuestionsAnswers.pdf

PDF 87 KB Posted

Attached to
Ramp Surveliiance
Solicitation number
FA8126-11-Q-0075
Issued by

About this file

Questions/Answers

View the file

Other files

File Type Posted
11-Q-0075-0006.pdf PDF
Amendment 0006.pdf PDF
SOW Revision .pdf PDF
Amendment -0005.pdf PDF
FA8126-11-Q-0075-U00004.pdf PDF
Correct Amendment for FA8126-11-Q-0075.pdf PDF
Basemap.pdf PDF
Bldg935.pdf PDF
Amendment.pdf PDF
Revised SOW.pdf PDF
Bldg260.pdf PDF
East Ramp area.pdf PDF
Questions Answers.pdf PDF
Amendment-0002.pdf PDF
11-Q-0075-0001.pdf PDF
5 jan 11 SOW 11-Q-0075.pdf PDF
SOO 11-Q-0075.pdf PDF
Combined Synopsis 11-Q-0075 .docx DOCX document
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions – FA8126-11-Q-0075

1. What government person will the contractor be coordinating with to complete DIACAP?

Winning bidder will have the capability to directly submit documentation for approval; project manager may review periodically to identify progress.

2. What templates will be provided to the contractor (winning bidder) to complete the DIACAP documentation package?

There are no specific templates for doing a DIACAP package. A spreadsheet of the controls is available which has been pulled from the system that the DIACAP packages are done in.

2. Who is the Designated Approving Authority (DAA) for the system?

DAA is the current Commander, AFNIC/EV, and is not at this base.

3. Who is the Certifying Authority (CA) for the system?

Same answer as #2

4. What government representative will act as the Certifying Agent responsible for validating the system controls?

Susan McClintick, 72 ABW/SCXS

6. Who is the government System Owner (Project Manager)?

This project will be supporting the aircraft maintenance group. A project manager will be provided to the winning bidder.

7. Has the government determined the Mission Assurance Level (MAC) and Confidentiality Level (CL) for the system?

Yes, MAC III, sensitive

8. Besides the DoD 8500.2, what component level (Air Force) or local security policies are required to be integrated into the system?

We only have AF level security policies, none locally.

9. What system will be used to register and track the DIACAP project?

EITDR until 1 March 2011, then eMASS thereafter.