This is a Performance Work Statement (PWS) for annual inspection, re-certification, and repair services for fall protection systems at the Oklahoma City Air Logistics Complex (OC-ALC) on Tinker Air Force Base.

The contract covers one base year with four option years. The contractor must provide comprehensive annual hands-on inspections of all fall protection systems including anchorages, rigid rail fall arrest systems, self-retracting lifelines, and horizontal lifeline systems. Inspections shall verify structural integrity, proper functionality, and compliance with ANSI Z359 and OSHA requirements. The contractor must perform one recertification per system during the standard June inspection cycle and provide written certification of serviceability. The contractor is responsible for all labor, tools, equipment, test equipment, materials, parts, quality control, transportation, and PPE including reflective clothing, safety harnesses, and fall protection equipment. A boom lift with minimum 125-foot reach height must be provided with at least three equipment relocations within the inspection window. The contractor must submit a sample inspection report demonstrating capability to document all system types as a proposal submission requirement. Personnel must be qualified as fall protection system inspectors under 29 CFR 1910.140(b) with proof of credentials, certifications, or professional standing submitted with the proposal.

Facility B requires an out-of-cycle baseline inspection completed no later than January 29, 2027, followed by a second inspection during the standard June cycle. Additional facilities currently under construction will activate in designated option years per Appendix A schedule. The contractor must provide inspection schedules within five business days of award and notify the GPOC seven business days before inspections. Malfunction reports must include equipment ID, findings, required parts with part numbers and costs, and estimated labor hours. Repair authorization requires written Contracting Officer approval before work commences. Service reports must be provided within five business days of completion, including labor cost breakdown and verification that only new parts were used. The contractor must comply with extensive base requirements including environmental protection, hazardous materials management, security briefings, FOD/DOP training, tool control accountability, and multiple mandatory training courses. Standard hours are Monday through Friday, 0700-1500, with flexibility for 24/7 scheduling upon Contracting Officer approval and Government oversight.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR

ANNUAL INSPECTION,

RE-CERTIFICATION

AND

REPAIR

OF

FALL PROTECTION SYSTEMS

Serv A27-048RN

PREPARED BY:

OC-ALC/OBCA

17 November 2026

Commanders Safety Intent: The safety of everyone on Tinker AFB is our top priority. All Individuals must accept personal responsibility for safety and seek opportunities for improving the safety of our work environment. Everyone working on Tinker AFB is challenged to find, fix (if able) and report all hazards and near-misses. It is our shared duty to take every reasonable step and precaution to prevent accidents and preserve the health/safety of each contractor and government employee.

Section One

Description of Services

1.1 Scope: This contract will be for one (1) Base Year and four (4) Option Years. The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation, inspection manuals and credentials necessary to perform the Annual Inspections, Re-Certifications, and (Over and Above) Repair Services for the Fall Protection Systems located at all buildings listed in the Appendix A at the Oklahoma City–Air Logistics Complex (OC-ALC).

[To protect critical installation assets, the public-facing Appendix A utilized during the solicitation phase references Facility Identifiers. The Government Point of Contact (GPOC) will provide a fully detailed Appendix A containing actual building numbers to the Contractor upon contract award.]

1.1.2 The Contractor shall also provide Personal Protective Equipment (PPE) and clothing, to include reflective clothing (belt, vest, etc.); hearing and eye protection, to include prescription safety glasses; safety harnesses; fall protection equipment: lifting equipment and any incidentals necessary to perform the requirements of this Performance Work Statement (PWS). The equipment is listed in the Appendix A.

1.1.3 The Contractor shall be responsible for ensuring all services provided under this contract are in accordance with (IAW) the terms and conditions outlined herein and conform to the safety requirements for Personal Fall Arrest Systems, Subsystems and components, American National Standard Institutes (ANSI) Z359, Occupational Safety and Health Administration (OSHA), manufacturer’s equipment specifications and this Performance Work Statement (PWS).

1.2 Requested Services: To fulfill the requirements in Section 1.1, the Contractor shall perform the following specific tasks for all systems and buildings listed in Appendix A:

1.2.1 Annual System Inspections: The Contractor shall perform one (1) annual comprehensive, physical hands-on inspection (not merely a ground-level visual check) of all Fall Protection Systems listed in Appendix A (with the exception of designated Base Year out-of-cycle facilities requiring two [2] inspections as specified in Section 1.2.4 and Appendix A) including Anchorages, Anchorage Extensions, Single-Point Anchors, Rigid Rail Fall Arrest Systems, Self-Retracting Lifelines/Devices (SRL/SRD), and Horizontal Lifeline Systems. Inspections shall include, at a minimum:

• Checking structural anchor points, fasteners, welds, and bolts for corrosion, deformation, cracks, or loosening.

• Inspecting rigid rail tracks, trolleys, and end-stops for smooth travel, wear, and structural integrity.

• Checking horizontal wire ropes/cables for fraying, kinking, broken strands, and proper tensioning/sag IAW manufacturer specifications.

• Testing Self-Retracting Lifelines (SRLs) for proper locking/braking action, retraction tension, housing damage, and load indicator deployment.

1.2.2 System Re-Certification: The Contractor shall perform one recertification of each fall protection system identified in Appendix A during the Standard In-Cycle Annual Inspection window (defined in 1.2.4.1) of the base year. Recertification shall be performed by a Qualified Person in accordance with applicable OSHA requirements, manufacturer instructions, and ANSI/ASSP Z359.6. The recertification shall include, at a minimum, engineering review as applicable, physical inspection of system components, verification of anchorage and system integrity, identification of deficiencies, and written certification of the system’s serviceability or required corrective action.

1.2.3 Deficient Equipment Lockout / Tag-Out: If any system or component fails inspection or is deemed unsafe, the Contractor shall immediately remove the component from service (or affix a clearly visible "DO NOT USE / OUT OF SERVICE" tag) and notify the GPOC. The Contractor shall coordinate with the Government to ensure the system is properly red-tagged in the local database IAW Section 1.16.

1.2.4 Site Coordination & Phasing: All site visits will be coordinated with the GPOC to maximize system inspections per cycle and minimize operational downtime at the installation.

1.2.4.1 Standard In-Cycle Annual Inspections (June Baseline): The standard base-wide annual inspection window occurs in June. The Contractor shall perform the standard annual inspections and re-certifications for all active facilities listed in Appendix A during this primary window.

1.2.4.2 Prioritized Out-of-Cycle Inspections (Immediate Requirement): To resolve immediate safety certification gaps for newly added assets, the Contractor shall perform an out-of-cycle baseline inspection of Facility B. This requirement is a prioritized baseline action and shall be completed No Later Than 29 January 2027.

1.2.4.3 Schedule Harmonization & Synchronization: To successfully synchronize all fall protection systems into the single recurring annual cycle, the Contractor shall perform a second inspection of Facility B during the standard June In-Cycle window. Following this Base Year synchronization, all active buildings will remain on the unified June cycle for all subsequent Option Years.

1.2.4.4 Deferred Construction Phasing (Option Years): Certain facilities listed in Appendix A are currently under construction or offline and are not active in the Base Year.

The Contractor shall refer to the detailed schedule in Appendix A to identify the specific Option Year (OY1 through OY4) in which each deferred facility is scheduled to activate.

The Contractor shall only perform inspection services and bid quantities for these deferred facilities starting in their designated activation years as outlined in Appendix A.

1.2.4.5 Construction Schedule Fluctuations & Option Adjustments: Estimated facility activation dates and Option Year schedules listed in Appendix A are based on current construction and facility modernization forecasts. The Government reserves the right to adjust or shift facility activation start dates between Option Years via contract modification to align with actual construction completion, facility acceptance, and occupancy dates. In the event of a construction delay or schedule adjustment, the Contractor shall provide the agreed-upon inspection and re-certification services IAW the established contract unit prices once the facility is officially accepted and released for service.

1.2.5 Lifting Equipment & Access: The Contractor shall furnish all necessary mobile lifting equipment / boom lifts required to reach the overhead systems safely.

1.2.5.1 The Contractor shall provide a boom lift with a minimum reach height of one hundred and twenty-five feet (125’ height minimum). To minimize operational disruptions across different installation sectors, the Contractor shall plan for, coordinate, and execute a minimum of three (3) equipment moves/relocations of the contractor-rented boom lift within the designated inspection window.

1.2.5.2 All transport, safety oversight, and spotters required for these equipment moves shall be provided solely at the Contractor's expense.

1.2.6 Technical Inspection Report Capability (Proposal Submission Requirement): To demonstrate technical capability to perform these services, the Offeror shall provide a sample inspection report at the time of proposal. The Government SME will base their technical evaluation on this submission. This example report must demonstrate the vendor's ability to document complex systems and shall include sample inspection results of the following:

• Anchorage

• Anchorage Extension

• Single-Point-Anchor

• Rigid Rail Fall Arrest System

• Self-Retracting Lifeline (also called Self-Retracting Device)

• Horizontal Lifeline System

1.2.7 Clarifications and Technical Baselines: To assist in the execution of the services defined in Sections 1.2.1 through 1.2.6, the following technical, logistical, and informational baselines apply:

1.2.7.1 System Measurements & Documentation: The historical certification package for Facility B is provided for reference as Attachment 1. Lengths of the rigid rail systems in Facility B are typical of eighty-five percent (85%) of similar systems in the remaining facilities across the complex. The remaining fifteen percent (15%) of rigid rail systems are approximately 30–35 feet in length. It should be assumed that all facilities, except Facility B, do not have active certification data on file within the past five (5) years; however, design drawings for nearly all engineered systems are maintained on-file.

1.2.7.2 Facility Access & Scheduling: To maximize efficiency, facilities in each major apron area (Campus area to include facilities N, O, P, Q, R, S, T, U, V / East side ALC / and Campus area to include facilities G, H, I) are spaced closely together and may be inspected in rapid succession. Facilities will be made available to the Contractor as much as possible, though some will require scheduling in advance (per the PWS) due to hazardous processes performed within those spaces.

1.2.7.3 Lift Transport and Site Mobilization: Facility B is on the East side ALC airfield apron adjacent to other facilities (Facilities C–F, and Facilities J–M). The lift may be driven directly between facilities, docks, and bays that are adjacent to each other on the same apron area. Truck-assisted moves will be encouraged when moving between separate apron areas (Campus areas N, O, P, Q, R, S, T, U, V / East side ALC / Facility A / and Campus area G, H, I).

1.2.7.4 Government-Furnished Information (GFI) – Design Documentation: The Government Point of Contact (GPOC) or designated Subject Matter Expert (SME) will furnish all available structural design drawings, equipment specifications, and historical engineering data maintained on-file to the Contractor/re-certifier to facilitate the engineering evaluations and ANSI/ASSP Z359.6 recertification requirements outlined in Section 1.2.2.

1.3 Special Qualifications (Proposal Submission Requirement): The Contractor shall provide personnel with the following special qualifications:

• Fall Protection System Inspector shall be qualified pursuant to the definition under 29 CFR

1910.140(b).

• The Inspector shall be Qualified, defined by 29 CFR 1910.140(b) as "a person who, by possession of a recognized degree, certificate, or professional standing, or who by extensive knowledge, training, and experience has successfully demonstrated the ability to solve or resolve problems relating to the subject matter, the work, or the project."

1.3.1 Submission Requirements: The Contractor is required to provide proof of these qualifications at the time of proposal. This proof must be submitted in the form of one or more of the following documents:

Document Type

Description of Acceptable Proof

Professional Certifications Credentials or certificates of completion from recognized fall protection training institutions.

Academic/Professional Credentials Copies of a recognized degree, certificate, or documentation of professional standing related to fall protection systems.

Manufacturer Certifications Valid factory-training or authorization certificates issued by fall protection equipment manufacturers.

Technical Experience Portfolio A detailed resume or training record demonstrating extensive knowledge, training, and practical experience in solving or resolving fall protection system issues.

1.4 Inspection Schedule: The Contractor shall provide a copy of the Annual Inspection Schedule of Daytime, Swing and Graveyard for Personal Fall Arrest Systems, Subsystems and components in Buildings listed in the Appendix A to the GPOC within five (5) business days after contract award. The Contractor shall notify the GPOC seven (7) business days prior to the Annual Inspection.

1.4.1 If the Contractor discovers a malfunction, during the course of the annual inspection of the Fall Protection Equipment, a copy of the findings shall be provided to the GPOC. The report shall include the following:

• Date of evaluation

• Description of findings and recommendations

• Required parts and part numbers (P/N)

• Cost of parts

• Number of parts needed

• Estimate labor hours required to complete the repair

1.5 Over and Above (O&A): O&A is defined as work discovered during the course of performing the repair efforts that is within the scope of the contract and necessary in order to satisfactorily complete the contract. The Contractor shall complete O&A requirements In Accordance With (IAW) Defense Federal Acquisition Regulation Supplement (DFARS) 252.217-7028. PGI 217.77.

1.6 Documentation: After completion of each annual inspection, the Contractor shall provide documentation to the GPOC within five (5) business days to certify that all the systems/and or components have been inspected and meet or exceed the performance requirements of ANSI Z359 and OSHA 1910 Fall Arrest Systems regulation and are suitable for use as fall protection safety systems. The certificates shall list the following information:

• Serial Number (if applicable)

• Description

• Manufacturer

• Building Location as listed in the Appendices

1.7 Malfunction and Notification Process: Upon occurrence of an equipment or system malfunction, the GPOC will contact the Contractor by telephone, email, or fax and provide information below. If the GPOC notifies the Contractor via telephone, the GPOC will provide a written copy of the request by email or fax.

• the equipment identification number (ID#)

• a brief description of the malfunction

• location of equipment

• name and telephone number of the Point of Contact (POC)

1.7.1 Upon notification of the system malfunction, the technician shall arrive on site at the equipment location within ten (10) business days after telephone notification of malfunction.

1.8 Equipment Evaluations: The Contractor shall provide a written Estimate Repair Report to the GPOC by fax or email no later than (NLT) one (1) business day after the completion of the inspection. As a minimum, the information cited on the Estimate Repair Report shall include:

• the equipment ID#

• date of evaluation

• description of findings and recommendations

• required parts and part numbers (P/N)

• cost of parts

• number of parts needed

• estimated labor hours required to complete the repair

1.8.1 Any recommendations cited shall consider:

• the priority of the requested service

• available source for obtaining new parts

• the availability of the new parts

• shipping and delivery schedules of parts

• other factors which may be peculiar to the specific repair requirement

1.9 Authorizations for Repair Actions: Only the Contracting Officer (CO) can authorize repair actions. The GPOC will coordinate any repair actions with the Government Subject Matter Expert (SME) and the CO in order to obtain the approval to proceed. The Contractor shall ensure all repair actions have the documented CO approval, in writing, before initiating any repair or ordering parts. The Contractor shall demonstrate to the Government SME that the repairs have been completed.

1.9.1 Once the authorization for repair action has been received from the CO, the Contractor shall order any required parts within two (2) business days and notify the GPOC, in writing, of the estimated arrival date of the parts. Upon the receipt of the parts, the Contractor shall perform the repair within five (5) business days. The GPOC will verify the receipt of the parts with the Contractor to ensure the repair is performed in a timely manner.

1.10 Parts and Materials: The Contractor shall provide and use only new parts and material in performance of this PWS unless otherwise authorized by the CO. Long lead items greater than five

(5) business days must be identified and provide sufficient documentation supporting the delay.

1.11 Service Report: Immediately upon completion of any maintenance and before leaving the OC-ALC, the Contractor shall provide a draft, written Service Report to the SME. When necessary the SME will forward the draft service report to the GPOC within 2 business days of receipt. The Contractor shall provide, by fax or email, the final service report within 5 business days to the GPOC. As a minimum, the final service report shall contain the following information:

• Company Name

• Requested service date

• Contract #

• Equipment ID #

• Description of Services provided

• Additional Services recommended (if any)

• Printed Name and Signature of Technician who performed the Services (electronic signatures are acceptable)

• Printed Name and Signature of on-site SME or GPOC (electronic signatures are acceptable)

• Start and Completion dates

• Complete Breakdown of the Labor Cost (hours and rate)

• Materials and Parts used

• Details of any other charges

• Printed Name and Signature stating only new parts and materials were used (electronic signatures are acceptable)

• Written verification statement that a performance check to verify operational condition was performed and that the equipment is in working order. (electronic signatures are acceptable)

1.12 Increase/Decrease of Equipment: The Government reserves the right to increase and/or decrease the number of the Fall Protection Systems to be serviced by up to forty (40) systems during any performance period, through means of a modification based on the Government need during the life of the contract. The Contractor shall provide the agreed upon Annual Inspections, Re-Certifications and Repair Services IAW the unit prices, terms and conditions agreed upon in the Basic and Option years of the contract.

1.13 Quality Assurance: According to the contract’s inspection clause, the Government will evaluate the Contractor’s performance under this contract. The GPOC will participate in the administration of this contract. Any matter concerning a change to the scope, prices, terms, or conditions of this contract shall be referred to the CO. All services to be performed by the Contractor during the period of this contract will be subject to review by the CO or GPOC.

1.14 Corrective Action Report (CAR)/Complaint Contractor Response Time: The Contractor shall provide a written response within two (2) business days which addresses the root cause, corrective action, and preventive actions in relation to the submitted CAR or Customer Complaint.

1.15 Maintenance Documentation: The Contractor shall notify the Government Subject Matter Expert (SME) upon completion of each Annual Inspection, Re-Certifications,or similar requirement, IAW OC-ALC Operating Instruction (OI) 21-203, Chapter 1, 2, and 3, as applicable.

1.16 Red Tagged Items: Red Tagged items create unsafe conditions for the workplace and are noted by the annotation of a Red X in the Facilities and Equipment Management Web-Based (FEM) system. A Red X indicates the equipment is considered unsafe or unserviceable and will not be used until the unsatisfactory condition is corrected and the Red X is cleared. The Contractor shall not authorize, use or direct equipment to be used until the Red “X” has been properly cleared IAW OC-ALC OI 21-203, Chapter 2.

1.16.1 Red X Clearance: The Contractor shall ensure the Red X’s are cleared IAW OC-ALC OI 21-203, Chapter 2. The Contractor shall immediately notify the shop supervisor or work leader in any instance where the Contractor clears a Red X in his or her assigned work area.

1.16.2 Red X Clearance on Equipment: Red X on Equipment will be cleared in FEM by the shop supervisor, work leader, or supervisor’s designee.

1.17 Continuation of Essential Department of Defense (DoD) Contractor Services During Crisis: This requirement has been determined not to be essential and does not require continued support during a crisis as defined in DFARS 252.237-7023.

1.18 Hours of Operation: The Contractor shall perform the work required under this contract during the standard hours of Monday through Friday, 0700 - 1500.

1.18.1 Flexible and Non-Standard Scheduling: To minimize impact on active military operations and aircraft maintenance schedules, work may be scheduled up to seven (7) days a week, twenty-four (24) hours a day (24/7), to include weekend hours, as coordinated and approved in the Annual Inspection Schedule.

1.18.2 Approval and Oversight: If work hours are required outside the standard hours stated (Monday through Friday, 0700 - 1500), the Contractor shall coordinate the schedule with the GPOC for approval from the CO. Upon approval from the CO, the Government Subject Matter Expert (SME) or GPOC must be present with the Contractor during all non-standard work hours.

1.18.3 Holiday and Base Closures: These dates and hours exclude Federal Holidays, base closures due to inclement weather, and furlough days, as applicable.

1.19 Contractor Personnel: The Contractor shall provide the name of the Contract Manager (CM) and any alternates who shall act for the Contractor when the CM is absent. They shall be designated to the CO and GPOC, in writing, within ten (10) business days after the contract award date. The Contractor shall provide telephone numbers and email addresses where the CM and alternates may be contacted at any time. The CM or alternate shall have full authority to act for the Contractor on all matters relating to operation of this contract at the OC-ALC on Tinker Air Force Base (AFB). The CM or alternate shall be available to meet on the installation with Government personnel designated by the CO to discuss problem areas. The Contractor shall provide a CM who can read, write, speak, and understand English fluently.

1.19.1 The Contractor and Contractor personnel shall be required to identify themselves as contractor personnel by introducing themselves or being introduced as Contractor personnel. The Contractor personnel shall also display distinguishing badges or other visible identification for meetings with Government personnel or while performing work for the OC-ALC on Tinker AFB.

The Contractor and Contractor personnel shall identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.

1.20 Listing of Contractor Employees: The Contractor shall provide an initial listing of names and position titles of employees who will come to Tinker Air Force Base to the GPOC within five

(5) business days after the contract award date. Within ten (10) business days, the Contractor shall also provide an updated listing of personnel to the GPOC when employees affecting the work of this contract change status or position.

1.20.1 The Contractor shall not employ persons on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, and/or general well-being, or operational mission of the installation and its population. The Contractor shall not employ any person who is an employee of the United States (US) Government if the employment of the person would create a conflict of interest. The Contractor shall not employ any person who is an employee of the Department of the Air Force (AF), either military or civilian, unless such person seeks and receives approval according to the DoD 5500.7-R Joint Ethics Regulations (JER). In addition, the Contractor shall not employ any person who is an employee of the Department of the AF if such employment would be contrary to the policies contained in Air Force Instruction (DAFI) 64-106, Contract Labor Relations Activities. The Contractor shall be prohibited from employing off-duty GPOCs who are providing surveillance on any contracts/sub-contracts awarded to the Contractor.

All contract personnel, depending on particular condition, occasion, or place or job assignment shall be required to wear professional and suitable attire. All Contractor personnel shall conduct themselves in a professional and courteous manner. The selection, assignment, reassignment, transfer, supervision, management, and control of contractor personnel in performance of this PWS shall be the responsibility and prerogative of the Contractor; however, the Contractor shall comply with the requirements set forth in this PWS and Tinker AFB regulations concerning the conduct of employees as referenced herein. The Contractor shall employ and maintain a technically trained and experienced work force.

1.21 Key Control: NOTE: All references to keys include key cards. The Contractor shall establish and implement methods to ensure all keys issued to the Contractor by the Government are not lost or misplaced, and are not used by unauthorized persons. Any keys issued to the Contractor by the Government shall not be duplicated. If a Quality Control Plan (QCP) is required in the PWS, the Contractor shall develop procedures covering key control and include them in the QCP. If a QCP is not required in the PWS, the Contractor shall develop written key control procedures. The Contractor shall provide the written key control procedures to the CO and the GPOC within ten (10) business days of the contract award date. The key control procedures shall include the turn-in of any issued keys by personnel who no longer require access to locked areas.

The Contractor shall immediately report any occurrence of lost or duplication of keys to the CO and the GPOC. When the Government replaces locks or rekeys locks due to the Contractor’s fault, the total cost of the rekeying or the replacement of the lock or locks will be deducted from the payment for services due to the Contractor. In the event a master key is lost or duplicated due to Contractor fault, the Government will replace all locks and keys for the system and the total cost of replacing all locks and keys for the system will be deducted from the payment for services due to the Contractor. The Contractor shall prevent the use of Government issued keys by any person or persons other than the authorized contractor personnel. The Contractor shall ensure that only contractor personnel performing work under this contract or personnel authorized by the CO gain entrance into locked areas.

1.22 Environmental Protection & Safety: The Contractor shall be knowledgeable of and comply with all applicable federal, state and local laws, regulations, instructions and requirements regarding environmental protection and occupational safety and health. The Contractor shall comply with any laws, instructions or regulation changes during the term of this contract.

1.22.1 Contractors shall be compliant Tinker Air Force Base (TAFB) Supplement to Air Force Manual (DAFMAN) 32-7002, “Environmental Compliance and Pollution Prevention”, Tinker AFB procedures per Tinker Air Force Base Hazardous Waste Management Plan (TAFB HWMP), and Complex procedures per Oklahoma City Air Logistics Complex (OC-ALC) Supplement to DAFMAN 32-7002, “Environmental Compliance and Pollution Prevention” and OC-ALCI 32- 101 “Air Quality Record Keeping Procedure GPOC”. Publications are available digitally on e- Publishing website at www.e-publishing.af.mil for downloading or ordering.”

1.23 Hazardous Material (HAZMAT): If no HAZMAT will be brought on base or used in performance on this contract, the contractor shall certify “No HAZMAT will be brought on base” or “No HAZMAT Usage” by official correspondence. This certification shall be provided to the GPOC within ten (10) days after award. Upon GPOC receipt of the certification, the requirements of this section no longer apply. Appropriate penalties for the contractor shall be assessed if found in violation of above certification.

1.23.1 The Contractor shall comply with applicable federal and military procurement policies IAW OC-ALC Supplement to DAFMAN 32-7002, “Environmental Compliance and Pollution Prevention”. The Contractor shall obtain access to the standardized Air Force HAZMAT tracking system and manage HAZMAT within the system or have a government designated HAZMART comply. The Contractor shall establish and reconcile the inventory, print the standardized Air Force HAZMAT tracking system bar code labels, and apply the labels to containers of HAZMAT so that the Occupational Safety and Health Administration (OSHA) compliant labels are not covered. Any failure to comply with proper HAZMAT management procedures shall be reported to the CO and GPOC who will notify 76 MXSG/MXDEU, OC-ALC Environmental Compliance.

1.24 Safety Data Sheet (SDS) and Labeling: Upon GPOC receipt of the “No HAZMAT Usage” certification, the requirements of this section no longer apply.

1.24.1 The The Contractor shall not transport, ship or use any chemical, material or substance used in the performance of this PWS on Tinker AFB before written approval is provided by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). The Contractor shall submit to the GPOC, ten (10) calendar days after contract award date all Safety Data Sheets (SDSs). The Contractor shall receive approval from the GPOC prior to shipping any chemical, material or substance to Tinker AFB. A copy of the manufacturer SDS shall accompany the shipment. Contractor shall comply with the effective dates for SDS requirements IAW the Occupational Safety and Health Administrations (OSHA) Hazardous Communication Standard, Title 29, Code of Federal Regulation (CFR) Part 1910.1200. The Contractor shall ensure containers of hazardous chemicals are labeled with the following information, prior to shipping to Tinker AFB IAW OSHA Hazardous Communication Standard, Title 29, CFR Part 1910.1200 http://www.e-publishing.af.mil/

(2012): product identifier; signal word; hazard statement(s); precautionary statement(s);

pictogram(s); and name, address and telephone number of the chemical manufacturer, importer, or other responsible party. The GPOC will forward all SDS submittals to 72 ABW/CEIE for approval. A current manufacturer SDS shall be submitted to the GPOC if the Contractor changes manufacturer or vendor for any chemicals that were prior approved. The Contractor shall maintain copies of manufacturer SDSs for all chemicals and SDSs shall be readily accessible at all times by Contractor personnel as well as government employees.

1.25 Hazardous Waste: If no HAZWASTE will be generated during performance of this contract, the Contractor shall certify “NO Hazardous Waste Generation” by official correspondence. This Certification shall be provided to the GPOC within ten (10) business days after award. After the GPOC receives the “No Hazardous Waste Generation” Certification, the requirements of this section no longer apply. Appropriate penalties for the Contractor shall be assessed if found in violation of the above Certification.

1.25.1 The Contractor shall dispose of contaminated solid waste, spent or processed chemical solutions, used rags and hazardous waste in government furnished waste containers located in the shop or area the work is being performed. The Contractor shall notify the GPOC if the required waste containers are not available on site.

1.26 Discharges: Any discharges into Tinker’s industrial waste treatment plant (IWTP) or sanitary sewer shall be approved and done IAW Tinker Industrial Wastewater Discharge Permit as instructed by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). Notice of intent documentation shall be provided to the GPOC within ten (10) days after award. The GPOC will submit the required notice of intent documentation to the UEC for 72 ABW/CEIE approval. The Contractor shall not discharge into IWTP and sanitary sewer prior to approval issued by 72 ABW/CEIE. The Contractor shall maintain records of written approval issued by 72 ABW/CEIE for discharges into IWTP and sanitary sewer.

1.27 Off-Site Discharges: For discharges outside of Tinker AFB, the Contractor shall ensure wastewater discharges, that may contain pollutants resulting from any contracted service, go to a state or federal permitted treatment facility such as a municipal Publicly Owned Treatment Works (POTW). The Contractor shall provide official correspondence ten (10) calendar days after contract award date to the GPOC from the POTW that states the POTW is permitted for all pollutants that the Contractor may discharge during the contracted service.

1.28 Spills: Upon occurrence of any spill that could enter the storm system or cause any harmful environment effects, the Contractor shall immediately call 911 to report the incident. When possible, the Contractor shall use a base telephone to receive help from Tinker AFB 911. If using a cell phone, the Contractor shall request Tinker AFB 911. The Contractor shall immediately report all environmental violations to the GPOC and UEC. The Contractor shall provide five (5) copies of a typed or written report about the incident within four (4) clock hours as follows:

1.28.1 One (1) copy to CO, two (2) copies to the GPOC, a copy for UEC and one (1) copy for record. The format of the report shall be left up to the Contractor, but the report shall contain the following information:

1.) Name and contact number of person reporting the spill 2.) Date and time of incident 3.) Location and source of spill 4.) Substance or pollutant spilled 5.) Amount spilled and rate of discharge 6.) Any damages or injuries involved 7.) Extent of area impacted 8.) Potential hazards 9.) Actions taken 10.) Organizations contacted 11.) Remarks Section - that addresses the cause of the spill (e.g. human error, equipment, etc.) and whether 911 was called and which agencies responded.

1.29 Environmental Training: Upon GPOC receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply.

1.29.1 Contractor personnel performing duties in the service of this PWS shall have training that acquaints the person with the details of Resource Conservation Recovery Act (RCRA) regulations in 40 CFR 260 through 279; applicable State Laws and regulations; DoD, Air Force and local requirements. This training can be obtained through creditable training institutions or companies. All training shall be approved by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). RCRA training is available at http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm;

http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000 and http://www.lion.com/Storing-Hazardous-Waste-for-LQGs at the Contractor’s expense. Prior to obtaining training, the Contractor shall provide the name of the training institution or company and course description to the GPOC for approval within ten (10) calendar days after contract award date. Once written approval is received from the GPOC, the Contractor shall provide the environmental training certificates for employees performing duties in the service of this PWS to the GPOC, within thirty (30) calendar days after contract award date. In addition to the required environmental training, Contractors shall be compliant with Tinker AFB procedures per TAFB HWMP, “Hazardous Waste Management”.

1.30 Forms, Technical Orders (T.O.), AFI, Air Force Material Command Instructions (AFMCI), and Publications: The Contractor shall obtain the forms and publications expressly required to perform the work in this contract via the internet at www.e-publishing.af.mil. In the event a form or publication is not available online, the GPOC will provide the form, instruction, or publication to the Contractor upon the Contractor’s written request (e-mail is acceptable). In the event, laws, regulations, T.O.’s, AFI’s, or AFMCI’s change during the term of this contract, the Contractor shall be required to comply as the changes come into effect. Contractors delivering or handling official United States Air Force (USAF) records shall comply with the applicable records management regulations in in accordance with AFI 33-322, Records Management and Information Governance Program, as modified by AFI 33-322_DAFGM2025-01.

1.31 OC-ALC Security and OPSEC briefing: All Contractor personnel working on base in the OC-ALC shall be required to read the OC-ALC Security and OPSEC briefings. The GPOC will ensure the Security and OPSEC briefings are available for review by the Contractor. The http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000 http://www.lion.com/Storing-Hazardous-Waste-for-LQGs http://www.e-publishing.af.mil/

Contractor shall provide the GPOC with a report within five (5) business days after receiving the briefings. The report shall contain the employee’s name and the date of review. These requirements are IAW DoDM 5200.01_AFMAN 16-1404 (Volumes 1-3), “Information Security Program”, DoDI 5220.22 “National Industrial Security Program (NISP)”, Section 9, Paragraph 9.2(6).; DAFI 10-701, “Operations Security”, Chapter 4, Paragraph 4.4. and OC-ALC 16-1404, “OC-ALC Security”, Paragraph 7.

1.31.1 The original contract sponsor will ensure delivery personnel are made aware that any photography or videography are not allowed on Tinker Air Force Base or its associated areas. Additionally, the disclosure (sharing) of any Department of Defense information, obtained from or while on Tinker Air Force Base, is unauthorized. Unauthorized disclosure can lead to severe penalties, including fines, imprisonment, and administrative action.

1.32 Housekeeping: The Contractor shall keep the work areas clean and neat IAW industry standards, OSHA, fire and safety standards, and this PWS.

1.33 Foreign Object Damage (FOD) and Dropped Object Prevention: Contractor personnel who work in or travel though areas near operational and production aircraft, engines, munitions, missiles, drones, space systems, support equipment, Aerospace Ground Equipment (AGE), trainers, and the Contactor personnel operating vehicles and equipment on flight lines, runways, taxiways, parking ramps, and in aircraft hangers and maintenance areas are required to receive the FOD/DOP training and to comply with AFI 36-2650, AFMC Supplement 1, paragraph 9.2., and A4.4.4. (Initial)/A4.4.5. (Refresher). The Contractor and Contractor personnel shall acknowledge the FOD/DOP training by viewing the Digital Versatile Disc (DVD) provided by the GPOC.

1.33.1 The Contract Manager shall provide written certification to the GPOC for each employee prior to the employees starting work in the OC-ALC shops. The certification shall have the title of the training, the name of the person who received the training, and the date of the training. The Contractor shall also ensure all new employees view the FOD/DOP training and provide written certification of training to the GPOC prior to the employees starting work in the OC-ALC shops.

Every 36 Months, the Contractor and Contractor personnel shall be required to review the FOD/DOP training and to provide written certification to the GPOC.

1.34 Tool Control and Accountability: While performing contract services in or around Maintenance Production Shops, which includes ramp areas, the Contractor shall comply with DAFI 21-101_Aircraft and Equipment Maintenance Managment, Chapter 8 (Tool and Equipment Management) including its corresponding AFMC Supplement; OC_ALCI 21-112, paragraphs

14.1 and 14.5.3. The Contractor shall provide the completed Tool Sheet Accountablity prior to performing work in the OC-ALC industrial areas. The Tool Sheet Accountability is available from the GPOC. The Contractor shall provide a Contractor Tool Listing, to the GPOC within five (5) business days after Annual Inspections, Re-Certifications, and (Over and Above) Repair Service actions. The Contractor or Contractor’s personnel shall inventory the container or bag of tools at the beginning of each work day and at the end of each workday. The Contractor personnel shall immediately notify the GPOC of any tools that are missing or lost from the work area or container (e.g. tool or job box or tool bag). The GPOC will report any missing Contractor’s tools which have not been located within one (1) hour after notification to the appropriate Government personnel. The Contractor shall obtain the Tool Control Accountability from the GPOC. The CM shall ensure each employee on the job site receives a briefing from the GPOC about Housekeeping, FOD/DOP, and Tool Control prior to starting work in OC-ALC Industrial Areas.

1.35 Privately Owned Motor Vehicles (POV): Contractor Contractor’s personnel shall comply with the directives pertaining to the operation of POVs on Tinker AFB, per DAFMAN 31-116, in its entirety, “Motor Vehicle Traffic Supervision”. The Contractor shall comply with Tinker AFBI 24- 302, in its entirety for the operation of POVs within Tinker AFB.

1.36 Required Initial and Refresher Courses for On-Base Driver’s Training: (SS) The Contractor and all Contractor employees shall take and pass the on-base Driver’s Training Course before driving on or in the Ramp areas. The Contractor shall contact the GPOC to schedule training. On an annual basis, the Contractor shall take the refresher on-base Driver’s Training Course. The Contractor shall submit each employee’s on-base Driver’s Training Course certificates to the GPOC upon completion of the initial or refresher courses.

1.37 FOD Training for Vehicle Operations: Vehicle operators shall complete all FOD awareness and prevention training, as well as testing requirements, before driving any vehicle on the flight line. The Contractor shall comply with DAFI 13-213_TINKERAFBSUP a10.4.1 & 2.16.4.

a) A10.4.1 - Airfield entry points. Entry points are marked with warning signs stating you are entering the airfield. Only government or POV/contractor owned/government leased vehicles with an airfield or ramp pass are authorized on the airfield. A FOD checkpoint is located at each airfield entry point.

b) 2.16.4 - Contractors. In accordance with DAFMAN 91-203, it is the responsibility of the Contracting Division to ensure contractors understand and comply with the airfield driving program and base personnel security access requirements. Additionally, they will inform AM and 72 SFS of contractors who will have a requirement to drive on the airfield.

No contractor is authorized to drive on Tinker airfield until properly trained and access granted. This requirement must be written in contract agreements.

1.38 Visitors Pass: The Contractor shall contact the GPOC seven (7) business days before arriving on Tinker AFB in order to make arrangements for Visitors Passes. The GPOC will assign a sponsor for the Contractor from within the organization. The Contractor and the sponsor shall arrange to meet at Pass and Registration. The GPOC will provide the address of Pass and Registration and all further instructions for obtaining the required credentials to come on Tinker

AFB.

1.39 Foreign Nationals: The Contractor shall notify the GPOC before sending a Foreign National representative to perform services. Special rules apply for foreign nationals visiting a US Government facility.

1.40 ISO 50001 – Energy Management System. The OC-ALC is certified to ISO 50001 Energy Management Systems. All contractors are subject to the Energy Management System (EnMS) requirements and shall abide by certification guidelines whenever applicable.

a) EnMS Training. All Contractors servicing OC-ALC facilities, systems, and equipment at Tinker AFB shall complete Air Force provided initial EnMS Training. It is the responsibility of the Prime Contractor to ensure that all sub-contractors, vendors, and employees complete this training prior to beginning work on Tinker AFB.

b) The Contractor shall complete the required training and provide the completion notification to the GPOC within five (5) business days of contract award or before arriving on base.

1.41 Safety and Health on Government Installations: While performing work under this contract on a Government installation, the Contractor shall comply with federal, state and local regulations, and DAFMAN 91-203, “Air Force Manual”, as established by this contract and Appendix C. The Contractor shall notify the CO, GPOC, and Government Contract Administrator (CA) within one (1) business day of any injuries that occur to contractor personnel while they are on the installation. The Contractor shall notify the CO, GPOC, and Government CA within one (1) business day of damage to Government property or equipment during the execution of the contract.

1.42 Communicating Hazards Of Workplace (CHOW): Contractor’s onsite representative communicates all hazards being introduced to the worksite by the Contractor. This is accomplished prior to commencement of work and refreshed daily during performance, IAW Contractor’s Site Safety Plan.

1.43 Safety and Health Plan: The Contractor shall be responsible for compliance with the OSHA Public Law 91-596. The Contractor shall submit a Safety and Health Plan (SHP) and corresponding site safety checklist to the CO and the GPOC (see Appendix C).

1.44 Combating Trafficking in Persons: IAW DFARS PGI 222.17, the GPOC shall pursue, as appropriate, the following methods of monitoring the Contractor’s performance regarding trafficking in persons such that non-compliances with FAR clause 52.222-50 are brought to the immediate attention of the Contracting Officer:

a. Keep the lines of communication open with the Contractor. At the Post-Award conference, remind the Contractor of his contractual responsibilities to notify the government if the Contractor receives notification of any alleged violations to this policy or if actions have been taken against the Contractor employees, subcontractor’s or subcontractor employees pursuant to the clause.

b. When appropriate, encourage Contractor to complete Human Trafficking Awareness Training.

c. Encourage the Contractor to take steps to investigate and eliminate slavery and human trafficking in their supply chains and to publish information for consumer awareness.

d. Periodically access the Department of State’s Trafficking in Person (TIP) website for updates and to view the latest reports. http://www.state.gov/g/tip

1.45 Speak Up for Safety: Safety surety is an integral part of our overall goal of establishing a world class safety and health program. Our “Speak Out for Safety” initiative ensures a partnership with contractors and government employees to further enhance safety to ensure we are looking out for all our partners and empowers all employees to actively participate in each other’s safety.

http://www.state.gov/g/tip

1.45.1 A safe workplace is everyone's business. As part of the contract team, military, civilian and contractor personnel are empowered to Speak Out for Safety (S.O.S.) when they observe an unsafe act.

1.45.2 Government personnel are empowered to intercede in events that pose imminent danger to personnel or catastrophic damage to property.

1.46 Emergency Procedures: The Contractor personnel shall follow the direction of the Government personnel with regard to emergency procedures, such as fire, tornado, active shooter, bomb threats, or other emergency. It is the responsibility of the Contractor to provide guidance and to establish procedures for its employees to respond to an emergency. It is the Contractor’s responsibility to account for their employees following an emergency evacuation. The Contractor personnel shall participate with the Government personnel in all fire and tornado drills at no additional cost to the Government.

1.47 Training – General (including but not limited to): The Government GPOC will provide training via slides, video, or classroom prior to the Contractor performing work at the OC-ALC.

The Government will be responsible for all approved costs associated with the training identified below. The GPOC will document training on and maintain copies of the completed AF IMT 2426, Training Attendance and Rating, as part of the contract surveillance file. The Government will add or remove training as required per Air Force Regulation.

1.47.1 The Contractor shall contact the GPOC prior to work being performed in order to accomplish the required training or to verify the required training as listed below has been completed:

Contractor Required Courses Course Number FOD and DOP Awareness Training Course Initial CHPMAS0000400SU AFMC FOD and DOP Awareness Training Refresher CHPMAS0001301CB Initial Fire Safety and Prevention Training CTESAF0000100SU Refresher Fire Safety and Prevention Training, Computer Based Training (CBT)

CTEMAS0002900CB

OC-ALC Environmental Accountability/Solid Waste Training, CBT MTEMAS9713800BR OC-ALC Human Factors Training, CBT MTEPDV9775100BR Environmental Management Systems (EMS) - General Awareness Training MTEENV9733070BR

OPSEC briefing ISO 50001 – Energy Management Training Records Management - User Training MLMW0188 Controlled Unclassified Information (CUI) Training_2022BG ZZZ2021CUI OC-ALC/OB Initial Workplace Specific FOD/DOP Briefing MTEMAS0002011BR Lockout/Tagout Initial and Refresher Course for Affected Personnel, CBT

CTEMAS0003001CB

Lockout/Tagout Initial Course TE00141 Lockout/Tagout Refresher Course for Authorized Personnel, CBT CTEMAS0003000CB

Contractor Initial Airfield Driving Block Training Course (OC-ALC Contractors Only)

C03530C

Airfield Driving Annual Refresher, CBT C03530 Contractor Airfield Driving Annual Refresher (OC-ALC Contractors Only)

C03530CR

Flightline Drivers Training Initial Course MTEMAS0000135SU Flightline Renewal Briefing MTEMAS0006135JT Airfield Driver Competency Card Initial/Annual Training Update MTESAT0006134JT Controlled Area Training MTEMAS9712900BR

Section Two Reserved

SECTION THREE

3.…