Annual Fall Protection Inspection -Appendix A.pdf
PDF 212 KB Posted
- Attached to
- Fall Protection Annual Inspection
- Solicitation number
- FA812527Q0015
About this file
This document is Appendix A to an Annual Fall Protection Contract, containing a comprehensive list of 249 fall protection systems across multiple facilities scheduled for inspection during fiscal years 2027 through 2031. The systems are located at 22 different facilities (designated A through V) and include various configurations of Self-Retracting Lifelines (SRLs), rigid rails, flexible rails, cables, single point anchors, fall arrest trolleys, and Aerial Work Platforms (AWPs). Each line item specifies the facility identifier, dock or hangar location, detailed description of fall protection equipment attached to aircraft structural members (wings, fuselage, tail sections, and noses), and the unit of issue (each). The table structure tracks inspection quantities across five contract periods: Base Year (FY27), Option Year 1 (FY28), Option Year 2 (FY29), Option Year 3 (FY30), and Option Year 4 (FY31).
The contract contemplates a phased implementation approach, with Facilities A through R and portions of Facilities N, O, P, and Q showing full quantities of one unit per fiscal year for all five contract periods. Facilities I and S mark systems as "Not Ready" for the base year and earlier option years, indicating delayed availability. Facilities T through V similarly show progressive "Not Ready" designations in earlier years, with Facility U beginning inspections in FY30 and Facilities T, U, and V not becoming inspection-ready until FY31. This staging pattern suggests a production or preparation schedule where fall protection systems will be brought online at different times across the contractor's facilities. The document serves as the definitive list for scheduling inspection services over the five-year contract term.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
To be used with Annual Fall Protection Contract
Item
Facility Identifier
Description & Special Characteristics Unit of Issue
System Will Be Inspected in
FY27
Base Year
QTY
System Will Be Inspected in
FY28
Option Year 1
QTY
System Will Be Inspected in
FY29
Option Year 2
QTY
System Will Be Inspected in
FY30
Option Year 3
QTY
System Will Be Inspected in
FY31
Option Year 4
QTY
1 Facility A Dock 1 (NE Building Section) – Right Wing – 2 SRLs attached to ceiling structural members EA 1 1 1 1 1
2 Facility A Dock 1 (NE Building Section) – Left Wing – 2 SRLs attached to ceiling structural members EA 1 1 1 1 1
3 Facility A Dock 1 (NE Building Section) – Tail – 1 SRLs attached to ceiling structural members EA 1 1 1 1 1
4 Facility A Dock 2 (NE Building Section) – Right Wing – 2 SRLs attached to ceiling structural members EA 1 1 1 1 1
5 Facility A Dock 2 (NE Building Section) – Left Wing – 2 SRLs attached to ceiling structural members EA 1 1 1 1 1
6 Facility A Dock 2 (NE Building Section) – Tail – 1 SRLs attached to ceiling structural members EA 1 1 1 1 1
7 Facility A Dock 3 (SW Building Section) – Right Wing – 2 SRLs attached to ceiling structural members EA 1 1 1 1 1
8 Facility A Dock 3 (SW Building Section) – Left Wing – 2 SRLs attached to ceiling structural members EA 1 1 1 1 1
9 Facility A Dock 3 (SW Building Section) – Tail – 1 SRLs attached to ceiling structural members EA 1 1 1 1 1
10 Facility A Dock 4 (SW Building Section) – Right Wing – 2 SRLs attached to ceiling structural members EA 1 1 1 1 1
11 Facility A Dock 4 (SW Building Section) – Fuselage – 1 SRL attached to ceiling structural members EA 1 1 1 1 1
12 Facility A Dock 4 (SW Building Section) – Left Wing – 2 SRLs attached to ceiling structural members EA 1 1 1 1 1
13 Facility A Dock 4 (SW Building Section) – Tail – 1 SRLs attached to ceiling structural members EA 1 1 1 1 1
14 Facility B East Dock – Right Wing – Rigid rail with 6 SRLs EA 2 1 1 1 1
15 Facility B East Dock – Fuselage – Rigid rail with 6 SRLs EA 2 1 1 1 1
16 Facility B East Dock – Left Wing – Rigid rail with 6 SRLs EA 2 1 1 1 1
17 Facility B East Dock – Ladders – 1 fall arrest trolley and rail EA 2 1 1 1 1
18 Facility B West Dock – Right Wing – Rigid rail with 6 SRLs EA 2 1 1 1 1
19 Facility B West Dock – Fuselage – Rigid rail with 6 SRLs EA 2 1 1 1 1
20 Facility B West Dock – Left Wing – Rigid rail with 6 SRLs EA 2 1 1 1 1
21 Facility B West Dock – Ladders – 1 fall arrest trolley and rail EA 2 1 1 1 1
22 Facility C Dock 1 (SW) – Right Wing – 3 Wing Fall Protection Rigid Rails; Main Wing Rigid Rail → 4 SRLs;
Inboard Engine Wing Rigid Rail → 2 SRLs; Outboard Engine Wing Rigid Rail → 2 SRLs
EA 1 1 1 1 1
23 Facility C Dock 1 (SW) – Fuselage – Double Cable → 4 SRLs EA 1 1 1 1 1
24 Facility C Dock 1 (SW) – Left Wing – 3 Wing Fall Protection Rigid Rails; Main Wing Rigid Rail → 4 SRLs;
Inboard Engine Wing Rigid Rail → 2 SRLs; Outboard Engine Wing Rigid Rail → 2 SRLs
EA 1 1 1 1 1
APPENDIX A - LIST OF FALL PROTECTION SYSTEMS 27 OCTOBER
25 Facility C Dock 1 (SW) – Tail – 2 Single Point Anchors for Right and Left Verticals Respectively; Right Horizontal → 1 Single Point Anchor → 1 SRL; Left Horizontal → 1 Single Point Anchor → 1 SRL
EA 1 1 1 1 1
26 Facility C Dock 2 (S-Center) – Right Wing – 3 Wing Fall Protection Rigid Rails; Main Wing Rigid Rail → 4 SRLs; Inboard Engine Wing Rigid Rail → 2 SRLs; Outboard Engine Wing Rigid Rail → 2 SRLs
EA 1 1 1 1 1
27 Facility C Dock 2 (S-Center) – Fuselage – Double Cable → 4 SRLs EA 1 1 1 1 1
28 Facility C Dock 2 (S-Center) – Left Wing – 3 Wing Fall Protection Rigid Rails; Main Wing Rigid Rail → 4 SRLs;
Inboard Engine Wing Rigid Rail → 2 SRLs; Outboard Engine Wing Rigid Rail → 2 SRLs
EA 1 1 1 1 1
29 Facility C Dock 2 (S-Center) – Tail – 2 Single Point Anchors for Right and Left Verticals Respectively; Right Horizontal → 1 Single Point Anchor → 1 SRL; Left Horizontal → 1 Single Point Anchor → 1 SRL
EA 1 1 1 1 1
30 Facility C Dock 3 (SE) – Right Wing – 3 Wing Fall Protection Rigid Rails; Main Wing Rigid Rail → 4 SRLs;
Inboard Engine Wing Rigid Rail → 2 SRLs; Outboard Engine Wing Rigid Rail → 2 SRLs
EA 1 1 1 1 1
31 Facility C Dock 3 (SE) – Fuselage – Double Cable → 4 SRLs EA 1 1 1 1 1
32 Facility C Dock 3 (SE) – Left Wing – 3 Wing Fall Protection Rigid Rails; Main Wing Rigid Rail → 4 SRLs;
Inboard Engine Wing Rigid Rail → 2 SRLs; Outboard Engine Wing Rigid Rail → 2 SRLs
EA 1 1 1 1 1
33 Facility C Dock 3 (SE) – Tail – 2 Single Point Anchors for Right and Left Verticals Respectively; Right Horizontal → 1 Single Point Anchor → 1 SRL; Left Horizontal → 1 Single Point Anchor → 1 SRL
EA 1 1 1 1 1
34 Facility C Dock 4 (NW) – Right Wing – 3 Wing Fall Protection Rigid Rails; Main Wing Rigid Rail 4 SRLs;
Inboard Engine Wing Rigid Rail 2 SRLs; Outboard Engine Wing Rigid Rail 2 SRLs
EA 1 1 1 1 1
35 Facility C Dock 4 (NW) – Fuselage – Double Cable 4 SRLs EA 1 1 1 1 1
36 Facility C Dock 4 (NW) – Left Wing – 3 Wing Fall Protection Rigid Rails; Main Wing Rigid Rail 4 SRLs;
Inboard Engine Wing Rigid Rail 2 SRLs; Outboard Engine Wing Rigid Rail 2 SRLs
EA 1 1 1 1 1
37 Facility C Dock 4 (NW) – Tail – 2 Single Point Anchors for Right and Left Verticals Respectively; Right Horizontal 1 Single Point Anchor 1 SRL; Left Horizontal 1 Single Point Anchor 1 SRL
EA 1 1 1 1 1
38 Facility C Dock 5 (N-Center) – Right Wing – 3 Wing Fall Protection Rigid Rails; Main Wing Rigid Rail 2 SRLs (Trolley present for 3rd & 4th SRL); Inboard Engine Wing Rigid Rail 2 SRLs; Outboard Engine Wing Rigid Rail 2 SRLs
EA 1 1 1 1 1
39 Facility C Dock 5 (N-Center) – Fuselage – Single Cable 4 SRLs EA 1 1 1 1 1
40 Facility C Dock 5 (N-Center) – Left Wing – 3 Wing Fall Protection Rigid Rails; Main Wing Rigid Rail 4 SRLs;
Inboard Engine Wing Rigid Rail 2 SRLs; Outboard Engine Wing Rigid Rail 2 SRLs
EA 1 1 1 1 1
41 Facility C Dock 5 (N-Center) – Tail – 2 Single Point Anchors for Right and Left Verticals Respectively; Right Horizontal 1 Single Point Anchor → 1 SRL; Left Horizontal 1 Single Point Anchor 1 SRL
EA 1 1 1 1 1
42 Facility C Dock 6 (NE) – Right Wing – 3 Wing Fall Protection Rigid Rails; Main Wing Rigid Rail 3 SRLs (Trolley for 4th SRL is present.); Inboard Engine Wing Rigid Rail 2 SRLs; Outboard Engine Wing Rigid Rail 2 SRLs
EA 1 1 1 1 1
43 Facility C Dock 6 (NE) – Fuselage – Double Cable 4 SRLs EA 1 1 1 1 1
44 Facility C Dock 6 (NE) – Left Wing – 3 Wing Fall Protection Rigid Rails; Main Wing Rigid Rail 4 SRLs; Inboard Engine Wing Rigid Rail 2 SRLs; Outboard Engine Wing Rigid Rail 2 SRLs
EA 1 1 1 1 1
45 Facility C Dock 6 (NE) – Tail – 2 Single Point Anchors for Right and Left Verticals Respectively; Right Horizontal 1 Single Point Anchor → 1 SRL; Left Horizontal 1 Single Point Anchor 1 SRL
EA 1 1 1 1 1
46 Facility C Other – 6 Single Point Anchors at the following locations: Post 4, within Dock 1; Post 11, between Docks 1 & 2; Post 17, between Docks 3 & 4; Post 20, within Docks 3; Post 16, between Docks 5 & 6; Post 17, between Docks 5 & 6
EA 1 1 1 1 1
47 Facility D Dock 1 (NW) – Right Wing – 1 Wing Fall Protection Rigid Rail; Wing Rigid Rail 3 SRLs EA 1 1 1 1 1
48 Facility D Dock 1 (NW) – Fuselage – Rigid Rail 4 SRLs EA 1 1 1 1 1
49 Facility D Dock 1 (NW) – Left Wing – 1 Wing Fall Protection Rigid Rail; Wing Rigid Rail 3 SRLs EA 1 1 1 1 1
50 Facility D Dock 1 (NW) – Tail – 2 Single Point Anchors 2 SRLs EA 1 1 1 1 1
51 Facility D Dock 2 (N- West Center) – Right Wing – 1 Wing Fall Protection Rigid Rail; Wing Rigid Rail 3 SRLs EA 1 1 1 1 1
52 Facility D Dock 2 (N- West Center) – Fuselage – Rigid Rail 4 SRLs EA 1 1 1 1 1
53 Facility D Dock 2 (N- West Center) – Left Wing – 1 Wing Fall Protection Rigid Rail; Wing Rigid Rail 3 SRLs; 1 SRL (Post 33)
EA 1 1 1 1 1
54 Facility D Dock 2 (N- West Center) – Tail – 1 Single Point Anchor EA 1 1 1 1 1
55 Facility D Dock 3 (N- East Center) – Right Wing – 1 Wing Fall Protection Rigid Rail; Wing Rigid Rail 3 SRLs EA 1 1 1 1 1
56 Facility D Dock 3 (N- East Center) – Fuselage – Rigid Rail 4 SRLs EA 1 1 1 1 1
57 Facility D Dock 3 (N- East Center) – Left Wing – 1 Wing Fall Protection Rigid Rail; Wing Rigid Rail 3 SRLs; 1 SRL (Post 39)
EA 1 1 1 1 1
58 Facility D Dock 3 (N- East Center) – Tail – 1 Single Point Anchor EA 1 1 1 1 1
59 Facility D Dock 4 (NE) – Right Wing – 1 Wing Fall Protection Rigid Rail; Wing Rigid Rail 2 SRLs (3rd trolley is present)
EA 1 1 1 1 1
60 Facility D Dock 4 (NE) – Fuselage – Rigid Rail 4 SRLs EA 1 1 1 1 1
61 Facility D Dock 4 (NE) – Left Wing – 1 Wing Fall Protection Rigid Rail; Wing Rigid Rail 3 SRLs; 1 SRL (Located between Posts 45 and 46)
EA 1 1 1 1 1
62 Facility D Dock 4 (NE) – Tail – 1 Single Point Anchor EA 1 1 1 1 1
63 Facility D S-Center Dock – Right Wing – 1 Wing Fall Protection Rigid Rail; Wing Rigid Twin Track Flexrail → 6 SRLs (3 SRLs per track)
EA 1 1 1 1 1
64 Facility D Building 2122 – S-Center Dock – Fuselage – 1 Fall Protection Rigid Rails; Rigid Twin Track Flexrail 8 SRLs (4 SRLs per track)
EA 1 1 1 1 1
65 Facility D Building 2122 – S-Center Dock – Left Wing – 1 Wing Fall Protection Rigid Rail; Wing Rigid Twin Track Flexrail → 6 SRLs (3 SRLs per track)
EA 1 1 1 1 1
66 Facility D S-Center Dock – Other – 3 Single Point Anchors (NW Dock Section, near Post 35) EA 1 1 1 1 1
67 Facility D SE Dock – Right Wing – 2 Wing Fall Protection Rigid Rails; Wing Rigid Rail (E) 4 SRLs; Wing Rigid Rail (W) 5 SRLs
EA 1 1 1 1 1
68 Facility D SE Dock – Fuselage – 1 Fall Protection Rigid Rail Rigid Rail 4 SRLs EA 1 1 1 1 1
69 Facility D SE Dock – Left Wing – 2 Wing Fall Protection Rigid Rails; Wing Rigid Rail (E) 4 SRLs; Wing Rigid Rail (W) 5 SRLs
EA 1 1 1 1 1
70 Facility D SE Dock – Tail – 2 Single Point Anchors for Right and Left Verticals Respectively; Right Horizontal 1 Single Point Anchor → 1 SRL; Left Horizontal 1 Single Point Anchor 1 SRL
EA 1 1 1 1 1
71 Facility D SW Dock – Nose – 3 Single Point Anchors (Other Aircraft excluding B-52) 3 SRLs EA 1 1 1 1 1
72 Facility D SW Dock – Right Wing – 2 Wing Fall Protection Rigid Rails; Wing Rigid Twin Track Flexrail (B-52) → 6 SRLs (3 SRLs per track); Wing Rigid Twin Track Flexrail (Other Aircraft excluding B-52) → 6 SRLs (3 SRLs per track)
EA 1 1 1 1 1
73 Facility D SW Dock – Fuselage – 2 Fall Protection Rigid Rails; Rigid Twin Track Flexrail (B-52) 8 SRLs (4 SRLs per track); Rigid Twin Track Flexrail (Other Aircraft excluding B-52) → 8 SRLs (4 SRLs per track)
EA 1 1 1 1 1
74 Facility D SW Dock – Left Wing – 2 Wing Fall Protection Rigid Rails; Wing Rigid Twin Track Flexrail (B-52) → 6 SRLs (3 SRLs per track); Wing Rigid Twin Track Flexrail (Other Aircraft excluding B-52) → 6 SRLs (3 SRLs per track)
EA 1 1 1 1 1
75 Facility D SW Dock – Tail – 1 Fall Protection Rigid Rail (B-52) EA 1 1 1 1 1
76 Facility E North Dock – Aircraft Right Wing Side – Total of four Rigid Rails; Two Rigid Rails for KC-10 (North Rails), each equipped with 3 SRLs, total 6 SRLs; Two Rigid Rails for all other aircraft except KC- 10 (South Rails), each equipped with 3 SRLs, total 6 SRLs
EA 1 1 1 1 1
77 Facility E North Dock – Aircraft Fuselage Section – 1 Rigid Rail equipped with 4 SRLs EA 1 1 1 1 1
78 Facility E North Dock – Aircraft Left Wing Side – Total of four Rigid Rails; Two Rigid Rails for KC-10 (North Rails), each equipped with 3 SRLs, total 6 SRLs; Two Rigid Rails for all other aircraft except KC- 10 (South Rails), each equipped with 3 SRLs, total 6 SRLs
EA 1 1 1 1 1
79 Facility E North Dock – Other – Four Aerial Work Platforms (AWPs) EA 1 1 1 1 1
80 Facility E North Dock – Other – 2 Single Point Anchors at the following locations: South of Left Wing Side Rigid Rails; South of Right Wing Side Rigid Rails
EA 1 1 1 1 1
81 Facility E South Dock – Aircraft Right Wing Side – Total of Two Rigid Rails; Each Rigid Rail equipped with 3 SRLs; Total of 6 SRLs
EA 1 1 1 1 1
82 Facility E South Dock – Aircraft Fuselage Section – 1 Rigid Rail equipped with 4 SRLs EA 1 1 1 1 1
83 Facility E South Dock – Aircraft Left Wing Side – Total of Two Rigid Rails; Each Rigid Rail equipped with 3 SRLs; Total of 6 SRLs
EA 1 1 1 1 1
84 Facility E South Dock – Other – Four Aerial Work Platforms (AWPs) EA 1 1 1 1 1
85 Facility F North Dock – Right Wing – 3 SRLs attached to ceiling structural members EA 1 1 1 1 1
86 Facility F North Dock – Fuselage – 5 SRLs attached to ceiling structural members EA 1 1 1 1 1
87 Facility F North Dock – Left Wing – 3 SRLs attached to ceiling structural members EA 1 1 1 1 1
88 Facility F South Dock / North Section – Right Wing – 3 SRLs attached to ceiling structural members EA 1 1 1 1 1
89 Facility F South Dock / North Section – Fuselage – 5 SRLs attached to ceiling structural members EA 1 1 1 1 1
90 Facility F South Dock / North Section – Left Wing – 3 SRLs attached to ceiling structural members EA 1 1 1 1 1
91 Facility F South Dock / Middle Section – Right Wing – 3 SRLs attached to ceiling structural members EA 1 1 1 1 1
92 Facility F South Dock / Middle Section – Fuselage – 5 SRLs attached to ceiling structural members EA 1 1 1 1 1
93 Facility F South Dock / Middle Section – Left Wing – 3 SRLs attached to ceiling structural members EA 1 1 1 1 1
94 Facility F South Dock / South Section – Right Wing – 3 SRLs attached to ceiling structural members EA 1 1 1 1 1
95 Facility F South Dock / South Section – Fuselage – 5 SRLs attached to ceiling structural members EA 1 1 1 1 1
96 Facility F South Dock / South Section – Left Wing – 3 SRLs attached to ceiling structural members EA 1 1 1 1 1
97 Facility G Hanger #1 - South Dock – Other – 10 Single Point Anchors with SRLs at various locations EA 1 1 1 1 1
98 Facility G Hanger #1 - South Dock – Fuselage – 2 Fall Protection Rigid Rails; Rigid Twin Track Flexrail → 4 SRLs per track
EA 1 1 1 1 1
99 Facility G Hanger #2 - North Dock – Other – 10 Single Point Anchors with SRLs at various locations EA 1 1 1 1 1
100 Facility G Hanger #2 - North Dock – Fuselage – 2 Fall Protection Rigid Rails; Rigid Twin Track Flexrail → 4 SRLs per track
EA 1 1 1 1 1
101 Facility H Hanger #3 – Right Wing – 1 SRL EA 1 1 1 1 1
102 Facility H Hanger #3 – Fuselage – 2 SRLs EA 1 1 1 1 1
103 Facility H Hanger #3 – Left Wing – 1 SRL EA 1 1 1 1 1
104 Facility I Dock 1 – Right Wing – 3 Wing Fall Protection Rigid Rails; Main Wing Rigid Rail → 4 SRLs; Inboard Engine Wing Rigid Rail → 2 SRLs; Outboard Engine Wing Rigid Rail → 2 SRLs
EA Not Ready 1 1 1 1
105 Facility I Dock 1 – Fuselage – 2 Rigid Rails → 3 SRLs per rail EA Not Ready 1 1 1 1
106 Facility I Dock 1 – Left Wing – 3 Wing Fall Protection Rigid Rails EA Not Ready 1 1 1 1
107 Facility I Dock 1 – Tail – 2 Rigid Rails → 2 SRLs per rail EA Not Ready 1 1 1 1
108 Facility I Dock 2 – Right Wing – 3 Wing Fall Protection Rigid Rails; Main Wing Rigid Rail → 4 SRLs; Inboard Engine Wing Rigid Rail → 2 SRLs; Outboard Engine Wing Rigid Rail → 2 SRLs
EA Not Ready 1 1 1 1
109 Facility I Dock 2 – Fuselage – 2 Rigid Rails → 3 SRLs per rail EA Not Ready 1 1 1 1
110 Facility I Dock 2 – Left Wing – 3 Wing Fall Protection Rigid Rails EA Not Ready 1 1 1 1
111 Facility I Dock 2– Tail – 2 Rigid Rails → 2 SRLs per rail EA Not Ready 1 1 1 1
112 Facility I Dock 3 – Right Wing – 3 Wing Fall Protection Rigid Rails; Main Wing Rigid Rail → 4 SRLs; Inboard Engine Wing Rigid Rail → 2 SRLs; Outboard Engine Wing Rigid Rail → 2 SRLs
EA Not Ready 1 1 1 1
113 Facility I Dock 3 – Fuselage – 2 Rigid Rails → 3 SRLs per rail EA Not Ready 1 1 1 1
114 Facility I Dock 3 – Left Wing – 3 Wing Fall Protection Rigid Rails EA Not Ready 1 1 1 1
115 Facility I Dock 3– Tail – 2 Rigid Rails → 2 SRLs per rail EA Not Ready 1 1 1 1
116 Facility I Dock 4 – Right Wing – 3 Wing Fall Protection Rigid Rails; Main Wing Rigid Rail → 4 SRLs; Inboard Engine Wing Rigid Rail → 2 SRLs; Outboard Engine Wing Rigid Rail → 2 SRLs
EA Not Ready 1 1 1 1
117 Facility I Dock 4 – Fuselage – 2 Rigid Rails → 3 SRLs per rail EA Not Ready 1 1 1 1
118 Facility I Dock 4 – Left Wing – 3 Wing Fall Protection Rigid Rails EA Not Ready 1 1 1 1
119 Facility I Dock 4– Tail – 2 Rigid Rails → 2 SRLs per rail EA Not Ready 1 1 1 1
120 Facility J North Dock / North Section (Aircraft Nose Faces West) – Right Wing – 1 Wing Fall Protection Rigid Rail; Rigid Twin Track Flexrail → 4 SRLs
EA 1 1 1 1 1
121 Facility J North Dock / North Section (Aircraft Nose Faces West) – Fuselage – 1 Fall Protection Rigid Rail;
Rigid Twin Track Flexrail → 4 SRLs
EA 1 1 1 1 1
122 Facility J North Dock / North Section (Aircraft Nose Faces West) – Left Wing – 1 Wing Fall Protection Rigid Rail; Rigid Twin Track Flexrail → 4 SRLs
EA 1 1 1 1 1
123 Facility J North Dock / North Section (Aircraft Nose Faces West) – Tail – 1 Fall Protection Rigid Rail (SE of Dock); Rigid Twin Track Flexrails → 4 SRLs
EA 1 1 1 1 1
124 Facility J North Dock / South Section (Aircraft Nose Faces East) – Right Wing – 1 Wing Fall Protection Rigid Rail; Rigid Twin Track Flexrail 4 SRLs
EA 1 1 1 1 1
125 Facility J North Dock / South Section (Aircraft Nose Faces East) – Fuselage – 1 Fall Protection Rigid Rail;
Rigid Twin Track Flexrail 4 SRLs
EA 1 1 1 1 1
126 Facility J North Dock / South Section (Aircraft Nose Faces East) – Left Wing – 1 Wing Fall Protection Rigid Rail; Rigid Twin Track Flexrail 4 SRLs
EA 1 1 1 1 1
127 Facility J North Dock / South Section (Aircraft Nose Faces East) – Tail – 1 Fall Protection Rigid Rail (NW of Dock); Rigid Twin Track Flexrails 4 SRLs
EA 1 1 1 1 1
128 Facility J North Dock / South Section (Aircraft Nose Faces East) – Other – 1 Fall Protection Rigid Rail (mid-section of dock); Rigid Twin Track Flexrail (East-West Aligned) 4 SRLs
EA 1 1 1 1 1
129 Facility J Center Dock – Nose – 2 Fall Protection Rigid Rails (NE of Dock); Rigid Twin Track Flexrails 4 SRLs;
Rigid Twin Track Flexrails 4 SRLs
EA 1 1 1 1 1
130 Facility J Center Dock – Right Wing – 2 Wing Fall Protection Rigid Rails; Wing Rigid Twin Track Flexrail (North-South Aligned) 4 SRLs; Wing Rigid Twin Track Flexrail (East-West Aligned) 4 SRLs
EA 1 1 1 1 1
131 Facility J Center Dock – Fuselage – 1 Fall Protection Rigid Rail; Rigid Twin Track Flexrail 4 SRLs EA 1 1 1 1 1
132 Facility J Center Dock – Left Wing – 2 Wing Fall Protection Rigid Rails; Wing Rigid Twin Track Flexrail (North- South Aligned) 4 SRLs; Wing Rigid Twin Track Flexrail (East-West Aligned) 4 SRLs
EA 1 1 1 1 1
133 Facility J Center Dock – Tail – 1 Fall Protection Rigid Rail (SW of Dock); Rigid Twin Track Flexrails → 4 SRLs EA 1 1 1 1 1
134 Facility J Center Dock – Other – 1 Fall Protection Rigid Rail (SE of Dock); Rigid Twin Track Flexrail (North- South Aligned) (SE of Dock) 4 SRLs
EA 1 1 1 1 1
135 Facility J South Dock – Right Wing – 2 Wing Fall Protection Rigid Rails; Wing Rigid Twin Track Flexrail (North-South Aligned) 4 SRLs; Wing Rigid Twin Track Flexrail (East-West Aligned) → 4 SRLs
EA 1 1 1 1 1
136 Facility J South Dock – Fuselage – 1 Fall Protection Rigid Rails; Rigid Twin Track Flexrail 4 SRLs EA 1 1 1 1 1
137 Facility J South Dock – Left Wing – 1 Wing Fall Protection Rigid Rail; Wing Rigid Twin Track Flexrail (East- West Aligned) 4 SRLs
EA 1 1 1 1 1
138 Facility J South Dock – Tail – 4 Fall Protection Rigid Rails; Right Horizontal – 2 Rigid Twin Track Flexrails 8 SRLs; Left Horizontal – 2 Rigid Twin Track Flexrails 8 SRLs
EA 1 1 1 1 1
139 Facility K Dock – Aircraft Right Wing Side – Total of Two Fall Protection Cables; Each Cable equipped with 1 SRL; Total of 2 SRLs
EA 1 1 1 1 1
140 Facility K Dock – Aircraft Fuselage Section – 1 Fall Protection Cable equipped with 1 SRL EA 1 1 1 1 1
141 Facility K Dock – Aircraft Left Wing Side – Total of Two Fall Protection Cables; Each Cable equipped with 1 SRL; Total of 2 SRLs
EA 1 1 1 1 1
142 Facility K Dock – Other – 4 Single Point Anchors with SRLs at varios locations EA 1 1 1 1 1
143 Facility L Dock – Aircraft Right Wing Side – One Rigid Rail equipped with 6 SRLs EA 1 1 1 1 1
144 Facility L Dock – Aircraft Fuselage Section – 1 Rigid Rail equipped with 4 SRLs EA 1 1 1 1 1
145 Facility L Dock – Aircraft Left Wing Side – One Rigid Rail equipped with 6 SRLs EA 1 1 1 1 1
146 Facility L Dock – Other – Four Aerial Work Platforms (AWPs) EA 1 1 1 1 1
147 Facility M Dock – Aircraft Right Wing Side – Total of Two Rigid Rails; Each Rigid Rail equipped with 4 SRLs;
Total of 8 SRLs
EA 1 1 1 1 1
148 Facility M Dock – Aircraft Fuselage Section – 1 Rigid Rail equipped with 4 SRLs EA 1 1 1 1 1
149 Facility M Dock – Aircraft Left Wing Side – Total of Two Rigid Rails; Each Rigid Rail equipped with 4 SRLs EA 1 1 1 1 1
150 Facility N West Bay – Teleplatform 1 – 5 Single Point Anchors 5 SRLs EA 1 1 1 1 1
151 Facility N West Bay – Teleplatform 2 – 5 Single Point Anchors 5 SRLs EA 1 1 1 1 1
152 Facility N West Bay – Teleplatform 3 – 5 Single Point Anchors 5 SRLs EA 1 1 1 1 1
153 Facility N West Bay – Teleplatform 4 – 5 Single Point Anchors 5 SRLs EA 1 1 1 1 1
154 Facility N West Bay – Teleplatform 5 – 5 Single Point Anchors 5 SRLs EA 1 1 1 1 1
155 Facility N West Bay – Teleplatform 6 – 5 Single Point Anchors 5 SRLs EA 1 1 1 1 1
156 Facility N West Bay – West Rigid Fuselage Rail and Trolley System – 3 Single Point Anchors 3 SRLs EA 1 1 1 1 1
157 Facility N West Bay – East Rigid Fuselage Rail and Trolley System – 3 Single Point Anchors 3 SRLs EA 1 1 1 1 1
158 Facility N East Bay – Teleplatform 7 – 5 Single Point Anchors → 5 SRLs EA 1 1 1 1 1
159 Facility N East Bay – Teleplatform 8 – 5 Single Point Anchors → 5 SRLs EA 1 1 1 1 1
160 Facility N East Bay – Teleplatform 9 – 5 Single Point Anchors → 5 SRLs EA 1 1 1 1 1
161 Facility N East Bay – Teleplatform 10 – 5 Single Point Anchors → 5 SRLs EA 1 1 1 1 1
162 Facility N East Bay – Teleplatform 11 – 5 Single Point Anchors → 5 SRLs EA 1 1 1 1 1
163 Facility N East Bay – Teleplatform 12 – 5 Single Point Anchors → 5 SRLs EA 1 1 1 1 1
164 Facility N East Bay – West Rigid Fuselage Rail and Trolley System – 3 Single Point Anchors → 3 SRLs EA 1 1 1 1 1
165 Facility N East Bay – East Rigid Fuselage Rail and Trolley System – 3 Single Point Anchors → 3 SRLs EA 1 1 1 1 1
166 Facility O Single Dock – Right Wing – 6 SRLs attached to fall protection rail EA 1 1 1 1 1
167 Facility O Single Dock – Fuselage – 10 SRLs attached to 2 fall protection rails EA 1 1 1 1 1
168 Facility O Single Dock – Left Wing – 6 SRLs attached to 2 fall protection rails EA 1 1 1 1 1
169 Facility O Single Dock – Tail – 6 SRLs attached to 2 fall protection rails EA 1 1 1 1 1
170 Facility P West Dock – Nose – 3 SRLs attached to fall protection rail EA 1 1 1 1 1
171 Facility P West Dock – Right Wing – 10 SRLs attached to 2 fall protection rails EA 1 1 1 1 1
172 Facility P West Dock – Fuselage – 10 SRLs attached to 2 fall protection rails EA 1 1 1 1 1
173 Facility P West Dock – Left Wing – 10 SRLs attached to 2 fall protection rails EA 1 1 1 1 1
174 Facility P West Dock – Tail – 3 SRLs attached to fall protection rails EA 1 1 1 1 1
175 Facility P East Dock – Nose – 3 SRLs attached to fall protection rail EA 1 1 1 1 1
176 Facility P East Dock – Right Wing – 10 SRLs attached to 2 fall protection rails EA 1 1 1 1 1
177 Facility P East Dock – Fuselage – 10 SRLs attached to 2 fall protection rails EA 1 1 1 1 1
178 Facility P East Dock – Left Wing – 10 SRLs attached to 2 fall protection rails EA 1 1 1 1 1
179 Facility P East Dock – Tail – 3 SRLs attached to fall protection rails EA 1 1 1 1 1
180 Facility Q West Dock – Nose – 3 SRLs attached to fall protection rail EA 1 1 1 1 1
181 Facility Q West Dock – Right Wing – 10 SRLs attached to 2 fall protection rails EA 1 1 1 1 1
182 Facility Q West Dock – Fuselage – 10 SRLs attached to 2 fall protection rails EA 1 1 1 1 1
183 Facility Q West Dock – Left Wing – 10 SRLs attached to 2 fall protection rails EA 1 1 1 1 1
184 Facility Q West Dock – Tail – 3 SRLs attached to fall protection rails EA 1 1 1 1 1
185 Facility Q East Dock – Nose – 3 SRLs attached to fall protection rail EA 1 1 1 1 1
186 Facility Q East Dock – Right Wing – 10 SRLs attached to 2 fall protection rails EA 1 1 1 1 1
187 Facility Q East Dock – Fuselage – 10 SRLs attached to 2 fall protection rails EA 1 1 1 1 1
188 Facility Q East Dock – Left Wing – 10 SRLs attached to 2 fall protection rails EA 1 1 1 1 1
189 Facility Q East Dock – Tail – 3 SRLs attached to fall protection rails EA 1 1 1 1 1
190 Facility R West Dock – Nose – 3 SRLs attached to fall protection rail EA 1 1 1 1 1
191 Facility R West Dock – Right Wing – 10 SRLs attached to 2 fall protection rails EA 1 1 1 1 1
192 Facility R West Dock – Fuselage – 10 SRLs attached to 2 fall protection rails EA 1 1 1 1 1
193 Facility R West Dock – Left Wing – 10 SRLs attached to 2 fall protection rails EA 1 1 1 1 1
194 Facility R West Dock – Tail – 3 SRLs attached to fall protection rails EA 1 1 1 1 1
195 Facility R East Dock – Nose – 3 SRLs attached to fall protection rail EA 1 1 1 1 1
196 Facility R East Dock – Right Wing – 10 SRLs attached to 2 fall protection rails EA 1 1 1 1 1
197 Facility R East Dock – Fuselage – 10 SRLs attached to 2 fall protection rails EA 1 1 1 1 1
198 Facility R East Dock – Left Wing – 10 SRLs attached to 2 fall protection rails EA 1 1 1 1 1
199 Facility R East Dock – Tail – 3 SRLs attached to fall protection rails EA 1 1 1 1 1
200 Facility S West Bay – Teleplatform 1 – 5 Single Point Anchors → 5 SRLs EA Not Ready Not Ready Not Ready 1 1
201 Facility S West Bay – Teleplatform 2 – 5 Single Point Anchors → 5 SRLs EA Not Ready Not Ready Not Ready 1 1
202 Facility S West Bay – Teleplatform 3 – 5 Single Point Anchors → 5 SRLs EA Not Ready Not Ready Not Ready 1 1
203 Facility S West Bay – Teleplatform 4 – 5 Single Point Anchors → 5 SRLs EA Not Ready Not Ready Not Ready 1 1
204 Facility S West Bay – Teleplatform 5 – 5 Single Point Anchors → 5 SRLs EA Not Ready Not Ready Not Ready 1 1
205 Facility S West Bay – Teleplatform 6 – 5 Single Point Anchors → 5 SRLs EA Not Ready Not Ready Not Ready 1 1
206 Facility S West Bay – West Rigid Fuselage Rail and Trolley System – 3 Single Point Anchors → 3 SRLs EA Not Ready Not Ready Not Ready 1 1
207 Facility S West Bay – East Rigid Fuselage Rail and Trolley System – 3 Single Point Anchors → 3 SRLs EA Not Ready Not Ready Not Ready 1 1
208 Facility S West Bay – East Wing Rigid Rail and Trolley System - 4 rigid rails and 12 SRLs EA Not Ready Not Ready Not Ready 1 1
209 Facility S West Bay – West Wing Rigid Rail and Trolley System - 4 rigid rails and 12 SRLs EA Not Ready Not Ready Not Ready 1 1
210 Facility S East Bay – Teleplatform 7 – 5 Single Point Anchors → 5 SRLs EA Not Ready Not Ready Not Ready 1 1
211 Facility S East Bay – Teleplatform 8 – 5 Single Point Anchors → 5 SRLs EA Not Ready Not Ready Not Ready 1 1
212 Facility S East Bay – Teleplatform 9 – 5 Single Point Anchors → 5 SRLs EA Not Ready Not Ready Not Ready 1 1
213 Facility S East Bay – Teleplatform 10 – 5 Single Point Anchors → 5 SRLs EA Not Ready Not Ready Not Ready 1 1
214 Facility S East Bay – Teleplatform 11 – 5 Single Point Anchors → 5 SRLs EA Not Ready Not Ready Not Ready 1 1
215 Facility S East Bay – Teleplatform 12 – 5 Single Point Anchors → 5 SRLs EA Not Ready Not Ready Not Ready 1 1
216 Facility S East Bay – West Rigid Fuselage Rail and Trolley System – 3 Single Point Anchors → 3 SRLs EA Not Ready Not Ready Not Ready 1 1
217 Facility S East Bay – East Rigid Fuselage Rail and Trolley System – 3 Single Point Anchors → 3 SRLs EA Not Ready Not Ready Not Ready 1 1
218 Facility S East Bay – East Wing Rigid Rail and Trolley System - 4 rigid rails and 12 SRLs EA Not Ready Not Ready Not Ready 1 1
219 Facility S East Bay – West Wing Rigid Rail and Trolley System - 4 rigid rails and 12 SRLs EA Not Ready Not Ready Not Ready 1 1
220 Facility T West Dock – Nose – 3 SRLs attached to fall protection rail EA Not Ready Not Ready Not Ready 1 1
221 Facility T West Dock – Right Wing – 10 SRLs attached to 2 fall protection rails EA Not Ready Not Ready Not Ready 1 1
222 Facility T West Dock – Fuselage – 10 SRLs attached to 2 fall protection rails EA Not Ready Not Ready Not Ready 1 1
223 Facility T West Dock – Left Wing – 10 SRLs attached to 2 fall protection rails EA Not Ready Not Ready Not Ready 1 1
224 Facility T West Dock – Tail – 3 SRLs attached to fall protection rails EA Not Ready Not Ready Not Ready 1 1
225 Facility T East Dock – Nose – 3 SRLs attached to fall protection rail EA Not Ready Not Ready Not Ready 1 1
226 Facility T East Dock – Right Wing – 10 SRLs attached to 2 fall protection rails EA Not Ready Not Ready Not Ready 1 1
227 Facility T East Dock – Fuselage – 10 SRLs attached to 2 fall protection rails EA Not Ready Not Ready Not Ready 1 1
228 Facility T East Dock – Left Wing – 10 SRLs attached to 2 fall protection rails EA Not Ready Not Ready Not Ready 1 1
229 Facility T East Dock – Tail – 3 SRLs attached to fall protection rails EA Not Ready Not Ready Not Ready 1 1
230 Facility U West Dock – Nose – 3 SRLs attached to fall protection rail EA Not Ready Not Ready Not Ready Not Ready 1
231 Facility U West Dock – Right Wing – 10 SRLs attached to 2 fall protection rails EA Not Ready Not Ready Not Ready Not Ready 1
232 Facility U West Dock – Fuselage – 10 SRLs attached to 2 fall protection rails EA Not Ready Not Ready Not Ready Not Ready 1
233 Facility U West Dock – Left Wing – 10 SRLs attached to 2 fall protection rails EA Not Ready Not Ready Not Ready Not Ready 1
234 Facility U West Dock – Tail – 3 SRLs attached to fall protection rails EA Not Ready Not Ready Not Ready Not Ready 1
235 Facility U East Dock – Nose – 3 SRLs attached to fall protection rail EA Not Ready Not Ready Not Ready Not Ready 1
236 Facility U East Dock – Right Wing – 10 SRLs attached to 2 fall protection rails EA Not Ready Not Ready Not Ready Not Ready 1
237 Facility U East Dock – Fuselage – 10 SRLs attached to 2 fall protection rails EA Not Ready Not Ready Not Ready Not Ready 1
238 Facility U East Dock – Left Wing – 10 SRLs attached to 2 fall protection rails EA Not Ready Not Ready Not Ready Not Ready 1
239 Facility U East Dock – Tail – 3 SRLs attached to fall protection rails EA Not Ready Not Ready Not Ready Not Ready 1
240 Facility V West Dock – Nose – 3 SRLs attached to fall protection rail EA Not Ready Not Ready Not Ready Not Ready 1
241 Facility V West Dock – Right Wing – 10 SRLs attached to 2 fall protection rails EA Not Ready Not Ready Not Ready Not Ready 1
242 Facility V West Dock – Fuselage – 10 SRLs attached to 2 fall protection rails EA Not Ready Not Ready Not Ready Not Ready 1
243 Facility V West Dock – Left Wing – 10 SRLs attached to 2 fall protection rails EA Not Ready Not Ready Not Ready Not Ready 1
244 Facility V West Dock – Tail – 3 SRLs attached to fall protection rails EA Not Ready Not Ready Not Ready Not Ready 1
245 Facility V East Dock – Nose – 3 SRLs attached to fall protection rail EA Not Ready Not Ready Not Ready Not Ready 1
246 Facility V East Dock – Right Wing – 10 SRLs attached to 2 fall protection rails EA Not Ready Not Ready Not Ready Not Ready 1
247 Facility V East Dock – Fuselage – 10 SRLs attached to 2 fall protection rails EA Not Ready Not Ready Not Ready Not Ready 1
248 Facility V East Dock – Left Wing – 10 SRLs attached to 2 fall protection rails EA Not Ready Not Ready Not Ready Not Ready 1
249 Facility V East Dock – Tail – 3 SRLs attached to fall protection rails EA Not Ready Not Ready Not Ready Not Ready 1
Sheet1
File details come from the government source that posted it. Updated .