Synopsis Serv C25-004 Leica Probe Repair.pdf
PDF 55 KB Posted
- Attached to
- Serv C25-004 Leica Probe Repair Synopsis Federal contract opportunity
- Solicitation number
- FA812525Q0033
About this file
This is a Performance Work Statement (PWS) for a one-time repair service of a Leica T-Probe for the Oklahoma City-Air Logistics Complex (OC-ALC). The work is to be performed at the contractor's off-site facility and requires the contractor to provide all necessary labor, tools, equipment, test equipment, materials, parts, quality control, transportation, and inspection manuals.
The contractor must be authorized to work on Hexagon Leica Probes and use only new parts and materials unless otherwise authorized by the Contracting Officer. Any parts with lead times exceeding five business days must be identified with supporting documentation provided to the GPOC. The contractor is responsible for ensuring all services, parts, and Original Equipment Manufacturer (OEM) components comply with manufacturer specifications and the PWS requirements.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Serv C25-004 Leica Probe Repair
The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform the one-time repair of Leica Probe for the Oklahoma City–Air Logistics Complex (OC-ALC) at the Contractor’s off-site facility.
The equipment is listed in Appendix A/GFP attachment.
1.1.1 The Contractor shall be responsible for ensuring all services, parts and Original Equipment Manufacturer (OEM) components provided under this contract are in accordance with (IAW) the terms and conditions outlined herein, conform to the manufacturer’s equipment specifications and this PWS.
1.2 Special Qualifications: The contractor will need to be an authorized to work on Hexigon Leica Probes.
1.3 Requested Services: The Contractor shall provide one time Repair to include but not limited to the following.
Repair of a Leica T-Probe
1.4 Parts and Materials: The Contractor shall provide and use only new parts and material in performance of this PWS unless otherwise authorized by the CO. Long lead items greater than five
(5) business days must be identified and provide sufficient documentation to the GPOC supporting the delaccord
File details come from the government source that posted it. Updated .