FA812518Q0097_Amendment_0001.pdf

PDF 146 KB Posted

Attached to
MultiRAE Six-Gas Monitor LEL Meters
Solicitation number
FA812518Q0097
Issued by

About this file

Amendment 0001

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F3YCEB8103A102

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to replace the item description in its entirety, update clause 52.212-2 and extend the closing date. See page 2 for further details.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 5

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-May-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA812518Q0097

X 9B. DATED (SEE ITEM 11)

30-Apr-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-May-2018

CODE

AFSC/PZIMA

LINSEY N LAIRD/405-739-9117

3001 STAFF DR STE 2S 76

TINKER AFB OK 73145

FA8125 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA812518Q0097

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 15-May-2018 02:00 PM to 21-May-2018 02:00 PM.

The following have been added by full text:

AMENDMENT 0001

FIRST: The item description is hereby replaced in its entirety. The updated item description is dated 15 May 2018 and has the following change:

FROM: Must have Combustible Sensor: NDIR (0-100% LEL Methane), Range: 0 to 100% LEL, Resolution: 1% LEL

TO: Must have Combustible Sensor: Catalytic LEL, Range: 0 to 100% LEL, Resolution: 1% LEL

SECOND: Clause 52.212-2 is hereby updated to reflect the change made to the Item description (see below)

THIRD: The closing date is hereby extended as follows:

FROM: 15 May 2018, 2:00 PM CST TO: 21 May 2018, 2:00 PM CST

FOURTH: All other terms and conditions remain unchanged and in full force and effect.

The following have been modified:

52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)

(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

1. Basis for Contract Award:

The Award will be conducted and evaluated under the provisions of FAR Part 12, Commercial Items and FAR Part 13, Simplified Acquisition Procedures. This acquisition will utilize Lowest Price Technically Acceptable (LPTA) source selection procedures. Technical tradeoffs will not be made and no additional credit will be given for exceeding acceptability. Award will be made to the acceptable offeror with the lowest evaluated cost or price, which is deemed responsible in accordance with the Federal Acquisition Regulation and whose proposal conforms to the solicitation requirements. The solicitation requirements include all stated terms, conditions, representations, certifications, and all other information required by FAR 52.212-1 of this solicitation. The Government reserves the right to award without clarifications. However, the Government reserves the right to conduct clarifications if determined necessary by the Contracting Officer.

The responsible offerors must be registered in the System for Award Management (SAM) database (available at:

https://www.sam.gov/portal/public/SAM/) and submit a completed copy of the Offeror Representations and

Certifications – Commercial Items with their response. Lack of registration in SAM will disqualify the vendor and declare them ineligible for award.

The Oklahoma City‐Air Logistics Center (AFSC/PZIMA) at Tinker Air Force Base Oklahoma intends to issue a commercial firm fixed price contract for this acquisition.

2. Number of Contracts to be Awarded:

The Government intends to select one contractor for the award. However, the Government reserves the right to award no contract at all; depending on the quality of the proposals, prices submitted and the availability of funds, or other factors identified by the Contracting Officer.

3. Rejection of Unreasonable Offers:

The Government may reject any proposal that is evaluated to be unrealistic in terms of program commitments, including contract terms and conditions, or unrealistically high or low in cost/price when compared to Government estimates, such that the proposal is deemed to reflect an inherent lack of competence or failure to comprehend the complexity and risks of the program, item or service.

4. Correction Potential of Proposals:

The Government will consider, throughout the evaluation, the "correction potential" of any proposal uncertainty.

The judgment of such "correction potential" is within the sole discretion of the Government. If an aspect of an offeror's proposal not meeting the Government's requirements is not considered correctable, the offeror may be eliminated from the competitive range.

5. Evaluation Factors

Factor 1—Technical Proposal Factor 2—Cost/Price

a. Evaluation Methodology:

The Government will evaluate all technical factors concurrently for the three (3) lowest priced proposals. Should one of those three (3) proposals not be found technically acceptable, the next one (1) lowest priced offeror will be reviewed for technical acceptance. Then, price will be evaluated and the proposals will be listed from lowest to highest price based on the total evaluated price either initially or as a result of clarifications.

Award will be made to the lowest evaluated priced proposal meeting the acceptability standards for the non-cost factors.

b. Technical Factor:

Acceptable – The proposal meets specified minimum technical evaluation requirements necessary for acceptable contract performance.

Unacceptable – The proposal fails to meet specified minimum technical eavluation requirements necessary for contract performance. Proposals with an unacceptable rating are not awardable.

Technical acceptability will be based on an evaluation of proposals against the criteria stated below and other technical specifications in the Item Description. Offerors are required to present all the information as stated in the Instructions to Offerors, FAR 52.212-1. The minimum technical evaluation requirement is met when the Offeror’s proposal thoroughly substantiates all the following essential criteria:

“CONTRACTOR MUST PROVIDE A WRITTEN STATEMENT TO EXPLAIN HOW THEY ARE

MEETING THE TECHNICAL EVALUATION CRITERIA LISTED BELOW. A STATEMENT OF “I

CONCUR” OR “CONCUR” WILL NOT BE ACCEPTED AND COULD DEEM YOUR PROPOSAL

TECHNICALLY UNACCEPTABLE. THE WRITTEN STATEMENT IS ESSENTIAL FOR YOUR

QUOTE TO BE RESPONSIVE AND BE REFERRED FOR TECHNICAL REVIEW.”

TECHNICAL EVALUATION CRITERIA

Specific Requirement ACCEPTABLE NON-

ACCEPTABLE

REMARKS

Shall be monitor part numbers: MBB3- A1C1E00-020 / GVMBB3-A1C1E00-020 / or model # PGM-6228

Must have PID Sensor VOC 10.6 eV (HR), Range: 0.1 to 5,000 ppm, Resolution: 0.1 ppm

Must have Combustible Sensor: Catalytic LEL, Range: 0 to 100% LEL, Resolution: 1%

LEL

Must have Electrochemical Sensor: Oxygen (O2), Range: 0 to 30% Vol., Resolution:

0.1% Vol.

Monitors must meet MIL-STD-810G and - 461F compliant.

Must have Rechargeable Li-ion extended duration batteries (18 hr. runtime) with alkaline battery adapters (4xAA batteries, 6

hr. runtime).

Must have LCD display with real-time gas concentrations, PID gas measurement and correction, battery status.

Must have built in pump for air sampling with average minimum flow rate of 250 cc/min and automatic shut off in low-flow conditions.

Must meet IP-65 ingress protection rating for dust and water resistance.

Must contains on-board gas libraries and continuous data logging.

c. Cost/Price Factor:

Cost/Price Evaluation: The offeror’s cost/price proposal will be evaluated for award purposes by adding the total price for basic requirements (basic award).

Total Evaluated Price: Price analysis will be performed to determine the reasonableness of the offeror’s price proposal. Reasonableness will be based on the total evaluated price. The total evaluated price will be calculated as the sum of the Contract Line Item Numbers (CLINs) unit/extended prices plus other associated factors such as: first article testing cost, transportation cost, price evaluation adjustments for Small Disadvantaged Business Concerns, and application of labor hours to labor hour rates, etc.

Unreasonably Low Costs or Prices: Unreasonably low proposed costs or prices, initially or subsequently, may be grounds for eliminating a proposal from competition either on the basis that the offeror does not understand the requirement or the offeror has made an unrealistic proposal.

Unbalanced Pricing: Offerors are cautioned against submitting an offer that contains unbalanced pricing.

Unbalanced pricing may increase performance risk and could result in payment of unreasonably high prices.

Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly over or understated as indicated by the application of cost or price analysis techniques. The Government shall analyze offers to determine whether they are unbalanced with respect to separately priced line items or subline items. Offers that are determined to be unbalanced may be rejected if the contracting officer determines that the lack of balance poses an unacceptable risk to the Government.

6. Determination of Contractor Responsibility

To be eligible for award, an offeror must be determined responsible. A Determination of Contractor Responsibility will be conducted in accordance with FAR 9.1 (SAM and FAPIIS). An offeror who receives a determination of non-responsibility will not be eligible to receive the contract award.

7. Clarifications:

It is the Government’s intent to award without clarificatons; therefore, it is imperative that offerors submit their best terms initially. However, if during the evaluation period, it is determined to be in the best interest of the Government to hold clarifications, those clarifications will be considered in making the source selection decision.

8. SOLICITATION REQUIREMENTS, TERMS AND CONDITIONS

Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors or sub-factors, and all technical specifications of the item description. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale. In the case that a discrepancy exist between the Instruction to Offerors (ITO) and the evaluation factors for award, the evaluation criteria in 52.212-2 will take precedence.

(End of provision)

(End of Summary of Changes)

File details come from the government source that posted it.