Tech_Vacuum_Item_Description.pdf

PDF 51 KB Posted

Attached to
Rotary Screw Vacuum System Federal contract opportunity
Solicitation number
FA8125-17-Q-0066
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

Item Description

View the file

Other files for this federal contract opportunity

Other files attached to Rotary Screw Vacuum System, newest first.
File Type Posted
FA8125-17-Q-0066_Solicitation_Amendment-1.pdf PDF
Tech_Vacuum_SOW.pdf PDF
Solicitation_FA8125-17-Q-0066.pdf PDF
Tech_Vacuum_SOW.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Description

Technical Vacuum Pump

Sullair 60 HZ Rotary Screw Vacuum System Model: VS25 100 Brand Name or Equivalent:

Two (2) Rotary Screw Vacuum Systems with the following specifications:

• 1650 acfm minimum per unit (cannot be split into multiple systems)

• Rated at least 100 HP

• 460 Voltage

• Dual Control

• Enclosure to cover the unit

• NEMA 4

• Power Failure Auto Restart

• Factory filled Lubricant – at least 8,000 hour fluid

• Inlet Filter

• Units will need to fit together in 18 ft x 13 ft area

The purchase of the vacuum pump will be so that the vacuum pump itself is of rotary screw design, a complete packaged system with no additional components to purchase for startup/installation, and includes major damage prevention in the form of high temperature shutdown & low oil pressure shutdown.

Purchase of vacuum pumps shall include the following training for 76 CMXG/MXDEA personnel at Building 1055:

At time of delivery:

• Inspection of equipment installation with Tinker AFB mechanical installer prior to actual start

• up/commissioning to be scheduled in advance as notified by Tinker AFB.

• Removal of any and all shipment brackets and insulation

• Verify proper mechanical connections

• Verify proper electrical connections

After Tinker AFB installs:

• Verify proper fluid levels

• Verify proper air and oil filter installation

• Verify Start/Stop and restart operation

• Verify proper gauge and instrumentation operation

• Verify operational temperatures within tolerance

• Familiarize end user personnel from each shift with general machine features and operation including o Proper startup/shutdown sequence

DEPARTMENT OF THE AIR FORCE

OKLAHOMA CITY AIR LOGISTICS COMPLES (OC-ALC)

TINKER AIR FORCE BASE OKLAHOMA

o Machine inspection o Instrumentation o General preventative maintenance requirements o General trouble shooting maintenance

File details come from the government source that posted it. Updated .