Tech_Vacuum_Item_Description.pdf

PDF 51 KB Posted

Attached to
Rotary Screw Vacuum System
Solicitation number
FA8125-17-Q-0066
Issued by

About this file

Item Description

View the file

Other files

File Type Posted
FA8125-17-Q-0066_Solicitation_Amendment-1.pdf PDF
Tech_Vacuum_SOW.pdf PDF
Solicitation_FA8125-17-Q-0066.pdf PDF
Tech_Vacuum_SOW.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Item Description

Technical Vacuum Pump

Sullair 60 HZ Rotary Screw Vacuum System Model: VS25 100 Brand Name or Equivalent:

Two (2) Rotary Screw Vacuum Systems with the following specifications:

• 1650 acfm minimum per unit (cannot be split into multiple systems)

• Rated at least 100 HP

• 460 Voltage

• Dual Control

• Enclosure to cover the unit

• NEMA 4

• Power Failure Auto Restart

• Factory filled Lubricant – at least 8,000 hour fluid

• Inlet Filter

• Units will need to fit together in 18 ft x 13 ft area

The purchase of the vacuum pump will be so that the vacuum pump itself is of rotary screw design, a complete packaged system with no additional components to purchase for startup/installation, and includes major damage prevention in the form of high temperature shutdown & low oil pressure shutdown.

Purchase of vacuum pumps shall include the following training for 76 CMXG/MXDEA personnel at Building 1055:

At time of delivery:

• Inspection of equipment installation with Tinker AFB mechanical installer prior to actual start

• up/commissioning to be scheduled in advance as notified by Tinker AFB.

• Removal of any and all shipment brackets and insulation

• Verify proper mechanical connections

• Verify proper electrical connections

After Tinker AFB installs:

• Verify proper fluid levels

• Verify proper air and oil filter installation

• Verify Start/Stop and restart operation

• Verify proper gauge and instrumentation operation

• Verify operational temperatures within tolerance

• Familiarize end user personnel from each shift with general machine features and operation including o Proper startup/shutdown sequence

DEPARTMENT OF THE AIR FORCE

OKLAHOMA CITY AIR LOGISTICS COMPLES (OC-ALC)

TINKER AIR FORCE BASE OKLAHOMA

o Machine inspection o Instrumentation o General preventative maintenance requirements o General trouble shooting maintenance