Tech_Vacuum_Item_Description.pdf
PDF 51 KB Posted
- Attached to
- Rotary Screw Vacuum System Federal contract opportunity
- Solicitation number
- FA8125-17-Q-0066
About this file
Item Description
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA8125-17-Q-0066_Solicitation_Amendment-1.pdf | ||
| Tech_Vacuum_SOW.pdf | ||
| Solicitation_FA8125-17-Q-0066.pdf | ||
| Tech_Vacuum_SOW.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Item Description
Technical Vacuum Pump
Sullair 60 HZ Rotary Screw Vacuum System Model: VS25 100 Brand Name or Equivalent:
Two (2) Rotary Screw Vacuum Systems with the following specifications:
• 1650 acfm minimum per unit (cannot be split into multiple systems)
• Rated at least 100 HP
• 460 Voltage
• Dual Control
• Enclosure to cover the unit
• NEMA 4
• Power Failure Auto Restart
• Factory filled Lubricant – at least 8,000 hour fluid
• Inlet Filter
• Units will need to fit together in 18 ft x 13 ft area
The purchase of the vacuum pump will be so that the vacuum pump itself is of rotary screw design, a complete packaged system with no additional components to purchase for startup/installation, and includes major damage prevention in the form of high temperature shutdown & low oil pressure shutdown.
Purchase of vacuum pumps shall include the following training for 76 CMXG/MXDEA personnel at Building 1055:
At time of delivery:
• Inspection of equipment installation with Tinker AFB mechanical installer prior to actual start
• up/commissioning to be scheduled in advance as notified by Tinker AFB.
• Removal of any and all shipment brackets and insulation
• Verify proper mechanical connections
• Verify proper electrical connections
After Tinker AFB installs:
• Verify proper fluid levels
• Verify proper air and oil filter installation
• Verify Start/Stop and restart operation
• Verify proper gauge and instrumentation operation
• Verify operational temperatures within tolerance
• Familiarize end user personnel from each shift with general machine features and operation including o Proper startup/shutdown sequence
DEPARTMENT OF THE AIR FORCE
OKLAHOMA CITY AIR LOGISTICS COMPLES (OC-ALC)
TINKER AIR FORCE BASE OKLAHOMA
o Machine inspection o Instrumentation o General preventative maintenance requirements o General trouble shooting maintenance
File details come from the government source that posted it. Updated .