Electronic_Ramp_Appendix_B_(12-22-14).xlsx

XLSX spreadsheet 26 KB Posted

Attached to
Electronic Ramp Gate System Federal contract opportunity
Solicitation number
FA8125-15-Q-0020
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

Appendix B

View the file

Other files for this federal contract opportunity

Other files attached to Electronic Ramp Gate System, newest first.
File Type Posted
Combined_synopsis-solicitation_FA8125-15-Q-0020.pdf PDF
Combined_synopsis-solicitation_FA8125-15-Q-0020.pdf PDF
Electronic_Ramp_Appendix_A_(12-08-14).xlsx XLSX spreadsheet
Electronic_Ramp_PWS_(02-05-15).docx DOCX document
Wage_Determination_(22_Dec_14).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Task_Table

INTERIM DOCUMENT - DO NOT CHANGE FORMAT. DO NOT CHANGE CONTENT. KLM.
SCHEDULED GOVERNMENT FURNISHED PROPERTY (SGFP) - MODIFIED- 091012 (Superseded 082112; 080112).
DFARS PGI 245.201-71.
UPDATE PENDING 111314 (Previous 102214).
Off-Base Repair/Maintenance/Similar Requirements.
APPENDIX: B Dated: 22 Dec 2014
Attachment Number: N/A
Requirement Name: Electronic Ramp Gate PM/RM
Solicitation Number: TBD
Contract Number: TBD
DoD Enterprise Identifier: FA8125
Year: 2015
Procurement Instrument Type Code: TBD
Serialized Identifier: TBD
Order Number: TBD
Non-DoD Number: TBD
SERIALIZED ITEMS LIST
ITEMDESCRIPTION*MFGMARKINGMODELNSNPARTPART ORQTYSERIALTYPEUNIQUE ITEMUNIT *EXTENDEDUSEDISPOSITION*
NUMBERNOMENCLATURECAGEINSTRUMENTNUMBERNUMBERNUMBERIDENTIFYINGNUMBERDESNUMBERACQTOTALUOMAS-ISLOCATION/DATE
NUMBER
1Any Component of Electronic Gate System - Entrance1FCX2N/A222 SS STN/AN/AN/A10 14200-0405-323N/AN/A$8,450.00$8,450.00EaNoB3001/20141209
2Any Component of Electronic Gate System - Exit1FCX2N/A222 SS STN/AN/AN/A10 14200-0405-322N/AN/A$8,450.00$8,450.00EaNoB3001/20141209
3Any Component of Electronic Gate System - Entrance1FCX2N/A222 SS STN/AN/AN/A10 14200-0507-103N/AN/A$8,450.00$8,450.00EaNoB3105/20141209
4Any Component of Electronic Gate System - Exit1FCX2N/A222 SS STN/AN/AN/A10 14200-0507-102N/AN/A$8,450.00$8,450.00EaNoB3105/20141209
5Any Component of Electronic Gate System - Entrance1FCX2N/A222 SS STN/AN/AN/A1SEO-S2.00-20442N/AN/A$8,450.00$8,450.00EaNoB2880/20141209
6Any Component of Electronic Gate System - Exit1FCX2N/A222 SS STN/AN/AN/A1SEO-S2.00-20443N/AN/A$8,450.00$8,450.00EaNoB2880/20141209
7Any Component of Electronic Gate System - Entrance1FCX2N/A222 SS STN/AN/AN/A10 14200-0405-325N/AN/A$8,450.00$8,450.00EaNoB2136/20141209
8Any Component of Electronic Gate System - Exit1FCX2N/A222 SS STN/AN/AN/A10 14200-0405-324N/AN/A$8,450.00$8,450.00EaNoB2136/20141209

NON-SERIALIZED ITEMS LIST

ITEMDESCRIPTIONMFGMARKINGMODELNSNPARTPART ORQTYSERIALTYPEUNIQUE ITEMUNITEXTENDEDUOMUSEDISPOSITION
NUMBERNOMENCLATURECAGEINSTRUMENTNUMBERNUMBERNUMBERIDENTIFYINGNUMBERDESNUMBERACQTOTALAS-ISLOCATION/DATE
NUMBER
1Any Component of Ramp Pass ReaderUNKN/AAP-4N/AN/AN/A1N/AN/AN/A$1,000.00$1,000.00EaNoB3001/20141209
2Any Component of Intercom SystemUNKN/A1808-080N/AN/AN/A1N/AN/AN/A$750.00$750.00EaNoB3001/20141209
3Any Component of Ramp Pass ReaderUNKN/AAP-4N/AN/AN/A1N/AN/AN/A$1,000.00$1,000.00EaNoB3105/20141209
4Any Component of Intercom SystemUNKN/A1808-080N/AN/AN/A1N/AN/AN/A$750.00$750.00EaNoB3105/20141209
5Any Component of Ramp Pass ReaderUNKN/AAP-4N/AN/AN/A1N/AN/AN/A$1,000.00$1,000.00EaNoB2880/20141209
6Any Component of Intercom SystemUNKN/A1808-080N/AN/AN/A1N/AN/AN/A$750.00$750.00EaNoB2880/20141209
7Any Component of Ramp Pass ReaderUNKN/AAP-4N/AN/AN/A1N/AN/AN/A$1,000.00$1,000.00EaNoB2136/20141209
1.18Any Component of Intercom SystemUNKN/A1808-080N/AN/AN/A1N/AN/AN/ANSP$750.00$750.00EaNoB2136/20141209
LEGEND:
ACQ=Acquisition.
CAGE=Commercial and Government Entity.
MFG=Manufacturer.
NA=Not Applicable.
NSN=National Stock Number.
NSP=Not Separately Priced.
PIN=Part or Identifying Number.
QTY=Quantity.
TBD=To Be Determined.
TYPE DES=Type Designation.
UII=Unique Item Identifier.
UOM=Unit of Measure.
Use As Is=No (No Same as False).

*ADDITIONAL INFORMATION/INSTRUCTIONS - Off-Base Repair/Maintenance/Similar Requirements.

Example 1 - System with Removable Components. Specific Components Undeterminable at Time of Contract Award.

1. The Unit Acquisition Cost cited above is for each "System" and is not the cost of any component.

2. The Contracting Officer Representative (COR) will track the Unit Acquistion Cost of each Component sent off-base
to determine the applicability of Performance Work Statement (PWS) 3.X.X, Government Furnished Property (GFP)
Exceeds $150,000-Repair/Maintenance Off-Base or PWS 3.X.X, GFP Not Exceed $150,000-Repair/Maintenance Off-Base.
3. After contract award, No GFP shall be removed from Appendix B. The disposition of GFP shall be indicated in Appendix B.
Items #1-#2 (Serialized) above, will remain Items #1-#2 during the life of the contract.
4. If applicable, Appendix B should be updated to ADD Each Component, Including Unit Acquisition Cost, sent off-base during the life of the contract
in accordance with (IAW) the contract terms and conditions.
Start with Item #3 (Serialized) or Start with Item #1 (Non-Serialized).

Example 2 - Whole System Goes Off-Base or Example 3 - Item Goes Off-Base. Determinable at Time of Contract Award.

1. After contract award, No GFP shall be removed from Appendix B. The disposition of GFP shall be indicated in Appendix B.
Items #1-#2 (Serialized) above, will remain Items #1-#2 during the life of the contract.
2. If applicable, Appendix B should be updated to add GFP during the life of the contract in accordance with (IAW) the contract terms and conditions.
Start with Item #3 (Serialized) or Start with Item #1 (Non-Serialized).

KLM.

Info_Table Microsoft Office Project Template ID: 4535923402 (Do Not Edit)

Project is a project management program designed to help you plan, manage, and communicate your projects.

Whether you have a simple list of tasks or want to coordinate activities across multiple projects, Project makes it easy to get started and learn as you go.

This template has been designed to help you to get started in Excel, but when you need more like:
* See your tasks in a Gantt Chart
* Create links between tasks so one task starts after another task finishes
* See how much work each person on the team has assigned to them

You can easily import this information into Project and keep working.

Sheet1

File details come from the government source that posted it. Updated .