Attachment_9_Government_Response_Industry_Questions.pdf

PDF 407 KB Posted

Attached to
Remanufacture of F108 Fuel Nozzles
Solicitation number
FA8122-20-R-0010
Issued by

View the file

Other files

File Type Posted
Attachment_5_SOW_CAVAF_REV1.pdf PDF
FA812220R0010_______0001.pdf PDF
Attachment_6_Packaging.pdf PDF
Attachment_3_DIDS.pdf PDF
Attachment_2_CDRL_Report.pdf PDF
Attachment_1_Pricing_Matrix.xlsx XLSX spreadsheet
FA812220R0010.pdf PDF
Attachment_4_GFP.pdf PDF
Attachment_5_SOW_CAVAF.pdf PDF
Attachment_8_RQR.pdf PDF
Attachment_7_Transportation.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F108 Fuel Nozzles Vendor Questions as of 5/13/2020

Question

Number

Question Gov't Response

DD 1694 is required to be submitted to obtain authorization – is the current DD 1694 version

August 1996?

The current DD 1694 version is April 2017

I also note you checked IUID required. These items are well under $5,000. Also, IUID would normally be added during new manufacture to the nozzle flange using a laser marker prior to assembly. Because these nozzles are already assembled we cannot add IUID using the approved methods.

Because the items are CSI, cost does not have limit. "Bag/Tag" would be an acceptable method where as items that cannot be marked per IUID requirements shall be packaged and all applicable IUID marking and identification shall be on the package or on a tag attached to the item. Please see SOW Revision 1.

Current contract FA8121-15-C-0005 BEQ for this NSN is 804. The BEQ for this solicitation is only 15. Or you could say it is 148 if you combine it with CLIN 0002. That seems very low and

I’m wondering if you could double check with whoever gave you the numbers.

The Best Estimated Quantity (BEQ) is a projected estimate based on historical and projected requirements. The BEQs as stated in the RFP are correct per CLIN. BEQs are an estimated quantity and are not a guarauntee of actual quantities to be ordered.

4 Since this is a remanufacture contract is contract manpower reporting required?

Manpower reporting is not required and has been removed from the SOW. Please see SOW

Revision 1.