Attachment_3_DIDS.pdf
PDF 674 KB Posted
- Attached to
- Remanufacture of F108 Fuel Nozzles
- Solicitation number
- FA8122-20-R-0010
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_5_SOW_CAVAF_REV1.pdf | ||
| Attachment_9_Government_Response_Industry_Questions.pdf | ||
| FA812220R0010_______0001.pdf | ||
| Attachment_6_Packaging.pdf | ||
| Attachment_2_CDRL_Report.pdf | ||
| Attachment_1_Pricing_Matrix.xlsx | XLSX spreadsheet | |
| FA812220R0010.pdf | ||
| Attachment_4_GFP.pdf | ||
| Attachment_5_SOW_CAVAF.pdf | ||
| Attachment_8_RQR.pdf | ||
| Attachment_7_Transportation.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATA ITEM DESCRIPTION
Title: GOVERNMENT PROPERTY INVENTORY REPORT
Number: DI-MGMT-80441C Approval Date: 20171101 AMSC Number: 9865 Limitation:
DTIC Applicable: No GIDEP Applicable: No Preparing Activity: MDA Project Number: MGMT-2017-059 Applicable Forms: None
Use/Relationship: This report enables the contractor to periodically provide to the DoD Service/Agency an inventory listing of Government Property (i.e., both Government Furnished Property (GFP) and Contractor Acquired Property (CAP)) in the contractor’s possession (to include subcontractors) by contract.
This DID is applicable to all contracts where Government Property will be furnished by the Government (i.e., GFP) or acquired, fabricated, or otherwise provided by a contractor (i.e., CAP) in performance of a contract.
This DID contains the format and content preparation instructions for the data deliverable resulting from the work task described in the solicitation.
This DID supersedes DI-MGMT-80441B.
Requirements:
1. Format. The report shall be electronic .xls or .xlsx compatible.
2. Content. The report shall contain the following columns/data fields:
A. Contract Number B. Manufacturer CAGE Code (if known) C. Item Name D. Item Description E. Manufacturer Name F. Manufacturer Part Number G. Manufacturer Model Number H. Material Control Number (MCN) (if applicable) I. Serial Number J. National Stock Number (NSN) K. Quantity L. Unit of Measure M. Unit Acquisition Cost N. Location O. Sub Location (if applicable) P. Unique Item Identifier (as registered in the IUID Registry) Q. Type of Government Property (i.e., Government Furnished Property (GFP) or
Contractor Acquired Property (CAP) R. Classification of Government Property (i.e., Communication Security (COMSEC), Equipment (EQP), Material (MAT), Special Test Equipment (STE), or Special Tooling
(ST))
Source: https://assist.dla.mil -- Downloaded: 2018-05-22T20:41Z Check the source to verify that this is the current version before use.
DI-MGMT-80441C
S. Posting Reference T. Date of Transaction / Date of Acquisition U. Date Placed in Service V. Date of Last Physical Inventory W. Condition Code
END OF DI-MGMT-80441C
Source: https://assist.dla.mil -- Downloaded: 2018-05-22T20:41Z
Source: https://assist.dla.mil -- Downloaded: 2018-09-06T15:32Z
DATA ITEM DESCRIPTION I Form Approved OMB No.0704.0188
1.nTLE 2.IOENTIFICATIONNUMBER
TEST/ INSPECTION REPORT DI-NM’I-80809B
L OESCRIPTlOtVPURPOSE
3.1 The testl inspection report is used to document testl inspection results, findings, and analyses that will enable the government or contracting agency to evaluate compliance with system requirements, performance objectives, specifications, and test linspection plans.
1.APPROVALDATE 5.OFFICEOFPRIMARYRESPONSIBILITY(OPB) Ea.DTICAPPLICABLE 6b.CWIEP AppliCable
(YVMMOD)
F/AFMC-DCJP
970124
,.APPLlCAT\0NflNTER7iElAT10NSH1P
7.1 This data item description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement
I as delineated in the contract.
I
7.2 This DID is applicable to engineering (developmental ), preliminary qualification, qualification, and acceptance testing.
7.3 This DID supersedes DI-NDTI-80809A and DI-MISC-80653
1.APPROVALLIMITATION 9a.APPLICABLEFORMS 9b.AMSCNUMBER
F7231
10,PREPARATIONlNSTRUCnONS
10.1 Format. Contractor format is acceptable.
paragraph 10.2 and its subparagraphs in a manner understanding
10.2 CQnL!aL. The test/inspection report shall
applicable.
Organize the information required by that facilitates presentation and contain the following information, as
10. 2.1 Cove. and tile uaae. The following information shall appear on the outside front :over and title page:
a. Report date.
b. Report number (contractor or government)
Contractor’ s name, address, and commercia 1 and government entity code.
Contract number and contract line item number or sequence number (if applicable)
e. ‘fvpe of test/inspection (for example. first article acceptance test, aualitv con formanc-e-inspection, d-evelopmental test-, qualification test, f Identification of item tested/inspected.
9. Date or period of test/inspection.
h. Name and address of requiring government activity.
i. Security classification, downgrading and declassifying environmental Lest) .“ information, if applicable.
(Continued on page 2 )
1.DIS77UBUTIONSTATEMEW
DISTRIBUTION STATEMRNT A : APPROVED FOR PUBLIC RELBASE; DISTRIBUTION IS UNLIMITED.
ID Form 1664,APR 89 PreviOLIsedtliomwe obsdem. Page 1 of & Pages 39123
Source: https://assist.dla.mil -- Downloaded: 2017-02-14T20:09Z
DI-NDTI-80809B
Block 10, Preparation Instructions (continued)
10.2.2 ~. The table of contents shall identify the following:
a. The title and starting page of each major section, paragraph, and apPendix of the report.
b. The page, identifying number, and title of each illustration (for example; figure, table, photograph, chart, and drawing)
10 .2.3 -ductim. The introduction shall include the following information:
10.2 .3.1 obyectlve W. The specific test/ inspection objective (s) as specified in the contract tasking document.
10. 2.3.2 L.temls) tes~. Complete identification of the item(s) testedl inspected including the following:
a. Nomenclature.
b. National stock number.
Model number, part number t and serial number :: Type of item (for example, prototype, production item, laboratory model )
e. Serial or lot number.
f. Applicable engineering changes
9. Production item specification, if applicable.
h. Date of manufacture.
10.2 .3.3 Complete inspection requirements correlated to contractual following:
Required testl inspection parameters :: Performance requirements, acceptance or environmental criteria.
10.2.4 ~. Complete test/inspection report following:
identification of the testl requirements including the compliance limits, and summary including the
a. A brief discussion of the significant test/inspection results, ObSerVati Qns, conclusions, and recommendations covered in greater detail elsewhere in the report.
b. Proposed corrective actions and schedules for failures or problems encountered.
c. Identification of deviations, departures, or limitations encountered, referenced to the contract requirements.
d. Tables, graphs, illustrations, or charts as appropriate to simplify the summary data.
10.2.5 ~. Complete identification of all documents referenced in the test finspection report including the following, as applicable:
a. Prior testf inspection reports on the same item.
b. Test /inspection plans and procedure documents
c. Prior certifications of compliance.
d. Contractor’ s file designation where test/ inspection records are maintained.
e. Input parameters used.
The applicable issue of the documents cited therein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
Page 2 of 4 Pages Source: https://assist.dla.mil -- Downloaded: 2017-02-14T20:09Z
10.2.6 ~. The body of the testlinspection report shall be as follows :
10 .2.6.1 KzZL_ + de.tlflca~.
Complete identification of each item of test equipment used in the testlinspection including the following:
a.
b.
c.
d.
e.
f.
9.
10. 2.6.2
Nomenclature.
Model number.
Serial number.
Manufacturer.
Calibration status.
Accuracy data.
Comments, if applicable.
Testlinmection kuhtv mstd.b&mn and set–w. Complete description of the physical set-up used in conducting the test/inspection to include the following:
a. Location or orientation of the item.
b. Location. orientation, or settinm of test equipment and instrumentation.
c. Location, orientation, or settings of sensors and probes
d. Location or orientation of interconnections, cables, and hoop-ups.
e. Electrical power, pneumatic, fluidic, and hydraulic requirements.
Drawings, illustrations, and photographs maY be used for clarification.
10 .2.6.3 wrocedur~. Complete description of the procedures used in conducting the test/inspection to include the following:
a. Item selection and inspection that verified suitability for test/ inspection.
b. Summarized sequence of testing/inspection steps, including a description of how the item was operated during the test/inspection, and any control conditions imposed.
10 .2.6.4 A copy of all testlinspection results and analysis to include the following:
10.2.6 .4.1 ~. The actual recorded data (for example, log book entries, oscillographs, instrument readings, plotter graphs) If the recorded data is extensive, provide it in an appendix.
10. 2.6.4.2 Test/ insQec!iion resu. Identification of all testlinspection results to include the following:
a. Matrices comparing results achieved against test/inspection objectives or requirements
b. A discussion of these matrices as to their significance, and how they compare to any prior testlinspections.
Calculation examples.
;; Discussion of anomalies, deviations, discrepancies, or failures, including their impact, causes, and proposed corrective actions The discussion shall address discrepancies between design requirements and the tested/inspected Configuration.
10. 2.6.5 Conclusicxls Test/ inspection conclusions distinguished between objective and subjective to include the following:
a. The effectiveness of the testlinspection procedures in measuring item performance.
Page 3 of 4 PagesSource: https://assist.dla.mil -- Downloaded: 2017-02-14T20:09Z
b. The success or failure of the item to meet required test/inspection objectives.
c. The need for repeat, additional, or alternative tests linspections.
d. The need for item redesign or further development.
e. The need for improved test/inspection procedures, techniques, or facilities.
f. The adequacy and completeness of the test/inspection requirements.
10.2 .6.6 Recommendations appropriate to the test/inspection results and conclusions including the following:
a b.
c.
d.
e.
f.
9.
h.
Acceptability of the item tested/inspected (pass or fail) Additional testing/inspection required. ,.
Redesign required.
Problem resolution.
Test/inspection procedure or facility improvements Disposition of items tested/inspected.
Documentation changes required.
Testing/ inspection improvements
10.2.7 The following certifications shall be included, .as
applicable:
10.2 .7.1 A statement that the testlinspection was performed in accordance with applicable testlinspection plans and procedures, and that the results are true and accurate. The authentication shall include the signature of the contractor personnel that performed the test(s) /inspection(s) , a contractor representative authorized to make such certification, and any government witnesses
10.2 .7.2 A statement identifying those requirements not tested/inspected or measured that were previously validated.
Include identification of the data and method employed for such validation (for example, prior test/inspection, analytical verification, equivalent item, and so on) The authentication shall include the signature of a contractor representative authorized to make such authentication and any government witness.
10.2 .7.3 A statement that the item tested/ inspected either passed or failed item acceptability requirements This authentication shall include the signature of a contractor representative authorized to make such authentication and any government witness
10.2.8 Appendices shall be used to append detailed
test/inspection daia, drawings, photographs , or other documentation too voluminous to include in the main body of the report This includes referenced documentation not previously provided by the government, and test/ inspection reports from any associated test/inspection activity that may have performed some of the testing/inspecting requirements.
Page 4 of 4 Pages Source: https://assist.dla.mil -- Downloaded: 2017-02-14T20:09Z
Title: DEFICIENCY REPORT (DR)
Number: DI-PSSS-81535A Approved Date: 20160524 AMSC Number: F9660 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: AF 11 (AFLCMC/EZSC) Project Number: PSSS-2016-013 Applicable Forms: N/A
Use/Relationship: The Deficiency Report (DR) provides complete and accurate deficiency identification on government furnished material (GFM) in repair contracts by contractors to the Government. This information is used by the Government to identify necessary corrective action in accordance with T.O. 00-35D-54, USAF Deficiency Reporting, Investigation, and Resolution.
(Copies of this document are available online at http://www.tinker.af.mil/technicalorders/.)
a. This Data Item Description (DID) contains the format, content, and intended use information for the data deliverable resulting from the work task described in the solicitation.
b. This DID is applicable when contractors are responsible for maintaining custodial records for government property being repaired.
c. This DID interrelates with DI-MGMT-80258, Material Improvement Project (MIP) Report.
(Copies of this document are available online at http://quicksearch.dla.mil.)
d. This DID supersedes DI-ALSS-81535.
Requirements:
1. Reference documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
2. Format. The Contractor format is acceptable.
3. Content. The Deficiency Report content shall be as described in Table I.
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Source: https://assist.dla.mil -- Downloaded: 2018-09-06T15:24Z Check the source to verify that this is the current version before use.
http://www.tinker.af.mil/technicalorders/ http://quicksearch.dla.mil/
DI-PSSS-81535A
TABLE I. Deficiency report content.
1. From: Address of Originating Activity
2. To: Office of Primary Responsibility (OPR) for the equipment. Refer to D043 or D086 for guidance.
Subject First Part as applicable:
a. Category I Deficiency Report (CAT I DR)
b. Category II Deficiency Report (CAT II DR)
c. Report Control Number (RCN): An RCN consists of three parts. The first part will be the DoD Activity Address Code (DoDAAC).
The second part will be the last two digits of the calendar year.
The third part will be a 4-digit sequence number that is locally assigned.
3. Description of Deficiency:
Describe in detail what is wrong, the circumstances prior to the difficulty, probable cause, any action taken, and recommendations. Attach copy of supporting documents. Continue on separate sheet if necessary. Ensure that the description answers the questions listed in the instructions on the back of this form
4. Date of Deficiency: Year, month, day deficiency was discovered.
5. National Stock
Number (NSN) NSN and applicable Material Management Aggregation Code (MMAC) of item (see D043 and D086).
6. Nomenclature Noun of item for which report is submitted. Software DRs shall provide nomenclature of programmable hardware.
7. Operating Time at Failure
Hours, cycles, days, miles rounds or others
8. Deficient Item Part Number
Complete Manufacturer part number. If Computer Identification Number (CPIN) is associated with a computer program it shall also be provided.
9a. Manufacturer’s CAGE Code
Unique code assigned to suppliers of government or defense agencies.
9b. Manufacturer/Shipper/ City/State
Complete address of manufacturer or shipper.
10. Quantity Number received, inspected, deficient, and in stock.
11. Serial, lot or batch number Complete item serial number.
12a. Item new, repaired or overhauled
Use one to identify item as appropriate.
12b. Date Manufacturer, Repaired or Overhauled
Year/Month/Day
12c. Last Repair Facility CAGE/DoDAAC/Address
DI-PSSS-81535A
13a. Contract Number Obtain contract number from records service tag, manufacturer/container label, etc. Contract number is critical to processing reports.
13b. Requisition/Document Number
Obtain from tags/labels on item packaging.
13c. Purchase Order Number.
The Purchase Order Number associated with the defective part. This can usually be found on the attached shipping document.
14. Government Furnished Material (GFM)
Yes/No/Unknown
15a. Item Under Warranty Yes/No/Unknown 15b. Warranty Expiration
Date Provide if known.
16. End Item Enter the applicable Equipment Item Code (EIC), Work Unit Code (WUC), or Table of Authorized Material Control Number (TAMCN) for the deficient material.
17. Next Higher Assembly a. NSN – National Stock Number associated with the next higher assembly.
b. NOMENCLATURE – Item name of the next higher assembly.
c. PART NUMBER – Part number assigned to the next higher assembly.
d. SERIAL NUMBER – Serial number from the next higher assembly.
18. End Item a. NSN – National Stock Number associated with the end item.
b. NOMENCLATURE – Name of the end item.
c. TYPE/MODEL – Type or model assigned to the end item configuration.
d. SERIAL NUMBER – Serial number from the end item equipment or system.
19. Current Disposition of Deficient Item
Holding/Disposed or Destroyed/Repaired/Other
20. Location of Deficient Material
Enter the name and location or supply activity that is currently holding the exhibit/deficient material.
End of DI-PSSS-81535A.
Title: COMMERCIAL ASSET VISIBILITY (CAV) REPORTING
Number: DI-MGMT-81838 Approval Date: 20110914 AMSC Number: N9211 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility: SA/WSS 071.02 Applicable Forms: N/A
Use/relationship:
The Commercial Asset Visibility (CAV) application provides a web-based, automated method of tracking Government owned reparable assets as they flow through the repair cycle at the contractor's repair facility. The main purpose of CAV is to provide an inventory management system for reparable assets while they are at commercial repair vendors. CAV on the World Wide Web allows the contractor to report transactions as they occur. These transactions automatically update the CAV database. An integrated, relational database allows the commercial repair vendors to access their repair data to produce all of the required status and activity reports.
This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement, as delineated in the contract.
Requirements:
1. Format. The CAV System transactions are processed via the World Wide Web. Input formats and methodology are defined in the Contract Statement of Work.
2. Content. The Contractor reporting shall contain the following transactions, status code changes and report types, as described in the Contract Statement of Work:
A. Receipt of Asset
1) On Contract
2) Not on Contract
3) Procurement
4) "A" Condition
5) Rotable Pool
6) Loaned Asset
B. Inductions C. Items Awaiting Parts D. Re-inductions E. Completions F. Shipments
Source: http://assist.dla.mil -- Downloaded: 2019-05-06T18:27Z
DI-MGMT-81838
G. Bulk Shipments H. Proof of Shipment I. Items that are Beyond Economic Repair (BER) J. Survey/Scrap Items K. Reversals L. Report of Discrepancies M. Print DD Form 1348's N. Print Material Movement Documents O. Print CAV Inventory Labels P. Print Item Action Reports Q. Print Repair History Reports R. Print Condition Code Reports S. Print Awaiting Parts Report T. Print Proof of Shipment Reports U. Perform Item Maintenance V. Print Report of Discrepancies (RODs) W. Add and Delete Carriers
3. End of DI-MGMT-81838.
Source: http://assist.dla.mil -- Downloaded: 2019-05-06T18:27Z
Title: CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT
Number: DI-PSSS-81995 Approved Date: 20150904 AMSC Number: 9576 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: 11 (AFMC/A4) Project Number: PSSS-2015-009 Applicable Forms: N/A Use/Relationship: The Contract Depot Maintenance (CDM) Production Report is a two-part report which provides the Government with monthly maintenance production figures, status and accountability of assets at the contractor facility, performance to schedule, anticipated production for the next month, and a summary of unresolved problems at the end of the report period.
a. This Data Item Description (DID) contains the format, content and preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
b. This DID may be used on any depot level maintenance contract.
Requirements:
1. Format. This report shall be provided in the format of Table I.
2. Content. The report shall consist of two parts and contain the following information:
a. Part I:
(1) As of date: The year, month and day applicable to the report. Data must be through the end of the month.
(2) Block 1, Issuing/Procuring Agency. Include address and Point of Contact.
(3) Block 2, Contractor and activity address code (AAC). The name of the business and the DoDAAC assigned to your business for shipment of material.
(4) Block 3, Contract number and Program or Weapon System supported.
(5) Block 4, Government item manager or technical Point of Contact.
(6) Block A, Item identification. The National Stock Number (NSN), A-1 is the Federal Supply Class (FSC) and A-2 is the National Item Identification Number (NIIN) of the item being reported.
(7) Block B, Delivery/Call Order number. When the awarded contract is a call/delivery order type, this is the applicable order number. When an item is awarded on more than one order, it is repeated for each order until completed. If the current report completes the call, the word “completed” will be added.
(8) Block C, The contract line item number (CLIN). The CLIN assigned to the NSN in the contract.
DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited.
Source: https://assist.dla.mil -- Downloaded: 2016-04-12T17:42Z
DI-PSSS-81995
(9) Block D, The document/voucher number the item was received under. The document number listed on the shipping documentation the item was received against.
(10) Block E, Quantity on contract or call. E-1 is the quantity of the end items to be repaired on each call/delivery order or contract quantity when orders do not apply. E-2 is the total quantity scheduled for repair cumulative to date.
(11) Block F, Reparables received. Number of reparable items received for repair. F-1 is the quantity of reparables received during the report month. F-2 is the quantity of reparables received cumulative from the start of the contract through report month.
(12) Block G, Reparables inducted into repair during report month.
(13) Block H, Reparables on hand. Number of reparables on hand waiting induction into repair.
(14) Block I, Quantity produced. The quantity produced during the month.
(15) Block J, Serviceables shipped. Serviceables shipped from repair facility. J-1 is the serviceables shipped through report month. J-2 is serviceables shipped cumulative from start of contract.
(16) Block K, Serviceables on hand. The quantity of serviceables on hand awaiting shipping action.
(17) Block L, Quantity condemned. The quantity condemned. L-1 is the quantity condemned during report month. L-2 is the quantity condemned cumulative from start of contract.
(18) Block M, Forecast to complete. The quantity of items scheduled to be produced next month.
(19) Block N, Report date. Enter date of report.
b. Part II, Production problems. Report shall be in narrative format and only required if:
(1) Previous reports production forecast was not shipped.
(2) Current forecast does not equal contract scheduled quantity.
(3) Contract anticipates a problem in the near future.
TABLE I. Contract Depot Maintenance (CDM) Production Report format.
CONTRACT DEPOT MAINTENANCE (CDM) PRODUCTION REPORT Month and As-Of Date
(YYYYMMDD)
Part I
1. ISSUED BY: 2. CONTRACTOR AND ACTIVITY ADDRESS CODE 3. CONTRACT NUMBER/PRGM/WS 4. GOVERNMENT ITEM MANAGER OR TECHNICAL POC
DURING REPORT PERIOD/TOTAL TO DATE
A.
ITEM
IDENTIFICATION
B.
DELIVERY/
CALL NUMBER
C.
CONTRACT
LINE ITEM
(CLIN)
D.
DOCUMENT/
VOUCHER
NUMBER
E.
QTY ON
CONTRACT
OR
DO/CALL
F.
REPARABLES
RECEIVED
G.
QTY
IND TO
WORK
H.
REPS ON
HAND
I.
QTY
PROD
J.
SERVICEABLES
SHIPPED
K.
SERV ON
HAND
L.
QTY
CONDEMNED
M.
FORECAST PROD
N.
REPORT DATE
FSC NIIN
1 2 1 2 3 1 2 1 2 1 2
Part II, Production Summary
End of DI-PSSS-81995.
| DID 80441C |
| AMSC Number: 9865 Limitation: |