SOW.pdf

PDF 114 KB Posted

Attached to
Remanufacture F110-100 FDT Temperature Sensors
Solicitation number
FA8122-20-R-0004
Issued by

View the file

Other files

File Type Posted
2931920_CDRL1_REPORT.pdf PDF
DID_GOVERNMENT_PROPERTY_REPORT.pdf PDF
FA812220R0004.pdf PDF
DID_CDM_PRODUCTION_REPORT.pdf PDF
DID_CEMS_REPORTING.pdf PDF
DID_CAV_REPORTING.pdf PDF
DID_CAVAF_MATERIAL_REPORT.pdf PDF
FDTSENSOR_GFP_FORM.pdf PDF
TRNSPDATA_REPORT.pdf PDF
PKGRQMT_REPORT.pdf PDF
Synopsis.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FD2030-20-00004

STATEMENT OF WORK

(SOW) Fll0-100, F118-100 FDT

Sensors

PURCHASE REQUEST NUMBER: FD2030-20-00004

PREPARATION DATE: 27 Mar 2019

PREPARING ORGANIZATION:

421st Supply Chain Management Squadron (SCMS)/GUMCA

Oklahoma Air Logistics Center And

Air Force Life Cycle Management Center (AFLCMC) Fl10 Technical Services Element (LPSBBB)

TINKER AFB, OK 73145-3031

FD2030-20-00004 2

TABLE OF CONTENTS Page

SECTION I 3

1.0 Work Scope 3

1.1 SOW Updates 3

1.2 Quality System and Quality Assurance Plan 3

1.3 Subcontractor and Vendor Management 4

1.4 Safety 4

1.5 General Services and Material 4

1.6 Reporting 4

1.6.1 Condemnation of Assets 5

1.7 Receiving 5

1.7.1 Condemnation of assets 5

1.7.2 Deliverables Quality 6

1.7.3 Remanufacture 6

1.7.4 Remanufacture Procedures 6

1.7.5 Deliverable Quality 7

1.7.6 Designated Engineering Representative (DER) processes and procedures 7

1.8 Packaging and Handling 7

1.9 Shipping and Transportation 7

1.10 Document Storage 7

SECTION II 7

2.0 Reference & Technical Manuals 7

SECTION III 8

3.0 Requirements 8

3.1 Government Furnished Material (GFM) 8

3.2 Government Furnished Property (GFP) 8

APPENDIX A 9

Acronyms 9

ATTC 1 CAV Statement of Work 10

FD2030-20-00004 3

SECTION 1

1.0 WORK SCOPE:

This Statement of Work (SOW) defines the requirements necessary to ensure that delivered remanufactured F110-100, F118 -100 FDT Sensors are remanufactured as nearly as possible to original life expectancy consistent with Air Force (AF) requirements set forth herein. This SOW applies to the following National Stock Numbers (NSN) and Part Numbers (P/N):

Input P/N Input NSN Output P/N Output NSN

1269M86P01/ 2915-01-191-1818PR 1269M86P02 2915-01-485-7506PR

8901-277

1269M86P02 2915-01-485-7506PR 1269M86P02 2915-01-485-7506PR

The sub NSN and P/N 8901-277 shall be remanufactured to NSN 2915-01-485-7506PR, P/N 1269M86P02. The instructions stipulated are brief, concise statements providing general requirements for delivered remanufactured F110-100, F118-100 FDT Sensors. All performance, with respect to the delivered remanufactured F110-100, F118-100 FDT Sensors and component parts shall be performed at a contractor owned or operated facility that performs remanufacture using manufacturing processes similar to those used in the manufacture of F110- 100, F118- 100 FDT Sensors. Contractor shall have remanufacture capabilities to include required technical data, repair documents, and license agreements to accomplish remanufacture of F110-100, F118 -100 FDT Sensors strictly in accordance with Government requirements and scheduled delivery of a quality product.

1.1 SOW Updates:

The Contractor shall not make any changes to the requirements in this SOW without written approval of the Procurement Contracting Officer (PCO). Contractor recommended changes shall be in writing (email is acceptable), but the Government shall maintain the SOW during the performance of this contract and ensure all changes are necessary and consistent with the requirement of FAR 22.1003-6(a)(1) prior to approval and performance.

1.2 Quality System and Quality Assurance Plan:

The contractor shall develop, implement, and maintain an integrated Quality Control (QC)/Quality Assurance (QA) plan for the purpose of providing and maintaining confidence in contractor performance, product delivery, and data integrity throughout the life of the contract.

Quality shall be ensured throughout the program in all areas of remanufacture, assembly inspection testing, and shipping.

The QC/QA plan shall be developed IAW AFPD 63-5, Quality Assurance and AFI63-501, Air Force Acquisition Quality Program, or an ISO 9001:2000/ANSI ASQC Q92 or equivalent requirements certified plan to ensure quality across all aspects of the remanufacturing processes used, product assurance, reliability, maintainability, and supportability.

The Air Force reserves the right to verify the effectiveness of the QA program through reviews and audits of work in progress at the Contractor owned or operated facilities.

FD2030-20-00004 4

1.3 Subcontractor and Vendor Management:

The Contractor shall maintain a system for the management of subcontractors and vendors IAW the provisions of this contract. The Contractor shall ensure that the subcontractor(s)/vendor(s) manufacturing processes, data, designs, and deliverables meet all F110-100, F118-100 FDT Sensors engineering and technical requirements arc in accordance with this SOW and shall fulfill the requirements of this contract and FAR 22. 1003-6(a)(I). The Government personnel shall be provided the opportunity to attend all subcontractor reviews and other problem solving reviews as observers to ensure compliance with this SOW and FAR 22.1003-6(a) (I).

1.4 Safety:

The Contractor shall maintain and execute a safety program using MIL-STD-882D, AFI 91-202 and AFI 91-204 as guides. The Contractor shall comply with all safety provisions and technical specifications listed in OEM shop maintenance manuals. All Contractor personnel and technicians shall comply with system safety engineering principles during all levels of remanufacturing.

While performing work under this contract the contractor shall comply with all applicable federal, state and local regulations regarding occupational safety and health. The contractor shall notify the PCO within eight (8) hours of any damage to GFP where the dollar value exceeds $500,000.00 and within two workdays, for any damage to GFP less than $500,000.00 during the execution of the contract.

Mishap notifications shall contain, as a minimum, the following information:

a. Contract, Contract Number, Name and Title of Person(s) Reporting

b. Date, Time and exact location of accident/incident

c. Brief Narrative of accident/incident (Events leading to accident/incident)

d. Cause of accident/incident, if known

e. Estimated cost of accident/incident (material and labor to repair/replace)

f. Nomenclature of equipment and personnel involved in accident/incident

g. Corrective actions (taken or proposed)

h. Other pertinent information If requested by the designated PCO, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office.

1.5 General Services and Material:

The Contactor shall provide all materials for the manufacturing processes required to execute this contract, however pooling of hardware is acceptable. In exchange, in part, for each remanufactured F110-100, F118-100 FDT Sensor ordered, the Government will provide, on a one to one basis, degraded or inoperable GFP F110-100, F118-100 FDT Sensors free of meaningful damage inconsistent with aircraft engine usage.

1.6 Reporting:

The Contractor shall meet the delivery schedule. The Contractor shall ensure that all reporting as specified under the following CDRL(s) is accomplished:

FD2030-20-00004 5

Commercial Asset Visibility Air Force (CAVAF) End Item Reporting, DI-MGMT- 81838 CDM Monthly Production Report, DI-PSSS-81995/T Annual Inventory Report, DI-MGMT-80441C Comprehensive Engine Management System (CEMS), DI-MGMT-81324C CEMS system info/POC:

AFLCMC/LPSC

Bldg 4008 Room 12 Tinker AFB, Ok. 73145 Email: CEMS.PMO.helpdesk@us.af.mil

1.6.1 Condemnation of Assets:

The Contractor shall condemn, at the contractor’s facility, any FDT Sensor component parts that do not meet ESM “Serviceable Limits” or Build Policy life cycle limits, before those components lose their identities as GFP and become contractor property. The Contractor shall process all condemned assets through Plant Clearance Automated Reutilization Screening System (PCARSS). The contractor shall also provide Government quantities by PIN and NSN of components condemned and annotate on AFMC Form 413 Monthly Production Report via the Contract Data Requirements List (Depot Maintenance Production Report, DI-PSSS-81995/T.

The Contractor shall also report all condemned FDT Sensor in the Commercial Asset Visibility for Air Force (CAVAF) IAW CAVAF end item report DI-MGMT-81838

1.7 Receiving:

The Contractor shall inspect scheduled incoming sensors for missing parts, any damage associated with improper handling and shipping, and damage other than normal failures. For sensors with missing parts or damage, the Contractor shall provide the PCO, PM and PMS with the estimated parts list required for the remanufacture and submit an SDR (SOW par 1.6.3). The contractor shall contact the PCO, PM and PMS for disposition instructions within 2 days of receipt (email is acceptable). The Contractor shall not destroy reusable shipping containers and will reuse them for return shipment. The contractor shall submit Supply Discrepancy Reports (SDRs) related to shipment of misidentified items, variations in quantity, lost or damaged parcel post, and meaningful damage to GFP inconsistent with aircraft engine usage. These discrepancies shall be reported and resolved using the DoD web-based application WebSDR https://www.daas.dla.mil/websdr/home.asp. This system of reporting an SDR has been developed in compliance with DoD regulations 4140. l-R Supply Chain Material Management Regulation and 4000.25-M, Defense Logistics Management System (DLMS) Supply Standards and Procedures, which requires automated SOR processing. The Government's Prime Packaging Specialist may authorize exceptions to these requirements.

1.7.1 Condemnation of Assets:

The Contractor shall condemn, at the Contractor's facility, any F l10-100 FDT Sensor component parts that do not meet ESM "Serviceable Limits" or Build Policy life cycle limits, before those components lose their identities as GFP and become contractor property. The mailto:CEMS.PMO.helpdesk@us.af.mil http://www.daas.dla.mil/websdr/home.asp http://www.daas.dla.mil/websdr/home.asp http://www.daas.dla.mil/websdr/home.asp

FD2030-20-00004 6

Contractor shall process all condemned assets through Plant Clearance Automated Reutilization Screening System (PCARSS). The Contractor shall also provide Government quantities by Part Number and NSN of components condemned and annotate on AFMC Form 413 Monthly Production Report via the Contract Data Requirements List.

The Contractor shall report all condemned F 110-100, F118-100 FDT Sensor via AFMC Form 413 Depot Maintenance Production Report; Monthly and Commercial Asset Visibility for Air Force (CAVAF) System.

1.7.2 Supply Discrepancy Report (SDR):

The Contractor shall submit SDRs when required IAW Technical Order (TO) 00-35D-54 and CAVAF End Item Reporting.

1.7.3 Remanufacture

Remanufactured F110-100, F118-100 FDT Sensors shall be restored to original life expectancy or nearly so, in compliance with all applicable OEM technical repair procedures, manufacturing specifications, and OEM Engineering approved rework drawings/procedures. The production output should meet or exceed the United States Air Force (USAF) build requirements found in F110-GE-100, F118-100: 5E6-3-112-3. Contractor shall identify all Military F110-100, F118- 100 FDT Sensors processed through contractors remanufacture facility as Military Parts prior to processing.

1.7.4 Remanufacture Procedures:

F110-100, F118-100 FDT Sensors shall be remanufactured IAW the procedures outlined in accordance with Original Equipment Manufacturers (OEM) tech data. All component parts will be inspected for acceptance and reused if within tolerance in lieu of rework, rehabilitation, alter or replacement. Delivered remanufactured F110-100, F118-100 FDT Sensors shall contain remanufactured hardware or new parts meeting the requirements of this SOW. The Contractor shall inspect remanufactured and new components to ensure that they meet United States Air Force (USAF) build requirements.

Contractor shall acquire component parts from Air Force approved vendors, Government inventory; Original Equipment Manufacturer (OEM) approved vendors, or commercial inventories approved by the USAF and/or OEM.

All remanufactured sensors delivered will meet the inspection criteria. All remanufactured components shall comply with the latest revision of all OEM’s build book, along with any outstanding FAA Airworthiness Directives.

All detailed parts or components required to accomplish the remanufacture of the F 110- 100 FDT Sensors shall be contractor furnished. Contractor may retain condemned units for spare parts, and may move components among serviceable end items to expedite the remanufacturing process. The OEM must report condemnations or scrapped units, even if component parts are used to remanufacture another end item. Serial number integrity must be maintained.

FD2030-20-00004 7

The Contractor shall conduct all testing IAW the OEM’s build book. The Government reserves the right to witness any and/or all tests conducted by the Contractor and/or subcontractors on a noninterference basis.

1.7.5. Deliverables Quality:

The Contractor shall ensure that materials, parts, and accessories used in remanufactured components are restored to original life expectancy or nearly so.

1.7.6 Designated Engineering Representative (DER) processes and procedures:

The Contractor shall obtain written approval from the PCO for all DER manufacturing processes and procedures (email is acceptable), prior to using those DER manufacturing processes and procedures in the remanufacture of Fl10-100, F118-100 FDT Sensors or component parts.

1.8 Packaging and Handling:

The Contractor shall be responsible for the preservation and packaging of the delivered F110- 100, F118-100 FDT Sensors IAW the Special Packaging Instructions specified on AFMC Form 158, Packaging Requirements. The Contractor shall place a serviceable tag, Department of Defense (DD) Form 1574, inside the package along with the assembly as well as outside the package. In addition, all marking and labeling of unit and shipping containers shall be in accordance with Mil-Std-129P, Department of Defense Standard Practice, Military Marking for Shipment and Storage.

1.9 Shipping and Transportation:

Contractor shall meet the delivery schedule. Contractor shall ship or transport applicable deliverables as appropriate in order to have the deliverables available to support the customer’s operational requirements and in accordance with the contract’s delivery schedule. Contractor shall not destroy reusable shipping containers, and will reuse them for return shipment.

1.10 Document Storage:

All records and reports outlined in this SOW shall be prepared for each part and a copy kept on file by the contractor for five (5) years.

SECTION II

2.0 Reference & Technical Manuals:

In execution of this SOW, the Contractor shall apply manufacturing processes, tools, and products as prescribed in FAR 22.1003-6(a)(1)(iv) and OEM build book, applicable OEM technical repair procedures, and manufacturing specifications. The production output should meet or exceed the United States Air Force (USAF) build requirements found in F110-GE- 100: 5E6-3-112-3. All remanufactured sensors must meet the inspection criteria.

FD2030-20-00004 8

SECTION III

3.1 Requirements:

3.1 Government Furnished Material (GFM):

None. Contractor shall furnish all material, support equipment, tools, test equipment and services. Government Furnished Material will not be provided.

Contractor furnished material used for replacement components shall be parts specified in ESM CFM56-2B Engine Shop Manual. Any deviations shall have written approval from Propulsion Engineering, AFLCMC/LPSBAA and AFLCMC/LPSBAB through the PCO.

3.2 Government Furnished Property (GFP):

GFP shipped to the contractor ceases to be GFP at the point identified in FAR 22.1003- 6(a)(1)(v), except as specified in SOW Section 1.6.

FD2030-20-00004 9

APPENDIX A

ACRONYMS

AF Air Force AFMC Air Force Materiel Command CAV AF Commercial Asset Visibility Air Force CDRL Contract Data Requirements List CMM Commercial Maintenance Manual DD Department of Defense DCMA Defense Contract Management Agency DR Deficiency Report FAR Federal Acquisition Regulation IAW In Accordance With ISO International Standards Organization NSN National Stock Number OC-ALC Oklahoma City Air Logistics Center PCO Procurement Contracting Officer PCARSS Plant Clearance Automated Reutilization Screening System P/N Part Number PMS Production Management Specialist SB Service Bulletin SDR Supply Discrepancy Report SOW Statement of Work SP Surveillance Plan SS Service Summary TAFB Tinker Air Force Base USAF United States Air Force

FD2030-20-00004 10

ATTCH 1

CAVAF CFM

REPORTING REQUIREMENTS

The purpose of this attachment is to provide Contract Depot Maintenance (CDM) guidance for contractor technical responsibilities and reporting requirements of the Commercial Asset Visibility Air Force (CAVAF) system. CAVAF shall be the primary system of record for providing daily status of all Government owned assets located at contractor repair facilities. Reporting within CAV AF shall not be limited to end items subject to repair but are to include assets stored at a contractor Inventory Control Point (ICP). Any CAVAF system down-time will be identified on the CAVAF home page banner. Contractors are responsible for ensuring current User Guides are utilized by their CAVAF reporters. NOTE: Contractor User’s Guide may be accessed from the CAVAF Homepage.

CAVAF FAMILIARIZATION TRAINING:

1. Familiarization training for CAVAF reporting will be requested by the contractor via the applicable ICP CAVAF system administrator (SA). For assistance, guidance or questions to specific contract transactional reporting requirements may be addressed to the CAV AF contract monitor (CM). ICP CAVAF (SA and/or CM) points of contact (See Contractor Responsibility Item #4).

CONTRACTOR RESPONSIBILITY:

1. Contractor CAVAF reporting requirements shall be accomplished daily and/or within one (1) business day of a maintenance action occurrence IAW the applicable CAVAF CDRL and CAVAF system, version

8.0.1 or higher. Accurate and timely reporting of maintenance transactions into CAVAF is critical to the management of repair requirements and the management of world-wide asset distribution.

Contractor shall ensure asset record in CAVAF is an accurate reflection of physical assets on hand at all times.

2. Each CAVAF reporter shall submit a completed System Authorization Access Request, DD Form 2875, per instructions within 10 days after contract award date. All DD Form 2875(s) shall be digitally signed.

There “must be two CAVAF reporters” for the contractual reporting requirements to ensure there is no possibility of a lapse in reporting coverage.

3. User(s) shall complete initial DoD Information Assurance (IA) Cyber Awareness Challenge training and submit a course completion certificate with the DD Form 2875. IA Cyber Awareness Challenge course completion certification shall be accomplished annually. Users shall access IA training on the Cyber Awareness Challenge website, under the Department of Defense Employees section, click hyperlink;

“Launch New Cyber Awareness Challenge Department of Defense Version” using the following website:

http://iase.disa.eta/cyberchallenge/launchPage.htm

a. First time CAV AF users will email initial IA Cyber Awareness Challenge course completion certificates, AF Form 4394, AF User Agreement Statement, and completed DD Form 2875 to point of contact at applicable ICP (see item #4).

http://iase.disa.eta/cyberchallenge/launchPage.htm

FD2030-20-00004 11

b. All following annual course completion certificates shall be completed before lapse in certification occurs and will be emailed to respective ICP identified in paragraph 4a, 4b, and 4c below.

c. Product Functionality Caution: To meet technical functionality requirements, this awareness product was developed to function with Windows operating systems (Window 7, VISTA, and XP), when configured correctly) using either the Internet Explorer (IE) or Firefox browsers. Users employing either OS or browser may experience difficulties and may not be able to complete the training or print the certificate of completion. They Cyber Awareness Challenge course completion is a contractual requirement and the contractor must comply.

4. Reporters requiring the default password or password resets should contact their applicable ICP CAV AF System Administrator POC listed below:

a. Robins AFB, GA, call (478) 327-6602 or 327-6603, or send email request to:

406scms.cav.af.ar@us.af.mil

b. Hill AFB, UT, call (801) 586-3736, or send email request to:

420scms.cdm@us.af.mil

c. Tinker AFB, OK, call (405) 739-3229, or send email request to:

420.scms.tinker.cdm.workflow@us.af.mil

5. To access the CAVAF system, contractor and subcontractor reporters shall follow “initial log-in procedures” as prescribed within the Contractors User’s Guide.

6. Contractor shall ensure accountability of all Government Furnished Property (GFP) within their Enterprise Resource Planning (ERP) or Commercial Off-the-Shelf (COTS) system, which must be reported accurately for same GFP records within CAVAF at all times.

7. Contractual Induction-at-Risk of end items is prohibited on all repair contracts.

8. Contract/Delivery Order Closure Disposition– Government will provide disposition instructions to contractor’s reporter. Contractor shall begin shipping assets within 10 days of receiving government disposition instructions and have completed all shipping actions 30 days thereafter. Contractor shall be fully responsible to ensure all corresponding CAVAF reporting actions associated with disposition occur within one (1) business day of related shipment action.

9. All NSNs identified as Nuclear Weapon Related Materiel (NWRM) shall require contractor CAVAF reporting for production management, to track and report NWRM end items in repair with Serial Number identification within one (1) business day for asset visibility and serial number tracking. When receipted, Contractor’s reporter shall capture each NWRM asset’s Serial Number when reparable is received.

Contractors shall follow all NWRM management requirements outlined in AFI 20-110, NWRM Management, to include, but not limited to packaging, marking, labeling, storage, transportation and receipt of all NWRM assets, with emphasis on Positive Inventory Control (PIC) and records management by the contractor and government to assure compliance. The successful application of these procedures requires the full cooperation of all personnel associated with the storage, shipping, transshipping and receiving of all NWRM assets.

mailto:420scms.cdm@us.af.mil mailto:420.scms.tinker.cdm.workflow@us.af.mil

FD2030-20-00004 12

SPECIFIC CAVAF CONTRACTOR TRANSACTIONAL REPORTING REQUIREMENTS:

1. “Not-on-Contract” (NOC) receipt transactions apply to assets which are associated to a contractor facility DoDAAC and not an active contract delivery order. Regardless of asset condition code status, Not-on-contract shall be used for the following reporting actions:

a. Discrepancy Items – Are identified as misrouted shipments, misidentified shipments, or damaged end items. Contractor’s reporter will verify resolution weekly to acquire resolution to discrepancy within 30-days of receipt transaction. The contractor shall comply with disposition instructions provided by the Government within 10-days and complete all associated reporting actions within same period. Contractor reporting actions shall be resolved using reversals of individual record control document numbers (RCDN) or may be accomplished utilizing a ‘bulk’ shipment action of RCDN.

b. Inventory Control Point Items – are identified as assets stored at contractor facility and are not repair end items or discrepancies items. Movement of assets from “Not-on-Contract” category shall be resolved using reversals of individual record control document numbers (RCDN) or may be accomplished utilizing a ‘bulk’ shipment action of RCDN.

NOTE: Contractor is responsible for all “Not-on-Contract” assets ensuring physical asset balances are reflected and CAV AF reporting actions occur within one (1) business day of occurrence.

2. CAVAF receipt or reporting actions will not be utilized for quality deficiency report (QDR) items, as there is a separate process and tracking mechanism for them.

3. All Contract Line Item Number (CLIN) repairable assets shall be receipted in CAVAF under Receipt Type: On Contract (F). CAVAF generates an RCDN for each unit receipted and allows the reporter to assign a reference or serialization number for tracking purposes. Where no reference or serialization numbers are utilized, the oldest RCDNs (listed first) shall always be processed first. Any reversal actions shall be accomplished using the last RCDNs processed and no reversal actions shall occur without concurrence from the Production Management Specialist managing the contract.

4. The “Complete Date” entered into CAVAF cannot be dated prior to the DD250 date entered in the same screen. Contractor will validate that the DD250 shipment number and date entered into CAVAF are accurate. This requirement is also applicable to Condition Code H (Condemned) only when specifically directed by the contract.

5. Proper usage of DD Form 1348-1A, Issue Release/Receipt Document in relation to CAVAF reporting requirements.

a. Receipt Actions: Contractor’s reporter will use government issued shipment document numbers for CAVAF end item receipt transaction reporting only in the absence of missing DD Form 1348-1A or shipment document number. Contractors are not authorized to generate pseudo shipment document numbers for receipt transactions because this creates disconnects in shipment tracking within government inventory systems. NOTE: If the DD Form 1348-1A is missing or no shipment document number is available, contractors are to immediately contact Production Management Specialist (PMS), who will acquire

FD2030-20-00004 13

government issued shipment document number from the Inventory Management Specialist

(IMS).

b. Shipping Actions: DD Form 1348-1A shall be used as the shipping document for shipment transactions of all end items. A DD Form 1348-1A is also applicable to all Consolidated Serviceable Inventory/Consolidated Reparable Inventory (CSI/CRI) assets regardless of tracking or reporting purposes. A Material Inspection and Receiving Report, DD Form 250 or Requisition and Invoice/Shipping Document, DD Form 1149 are not authorized as a shipment document, and shall not accompany any material shipments on repair contracts.

CAVAF provides a DD Form 1348-1A in a Portable Document Format (PDF). DD Form 1348-1A shipping documents will be prepared for each NSN shipment from contractor’s facility, regardless of destination. The entire form, complete with bar coding, will be printed on a laser printer as specified under technical considerations. It is recommended the PDF be saved at the contractor’s facility prior to printing. The Contractor shall print three copies as required for shipping. Place one copy on the outside of the shipment container, one copy inside the shipment container, and retain the third copy for the contractor’s records. For end item shipments the DD Form 1348-1A shipment document number shall be comprised as one of the following actions:

i.Back to Depot Shipments:

(1) For a “single” unit NSN shipment, the default shipment document number will be the CAV AF record control document number (RCDN) of item being shipped.

(2) For “multiple” quantity shipments, it is recommended the CAV AF RCDN of the lead item of the shipment be used as the shipment document number.

ii. Amended Shipping Instructions (ASI): Are used to divert material that is due-in from a contractor to a requisitioner. Government disposition instructions will provide a shipment document number to the contractor to be utilized for CAV AF shipment transaction reporting and the DD Form 1348-1A.

c. In the event CAVAF system is inoperable or is on a scheduled downtime:

i. The DD Form 1348-1A shall be manually completed and generated (printed) by contractor, using the AFPUBS website.

ii. When CAVAF is again operational, the contractor shall resume with transactional reporting actions in a timely and accurate manner, including completing a DD Form 1348-1A (printing not required if manual DD1348-1A PDF file utilized) and the shipment process in CAV AF.

6. Upon contract expiration and/or becoming production complete, the contractor will complete a 100% physical inventory inspection. Any assets remaining at the facility within 30-days must be noted in an email request to the contracting officer (CO) and PMS for disposition instructions by the government. If none is provided, assets are to be returned to the depot and reported within CAVAF, shipping to the following addresses according to each national stock number (NSN) inventory management location by source of supply (SOS) code:

FD2030-20-00004 14

a. FHZ – Tinker AFB, the ship for disposition address to SW3211:

TYPE/CODE: A SW3211

DEF DISTRIBUTION DEPOT OF OKLAHOMA

CEN REC 3301 F AVE

BLDG 506, DR 22

TINKER AFB, OK, 73145-8000

b. FGZ – Ogden AFB, the ship for disposition address to SW3210:

TYPE/CODE: A SW3210

DLA DISTRIBUTION DEPOT HILL

7537 WARDLEIGH RD

BLDG 849W

HILL AFB, UT 84056-5734

c. FLZ – Robins AFB, the ship for disposition address to SW3119:

TYPE/CODE: A SW3119

DLA DISTRIBUTION WARNER ROBINS

455 BYRON STREET

BLDG 376

ROBINS AFB, GA 31098-1887

7. Systemic data problems created by contractor’s failure to report data accurately or in a timely manner are subject to immediate Program Management Review (PMR). Examples of documented system data problems include but are not limited to:

a. Timely reporting means compliance with 24 hour requirement for all contractor CAVAF reporting of maintenance transactions. Actual date information is required for all reporting actions. Contractor’s are not authorized to report all receipt, induction, complete and ship transactions the same day to ‘catch-up’ due to periodic reporting. This affects government inventory management systems and balances creating D035 Stock Control Supply System (SCSS) controlled exceptions (associated with same day reporting issue).

b. Contractors not using government issued DD Form 1348-1A document numbers on

CAVAF contractor reporting on end item receipt transactions. This creates a data variance disconnect with government inventory D035 Stock Control System (SCS). Contractors are required to use DD Form 1348-1A document numbers for end item receipt transactions.

NOTE: If the DD Form 1348-1A is missing or no shipment document number is available, contractors are to immediately contact Production Management Specialist (PMS) and acquire government issued shipment document number from Inventory Management Specialist (IMS).

c. Overages and shortages, for items which are part of this contract shall be reported by the contractor into CAVAF as received “On-Contract” with actual quantities received. Any

FD2030-20-00004 15

items which are not part of this contract shall be receipted as “Not-on-Contract”, which represents misdirected or misidentified assets.

8. RCDNs are systemically generated in CAVAF and should not be duplicated or fabricated with a suffix for shipment document numbers. RCDN is comprised of the CAVAF Contractors DoDAAC, the Julian date the RCDN was produced, and a four digit serial number (begins with 0001 each day). This affects government inventory management systems D035 SCSS controlled exceptions.

DISCREPANCIES INCIDENT TO SHIPMENT:

1. There are transportation and item discrepancies, each having different reporting requirements. Detailed information for each report is in the pertinent service publications.

2. Discrepancies incident to shipment include misidentified items, variations in quantity, non-requisitioned items, lost or damaged parcel post, and items in dubious condition. These discrepancies shall be reported and resolved using the DoD web-based application WebSDR link is https://www2.transactionservices.dla.mil/websdr/home.asp This system of reporting a Supply Discrepancy Report (SDR), formerly called Report of Discrepancy (ROD), has been developed in compliance with DoD regulations 4140.1-Vol 6 and DLM 4000.25, Vol 2, Ch 17 which requires automated SDR processing. In those situations where the SDR initiator is unable to gain access to the AF WebSDR, continued use of manual forms is permitted. A copy of the form will be forwarded through the CAO and Quality Assurance (QA) activity for corrective action.

3. Transportation discrepancies and item transaction discrepancies shall be coordinated with the DCMA Property Administrator and Administrative Contracting Officer (ACO) immediately upon discovery for corrective action in addition to AF WebSDR submittal.

4. Contract line items received with missing components (Missing On Induction, (MOI)) the contractor shall process a SDR (SF Form 364) immediately upon discovery in accordance with AFJMAN 23-215 and provide a copy of submitted MOI SDR form to the ACO within 2 days of discovery.

5. All misdirected shipments of GFP shall be reported to the Production Management Specialist (PMS) via email notification within three work days. The PMS will consult with issue appropriate disposition instructions for the misdirected items.

6. Overages, shortages, and misidentified items which are part of this contract and received by the contractor shall be reported into CAVAF with the actual received quantity and with the correct NSN. An SDR shall be processed in accordance with standard procedures identified above for these overages, shortages, and misidentified items.

CONTRACTOR COMMUNICATIONS NETWORK (CCN)

GENERAL INFORMATION:

2. Initial CAVAF training will be provided by the contracting ICP. Any follow up training will be the responsibility of the contractor. Training request and/or questions on CAVAF, please contact CAVAF System Administrators (SA) for contracts issued by respective ICP, from one of the following areas:

a. Robins AFB, GA, call (478) 327-6602 or 327-6603, or send email request to:

406scms.cav.af.ar@us.af.mil https://www2.transactionservices.dla.mil/websdr/home.asp

FD2030-20-00004 16

b. Hill AFB, UT, call (801) 586-3736, or send email request to:

c. 420scms.cdm@us.af.mil

d. Tinker AFB, OK, call (405) 739-3229, or send email request to:

420.scms.tinker.cdm.workflow@us.af.mil

i. Tinker AFB, OK, Contractor furnished material (CFM) contracts call;

(405) 736-7171 or (405) 736-2046

ii. Tinker AFB, OK, Government furnished material (GFM) contracts call:

(405) 739-7329 or (405) 736-7362

NOTE: CAVAF Contractor’s User’s Guide can be accessed via CAVAF main menu at bottom of screen.

mailto:420.scms.tinker.cdm.workflow@us.af.mil

STATEMENT OF WORK (SOW) Fll0-100, F118-100 FDT Sensors
TABLE OF CONTENTS Page
1.0 WORK SCOPE:
1.1 SOW Updates:
1.2 Quality System and Quality Assurance Plan:
1.3 Subcontractor and Vendor Management:
1.4 Safety:
1.5 General Services and Material:
1.7 Receiving:
1.7.1 Condemnation of Assets:
1.7.2 Supply Discrepancy Report (SDR):
1.7.3 Remanufacture
1.7.4 Remanufacture Procedures:
1.7.5. Deliverables Quality:
1.7.6 Designated Engineering Representative (DER) processes and procedures:
1.8 Packaging and Handling:
1.9 Shipping and Transportation:
1.10 Document Storage:
2.0 Reference & Technical Manuals:
SECTION III
3.1 Government Furnished Material (GFM):
3.2 Government Furnished Property (GFP):
APPENDIX A
ACRONYMS