About this file

This document is a Contract Data Requirements List (CDRL) that details the data items required for a federal contract opportunity related to a Turbine 1st Stage Duct Support component. The CDRL specifies the requirements for a First Article Qualification Test Plan and Procedures (CDRL A001) and a Test/Inspection Report (CDRL A002). Key details include:

The First Article Qualification Test Plan and Procedures must be submitted within 30 calendar days of contract award and include plans to verify all drawing requirements, non-destructive inspections, visual inspections, material properties, and manufacturing processes. The first article test report must be submitted within 120 calendar days of government approval of the test plan and demonstrate that all requirements have been satisfied. A government representative must coordinate on both the test plan and report. The data deliveries must be submitted on ISO-10149 compliant CD-ROMs in Adobe Acrobat format.

The related federal contract opportunity is for the procurement of Duct, Turbine, Aircraft. Offerors must be qualified sources per FAR 52.209-1 prior to award. The Government is not required to delay award to review pending Source Approval Requests, so offerors are encouraged to submit them as soon as possible. Quotes are due by the closing date stated in the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Duct, Turbine, Aircraft, newest first.
File Type Posted
DD_FORM_1653_TRNSP_DATA_REPORT.pdf PDF
AFMC158_PKG_RQMT_REPORT.pdf PDF
Solicitation - FA812124R0011.pdf PDF
MANUFACTURE_QUAL_RQMT.pdf PDF
LPF_QAR_FA_TEST_REPORT.pdf PDF
DD260_FA_REPORT.pdf PDF
DID_FIRST_ARTICLE_QUAL_TEST_PLAN_AND_PRO.pdf PDF
DID_TEST_AND_INSPECTION_REPORT.pdf PDF
SURPLUS_MATERIAL_EVAL.pdf PDF
ENGINEERING_DATA_LIST.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100/ P/N 4086297

E. CONTRACT / PR NO.

FD20302300295

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

First Article Qualification Test Plan and Procedures

3. SUBTITLE

NSN: 2840-01-504-2791NZ NOUN: Turbine 1st Stage Duct Support

4. AUTHORITY

DI-NDTI-81307A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

AFLCMC/LPSAA

7. DD 250 REQ

SD

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

1 XTIME

11. AS OF DATE

SEE BLOCK 16

12. DATE OF FIRST

SUBMISSION

SEE BLOCK 16

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Hobbs, Carly RNAME: 01 DEC 2022DATE:

Block 9: DIST STATEMENT REQUIRED: Distribution Statement A: Approved for public release; distribution is unlimited. Controlling DoD office is 848 SCMG/421 GUEA.

Disposal and destruction notices: Dispose of by putting it in a recycle container or regular trash receptacle.

Block 14: Deliveries shall be submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format.

Contractor must provide a plan to ensure that all drawing requirements are met on each first article. The plan should include the equipment and facilities utilized to verify all drawing requirements. As a minimum, the following information is required.

a. A list of all drawing dimension, tolerances and the equipment utilized to verify each dimension. An actual drawing should be submitted to correlate with the dimension list.

b. A plan to verify that all non-destructive inspections are met.

c. A plan to verify that all visual inspection requirements are met.

d. A plan to verify material properties to include mechanical properties, metallurgical properties and chemical compositions.

e. A plan to verify that all significant manufacturing processes are performed by sources that are currently approved/ certified by the OEM (P&W) or the CEA (AFLCMC/LPSAA).

f. A plan to verify that all forging or casting sources are currently approved/certified by the OEM (P&W) or the CEA (AFLCMC/LPSAA) if applicable. Guidelines for first article test plans are contained within LPF-QAR-003, attached.

A government representative must coordinate on the first article test plan. The first article test plan shall be received 30 calendar days from the date of contract.

Contractor will include any QAR findings relative to the test report with the final test report submitted to

AFLCMC/LZPED.

COORDINATORS:

AFLCMC/LZPED

3001 Staff Dr, Ste 1AB 85A Tinker AFB, OK 73145-3041 Attn: FA Monitor

0 2 0

0 2 015. TOTAL

G. PREPARED BY

Hobbs, Carly R

421 SCMS / GUMAA

405-582-5971

H. DATE

12 DEC 2022

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Bray, Benjamin M

AFLCMC / LPEA2 405-734-7558 / 884-7558

J. DATE

12-DEC-22

Page 1 of 2DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 28 Mar 2023

PREVIOUS EDITION MAY BE USED.

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100/ P/N 4086297

E. CONTRACT / PR NO.

FD20302300295

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Test/Inspection Report

3. SUBTITLE

NSN: 2840-01-504-2791NZ NOUN: Turbine 1st Stage Duct Support

4. AUTHORITY

DI-NDTI-80809B/T

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

AFLCMC/LPSAA

7. DD 250 REQ

SD

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

A

10. FREQUENCY

1 XTIME

11. AS OF DATE

SEE BLOCK 16

12. DATE OF FIRST

SUBMISSION

SEE BLOCK 16

13. DATE OF SUBSEQUENT

SUBMISSION

N/A

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Hobbs, Carly RNAME: 01 DEC 2022DATE:

Block 9: Distribution Statement A: Approved for public release; distribution is unlimited. Controlling DoD office is 848

SCMG/421 GUEA.

Disposal and destruction notices: Dispose of by putting it in a recycle container or regular trash receptacle.

Block 14: Deliveries shall be submitted on ISO-10149 compliant CD-ROM in Adobe Acrobat Portable Document Format.

Contractor format acceptable unless otherwise defined by applicable Data Item Description (DID).

The first article test report shall satisfy all requirements in the first article test plan. All drawing requirements must be satisfied including dimensions, visual inspections, non-destructive inspections (NDIs), manufacturing processes and material requirements. The test report shall indicate that any sources used to perform significant manufacturing processes are approved/certified by the OEM (P&W) or the CEA (AFLCMC/LPSAA).

A copy of the part process sheets shall be provided also. A government representative must coordinate on the test report.

Guidelines for the test reports are contained within LPF-QAR-003 Rev E, attached.

The first article test reports shall be received at OC-ALC/ENRS 120 calendar days from the date of government approval of test plan.

Contractor will include any QAR findings relative to the test report with the final test report submitted to

AFLCMC/LZPED.

COORDINATORS:

AFLCMC/LZPED

3001 Staff Dr, Ste 1AB 85A Tinker AFB, OK 73145-3041 Attn: FA Monitor

0 2 0

0 2 015. TOTAL

G. PREPARED BY

Hobbs, Carly R

421 SCMS / GUMAA

405-582-5971

H. DATE

12 DEC 2022

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Bray, Benjamin M

AFLCMC / LPEA2 405-734-7558 / 884-7558

J. DATE

12-DEC-22

Page 2 of 2DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 28 Mar 2023

PREVIOUS EDITION MAY BE USED.