2444577_CDRL1_REPORT.pdf

PDF 112 KB Posted

Attached to
F-100 Divergent Nozzle Segment Seal Assembly NSN: 2840-01-254-3054NZ P/N: 4072683
Solicitation number
FA812119R0022
Issued by

About this file

CDRLS

View the file

Other files

File Type Posted
FA812119R0022.pdf PDF
2624683_EI.pdf PDF
2791914_PKGRQMT_REPORT.pdf PDF
2433160_WAGEDET.doc DOC document
2791913_TRNSPDATA_REPORT.pdf PDF
QASP.doc DOC document
2566463_RDL_REPORT.pdf PDF
FA812119R0022.pdf PDF
2788621_JUSTAPPR.docx DOCX document
2797555_ATTACH.xlsx XLSX spreadsheet
2797867_PWS.doc DOC document
2791987_ATTACH_Packaging_Inst.pdf PDF
2615424_QUALRQMT.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100-PW-220/229 / Seal, Air, Aircraft G

E. CONTRACT / PR NO.

FD20301801798

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Commercial Asset Visibility Air Force (CAV AF) End Item Reporting

3. SUBTITLE

CAV AF

4. AUTHORITY

DI-MGMT-81634C

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

421 SCMS/GUMAB

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

DAILY

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 02 MAR 2018DATE:

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID and/or Contract Repair PWS. This information will be accessed by the program office PMS and by 422 SCMS/GUBAB Contract Monitors in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF Contractor User Guide, Version 9.0.4 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF. Each user shall have an Identity Certificate only; an encryption certificate is not required. Reporting must be accomplished for each Contractor facility/location AND any subcontractor locations.

3. Transactional Training will be provided by 422 SCMS/GUBAB Contract Monitors, (405) 736-7171.

4. This DD Form 1423-1 applies to end item repair CAV AF reporting only contracts, commonly referred to as Contractor Furnished Material (CFM) type contracts.

5. It is imperative the CAV AF Proof of Shipment reporting actions are accomplished by the contractor.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or one business day of a maintenance action IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor User's Guide.

Block 11: Data shall be current within one business day of last End Item maintenance occurrence and reflect an accurate representation/status of all assets at a contractor for repair.

Block 12: Date of first submission shall be within one business day following a maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Within one business day of each maintenance action/occurrence.

The contractor's CAV AF reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities); shop floor, bond room and/or receiving/shipping docks, etc. for each repair.

COORDINATORS:

OC-ALC 0 1 0

0 1 015. TOTAL

Page 1 of 4DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 30 Apr 2019

PREVIOUS EDITION MAY BE USED.

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

12 MAR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

SNEED.TOMMY.J.1062507779

421 SCMS / GUMAB 405-734-5446 / 884-5446

J. DATE

06 MAR 2018

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100-PW-220/229 / Seal, Air, Aircraft G

E. CONTRACT / PR NO.

FD20301801798

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Contract Depot Maintenance (CDM) Production Report

3. SUBTITLE

CDM Production Report

4. AUTHORITY

DI-PSSS-81995

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

421 SCMS/GUMAB

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

MTHLY

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 02 MAR 2018DATE:

Manual Report - Ref Block 11, 12, and 13:

Contractor shall report by contract delivery order on all applicable categories, totals and on-hand balances, IAW DI- PSSS-81995, providing TABLE I for EACH repair location, including subcontractor facilities, for the contracts maintenance occurrence actions during the reporting period.

Contractor shall report on production, providing TABLE I for EACH repair location, including subcontractor facilities, for which the contractor produced assets during the reporting period.

Reports will continue to be forwarded unless terminated by the 421 SCMS/GUMAB Production Management Specialist (PMS). The report following the final reporting period on contract will be annotated "Final Report".

Complete address for distribution:

421 SCMS/GUMAB

3001 Staff Drive, Annex 4, Suite 1AF1 115 Tinker AFB, OK 73145-3033

Commercial phone number: (405) 734-5446 Email preferred: Tommy.Sneed@us.af.mil

Contractor format acceptable unless otherwise defined by applicable Data Item Description (DID).

DID Requirements are NOT tailored.

Delivery CANNOT be deferred.

The contractor's CAV AF reporting shall reflect their inventory property control management system data records which shall represent timely and accurate accountability of AF inventory assets at the physical location(s) of the contractor's repair facility (including subcontractor facilities); shop floor, bond room and/or receiving/shipping docks, etc. for each repair, The report shall be provided within 5 business days of the previous month's last calendar date.

COORDINATORS:

421 SCMS/GUMAB 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

12 MAR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

SNEED.TOMMY.J.1062507779

421 SCMS / GUMAB 405-734-5446 / 884-5446

J. DATE

06 MAR 2018

Page 2 of 4DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 30 Apr 2019

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100-PW-220/229 / Seal, Air, Aircraft G

E. CONTRACT / PR NO.

FD20301801798

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Technical Order Improvement Report and Reply

3. SUBTITLE

AFTO Form 22

4. AUTHORITY

DI-TMSS-80229D

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

PWS

6. REQUIRING OFFICE

421 SCMS/GUMAB

7. DD 250 REQ

NO

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

ASREQ

11. AS OF DATE

As Required

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

As Required

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 31 AUG 2016DATE:

Changes to the office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

This report shall be submitted IAW TO 00-5-1 using AFTO 22 for Air Force TOs. The contractor shall report when an error or improvement changes the meaning of the instructions or information contained in the technical directives where it may prevent mission performance. Also, this report shall be used by the contractor to indicate omissions of pertinent overhaul procedures in TOs or desired changes to TO date.

COORDINATORS:

421 SCMS/GUMAB

3001 Staff Drive, Annex 4, Suite 1AF1 115 Tinker Air Force Base, Oklahoma 73145-3033

0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

12 MAR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

SNEED.TOMMY.J.1062507779

421 SCMS / GUMAB 405-734-5446 / 884-5446

J. DATE

06 MAR 2018

Page 3 of 4DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 30 Apr 2019

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

F100-PW-220/229 / Seal, Air, Aircraft G

E. CONTRACT / PR NO.

FD20301801798

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Deficiency Report (DR)

3. SUBTITLE

DR

4. AUTHORITY

DI-PSSS-81535A

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

N/A

6. REQUIRING OFFICE

421 SCMS/GUMAB

7. DD 250 REQ

LT

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

N/A

10. FREQUENCY

ASREQ

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

As Required

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Zilar, Dale NNAME: 22 SEP 2016DATE:

Blocks 10, 11, 12, and 13: As defined by T.O. 00-35D-54, submit a report whenever a material or quality deficiency occurs using SF 368 or equivalent.

Changes to office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

COORDINATORS:

421 SCMS/GUMAB 0 1 0

0 1 015. TOTAL

G. PREPARED BY

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

H. DATE

12 MAR 2018

I. APPROVED BY

//DIGITALLY SIGNED//

SNEED.TOMMY.J.1062507779

421 SCMS / GUMAB 405-734-5446 / 884-5446

J. DATE

06 MAR 2018

Page 4 of 4DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 30 Apr 2019

File details come from the government source that posted it.