FA8119-16-R-0013_FINAL.pdf
PDF 177 KB Posted
- Attached to
- Repair of AN/MPN-14K Electron Tube
- Solicitation number
- FA811916R0013
About this file
Request for Proposal
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD FORM 1447 (2/2012)
Prescribed by GSA FAR (48 CFR) 53.215-1(d)
4. SOLICITATION NUMBER
FA8119-16-R-0013
6.SOLICITATION ISSUE DATE
8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOSB PROGRAM
HUBZONE SMALL
BUSINESS EDWOSB
SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS NAICS CODE: 336413
8(A) SIZE STANDARD: 1250
DATE SIGNED
28. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER
SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH
ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.
SEE LINE ITEM SCHEDULE
22.
AMOUNT
16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253
FULL AND OPEN COMPETITION (c) (1 ) (c) ( )
DATE SIGNED
27. SIGNATURE OF OFFEROR/CONTRACTOR
20.
UNIT
21.
UNIT PRICE
19.
QUANTITY
13. CONTRACTOR OFFEROR CODE FACILITY CODE
11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR
DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLK 9
ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS
SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND
CONDITIONS STATED HEREIN. *120
RATING
DO: A1
3. AWARD/EFFECTIVE DATE
FA8119
2. CONTRACT NO.
X
CHECK IF REMITTANCE IS DIFFERENT
AND PUT SUCH ADDRESS IN OFFER
17.
ITEM NO.
12. ADMINISTERED BY CODE
Total
SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T
SCD:B
NAME AND TITLE OF SIGNER (TYPE OR PRINT) NAME OF CONTRACTING OFFICER
24. AWARD AMOUNT (FOR GOVT USE ONLY)
23. ACCOUNTING AND APPROPRIATION DATA
SEE SCHEDULE
5. SOLICITATION TYPE
SEALED BIDS NEGOTIATED
(IFB) (RFP)
15. PROMPT PAY DISCOUNT
25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH
OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT
THE TERMS AND CONDITIONS SPECIFIED HEREIN.
10. ITEMS TO BE PURCHASED (BRIEF DESCRIPTION)
SUPPLIES SERVICES Other Aircraft Part and Auxiliary Equipment Manufacturing
9.
LATE OFFERS ARE SUBJECT TO LATE PROPOSAL PROVISIONS INCORPORATED HEREIN. ALL OFFERS ARE SUBJECT TO SUCH PROVISIONS, REPRESENTATIONS, CERTIFICATIONS AND SPECIFICATIONS AS ARE ATTACHED OR INCORPORATED BY REFERENCE.
SOLICITATION: SEALED OFFERS WILL BE RECEIVED AT THE ISSUING OFFICE UNTIL
16-MAY-2016 3:00PM
X
18.
SCHEDULE OF SUPPLIES/SERVICES
14. PAYMENT WILL BE MADE BY CODE
(SEE ESP CLAUSE 252.232-7003.)
X
7. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, AFSC PZABC
3001 STAFF DR STE 1AD2 99A
TINKER AFB OK 73145-3015
BUYER: Jeff Schmidt/AFSC/PZABC jeffrey.schmidt.19@us.af.mil Phone: (405) 739- 4206 No Collect Calls
X
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 350)SOLICITATION/CONTRACT
BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.
J
SF 1447 (rev 2/2012) BACK
NO RESPONSE FOR THE REASONS CHECKED
TYPE OR PRINT NAME AND TITLE OF SIGNER
SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)
WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF
ITEMS INVOLVED
WE DO
OTHER (Specify)
CANNOT COMPLY WITH SPECIFICATIONS
CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT
FOLD
FOLD
SOLICITATION NO. FA811916R0013
DUE: 16 MAY 2016 3:00 PM
FROM: AFFIX
STAMP
HERE
TO:
ATTN: Jeff Schmidt/AFSC/PZABC
DEPARTMENT OF THE AIR FORCE, AFSC PZABC
3001 STAFF DR STE 1AD2 99A
TINKER AFB OK 73145-3015
Request for Proposal FA8119-16-R-0013
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Tear Down, Test, & Evaluation (TT&E)
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
15 EA
CLIN ACRN ACRN Total
0001 AA
NSN: 5960-01-274-7627 IM
ELECTRON TUBE
Tunable frequency, integral magnet, air cooled, 1000Kw min power output, 2.7-2.9 GHz.
ENVELOPE MATERIAL: METAL
Manufacturer Part Number 24930 190999-1
5W432 PM110S
88236 VMS-1610
89146 PM110S
T6976 190999-1 Associated Document(s) Line Item(s)
FD20301401685 02 0001AA
Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Invoicing, Receipt, Acceptance, and Property Transfer iRAPT Quality Assurance: Standard Inspection IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAA ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded
Order or Reparable Assets, Whichever is Later
Req No / Pri
Required Delivery
A SW3211 15 EA *15 Calendar Days Non-MilStrip
Proposed Delivery
A SW3211 15 EA
Perform in accordance with Performance Work Statement (PWS) Teardown, Test, and Evaluate (TT&E) instructions.
Upon completion of Teardown, Test, and Evaluate actions, a Teardown Deficiency Report will be furnished to the Government IAW CDRL A003 for the basic year, B003 for option year 1, C003 for option year 2, D003 for option year 3, and E003 for option year 4.
In the event that the TT&E process yields a no fault found result, reference Quality Assurance and Inspection / Ship To / Transport / and packaging specifications in the TT&E Contract Line Item Number (CLIN) for return of electron tube to the Government.
In the event that the TT&E process yields a fault found result and a determination of Minor Repair, Major Repair, or BER is made, disregard the Quality Assurance / Inspection / Ship To / Transport instructions in the TT&E CLIN and refer to the applicable Minor Repair or Major repair CLIN in the contract for this type of information. In the case of a BER determination, refer to the PWS instructions concerning BER.
The following table modifies and/or supplements the information provided in CDRL A003, B003, C003, D003, E003 and the corresponding Data Item Description (DID), Teardown Deficiency Report (DI-ALSS-81534):
CDRL or DID Identification Code
Block/Section Current Information provided
Replace* Supplementary** Information
CDRL: A003, B003, C003,
D003, E003
10. Frequency See Block 16 One report per order placed against the basic contract*
CDRL: A003, B003, C003,
D003, E003
11. As Of Date See Block 16 Requirement begins with first order against the basic contract*
CDRL: A003, B003, C003,
D003, E003
12. Date of First Submission See Block 16 15 calendar days after receipt of first funded order or 15 days after receipt of assets, whichever is later*
CDRL: A003, B003, C003,
D003, E003
13. Date of Subsequent Submission
See Block 16 15 calendar days after receipt of any subsequent funded order or 15 days after receipt of assets, whichever is later*
CDRL: A003, B003, C003,
D003, E003
16. Remarks Block 7: All Inspection and acceptance shall be at destination utilizing WAWF. A combination of an invoice and receiving report shall be submitted through WAWF in order to receive payment for data reports. Blocks 10, 11, 12, and 13: To be negotiated on call by demand.
Block 7: All inspection and acceptance shall be at destination utilizing Invoicing, Receipt, Acceptance, and Property Transfer (iRAPT)
Data reports are not separately priced but all reports for the applicable contract period must be submitted in iRAPT before payment will be processed.*
DID, Teardown Deficiency Report, DI-ALSS-81534
10. Preparation Instructions (Current preparation instructions still apply but will be supplemented by the Replace, Supplementary info column)
See Replace, Supplementary Information description below.**
Replace, Supplementary Information Description for DID, Teardown Deficiency Report, DI-ALSS-81534:
As part of the Teardown Deficiency Report required with each order placed against the basic contract, the contractor must assert one of the following conditions for each electron tube.
1. No Fault Found
2. Minor Repair Required – Standard justification of reason for repair/type of repair
3. Major Repair Required – Standard justification of reason for repair/type of repair
4. Beyond Economical Repair (BER) – Advanced justification of reason for BER status. This repair exceeds the scope of
Heavy Repair as defined by the Performance Work Statement (PWS).
5. Condemnation – With CO approval, the contractor may condemn any electron tube after the tube has been through the repair process three (3) times. The contactor will request authority to condemn any electron tube by providing the CO / CS the serial number via electronic mail to prove the electron tube meets the requirements of PWS paragraph 1.6.
Standard Justification
The standard justification will address the technical reason for level of repair selected, delivery order number, electron tube part number, electron tube serial number for each electron tube. A single sentence for each electron tube may satisfy the justification requirement. The CO reserves the right to challenge any contractor determination that is a product of the TT&E process. Disagreements resulting from the contractor providing insufficient substantiation regarding a BER determination and a higher than necessary level of repair determination will be documented in the Contractor Performance Assessment Reporting (CPAR) tool.
Advanced Justification
The Advanced Justification includes all requirements and provisions outlined in the Standard Justification and will provide a cost breakdown to continue repair versus BER condemnation decisions.
The CO also reserves the right to request more information regarding the TT&E decision from the contractor, to which the contractor must comply with the best of their ability.
The right to request more information regarding TT&E and the right to disagree and report finding in the CPAR tool are mutually exclusive.
Repair Level I (Minor Repair)
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
15 EA
CLIN ACRN ACRN Total
0002 AA
NSN: 5960-01-274-7627 IM
ELECTRON TUBE
Tunable frequency, integral magnet, air cooled, 1000Kw min power output, 2.7-2.9 GHz.
ENVELOPE MATERIAL: METAL
Manufacturer Part Number 24930 190999-1
5W432 PM110S
88236 VMS-1610
89146 PM110S
89146 VMS-1610
T6976 190999-1 Associated Document(s) Line Item(s)
FD20301401685 02 0001
Priority: R
Repair Level I (Minor Repair)
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Invoicing, Receipt, Acceptance, and Property Transfer iRAPT Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
IUID Required: Yes Title Number Date Tailoring
ISO 9001-2008 2008
Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAA ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded
Order or Reparable Assets, Whichever is Later
Req No / Pri
Required Delivery
A SW3211 15 EA *120 Calendar Days Non-MilStrip
Proposed Delivery
A SW3211 15 EA
Repair Level II (Major Repair)
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
15 EA
CLIN ACRN ACRN Total
0003 AA
NSN: 5960-01-274-7627 IM
ELECTRON TUBE
Tunable frequency, integral magnet, air cooled, 1000Kw min power output, 2.7-2.9 GHz.
ENVELOPE MATERIAL: METAL
Manufacturer Part Number 24930 190999-1
5W432 PM110S
88236 VMS-1610
89146 PM110S
89146 VMS-1610
T6976 190999-1 Associated Document(s) Line Item(s)
FD20301401685 02 0001
Repair Level II (Major Repair)
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year
Inspection: Origin Acceptance: Origin Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAA ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded
Order or Reparable Assets, Whichever is Later
Req No / Pri
Required Delivery
A SW3211 15 EA *120 Calendar Days
Proposed Delivery
A SW3211 15 EA
Over & Above
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year Item No.
Firm Fixed Price Quantity U/I Unit Price To Be Negotiated
1 LO
CLIN ACRN ACRN Total
0004 AA
Over & Above Over and Above estimated total $25,900 Associated Document(s) Line Item(s)
FD20301401685 02 0002
Priority: R
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 ACCT 09
Type / Ship To Quantity (U/I) Over and above to be determined on a case by case basis per PWS
Req No / Pri
Over & Above
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year Required Delivery
A SW3211 1 LO Over and above to be dete
Proposed Delivery
A SW3211 1 LO
Data Line Item
NOT SEPARATELY PRICED
Item No.
Firm Fixed Price Quantity U/I Unit Price Not Separately Priced
1 LO
CLIN ACRN ACRN Total
0005 AA
Data CAVAF reporting (DATA) line IAW PWS and all associated DID's and CDRL's Associated Document(s) Line Item(s)
FD20301401685 02 0003
Priority: R
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Type / Ship To PACRN Mark For
ACCT 09
Type / Ship To Quantity (U/I) *ARO See CDRL for delivery requirements of data items.
Req No / Pri
Required Delivery
1 LO *1 Hours
Proposed Delivery
1 LO
Tear Down, Test, & Evaluation (TT&E) Option Year 1
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
10 EA
CLIN ACRN ACRN Total
1001 AA
NSN: 5960-01-274-7627 IM
ELECTRON TUBE
Tunable frequency, integral magnet, air cooled, 1000Kw min power output, 2.7-2.9 GHz.
Tear Down, Test, & Evaluation (TT&E) Option Year 1
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year
ENVELOPE MATERIAL: METAL
Manufacturer Part Number 24930 190999-1
5W432 PM110S
88236 VMS-1610
89146 PM110S
T6976 190999-1 Associated Document(s) Line Item(s)
FD20301401685 02 0001AA
Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Invoicing, Receipt, Acceptance, and Property Transfer iRAPT Quality Assurance: Standard Inspection IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAA ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded
Order or Reparable Assets, Whichever is Later
Req No / Pri
Required Delivery
A SW3211 10 EA *15 Calendar Days Non-MilStrip
Proposed Delivery
A SW3211 10 EA
Perform in accordance with Performance Work Statement (PWS) Teardown, Test, and Evaluate (TT&E) instructions.
Upon completion of Teardown, Test, and Evaluate actions, a Teardown Deficiency Report will be furnished to the Government IAW CDRL A003 for the basic year, B003 for option year 1, C003 for option year 2, D003 for option year 3, and E003 for option year 4.
In the event that the TT&E process yields a no fault found result, reference Quality Assurance and Inspection / Ship To / Transport / and packaging specifications in the TT&E Contract Line Item Number (CLIN) for return of electron tube to the Government.
In the event that the TT&E process yields a fault found result and a determination of Minor Repair, Major Repair, or BER is made, disregard the Quality Assurance / Inspection / Ship To / Transport instructions in the TT&E CLIN and refer to the applicable Minor Repair or Major repair CLIN in the contract for this type of information. In the case of a BER determination, refer to the PWS instructions concerning BER.
The following table modifies and/or supplements the information provided in CDRL A003, B003, C003, D003, E003 and the corresponding Data Item Description (DID), Teardown Deficiency Report (DI-ALSS-81534):
CDRL or DID Identification Code
Block/Section Current Information provided
Replace* Supplementary** Information
CDRL: A003, B003, C003,
D003, E003
10. Frequency See Block 16 One report per order placed against the basic contract*
CDRL: A003, B003, C003,
D003, E003
11. As Of Date See Block 16 Requirement begins with first order against the basic contract*
CDRL: A003, B003, C003,
D003, E003
12. Date of First Submission See Block 16 15 calendar days after receipt of first funded order or 15 days after receipt of assets, whichever is later*
CDRL: A003, B003, C003,
D003, E003
13. Date of Subsequent Submission
See Block 16 15 calendar days after receipt of any subsequent funded order or 15 days after receipt of assets, whichever is later*
CDRL: A003, B003, C003,
D003, E003
16. Remarks Block 7: All Inspection and acceptance shall be at destination utilizing WAWF. A combination of an invoice and receiving report shall be submitted through WAWF in order to receive payment for data reports. Blocks 10, 11, 12, and 13: To be negotiated on call by demand.
Block 7: All inspection and acceptance shall be at destination utilizing Invoicing, Receipt, Acceptance, and Property Transfer (iRAPT)
Data reports are not separately priced but all reports for the applicable contract period must be submitted in iRAPT before payment will be processed.*
DID, Teardown Deficiency Report, DI-ALSS-81534
10. Preparation Instructions (Current preparation instructions still apply but will be supplemented by the Replace, Supplementary info column)
See Replace, Supplementary Information description below.**
Replace, Supplementary Information Description for DID, Teardown Deficiency Report, DI-ALSS-81534:
As part of the Teardown Deficiency Report required with each order placed against the basic contract, the contractor must assert one of the following conditions for each electron tube.
1. No Fault Found
2. Minor Repair Required – Standard justification of reason for repair/type of repair
3. Major Repair Required – Standard justification of reason for repair/type of repair
4. Beyond Economical Repair (BER) – Advanced justification of reason for BER status. This repair exceeds the scope of
Heavy Repair as defined by the Performance Work Statement (PWS).
5. Condemnation – With CO approval, the contractor may condemn any electron tube after the tube has been through the repair process three (3) times. The contactor will request authority to condemn any electron tube by providing the CO / CS the serial number via electronic mail to prove the electron tube meets the requirements of PWS paragraph 1.6.
Standard Justification
The standard justification will address the technical reason for level of repair selected, delivery order number, electron tube part number, electron tube serial number for each electron tube. A single sentence for each electron tube may satisfy the justification requirement. The CO reserves the right to challenge any contractor determination that is a product of the TT&E process. Disagreements resulting from the contractor providing insufficient substantiation regarding a BER determination and a higher than necessary level of repair determination will be documented in the Contractor Performance Assessment Reporting (CPAR) tool.
Advanced Justification
The Advanced Justification includes all requirements and provisions outlined in the Standard Justification and will provide a cost breakdown to continue repair versus BER condemnation decisions.
The CO also reserves the right to request more information regarding the TT&E decision from the contractor, to which the contractor must comply with the best of their ability.
The right to request more information regarding TT&E and the right to disagree and report finding in the CPAR tool are
Option Year 1
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
10 EA
CLIN ACRN ACRN Total
1002 AA
NSN: 5960-01-274-7627 IM
ELECTRON TUBE
Tunable frequency, integral magnet, air cooled, 1000Kw min power output, 2.7-2.9 GHz.
ENVELOPE MATERIAL: METAL
Manufacturer Part Number 24930 190999-1
5W432 PM110S
88236 VMS-1610
89146 PM110S
89146 VMS-1610
T6976 190999-1 Associated Document(s) Line Item(s)
FD20301401685 02 0001
Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Invoicing, Receipt, Acceptance, and Property Transfer iRAPT Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAA ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
Req No / Pri
Repair Level I (Minor Repair) Option Year 1
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year Required Delivery
A SW3211 10 EA *120 Calendar Days Non-MilStrip
Proposed Delivery
A SW3211 10 EA
Repair Level II (Major Repair) Option Year 1
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
10 EA
CLIN ACRN ACRN Total
1003 AA
NSN: 5960-01-274-7627 IM
ELECTRON TUBE
Tunable frequency, integral magnet, air cooled, 1000Kw min power output, 2.7-2.9 GHz.
ENVELOPE MATERIAL: METAL
Manufacturer Part Number 24930 190999-1
5W432 PM110S
88236 VMS-1610
89146 PM110S
89146 VMS-1610
T6976 190999-1 Associated Document(s) Line Item(s)
FD20301401685 02 0001
Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Invoicing, Receipt, Acceptance, and Property Transfer iRAPT Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAA ACCT 09
Repair Level II (Major Repair) Option Year 1
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
Req No / Pri
Required Delivery
A SW3211 10 EA *120 Calendar Days Non-MilStrip
Proposed Delivery
A SW3211 10 EA
Over & Above Option Year 1
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year Item No.
Firm Fixed Price Quantity U/I Unit Price To Be Negotiated
1 LO
CLIN ACRN ACRN Total
1004 AA
Over and Above Over and Above estimated total $25,900 Associated Document(s) Line Item(s)
FD20301401685 02 0002
Priority: R
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 ACCT 09
Type / Ship To Quantity (U/I) Over and above to be determined on a case by case basis per PWS
Req No / Pri
Required Delivery
A SW3211 1 LO Over and above to be dete
Proposed Delivery
A SW3211 1 LO
Data Line Item Option Year 1
NOT SEPARATELY PRICED
Item No.
Firm Fixed Price Quantity U/I Unit Price Not Separately Priced
Data Line Item Option Year 1
NOT SEPARATELY PRICED
1 LO
CLIN ACRN ACRN Total
1005 AA
Data CAVAF reporting (DATA) line IAW PWS and all associated DID's and CDRL's Associated Document(s) Line Item(s)
FD20301401685 02 0003
Priority: R
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Invoicing, Receipt, Acceptance, and Property Transfer iRAPT Quality Assurance: Standard Inspection Type / Ship To PACRN Mark For
ACCT 09
Type / Ship To Quantity (U/I) *ARO See CDRL for delivery requirements of data items.
Req No / Pri
Required Delivery
1 LO *1 Hours
Proposed Delivery
1 LO
Tear Down, Test, & Evaluation (TT&E) Option Year 2
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
6 EA
CLIN ACRN ACRN Total
2001 AA
NSN: 5960-01-274-7627 IM
ELECTRON TUBE
Tunable frequency, integral magnet, air cooled, 1000Kw min power output, 2.7-2.9 GHz.
ENVELOPE MATERIAL: METAL
Manufacturer Part Number 24930 190999-1
5W432 PM110S
88236 VMS-1610
89146 PM110S
T6976 190999-1 Associated Document(s) Line Item(s)
FD20301401685 02 0001AA
Tear Down, Test, & Evaluation (TT&E) Option Year 2
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Invoicing, Receipt, Acceptance, and Property Transfer iRAPT Quality Assurance: Standard Inspection IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAA ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
Req No / Pri
Required Delivery
A SW3211 6 EA *15 Calendar Days Non-MilStrip
Proposed Delivery
A SW3211 6 EA
Perform in accordance with Performance Work Statement (PWS) Teardown, Test, and Evaluate (TT&E) instructions.
Upon completion of Teardown, Test, and Evaluate actions, a Teardown Deficiency Report will be furnished to the Government IAW CDRL A003 for the basic year, B003 for option year 1, C003 for option year 2, D003 for option year 3, and E003 for option year 4.
In the event that the TT&E process yields a no fault found result, reference Quality Assurance and Inspection / Ship To / Transport / and packaging specifications in the TT&E Contract Line Item Number (CLIN) for return of electron tube to the Government.
In the event that the TT&E process yields a fault found result and a determination of Minor Repair, Major Repair, or BER is made, disregard the Quality Assurance / Inspection / Ship To / Transport instructions in the TT&E CLIN and refer to the applicable Minor Repair or Major repair CLIN in the contract for this type of information. In the case of a BER determination, refer to the PWS instructions concerning BER.
The following table modifies and/or supplements the information provided in CDRL A003, B003, C003, D003, E003 and the corresponding Data Item Description (DID), Teardown Deficiency Report (DI-ALSS-81534):
CDRL or DID Identification Code
Block/Section Current Information provided
Replace* Supplementary** Information
CDRL: A003, B003, C003,
D003, E003
10. Frequency See Block 16 One report per order placed against the basic contract*
CDRL: A003, B003, C003,
D003, E003
11. As Of Date See Block 16 Requirement begins with first order against the basic contract*
CDRL: A003, B003, C003,
D003, E003
12. Date of First Submission See Block 16 15 calendar days after receipt of first funded order or 15 days after receipt of assets, whichever is later*
CDRL: A003, B003, C003,
D003, E003
13. Date of Subsequent Submission
See Block 16 15 calendar days after receipt of any subsequent funded order or 15 days after receipt of assets, whichever is later*
CDRL: A003, B003, C003,
D003, E003
16. Remarks Block 7: All Inspection and acceptance shall be at destination utilizing WAWF. A combination of an invoice and receiving report shall be submitted through WAWF in order to receive payment for data reports. Blocks 10, 11, 12, and 13: To be negotiated on call by demand.
Block 7: All inspection and acceptance shall be at destination utilizing Invoicing, Receipt, Acceptance, and Property Transfer (iRAPT)
Data reports are not separately priced but all reports for the applicable contract period must be submitted in iRAPT before payment will be processed.*
DID, Teardown Deficiency Report, DI-ALSS-81534
10. Preparation Instructions (Current preparation instructions still apply but will be supplemented by the Replace, Supplementary info column)
See Replace, Supplementary Information description below.**
Replace, Supplementary Information Description for DID, Teardown Deficiency Report, DI-ALSS-81534:
As part of the Teardown Deficiency Report required with each order placed against the basic contract, the contractor must assert one of the following conditions for each electron tube.
1. No Fault Found
2. Minor Repair Required – Standard justification of reason for repair/type of repair
3. Major Repair Required – Standard justification of reason for repair/type of repair
4. Beyond Economical Repair (BER) – Advanced justification of reason for BER status. This repair exceeds the scope of
Heavy Repair as defined by the Performance Work Statement (PWS).
5. Condemnation – With CO approval, the contractor may condemn any electron tube after the tube has been through the repair process three (3) times. The contactor will request authority to condemn any electron tube by providing the CO / CS the serial number via electronic mail to prove the electron tube meets the requirements of PWS paragraph 1.6.
Standard Justification
The standard justification will address the technical reason for level of repair selected, delivery order number, electron tube part number, electron tube serial number for each electron tube. A single sentence for each electron tube may satisfy the justification requirement. The CO reserves the right to challenge any contractor determination that is a product of the TT&E process. Disagreements resulting from the contractor providing insufficient substantiation regarding a BER determination and a higher than necessary level of repair determination will be documented in the Contractor Performance Assessment Reporting (CPAR) tool.
Advanced Justification
The Advanced Justification includes all requirements and provisions outlined in the Standard Justification and will provide a cost breakdown to continue repair versus BER condemnation decisions.
The CO also reserves the right to request more information regarding the TT&E decision from the contractor, to which the contractor must comply with the best of their ability.
The right to request more information regarding TT&E and the right to disagree and report finding in the CPAR tool are
Option Year 2
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
6 EA
CLIN ACRN ACRN Total
2002 AA
NSN: 5960-01-274-7627 IM
ELECTRON TUBE
Tunable frequency, integral magnet, air cooled, 1000Kw min power output, 2.7-2.9 GHz.
ENVELOPE MATERIAL: METAL
Manufacturer Part Number 24930 190999-1
5W432 PM110S
88236 VMS-1610
89146 PM110S
89146 VMS-1610
T6976 190999-1 Associated Document(s) Line Item(s)
FD20301401685 02 0001
Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Invoicing, Receipt, Acceptance, and Property Transfer iRAPT Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAA ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
Req No / Pri
Required Delivery
A SW3211 6 EA *120 Calendar Days Non-MilStrip
Proposed Delivery
A SW3211 6 EA
Repair Level II (Major Repair) Option Year 2
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
6 EA
CLIN ACRN ACRN Total
2003 AA
NSN: 5960-01-274-7627 IM
ELECTRON TUBE
Tunable frequency, integral magnet, air cooled, 1000Kw min power output, 2.7-2.9 GHz.
ENVELOPE MATERIAL: METAL
Manufacturer Part Number 24930 190999-1
5W432 PM110S
88236 VMS-1610
89146 PM110S
89146 VMS-1610
T6976 190999-1 Associated Document(s) Line Item(s)
FD20301401685 02 0001
Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Invoicing, Receipt, Acceptance, and Property Transfer iRAPT Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAA ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
Req No / Pri
Required Delivery
A SW3211 6 EA *120 Calendar Days Non-MilStrip
Proposed
A SW3211 6 EA
Over & Above Option Year 2
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year Item No.
Firm Fixed Price Quantity U/I Unit Price To Be Negotiated
1 LO
CLIN ACRN ACRN Total
2004 AA
Over and Above Over and Above estimated total $25,900 Associated Document(s) Line Item(s)
FD20301401685 02 0002
Priority: R
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 ACCT 09
Type / Ship To Quantity (U/I) Over and above to be determined on a case by case basis per PWS
Req No / Pri
Required Delivery
A SW3211 1 LO Over and above to be dete
Proposed Delivery
A SW3211 1 LO
Data Line Item Option Year 2
NOT SEPARATELY PRICED
Item No.
Firm Fixed Price Quantity U/I Unit Price Not Separately Priced
1 LO
CLIN ACRN ACRN Total
2005 AA
Data CAVAF reporting (DATA) line IAW PWS and all associated DID's and CDRL's Associated Document(s) Line Item(s)
FD20301401685 02 0003
Priority: R
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Invoicing, Receipt, Acceptance, and Property Transfer iRAPT Quality Assurance: Standard Inspection Type / Ship To PACRN Mark For
ACCT 09
Data Line Item Option Year 2
NOT SEPARATELY PRICED
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
Req No / Pri
Required Delivery
1 LO *1 Hours
Proposed Delivery
1 LO
Tear Down, Test, & Evaluation (TT&E) Option Year 3
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
6 EA
CLIN ACRN ACRN Total
3001 AA
NSN: 5960-01-274-7627 IM
ELECTRON TUBE
Tunable frequency, integral magnet, air cooled, 1000Kw min power output, 2.7-2.9 GHz.
ENVELOPE MATERIAL: METAL
Manufacturer Part Number 24930 190999-1
5W432 PM110S
88236 VMS-1610
89146 PM110S
T6976 190999-1 Associated Document(s) Line Item(s)
FD20301401685 02 0001AA
Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Invoicing, Receipt, Acceptance, and Property Transfer iRAPT Quality Assurance: Standard Inspection IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAA ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
Req No / Pri
Required
Tear Down, Test, & Evaluation (TT&E) Option Year 3
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year A SW3211 6 EA *15 Calendar Days Non-MilStrip
Proposed Delivery
A SW3211 6 EA
Perform in accordance with Performance Work Statement (PWS) Teardown, Test, and Evaluate (TT&E) instructions.
Upon completion of Teardown, Test, and Evaluate actions, a Teardown Deficiency Report will be furnished to the Government IAW CDRL A003 for the basic year, B003 for option year 1, C003 for option year 2, D003 for option year 3, and E003 for option year 4.
In the event that the TT&E process yields a no fault found result, reference Quality Assurance and Inspection / Ship To / Transport / and packaging specifications in the TT&E Contract Line Item Number (CLIN) for return of electron tube to the Government.
In the event that the TT&E process yields a fault found result and a determination of Minor Repair, Major Repair, or BER is made, disregard the Quality Assurance / Inspection / Ship To / Transport instructions in the TT&E CLIN and refer to the applicable Minor Repair or Major repair CLIN in the contract for this type of information. In the case of a BER determination, refer to the PWS instructions concerning BER.
The following table modifies and/or supplements the information provided in CDRL A003, B003, C003, D003, E003 and the corresponding Data Item Description (DID), Teardown Deficiency Report (DI-ALSS-81534):
CDRL or DID Identification Code
Block/Section Current Information provided
Replace* Supplementary** Information
CDRL: A003, B003, C003,
D003, E003
10. Frequency See Block 16 One report per order placed against the basic contract*
CDRL: A003, B003, C003,
D003, E003
11. As Of Date See Block 16 Requirement begins with first order against the basic contract*
CDRL: A003, B003, C003,
D003, E003
12. Date of First Submission See Block 16 15 calendar days after receipt of first funded order or 15 days after receipt of assets, whichever is later*
CDRL: A003, B003, C003,
D003, E003
13. Date of Subsequent Submission
See Block 16 15 calendar days after receipt of any subsequent funded order or 15 days after receipt of assets, whichever is later*
CDRL: A003, B003, C003,
D003, E003
16. Remarks Block 7: All Inspection and acceptance shall be at destination utilizing WAWF. A combination of an invoice and receiving report shall be submitted through WAWF in order to receive payment for data reports. Blocks 10, 11, 12, and 13: To be negotiated on call by demand.
Block 7: All inspection and acceptance shall be at destination utilizing Invoicing, Receipt, Acceptance, and Property Transfer (iRAPT)
Data reports are not separately priced but all reports for the applicable contract period must be submitted in iRAPT before payment will be processed.*
DID, Teardown Deficiency Report, DI-ALSS-81534
10. Preparation Instructions (Current preparation instructions still apply but will be supplemented by the Replace, Supplementary info column)
See Replace, Supplementary Information description below.**
Replace, Supplementary Information Description for DID, Teardown Deficiency Report, DI-ALSS-81534:
As part of the Teardown Deficiency Report required with each order placed against the basic contract, the contractor must assert one of the following conditions for each electron tube.
1. No Fault Found
2. Minor Repair Required – Standard justification of reason for repair/type of repair
3. Major Repair Required – Standard justification of reason for repair/type of repair
4. Beyond Economical Repair (BER) – Advanced justification of reason for BER status. This repair exceeds the scope of
Heavy Repair as defined by the Performance Work Statement (PWS).
5. Condemnation – With CO approval, the contractor may condemn any electron tube after the tube has been through the repair process three (3) times. The contactor will request authority to condemn any electron tube by providing the CO / CS the serial number via electronic mail to prove the electron tube meets the requirements of PWS paragraph 1.6.
Standard Justification
The standard justification will address the technical reason for level of repair selected, delivery order number, electron tube part number, electron tube serial number for each electron tube. A single sentence for each electron tube may satisfy the justification requirement. The CO reserves the right to challenge any contractor determination that is a product of the TT&E process. Disagreements resulting from the contractor providing insufficient substantiation regarding a BER determination and a higher than necessary level of repair determination will be documented in the Contractor Performance Assessment Reporting (CPAR) tool.
Advanced Justification
The Advanced Justification includes all requirements and provisions outlined in the Standard Justification and will provide a cost breakdown to continue repair versus BER condemnation decisions.
The CO also reserves the right to request more information regarding the TT&E decision from the contractor, to which the contractor must comply with the best of their ability.
The right to request more information regarding TT&E and the right to disagree and report finding in the CPAR tool are
Option Year 3
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
6 EA
CLIN ACRN ACRN Total
3002 AA
NSN: 5960-01-274-7627 IM
ELECTRON TUBE
Tunable frequency, integral magnet, air cooled, 1000Kw min power output, 2.7-2.9 GHz.
ENVELOPE MATERIAL: METAL
Manufacturer Part Number 24930 190999-1
Repair Level I (Minor Repair) Option Year 3
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year
5W432 PM110S
88236 VMS-1610
89146 PM110S
89146 VMS-1610
T6976 190999-1 Associated Document(s) Line Item(s)
FD20301401685 02 0001
Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Invoicing, Receipt, Acceptance, and Property Transfer iRAPT Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAA ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
Req No / Pri
Required Delivery
A SW3211 6 EA *120 Calendar Days Non-MilStrip
Proposed Delivery
A SW3211 6 EA
Repair Level II (Major Repair) Option Year 3
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
6 EA
CLIN ACRN ACRN Total
3003 AA
NSN: 5960-01-274-7627 IM
ELECTRON TUBE
Tunable frequency, integral magnet, air cooled, 1000Kw min power output, 2.7-2.9 GHz.
ENVELOPE MATERIAL: METAL
Manufacturer Part Number
Repair Level II (Major Repair) Option Year 3
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year 24930 190999-1
5W432 PM110S
88236 VMS-1610
89146 PM110S
89146 VMS-1610
T6976 190999-1 Associated Document(s) Line Item(s)
FD20301401685 02 0001
Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Invoicing, Receipt, Acceptance, and Property Transfer iRAPT Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
IUID Required: Yes
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAA ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
Req No / Pri
Required Delivery
A SW3211 6 EA *120 Calendar Days Non-MilStrip
Proposed Delivery
A SW3211 6 EA
Over & Above Option Year 3
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year Item No.
Firm Fixed Price Quantity U/I Unit Price To Be Negotiated
1 LO
CLIN ACRN ACRN Total
3004 AA
Over and Above Over and Above estimated total $25,900 Associated Document(s) Line Item(s)
FD20301401685 02 0002
Over & Above Option Year 3
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year Priority: R
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 ACCT 09
Type / Ship To Quantity (U/I) Over and above to be determined on a case by case basis per PWS
Req No / Pri
Required Delivery
A SW3211 1 LO Over and above to be dete
Proposed Delivery
A SW3211 1 LO
Data Line Item Option Year 3
NOT SEPARATELY PRICED
Item No.
Firm Fixed Price Quantity U/I Unit Price Not Separately Priced
1 LO
CLIN ACRN ACRN Total
3005 AA
Data CAVAF reporting (DATA) line IAW PWS and all associated DID's and CDRL's Associated Document(s) Line Item(s)
FD20301401685 02 0003
Priority: R
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Invoicing, Receipt, Acceptance, and Property Transfer iRAPT Quality Assurance: Standard Inspection Type / Ship To PACRN Mark For
ACCT 09
Type / Ship To Quantity (U/I) *ARO See CDRL for delivery requirements of data items.
Req No / Pri
Required Delivery
1 LO *1 Hours
Proposed
1 LO
Tear Down, Test, & Evaluation (TT&E) Option Year 4
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
6 EA
CLIN ACRN ACRN Total
4001 AA
NSN: 5960-01-274-7627 IM
ELECTRON TUBE
Tunable frequency, integral magnet, air cooled, 1000Kw min power output, 2.7-2.9 GHz.
ENVELOPE MATERIAL: METAL
Manufacturer Part Number 24930 190999-1
5W432 PM110S
88236 VMS-1610
89146 PM110S
T6976 190999-1 Associated Document(s) Line Item(s)
FD20301401685 02 0001AA
Priority: R
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Invoicing, Receipt, Acceptance, and Property Transfer iRAPT Quality Assurance: Standard Inspection IUID Required: Yes Physical Item Markings:
Transportation From Continental United States CONUS (CONUS) Sources
TYPE / SHIP TO CODE F.O.B.
A SW3211 ORIGIN
Type / Ship To PACRN Mark For
A SW3211 PAA ACCT 09
Type / Ship To Quantity (U/I) *ARO Funded Order or Reparable Assets, Whichever is Later
Req No / Pri
Required Delivery
A SW3211 6 EA *15 Calendar Days Non-MilStrip
Proposed Delivery
A SW3211 6 EA
Perform in accordance with Performance Work Statement (PWS) Teardown, Test, and Evaluate (TT&E) instructions.
Upon completion of Teardown, Test, and Evaluate actions, a Teardown Deficiency Report will be furnished to the Government IAW CDRL A003 for the basic year, B003 for option year 1, C003 for option year 2, D003 for option year 3, and E003 for option year 4.
In the event that the TT&E process yields a no fault found result, reference Quality Assurance and Inspection / Ship To / Transport / and packaging specifications in the TT&E Contract Line Item Number (CLIN) for return of electron tube to the Government.
In the event that the TT&E process yields a fault found result and a determination of Minor Repair, Major Repair, or BER is made, disregard the Quality Assurance / Inspection / Ship To / Transport instructions in the TT&E CLIN and refer to the applicable Minor Repair or Major repair CLIN in the contract for this type of information. In the case of a BER determination, refer to the PWS instructions concerning BER.
The following table modifies and/or supplements the information provided in CDRL A003, B003, C003, D003, E003 and the corresponding Data Item Description (DID), Teardown Deficiency Report (DI-ALSS-81534):
CDRL or DID Identification Code
Block/Section Current Information provided
Replace* Supplementary** Information
CDRL: A003, B003, C003,
D003, E003
10. Frequency See Block 16 One report per order placed against the basic contract*
CDRL: A003, B003, C003,
D003, E003
11. As Of Date See Block 16 Requirement begins with first order against the basic contract*
CDRL: A003, B003, C003,
D003, E003
12. Date of First Submission See Block 16 15 calendar days after receipt of first funded order or 15 days after receipt of assets, whichever is later*
CDRL: A003, B003, C003,
D003, E003
13. Date of Subsequent Submission
See Block 16 15 calendar days after receipt of any subsequent funded order or 15 days after receipt of assets, whichever is later*
CDRL: A003, B003, C003,
D003, E003
16. Remarks Block 7: All Inspection and acceptance shall be at destination utilizing WAWF. A combination of an invoice and receiving report shall be submitted through WAWF in order to receive payment for data reports. Blocks 10, 11, 12, and 13: To be negotiated on call by demand.
Block 7: All inspection and acceptance shall be at destination utilizing Invoicing, Receipt, Acceptance, and Property Transfer (iRAPT)
Data reports are not separately priced but all reports for the applicable contract period must be submitted in iRAPT before payment will be processed.*
DID, Teardown Deficiency Report, DI-ALSS-81534
10. Preparation Instructions (Current preparation instructions still apply but will be supplemented by the Replace, Supplementary info column)
See Replace, Supplementary Information description below.**
Replace, Supplementary Information Description for DID, Teardown Deficiency Report, DI-ALSS-81534:
As part of the Teardown Deficiency Report required with each order placed against the basic contract, the contractor must assert one of the following conditions for each electron tube.
1. No Fault Found
2. Minor Repair Required – Standard justification of reason for repair/type of repair
3. Major Repair Required – Standard justification of reason for repair/type of repair
4. Beyond Economical Repair (BER) – Advanced justification of reason for BER status. This repair exceeds the scope of
Heavy Repair as defined by the Performance Work Statement (PWS).
5. Condemnation – With CO approval, the contractor may condemn any electron tube after the tube has been through the repair process three (3) times. The contactor will request authority to condemn any electron tube by providing the CO / CS the serial number via electronic mail to prove the electron tube meets the requirements of PWS paragraph 1.6.
Standard Justification
The standard justification will address the technical reason for level of repair selected, delivery order number, electron tube part number, electron tube serial number for each electron tube. A single sentence for each electron tube may satisfy the justification requirement. The CO reserves the right to challenge any contractor determination that is a product of the TT&E process. Disagreements resulting from the contractor providing insufficient substantiation regarding a BER determination and a higher than necessary level of repair determination will be documented in the Contractor Performance Assessment Reporting (CPAR) tool.
Advanced Justification
The Advanced Justification includes all requirements and provisions outlined in the Standard Justification and will provide a cost breakdown to continue repair versus BER condemnation decisions.
The CO also reserves the right to request more information regarding the TT&E decision from the contractor, to which the contractor must comply with the best of their ability.
The right to request more information regarding TT&E and the right to disagree and report finding in the CPAR tool are
Option Year 4
P/N: 190999-1, VMS-1610, and PM110S Period of Performance: 1 Year Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
6 EA
CLIN ACRN ACRN Total
4002 AA
NSN: 5960-01-274-7627 IM
ELECTRON TUBE
Tunable frequency, integral magnet, air cooled, 1000Kw min power output, 2.7-2.9 GHz.
ENVELOPE MATERIAL: METAL
Manufacturer Part Number 24930 190999-1
5W432 PM110S
88236 VMS-1610
89146 PM110S
89146 VMS-1610
T6976 190999-1 Associated Document(s) Line Item(s)
FD20301401685 02 0001
Priority: R
Inspection: Origin Acceptance: Origin…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .