CDRLREPORT.pdf
PDF 77 KB Posted
- Attached to
- OPTICAL ASSEMBLY, LA
- Solicitation number
- FA8119-13-R-0021
About this file
CDRL
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SPI.pdf | ||
| Packaging.pdf | ||
| PWS.docx | DOCX document | |
| DID2.pdf | ||
| VendorPkg_ATTACH.pdf | ||
| Safety.docx | DOCX document | |
| Transportation.pdf | ||
| DID1.pdf | ||
| DID3.pdf | ||
| DID5.pdf | ||
| DID4.pdf | ||
| CAVAF.docx | DOCX document | |
| FA811913R0021.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of11 25
FD20301300874B-2/MULTIPLE
A001
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
COMMERCIAL ASSET VISIBILITY AIR FORCE (CAV AF)
END ITEM REPORTING
CAV AF
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-MGMT-81634B PWS/SOW 424 SCMS/GUMB
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
XX
8. APP Code:
N/A N/A
11. As of Date: 13. Date of Subsequent Submission:
SEE BLOCK 16
SEE BLOCK 16
See Block 16
a. Addressee:
b. Copies:
Final
Draft Reg Repro
SEE BLOCK 16
G. Prepared By: H. Date I. Approved By: J. Date:
(SEE APPENDIX B)
OC-ALC
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 08 MAR 2013
1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 448 SCMW/FMA in order to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF.
Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.
3. Training will be provided by 428 SCMS/GULA, (405) 739-3229.
4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.
Block 7: Enter the applicable code as listed in DoD 5010.12-M, Chapter 3.
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.
b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.
Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.
Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.
Block 13: Same as remarks regarding Block 10 above.
Zilar, Dale N
424 SCMS / GUBA
405-736-7045
12 MAR 2013 //DIGITALLY SIGNED//
COORDINATORS:
424 SCMS / GUME
BOST.BRIAN.M.1385065902
405-736-3388 / 336-3388
12 MAR 2013
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of21 25
A002
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
END ITEM (EI) PRODUCTION AND COMPONENT ITEM (CI)
CONSUMPTION REPAIR HISTORY DATA
N/A
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-ALSS-81220A N/A 424 SCMS/GUME
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
NO
8. APP Code:
N/A A
11. As of Date: 13. Date of Subsequent Submission:
SEE BLOCK 16
N/A
ANNLY
a. Addressee:
b. Copies:
Final
Draft Reg Repro
SEE BLOCK 16
G. Prepared By: H. Date I. Approved By: J. Date:
424 SCMS/GUME 0 1 0
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 08 MAR 2013
BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION
UTILIZING WAWF. A COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL
BE SUBMITTED THROUGH WAWF IN ORDER TO RECEIVE PAYMENT FOR DATA
REPORTS.
BLOCK 11: TO BE DETERMINED
BLOCK 12: TO BE SUBMITTED 1 YEAR AFTER CONTRACT AWARD DATE AND 1 YEAR
AFTER ANY OPTION YEAR AWARD DATES.
CONTRACTOR FORMAT IS ACCEPTABLE.
DID REQUIREMENTS ARE NOT TAILORED.
DELIVERY CANNOT BE DEFERRED.
Zilar, Dale N
424 SCMS / GUBA
405-736-7045
12 MAR 2013 //DIGITALLY SIGNED//
COORDINATORS:
424 SCMS / GUME
BOST.BRIAN.M.1385065902
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of31 25
A003
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
SOURCE DATA FOR FORECASTING DIMINISHING
MANUFACTURING SOURCES AND MATERIAL
SHORTAGES (DMSMS)
N/A
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-SESS-81656A N/A 424 SCMS/GUME
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
NO
8. APP Code:
N/A D
11. As of Date: 13. Date of Subsequent Submission:
SEE BLOCK 16
SEE BLOCK 16
QRTLY
a. Addressee:
b. Copies:
Final
Draft Reg Repro
SEE BLOCK 16
G. Prepared By: H. Date I. Approved By: J. Date:
424 SCMS/GUME 0 1 0
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 08 MAR 2013
BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION
UTILIZING WAWF. A COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL
BE SUBMITTED THROUGH WAWF IN ORDER TO RECEIVE PAYMENT FOR DATA
REPORTS.
BLOCK 11: TO BE DETERMINED
BLOCK 12. TO BE DETERMINED
BLOCK 13: TO BE DETERMINED
BLOCK 14A: ALL DIGITAL SUBMISSIONS SHALL BE MADE VIA ELECTRONIC MAIL
TO: APPLICABLE PROGRAM MANAGER.
CONTRACTOR FORMAT IS ACCEPTABLE.
DID REQUIREMENTS ARE NOT TAILORED.
DELIVERY CANNOT BE DEFERRED.
Zilar, Dale N
424 SCMS / GUBA
405-736-7045
12 MAR 2013 //DIGITALLY SIGNED//
COORDINATORS:
424 SCMS / GUME
BOST.BRIAN.M.1385065902
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of41 25
A004
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
DEPOT MAINTENANCE PRODUCTION REPORT N/A
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-ALSS-80728A N/A 424 SCMS/GUME
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
SD
8. APP Code:
N/A A
11. As of Date: 13. Date of Subsequent Submission:
SEE BLOCK 16
SEE BLOCK 16
SEMIA
a. Addressee:
b. Copies:
Final
Draft Reg Repro
SEE BLOCK 16
G. Prepared By: H. Date I. Approved By: J. Date:
424 SCMS/GUME
ACO
15. Total: 0 2 0
16. Remarks:
NAME: Zilar, Dale N DATE: 08 MAR 2013
BOND ROOM MATERIAL AND SPECIAL TEST EQUIPMENT (STE) TO BE REPORTED
EVERY 6 MONTHS AFTER CONTRACT AWARD DATE AND ANY OPTION YEAR AWARD
DATES.
Zilar, Dale N
424 SCMS / GUBA
405-736-7045
12 MAR 2013 //DIGITALLY SIGNED//
COORDINATORS:
424 SCMS / GUME
BOST.BRIAN.M.1385065902
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of51 25
A005
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
CONTRACTOR'S CORRECTIVE ACTION PLAN N/A
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-MGMT-80501 N/A 424 SCMS/GUME
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
NO
8. APP Code:
N/A D
11. As of Date: 13. Date of Subsequent Submission:
SEE BLOCK 16
SEE BLOCK 16
ASREQ
a. Addressee:
b. Copies:
Final
Draft Reg Repro
SEE BLOCK 16
G. Prepared By: H. Date I. Approved By: J. Date:
424 SCMS/GUME 0 1 0
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 08 MAR 2013
BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION
UTILIZING WAWF. A COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL
BE SUBMITTED THROUGH WAWF IN ORDER TO RECEIVE PAYMENT FOR DATA
REPORTS.
BLOCK 11: TO BE DETERMINED
BLOCK 12. TO BE DETERMINED
BLOCK 13: TO BE DETERMINED
BLOCK 14A: ALL DIGITAL SUBMISSIONS SHALL BE MADE VIA ELECTRONIC MAIL
TO: APPLICABLE PROGRAM MANAGER.
CONTRACTOR FORMAT IS ACCEPTABLE.
DID REQUIREMENTS ARE NOT TAILORED.
DELIVERY CANNOT BE DEFERRED.
Zilar, Dale N
424 SCMS / GUBA
405-736-7045
12 MAR 2013 //DIGITALLY SIGNED//
COORDINATORS:
424 SCMS / GUME
BOST.BRIAN.M.1385065902
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of61 25
B001
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
COMMERCIAL ASSET VISIBILITY AIR FORCE (CAV AF)
END ITEM REPORTING
CAV AF
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-MGMT-81634B PWS/SOW 424 SCMS/GUME
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
XX
8. APP Code:
N/A N/A
11. As of Date: 13. Date of Subsequent Submission:
SEE BLOCK 16
SEE BLOCK 16
See Block 16
a. Addressee:
b. Copies:
Final
Draft Reg Repro
SEE BLOCK 16
G. Prepared By: H. Date I. Approved By: J. Date:
(SEE APPENDIX B)
OC-ALC
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 12 MAR 2013
1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 448 SCMW/FMA in order to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF.
Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.
3. Training will be provided by 428 SCMS/GULA, (405) 739-3229.
4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.
Block 7: Enter the applicable code as listed in DoD 5010.12-M, Chapter 3.
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.
b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.
Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.
Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.
Block 13: Same as remarks regarding Block 10 above.
Zilar, Dale N
424 SCMS / GUBA
405-736-7045
12 MAR 2013 //DIGITALLY SIGNED//
COORDINATORS:
424 SCMS / GUME
BOST.BRIAN.M.1385065902
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of71 25
B002
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
END ITEM (EI) PRODUCTION AND COMPONENT ITEM (CI)
CONSUMPTION REPAIR HISTORY DATA
N/A
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-ALSS-81220A N/A 424 SCMS/GUME
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
NO
8. APP Code:
N/A A
11. As of Date: 13. Date of Subsequent Submission:
SEE BLOCK 16
N/A
ANNLY
a. Addressee:
b. Copies:
Final
Draft Reg Repro
SEE BLOCK 16
G. Prepared By: H. Date I. Approved By: J. Date:
424 SCMS/GUME 0 1 0
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 08 MAR 2013
BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION
UTILIZING WAWF. A COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL
BE SUBMITTED THROUGH WAWF IN ORDER TO RECEIVE PAYMENT FOR DATA
REPORTS.
BLOCK 11: TO BE DETERMINED
BLOCK 12: TO BE SUBMITTED 1 YEAR AFTER CONTRACT AWARD DATE AND 1 YEAR
AFTER ANY OPTION YEAR AWARD DATES.
CONTRACTOR FORMAT IS ACCEPTABLE.
DID REQUIREMENTS ARE NOT TAILORED.
DELIVERY CANNOT BE DEFERRED.
Zilar, Dale N
424 SCMS / GUBA
405-736-7045
12 MAR 2013 //DIGITALLY SIGNED//
COORDINATORS:
424 SCMS / GUME
BOST.BRIAN.M.1385065902
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of81 25
B003
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
SOURCE DATA FOR FORECASTING DIMINISHING
MANUFACTURING SOURCES AND MATERIAL
SHORTAGES (DMSMS)
N/A
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-SESS-81656A N/A 424 SCMS/GUME
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
NO
8. APP Code:
N/A D
11. As of Date: 13. Date of Subsequent Submission:
SEE BLOCK 16
SEE BLOCK 16
QRTLY
a. Addressee:
b. Copies:
Final
Draft Reg Repro
SEE BLOCK 16
G. Prepared By: H. Date I. Approved By: J. Date:
424 SCMS/GUME 0 1 0
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 08 MAR 2013
BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION
UTILIZING WAWF. A COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL
BE SUBMITTED THROUGH WAWF IN ORDER TO RECEIVE PAYMENT FOR DATA
REPORTS.
BLOCK 11: TO BE DETERMINED
BLOCK 12. TO BE DETERMINED
BLOCK 13: TO BE DETERMINED
BLOCK 14A: ALL DIGITAL SUBMISSIONS SHALL BE MADE VIA ELECTRONIC MAIL
TO: APPLICABLE PROGRAM MANAGER.
CONTRACTOR FORMAT IS ACCEPTABLE.
DID REQUIREMENTS ARE NOT TAILORED.
DELIVERY CANNOT BE DEFERRED.
Zilar, Dale N
424 SCMS / GUBA
405-736-7045
12 MAR 2013 //DIGITALLY SIGNED//
COORDINATORS:
424 SCMS / GUME
BOST.BRIAN.M.1385065902
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of91 25
B004
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
DEPOT MAINTENANCE PRODUCTION REPORT N/A
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-ALSS-80728A N/A 424 SCMS/GUME
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
SD
8. APP Code:
N/A A
11. As of Date: 13. Date of Subsequent Submission:
SEE BLOCK 16
SEE BLOCK 16
SEMIA
a. Addressee:
b. Copies:
Final
Draft Reg Repro
SEE BLOCK 16
G. Prepared By: H. Date I. Approved By: J. Date:
424 SCMS/GUME
ACO
15. Total: 0 2 0
16. Remarks:
NAME: Zilar, Dale N DATE: 08 MAR 2013
BOND ROOM MATERIAL AND SPECIAL TEST EQUIPMENT (STE) TO BE REPORTED
EVERY 6 MONTHS AFTER CONTRACT AWARD DATE AND ANY OPTION YEAR AWARD
DATES.
Zilar, Dale N
424 SCMS / GUBA
405-736-7045
12 MAR 2013 //DIGITALLY SIGNED//
COORDINATORS:
424 SCMS / GUME
BOST.BRIAN.M.1385065902
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of101 25
B005
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
CONTRACTOR'S CORRECTIVE ACTION PLAN N/A
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-MGMT-80501 N/A 424 SCMS/GUME
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
NO
8. APP Code:
N/A D
11. As of Date: 13. Date of Subsequent Submission:
SEE BLOCK 16
SEE BLOCK 16
ASREQ
a. Addressee:
b. Copies:
Final
Draft Reg Repro
SEE BLOCK 16
G. Prepared By: H. Date I. Approved By: J. Date:
424 SCMS/GUME 0 1 0
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 08 MAR 2013
BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION
UTILIZING WAWF. A COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL
BE SUBMITTED THROUGH WAWF IN ORDER TO RECEIVE PAYMENT FOR DATA
REPORTS.
BLOCK 11: TO BE DETERMINED
BLOCK 12. TO BE DETERMINED
BLOCK 13: TO BE DETERMINED
BLOCK 14A: ALL DIGITAL SUBMISSIONS SHALL BE MADE VIA ELECTRONIC MAIL
TO: APPLICABLE PROGRAM MANAGER.
CONTRACTOR FORMAT IS ACCEPTABLE.
DID REQUIREMENTS ARE NOT TAILORED.
DELIVERY CANNOT BE DEFERRED.
Zilar, Dale N
424 SCMS / GUBA
405-736-7045
12 MAR 2013 //DIGITALLY SIGNED//
COORDINATORS:
424 SCMS / GUME
BOST.BRIAN.M.1385065902
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of111 25
C001
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
COMMERCIAL ASSET VISIBILITY AIR FORCE (CAV AF)
END ITEM REPORTING
CAV AF
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-MGMT-81634B PWS/SOW 424 SCMS/GUMB
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
XX
8. APP Code:
N/A N/A
11. As of Date: 13. Date of Subsequent Submission:
SEE BLOCK 16
SEE BLOCK 16
See Block 16
a. Addressee:
b. Copies:
Final
Draft Reg Repro
SEE BLOCK 16
G. Prepared By: H. Date I. Approved By: J. Date:
(SEE APPENDIX B)
OC-ALC
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 08 MAR 2013
1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 448 SCMW/FMA in order to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF.
Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.
3. Training will be provided by 428 SCMS/GULA, (405) 739-3229.
4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.
Block 7: Enter the applicable code as listed in DoD 5010.12-M, Chapter 3.
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.
b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.
Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.
Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.
Block 13: Same as remarks regarding Block 10 above.
Zilar, Dale N
424 SCMS / GUBA
405-736-7045
12 MAR 2013 //DIGITALLY SIGNED//
COORDINATORS:
424 SCMS / GUME
BOST.BRIAN.M.1385065902
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of121 25
C002
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
END ITEM (EI) PRODUCTION AND COMPONENT ITEM (CI)
CONSUMPTION REPAIR HISTORY DATA
N/A
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-ALSS-81220A N/A 424 SCMS/GUME
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
NO
8. APP Code:
N/A A
11. As of Date: 13. Date of Subsequent Submission:
SEE BLOCK 16
N/A
ANNLY
a. Addressee:
b. Copies:
Final
Draft Reg Repro
SEE BLOCK 16
G. Prepared By: H. Date I. Approved By: J. Date:
424 SCMS/GUME 0 1 0
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 08 MAR 2013
BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION
UTILIZING WAWF. A COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL
BE SUBMITTED THROUGH WAWF IN ORDER TO RECEIVE PAYMENT FOR DATA
REPORTS.
BLOCK 11: TO BE DETERMINED
BLOCK 12: TO BE SUBMITTED 1 YEAR AFTER CONTRACT AWARD DATE AND 1 YEAR
AFTER ANY OPTION YEAR AWARD DATES.
CONTRACTOR FORMAT IS ACCEPTABLE.
DID REQUIREMENTS ARE NOT TAILORED.
DELIVERY CANNOT BE DEFERRED.
Zilar, Dale N
424 SCMS / GUBA
405-736-7045
12 MAR 2013 //DIGITALLY SIGNED//
COORDINATORS:
424 SCMS / GUME
BOST.BRIAN.M.1385065902
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of131 25
C003
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
SOURCE DATA FOR FORECASTING DIMINISHING
MANUFACTURING SOURCES AND MATERIAL
SHORTAGES (DMSMS)
N/A
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-SESS-81656A N/A 424 SCMS/GUME
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
NO
8. APP Code:
N/A D
11. As of Date: 13. Date of Subsequent Submission:
SEE BLOCK 16
SEE BLOCK 16
QRTLY
a. Addressee:
b. Copies:
Final
Draft Reg Repro
SEE BLOCK 16
G. Prepared By: H. Date I. Approved By: J. Date:
424 SCMS/GUME 0 1 0
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 08 MAR 2013
BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION
UTILIZING WAWF. A COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL
BE SUBMITTED THROUGH WAWF IN ORDER TO RECEIVE PAYMENT FOR DATA
REPORTS.
BLOCK 11: TO BE DETERMINED
BLOCK 12. TO BE DETERMINED
BLOCK 13: TO BE DETERMINED
BLOCK 14A: ALL DIGITAL SUBMISSIONS SHALL BE MADE VIA ELECTRONIC MAIL
TO: APPLICABLE PROGRAM MANAGER.
CONTRACTOR FORMAT IS ACCEPTABLE.
DID REQUIREMENTS ARE NOT TAILORED.
DELIVERY CANNOT BE DEFERRED.
Zilar, Dale N
424 SCMS / GUBA
405-736-7045
12 MAR 2013 //DIGITALLY SIGNED//
COORDINATORS:
424 SCMS / GUME
BOST.BRIAN.M.1385065902
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of141 25
C004
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
DEPOT MAINTENANCE PRODUCTION REPORT N/A
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-ALSS-80728A N/A 424 SCMS/GUME
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
SD
8. APP Code:
N/A A
11. As of Date: 13. Date of Subsequent Submission:
SEE BLOCK 16
SEE BLOCK 16
SEMIA
a. Addressee:
b. Copies:
Final
Draft Reg Repro
SEE BLOCK 16
G. Prepared By: H. Date I. Approved By: J. Date:
424 SCMS/GUME
ACO
15. Total: 0 2 0
16. Remarks:
NAME: Zilar, Dale N DATE: 08 MAR 2013
BOND ROOM MATERIAL AND SPECIAL TEST EQUIPMENT (STE) TO BE REPORTED
EVERY 6 MONTHS AFTER CONTRACT AWARD DATE AND ANY OPTION YEAR AWARD
DATES.
Zilar, Dale N
424 SCMS / GUBA
405-736-7045
12 MAR 2013 //DIGITALLY SIGNED//
COORDINATORS:
424 SCMS / GUME
BOST.BRIAN.M.1385065902
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of151 25
C005
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
CONTRACTOR'S CORRECTIVE ACTION PLAN N/A
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-MGMT-80501 N/A 424 SCMS/GUME
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
NO
8. APP Code:
N/A D
11. As of Date: 13. Date of Subsequent Submission:
SEE BLOCK 16
SEE BLOCK 16
ASREQ
a. Addressee:
b. Copies:
Final
Draft Reg Repro
SEE BLOCK 16
G. Prepared By: H. Date I. Approved By: J. Date:
424 SCMS/GUME 0 1 0
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 08 MAR 2013
BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION
UTILIZING WAWF. A COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL
BE SUBMITTED THROUGH WAWF IN ORDER TO RECEIVE PAYMENT FOR DATA
REPORTS.
BLOCK 11: TO BE DETERMINED
BLOCK 12. TO BE DETERMINED
BLOCK 13: TO BE DETERMINED
BLOCK 14A: ALL DIGITAL SUBMISSIONS SHALL BE MADE VIA ELECTRONIC MAIL
TO: APPLICABLE PROGRAM MANAGER.
CONTRACTOR FORMAT IS ACCEPTABLE.
DID REQUIREMENTS ARE NOT TAILORED.
DELIVERY CANNOT BE DEFERRED.
Zilar, Dale N
424 SCMS / GUBA
405-736-7045
12 MAR 2013 //DIGITALLY SIGNED//
COORDINATORS:
424 SCMS / GUME
BOST.BRIAN.M.1385065902
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of161 25
D001
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
COMMERCIAL ASSET VISIBILITY AIR FORCE (CAV AF)
END ITEM REPORTING
CAV AF
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-MGMT-81634B PWS/SOW 424 SCMS/GUMB
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
XX
8. APP Code:
N/A N/A
11. As of Date: 13. Date of Subsequent Submission:
SEE BLOCK 16
SEE BLOCK 16
See Block 16
a. Addressee:
b. Copies:
Final
Draft Reg Repro
SEE BLOCK 16
G. Prepared By: H. Date I. Approved By: J. Date:
(SEE APPENDIX B)
OC-ALC
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 08 MAR 2013
1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 448 SCMW/FMA in order to ascertain production status.
2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF.
Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.
3. Training will be provided by 428 SCMS/GULA, (405) 739-3229.
4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.
Block 7: Enter the applicable code as listed in DoD 5010.12-M, Chapter 3.
Block 10:
a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.
b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.
Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.
Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.
Block 13: Same as remarks regarding Block 10 above.
Zilar, Dale N
424 SCMS / GUBA
405-736-7045
12 MAR 2013 //DIGITALLY SIGNED//
COORDINATORS:
424 SCMS / GUME
BOST.BRIAN.M.1385065902
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of171 25
D002
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
END ITEM (EI) PRODUCTION AND COMPONENT ITEM (CI)
CONSUMPTION REPAIR HISTORY DATA
N/A
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-ALSS-81220A N/A 424 SCMS/GUME
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
NO
8. APP Code:
N/A A
11. As of Date: 13. Date of Subsequent Submission:
SEE BLOCK 16
N/A
ANNLY
a. Addressee:
b. Copies:
Final
Draft Reg Repro
SEE BLOCK 16
G. Prepared By: H. Date I. Approved By: J. Date:
424 SCMS/GUME 0 1 0
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 08 MAR 2013
BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION
UTILIZING WAWF. A COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL
BE SUBMITTED THROUGH WAWF IN ORDER TO RECEIVE PAYMENT FOR DATA
REPORTS.
BLOCK 11: TO BE DETERMINED
BLOCK 12: TO BE SUBMITTED 1 YEAR AFTER CONTRACT AWARD DATE AND 1 YEAR
AFTER ANY OPTION YEAR AWARD DATES.
CONTRACTOR FORMAT IS ACCEPTABLE.
DID REQUIREMENTS ARE NOT TAILORED.
DELIVERY CANNOT BE DEFERRED.
Zilar, Dale N
424 SCMS / GUBA
405-736-7045
12 MAR 2013 //DIGITALLY SIGNED//
COORDINATORS:
424 SCMS / GUME
BOST.BRIAN.M.1385065902
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of181 25
D003
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
SOURCE DATA FOR FORECASTING DIMINISHING
MANUFACTURING SOURCES AND MATERIAL
SHORTAGES (DMSMS)
N/A
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-SESS-81656A N/A 424 SCMS/GUME
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
NO
8. APP Code:
N/A D
11. As of Date: 13. Date of Subsequent Submission:
SEE BLOCK 16
SEE BLOCK 16
QRTLY
a. Addressee:
b. Copies:
Final
Draft Reg Repro
SEE BLOCK 16
G. Prepared By: H. Date I. Approved By: J. Date:
424 SCMS/GUME 0 1 0
15. Total: 0 1 0
16. Remarks:
NAME: Zilar, Dale N DATE: 08 MAR 2013
BLOCK 7: ALL INSPECTION AND ACCEPTANCE SHALL BE AT DESTINATION
UTILIZING WAWF. A COMBINATION OF AN INVOICE AND RECEIVING REPORT SHALL
BE SUBMITTED THROUGH WAWF IN ORDER TO RECEIVE PAYMENT FOR DATA
REPORTS.
BLOCK 11: TO BE DETERMINED
BLOCK 12. TO BE DETERMINED
BLOCK 13: TO BE DETERMINED
BLOCK 14A: ALL DIGITAL SUBMISSIONS SHALL BE MADE VIA ELECTRONIC MAIL
TO: APPLICABLE PROGRAM MANAGER.
CONTRACTOR FORMAT IS ACCEPTABLE.
DID REQUIREMENTS ARE NOT TAILORED.
DELIVERY CANNOT BE DEFERRED.
Zilar, Dale N
424 SCMS / GUBA
405-736-7045
12 MAR 2013 //DIGITALLY SIGNED//
COORDINATORS:
424 SCMS / GUME
BOST.BRIAN.M.1385065902
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of191 25
D004
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
DEPOT MAINTENANCE PRODUCTION REPORT N/A
4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:
DI-ALSS-80728A N/A 424 SCMS/GUME
7. DD250 Req: 9. Dist.Statement Required:
10. Frequency: 12. Date of First Submission:
14. Distribution:
SD
8. APP Code:
N/A A
11. As of Date: 13. Date of Subsequent Submission:
SEE BLOCK 16
SEE BLOCK 16
SEMIA
a. Addressee:
b. Copies:
Final
Draft Reg Repro
SEE BLOCK 16
G. Prepared By: H. Date I. Approved By: J. Date:
424 SCMS/GUME
ACO
15. Total: 0 2 0
16. Remarks:
NAME: Zilar, Dale N DATE: 08 MAR 2013
BOND ROOM MATERIAL AND SPECIAL TEST EQUIPMENT (STE) TO BE REPORTED
EVERY 6 MONTHS AFTER CONTRACT AWARD DATE AND ANY OPTION YEAR AWARD
DATES.
Zilar, Dale N
424 SCMS / GUBA
405-736-7045
12 MAR 2013 //DIGITALLY SIGNED//
COORDINATORS:
424 SCMS / GUME
BOST.BRIAN.M.1385065902
DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of201 25
D005
CONTRACT DATA REQUIREMENTS LIST Form Approved
OMB NO.0704-D188
(1 Data Item)
Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. Contract Line Item No.: B. Exhibit: C. Category:
TDP TM OTHER X
D. System/Item: E. Contract/Pr No.: F. Contractor:
1. Data Item No.: 2. Title of Data Item: 3. Subtitle:
CONTRACTOR'S CORRECTIVE ACTION PLAN N/A
4. Authority(Data Acquisition Document No.): 5.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .