PWS Electron Tube CRT - 5960-01-010-6045 - 462114-1 - Revised 20100309.doc
DOC document 118 KB Posted
- Attached to
- Electrical and Electronic Equipment Components
- Solicitation number
- FA8119-10-R-0029
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix C.pdf | ||
| Performance Plan 10-27727.docx | DOCX document | |
| DD 1423 SCMG-4-10-107.doc | DOC document | |
| FA811910R0029.RTF | RTF text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR REPAIR OF
ELECTRON TUBE, CATHODE RAY TUBE (CRT)
PART NUMBER: 462114-1, 462788-1 or 16M72PX17
NSN: 5960-01-010-6045IM
PREPARATION DATE: 09 March 2010 (REVISED) PURCHASE REQUEST NUMBER: FD2030-08-03113 (Previous) PREPARING ORGANIZATION: ATCALS Program Office, Tinker AFB OK 73145
PREPARED BY: J. Mangin, 424 SCMS/GGUMF – Equipment Specialist – (405-739-9917)
TABLE OF CONTENTS
SECTION
PARAGRAPH / TITLE
Page
SECTION I – DESCRIPTION OF SERVICES……………………………………………………
1.1 Repair Concept…………………………………………………………………………….
1.2 Receiving…………………………………………………………………………………..
1.3 Condemnations……………………………………………………………………………
1.4 Item Identification and Marking………………………………………………………….
1.5 Configuration Control…………………………………………………………………….
1.6 Testing……………………………………………………………………………………..
1.7 Quality Control…………………………………………………………………………….
1.8 Reliability and Maintainability (R&M) Requirements………………………………….
1.9 Data Reporting…………………………………………………………………………….
1.10 Technical Order Maintenance…………………………………………………………..
1.11 Packaging and Handling…………………………………………………………………
1.12 Repair Scope……………………………………………………………………………….. 4
1.13 Contractor Personnel…………………………………………………………………….. 5
1.14 Contractor Employee General Requirements…………………………………………. 5
1.15 Government Quality Assurance Surveillance Support. ……………………………. 5
1.16 Mission Essential Services…………………………………………………………….. 5
SECTION II – SERVICE DELIVERY SUMMARY……………………………………………….
2.1 Service Delivery Summary (SS) Requirements……………………………………….
2.2 Contractor Performance Evaluation…………………………………………………….
SECTION III – GOVERNMENT FURNISHED PROPERTY AND SERVICES……………….
Government Furnished Materials……………………………………………………….
SECTION IV – APPENDICES……………………………………………………………………...
Appendix A – Acronyms………………………………………………………………………..
Appendix B – Applicable Documents…………………………………………………………
SECTION I – DESCRIPTION OF SERVICES
The purpose of this Performance Work Statement (PWS) is to define the requirements for the repair of the Cathode Ray Electron Tube. The Contractor shall provide all labor, material, quality systems, and vendor services necessary to return electron tube to a serviceable condition.
1.1. Repair Concept
1.1.1. The Contractor will provide the labor and material necessary to perform the work effort required under this PWS. All work accomplished in the repair of the electron tube shall be in accordance with this PWS. The Contractor shall have the right to interchange new and reworked components in order to meet contract delivery performance as long as reliability is not impacted as determined by the ATCALS Program Office. The Contractor shall return the electron tube to a serviceable condition meeting current OEM specifications unless otherwise approved by the Procurement Contracting Officer (PCO) IAW the terms of this contract.
1.1.2. Work performed shall be accomplished IAW current Original Equipment Manufacturer (OEM) procedures or Technical Orders (TOs) listed in Appendix B of this PWS. In the event a situation develops where instructions conflict, this PWS will take precedence. The work encompasses the disassembly, cleaning, inspection, maintenance/repair, reassembly, testing, and finishing actions required to return the electron tube to a serviceable condition.
1.2.
Receiving. Contractor shall perform a receiving inspection.
1.2.1. The electron tube shall be inspected prior to inducting into the repair process to determine condition and to ensure item identification corresponds to current schedule. Misidentified or incomplete assembly shall be reported to the ATCALS PMS within 5 days of receipt. The PMS will provide disposition instructions within 5 working days after notification, or the contractor will return the unit to the appropriate Government Inventory Control Point (ICP).
1.2.2. Inspection. Contractor shall perform an Initial Production Evaluation (IPE) of all components and parts of components to determine required repair.
1.3.
Condemnations The Contractor shall be required to repair all items unless the Procurement Contracting Officer (PCO) provides direction in writing that a particular item is excluded from these requirements. The Contractor will not condemn items without prior approval of the PCO.
1.3.1. The Contractor will notify the PCO of the Serial Number of the electron tube that is being recommended for condemnation.
1.4. Item Identification and Marking
Permanently and legibly mark repaired electron tube with the Contractor's identification. Identification shall include the Contractor's name, the AF contract number, and the date of repair. The identification shall be permanently affixed to the item by decal, stamp, stencil, or similar means. If size prohibits marking the item, the information above will be marked on the item packing.
1.4.1. The Contractor will establish, document, and maintain a parts control program for the work associated with this PWS and may use MIL-HDBK-512A as guidance.
1.5. Configuration Control
1.5.1. Replacement parts shall be IAW applicable Technical Order or current OEM technical data.
1.5.2. The Contractor shall establish the Program Parts Selection List (PPSL) for the item from the applicable documents in the following order of precedence:
a. Illustrated Parts Breakdown (IPB) TO
b. OEM parts list
c. Current configuration of the end item or system.
1.5.3. Approval from the PCO is required for the Contractor to use any parts not contained in the PPSL.
1.6.
Testing.
1.6.1. Contractor shall test IAW Technical Orders / current OEM Specifications to insure correct operation.
1.7.
Quality Control.
1.7.1. A quality program shall be implemented by the Contractor. This program will include a clear and complete set of work documents for all maintenance and repair required by the contract. The program shall be used to properly detect and correct assignable conditions adverse to quality in the design, development, production, installation service, repair and supplemental requirements.
1.7.2. The Contractor, with oversight by Defense Contract Management Agency (DCMA), shall investigate all Deficiency Reports (DRs) submitted against reported defective electron tube repaired. Any DR shall be processed IAW T.O. 00-35D-54.
1.8.
Reliability and Maintainability (R&M) Requirements.
1.8.1. The R&M which is inherent with design of the equipment shall in no way be adversely affected by the repair accomplished per direction contained in this PWS.
1.8.2. The Contractor shall ensure that all items repaired, rebuilt, or modified are tested against the temperature, vibration, and shock environments in which the item is expected exist during storage, transportation, and operation.
1.9. Data Reporting
1.9.1. Contractor shall provide data in accordance with the tasks specified in this PWS as specified by the Contract Data Requirements List (CDRL), Appendix E, of the contract.
1.9.2. Contractor shall provide Repair Item Transaction reporting to Wide Area Work Flow (WAWF) for contract production reporting in accordance with Appendix B of the contract.
1.10. Technical Order Maintenance
The Contractor shall maintain all TOs identified in this PWS and other technical directives applicable to the work requirements in an updated and current status according to TO 00-5-1, Technical Order System. The Contractor shall consider the impact of a TO change on costs, schedules, and any other pertinent factors. A written evaluation, along with specific backup data for those changes which impact the Contractor’s performance, shall be provided to the PCO within 10 workdays after receipt of updated TO and directives. The Contractor shall not incorporate these technical order changes until approved by the PCO.
1.11. Packaging and Handling.
Electron Tube shall be properly packaged IAW AFMC Form 158, Packaging Requirements, and MIL-STD-2073.
1.11.1. The Contractor shall package IAW the requirements of any Special Packaging Requirements (SPI) in Attachment 1 of the contract and is responsible for procuring or furnishing containers. Reusable containers shall be retained, stored, and protected for reuse, as long as they are in good condition. The Contractor shall immediately notify the PCO/PMS when assets or SPI containers are received damaged. Containers damaged due to Contractor negligence shall be repaired or replaced by the Contractor at no cost to the government.
1.11.2. If applicable, reusable containers that are received damaged and deemed no longer usable, the contractor will be allowed to make replacement cost a part of their requirement to purchase the appropriate shipping containers.
1.12. Repair Scope
Repair Scope assumes Contractor's normal repairs based on historical experience. Should an extensive repair be necessary, this shall be considered an "Over and Above" situation outside the normal Repair Scope. Extensive repair is defined as those items requiring rework due to 1) Major physical damage, massive component failures, or significant missing components; or 2) Obsolescence or Diminishing Manufacturing Sources (DMS) that precludes the Contractor from obtaining the necessary component for repair. In the event the sensor, electrical requires extensive repair, the item order shall be placed on-hold, and the Contractor shall notify the PCO that it considers the item an "Over and Above" situation. The PCO shall determine the disposition of the item. Should the Government wish to proceed with the extensive repair, the Contractor shall submit an estimate for the additional rework. The PCO will then either adjust the item cost/price/schedule or authorize the Contractor to proceed with the work under the "Over and Above" CLIN. Alternatively, should the Government decide not to proceed with the extensive repair, the item shall be handled IAW with paragraph 1.3 entitled “Condemnation”. Pending final resolution of an extensive repair situation as described above, the Contractor shall not be considered delinquent or in default of contract.
1.13. Contractor Personnel.
The selection, hiring, assignment of duties, reassignment of duties, transfer, supervision, management, control, and termination of Contractor employees in performance of this PWS shall be the responsibility and prerogative of the Contractor.
1.14 Contractor Employee General Requirements.
The Contractor shall ensure Contractor employees who are required to communicate with Government personnel have the ability to clearly read, write, and speak English.
1.15 Government Quality Assurance Surveillance Support.
The Contractor shall support Government quality assurance surveillance to periodically evaluate the Contractor’s performance IAW the Government’s Performance Plan.
1.16 Mission Essential Services
NA
SECTION II – SERVICE DELIVERY SUMMARY
The contractor service requirements are summarized into performance objectives. The performance threshold describes the minimum acceptable levels of service for this requirement. The contractor shall be aware that the absence of any contract requirement from the Service Summary does not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract. The Contractor shall ensure the following service summary requirements are accomplished:
2.1. Service Delivery Summary (SS) Requirements.
The contractor shall ensure the performance objectives and performance thresholds identified in Table 2-1 of this PWS is achieved as follows:
2.1.1. Surveillance Methods
Defense Contract Management Agency Quality Representative – DCMA ATCALS Program Office – OC-ALC ATCALS Program Office, Tinker AFB OK.
Table 2-1
| Performance Objective |
| Reference |
| Performance Threshold |
| SS-1 |
| Delivery of Initial Production Evaluation |
| 1.2.2 |
| Maintain the performance objective 100% of the time |
| SS-2 |
| Quality, No defective parts shall be delivered to the government |
| 1.7.2 |
| 100% of the items delivered shall be defect free. |
| SS-3 |
| The contractor shall meet the delivery schedule |
| 1.1.2 |
| 100% of the items shall be delivered IAW the contractual delivery schedule. |
2.2. Contractor Performance Evaluation.
The Contractor shall be aware that the evaluation of performance will occur when the ATCALS Program Office evaluates the service of the Contractor to determine whether or not it meets the performance measures of the contract.
SS-1: The contractor shall advise PMS or PCO of shortages or misidentified item. Failure to meet this performance threshold may result in termination of the contract. The contractor will be given a reasonable time to make corrections. Failure to meet this performance threshold may result in a poor rating under the Contractor Performance Assessment Review (CPAR).
SS-2: The contractor’s failure to meet this requirement shall result in a negative CPAR rating and or remedies.
SS-3: The contractor’s failure to meet this requirement shall result in a negative CPAR rating and or remedies or termination of the contract.
SECTION III-GOVERNMENT FURNISHED PROPERTY AND SERVICES
1.14. 3.1. Government Furnished Materials
This is a Contractor Furnished Material (CFM) and Contractor Furnished Equipment (CFE) contract.
SECTION V - APPENDICES
APPENDIX A – ACRONYMS
ACO
Administrative Contracting Officer
AF
Air Force
ANSI
American National Standards Institute
ASQC
American Society for Quality Control
ATCALS
Air Traffic Control and Landing Systems
CDRL
Contract Data Requirements List
CFE
Contractor Furnished Equipment
CFM
Contractor Furnished Material
CLIN
Contract Line Item Number
CO
Contracting Officer
CPAR
Contractor Performance Assessment Review
DCMA
Defense Contract Management Agency
DMS
Diminishing Manufacturing Sources
DR
Deficiency Reports
FAR
Federal Acquisition Regulation
IAW
In Accordance With
IPB
Illustrated Part Breakdown
ICP
Inventory Control Point
IPE
Initial Production Evaluation
ISO
International Standards Organization
NSN
National Stock Number
OEM
Original Equipment Manufacturer
PCO
Procurement Contracting Officer
P/N
Part Number
PMS
Production Management Specialist
PPSL
Program Parts Selection List
PWS
Performance Work Statement
QA
Quality Assurance
R&M
Reliability & Maintainability
SOR
Source of Repair
SPI
Special Packaging Requirements
SS
Service Summary
TAFB
Tinker Air Force Base
TCTO
Time Compliance Technical Order
TO
Technical Order
APPENDIX B – PPLICABLE DOCUMENTS
TECHNICAL ORDERS, DIRECTIVES, AND TECHNICAL GUIDANCE
Specific Technical Orders
| PART NUMBER |
| TO NUMBER |
| TITLE |
| 462114-1 |
| 31P5-2T-2 |
| Maintenance Instructions – Organizational, Intermediate and Depot |
| 31P5-2T-3 |
| Circuit Diagrams |
| 31P5-2T-4 |
| Illustrated Parts Breakdown |
Contractor may use current OEM proprietary documentation i.e., drawings, manuals, and specifications to accomplish the repair.
General Technical Orders
| TO NUMBER |
| DATE |
| TITLE |
| 00-5-1-WA-1 |
| 15 Aug 09 |
| AF Technical Order System |
| 00-20-2-WA-1 |
| 15 Jun 03 |
| Maintenance Data Documentation |
| 00-20-3-WA-1 |
| 01 Jan 09 |
| Maintenance Processing of Reparable Property and Repair Cycle Asset Control System |
| 00-25-234-WA-1 |
| 08 Jul 08 |
| General Shop Practice Requirements for the Repair, Maintenance and Test of Electrical Equipment |
| 00-35D-54-WA-1 |
| 01 Oct 09 |
| USAF Deficiency Reporting, Investigation and Resolution |
| 1-1-700-WA-1 |
| 21 Jul 09 |
| Corrosion Prevention and Control – Ground Communication Electronic Equipment (C-E) |
OTHER PUBLICATIONS FOR INFORMATION PURPOSES ONLY
Air Force Material Command Instructions and Manuals
| NUMBERS |
| DATE |
| TITLE |
| APPLICABLE |
PARAGRAPH
| AFMCI 21-113 |
| 5 Nov 08 |
| Contract Maintenance Program for Depot Maintenance Activity Group |
| ALL |
| AFMCI 21-134, Vol 2 |
| 19 May 00 |
| Government Furnished Material and End Item Transaction Reporting System (G009) Reporting Procedures for Contractors |
| ALL |
Military Specifications, Standards, Handbooks, and Non-Government Standards
| NUMBERS |
| DATE |
| TITLE |
| APPLICABLE |
PARAGRAPH
| NAS 410 Rev 2 |
| 01 Mar 06 |
| NAS Certification and Qualification of Nondestructive Test Personnel |
| ALL |
| NCSL Z540-1-1994 (formerly MIL-STD-45662) |
| 01 Aug 94 |
| Calibration Laboratories and Measuring and Test Equipment – General Requirements |
| ALL |
| ASTM E1444-05 |
| 01 Mar 05 |
| Standard Practice for Magnetic Particle Testing |
| ALL |
| ASTM E1417-05E1 |
| 01 Jul 05 |
| Standard Practice for Liquid Penetrant Testing |
| ALL |
| ASTM E1742-06 |
| 01 Jul 06 |
| Standard Practice for Radiographic Examination |
| ALL |
| FAR 52.246-4 |
| Aug 96 |
| Solicitation Provisions and Contract Clauses - Inspection of Services – Fixed Price |
| ALL |
| MIL-STD-3018 |
| 15 Oct 07 |
| Parts Management |
| ALL |
MIL-HDBK-781A
(Rev A)
| 1 Apr 96 |
| Handbook for Reliability Test Methods, Plans, and Environments for Engineering, Development, Qualification, and Production |
| ALL |
MIL-HDBK-6870
(Rev A)
| 28 Aug 01 |
| Inspection Program Requirements Nondestructive for Aircraft and Missile Materials and Parts |
| ALL |
MIL-STD-2073-1
(Rev E)
| 23 May 08 |
| DOD Standard Practices for Military Packaging |
| ALL |
| ISO 10012 |
| 7 Jan 94 |
| Measurement Management Systems – Requirements for measurement processes and measuring equipment |
| ALL |
Note: These specifications verified 9 Mar 2010.
PAGE