FA811825R0068.pdf

PDF 15 MB Posted

Attached to
FD20302400889 Remanufacture of KC-135 Flutter Dampener NSN#1650008983516FL
Solicitation number
FA811825R0068
Issued by

About this file

This is a federal solicitation (Request for Proposal) for the remanufacture of KC-135 Flutter Dampener components for the Department of the Air Force. The solicitation (FA811825R0068) is a firm-fixed-price requirements contract with a 5-year period consisting of a 3-year basic contract and a 2-year option period. The procurement is for remanufacturing 45 total flutter dampener units during the basic period (15 units per ordering period) and 25 units during the option period (13-12 units per ordering period), with NSN 1650-00-898-3516.

The solicitation is unrestricted but set aside for small businesses, with a NAICS code of 336413 and a size standard of 1,250 employees. Contractors must have a score of 110 in the Supplier Performance Risk System (SPRS) and submit a plan if their score is lower. The contract includes provisions for Over and Above work, commercial asset visibility reporting, and government property management. Offers are due by 9 July 2025 at 1:00 PM, with the contract period spanning from 20 December 2025 to 19 December 2030, including the basic and option periods.

View the file

Other files

File Type Posted
GP DID.pdf PDF
SOW Rev 9.pdf PDF
CDRL.pdf PDF
Transportation Data.pdf PDF
CAV DID.pdf PDF
CDM DID.pdf PDF
GFP.pdf PDF
Production Surge Plan DID.pdf PDF
CAV AF.pdf PDF
Shipping and Packaging Discrepancy DID.pdf PDF
Packaging Requirements.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)

PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

24. TOTAL AWARD AMOUNT (For Government Use Only)

TELEPHONE NUMBER

UNIQUE ENTITY

IDENTIFIER

CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER

NO COLLECT CALLS

4. SOLICITATION NUMBER

FA8118-25-R-0068

X

6.SOLICITATION ISSUE DATE

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS: 336413

8(A) SIZE STANDARD: 1,250

DATE SIGNED

28. UNITED STATES OF AMERICA (Signature of Contracting Officer)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.

CLIN BEQ/QTY Unit Price Estimated Total Price 3-YEAR BASIC (20 December 2025 - 19 December 2028)

0001 Remanufacture of KC-135 Flutter Dampener

0001AA 15

0001AB 15

0001AC 15

2-YEAR OPTION (20 December 2028 - 19 December 2030) 1001 Remanufacture of KC-135 Flutter Dampener

1001AA 13

1001AB 12

*120

DO: A1

FA8118

X

Total

14 EFT:T

SCD:B

(Type or Print)

(Brief Description)

Other Aircraft Part and Auxiliary Equipment Manufacturing

(Agency Use) LATE OFFERS ARE SUBJECT TO LATE PROPOSAL PROVISIONS INCORPORATED HEREIN. ALL OFFERS ARE SUBJECT TO SUCH PROVISIONS, REPRESENTATIONS, CERTIFICATIONS AND SPECIFICATIONS AS ARE ATTACHED OR INCORPORATED BY REFERENCE. SOLICITATION: OFFERS WILL BE RECEIVED AT THE ISSUING OFFICE

UNTIL

9-JUL-2025 1:00PM

(SEE ESP CLAUSE 252.232-7003.)

X

DEPARTMENT OF THE AIR FORCE, AFSC PZABB

3001 STAFF DR STE 1AC4 99A

TINKER AFB OK 73145-3303

BUYER: Merry Curry/AFSC/PZABB merry.curry.1@us.af.mil Phone: (405) 736- 4550

X

SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

NO RESPONSE FOR REASONS CHECKED

SOLICITATION NUMBER FA811825R0068

FROM: AFFIX

STAMP

HERE

TO:

ATTN:

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

A 5-YEAR (THREE-YEAR BASIC AND 1 TWO-YEAR OPTION PERIODS) FIRM FIXED PRICE REQUIREMENTS TYPE CONTRACT IS

CONTEMPLATED.

NOTE:

(b)

ALL work shall be completed in accordance with the requirements specified herein (including attachments hereto) and all costs associated with work specifications, technical orders, and/or cost associated with Over and Above request (excluding missing parts) shall be included in the unit price. The government shall only pay the contractor for missing components after review and approval of O&A request. No additional cost will be allowed (i.e. material handling, profit, direct or indirect costs).

Merry Curry merry.curry.1@us.af.mil, Jacqueline West jacqueline.west@us.af.mil.

A score of 110 must be in SPRS, if assessment score is less than 110 a contractors must submit a copy of their plan with their proposal.

Remanufacture of KC-135 Flutter Dampener - Basic Year

Item No.

Best Estimated Qty

U/I Unit Price Estimated Total Price

NSN:

Manufacturer Part Number

Priority:

Remanufacture of KC-135 Flutter Dampener - Basic Year Ordering Period I

Item No.

Best Estimated Qty

U/I Unit Price Estimated Total Price

NSN:

Manufacturer Part Number

Priority:

Limitations of Liability:

Inspection:

Acceptance:

Inspection/Acceptance Report:

Quality Assurance:

Transportation From Continental United States CONUS (CONUS) Sources

Type / Ship To PACRN Mark For

Type / Ship To Quantity (U/I) 6ea 45 days ARO reps Req No / Pri Required Delivery

Proposed Delivery

Remanufacture of KC-135 Flutter Dampener - Ordering Period II

Best Estimated Qty

U/I Unit Price Estimated Total Price

NSN:

Manufacturer Part Number

Priority:

Limitations of Liability:

Inspection:

Acceptance:

Inspection/Acceptance Report:

Quality Assurance:

Transportation From Continental United States CONUS (CONUS) Sources

Type / Ship To PACRN Mark For

Type / Ship To Quantity (U/I) 6ea 45 days ARO reps Req No / Pri Required Delivery

Proposed Delivery

Remanufacture of KC-135 Flutter Dampener - Ordering Period III

Item No.

Best Estimated Qty

U/I Unit Price Estimated Total Price

NSN:

Manufacturer Part Number

Priority:

Limitations of Liability:

Remanufacture of KC-135 Flutter Dampener - Ordering Period III

Inspection:

Acceptance:

Inspection/Acceptance Report:

Quality Assurance:

Transportation From Continental United States CONUS (CONUS) Sources

Type / Ship To PACRN Mark For

Type / Ship To Quantity (U/I) 6ea 45 days ARO reps Req No / Pri Required Delivery

Proposed Delivery

Over ans Above - Basic Year

Item No.

Quantity U/I Unit Price

Priority:

DESCRIPTION

FIXED PRICED ITEMS

Data and Reports - Basic Year

Quantity U/I Unit Price

Priority:

EXHIBIT ITEM

NO.

RELATED

LINE ITEM

NO.

DATA ITEM DECRIPTION QTY FREQ UNIT

PRICE

TOTAL

PRICE

Remanufacture of KC-135 Flutter Dampener - Option Year

Item No.

Best Estimated Qty

U/I Unit Price Estimated Total Price

NSN:

Manufacturer Part Number

Remanufacture of KC-135 Flutter Dampener - Option Year Ordering Period I

Best Estimated Qty

U/I Unit Price Estimated Total Price

NSN:

Manufacturer Part Number

Priority:

Limitations of Liability:

Inspection:

Acceptance:

Inspection/Acceptance Report:

Quality Assurance:

Transportation From Continental United States CONUS (CONUS) Sources

Type / Ship To PACRN Mark For

Type / Ship To Quantity (U/I) 6ea 45 days ARO reps Req No / Pri Required Delivery

Proposed Delivery

Remanufacture of KC-135 Flutter Dampener - Option Year Ordering Period II

Item No.

Best Estimated Qty

U/I Unit Price Estimated Total Price

NSN:

Manufacturer Part Number

Limitations of Liability:

Remanufacture of KC-135 Flutter Dampener - Option Year Ordering Period II

Inspection:

Acceptance:

Inspection/Acceptance Report:

Quality Assurance:

Transportation From Continental United States CONUS (CONUS) Sources

Type / Ship To PACRN Mark For

Type / Ship To Quantity (U/I) 6ea 45 days ARO reps Req No / Pri Required Delivery

Proposed Delivery

Over and Above - Option Year

Item No.

Quantity U/I Unit Price

Priority:

DESCRIPTION

FIXED PRICED ITEMS

Data and Reports - Option Year

Quantity U/I Unit Price

Priority:

EXHIBIT

ITEM

NO.

RELATED

LINE ITEM

NO.

DATA ITEM DECRIPTION QTY FREQ

UNIT

PRICE

TOTAL

PRICE

SHIP TO / PLACE OF PERFORMANCE

TYPE/CODE:

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

TYPE/CODE:

MARK FOR: (See Individual Line Item) REQUISITION NUMBER: (See Individual Line Item) REQUISITION PRIORITY: (See Individual Line Item)

AWARD NUMBER:

PART I - THE SCHEDULE

SECTION E

INSPECTION AND ACCEPTANCE

52.246-2 INSPECTION OF SUPPLIES--FIXED-PRICE

52.246-16 RESPONSIBILITY FOR SUPPLIES (APR 1984)

(IAW FAR 46.316)

INSPECTION AND ACCEPTANCE (SEP 1999)

(IAW FAR 46.401(b), FAR 46.503)

[CONTRACTOR FILL-IN]

See schedule for items with the following code(s) listed below :

Inspection Code and Address:

PART I - THE SCHEDULE

SECTION F

DELIVERIES OR PERFORMANCE

52.211-17 DELIVERY OF EXCESS QUANTITIES (SEP 1989)

(IAW FAR 11.703(b))

52.242-15 STOP-WORK ORDER (AUG 1989)

(IAW FAR 42.1305(b)(1))

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

(IAW FAR 42.1305(c))

52.247-30 F.O.B. ORIGIN, CONTRACTOR'S FACILITY (FEB 2006)

(IAW FAR 47.303-2(c))

52.247-65 F.O.B. ORIGIN, PREPAID FREIGHT--SMALL PACKAGE SHIPMENTS (JAN 1991)

(IAW FAR 47.303-17(f))

F.O.B. ORIGIN (OCT 1993)

(IAW FAR 47.305(b))

F.O.B. Address

[CONTRACTOR FILL-IN]

PART I - THE SCHEDULE

SECTION G

CONTRACT ADMINISTRATION DATA

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))

WAWF payment instructions

Document type

(Contracting Officer: Insert applicable document type(s).

Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)

Inspection/acceptance location

(Contracting Officer: Insert inspection and acceptance locations or “Not applicable.”) Document routing

Field Name in WAWF Data to be entered in WAWF

(*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)

Payment request and supporting documentation.

e.g

WAWF email notifications

(Contracting Officer: Insert applicable email addresses or “Not applicable.”)

WAWF point of contact.

(Contracting Officer: Insert applicable information or “Not applicable.”)

ACCOUNTING AND APPROPRIATION DATA (AUG 1998)

ACRN TOTAL $ 0.00

PART II - CONTRACT CLAUSES

SECTION I

CONTRACT CLAUSES

5352.201-9101 OMBUDSMAN (JUN 2023)

(IAW DAFFARS 5301.9103)

AFSC/PZC

405 736 3273 000 000 0000

52.202-1 DEFINITIONS (JUN 2020)

(IAW FAR 2.201)

52.203-3 GRATUITIES (APR 1984)

(IAW FAR 3.202)

52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

(IAW FAR 3.404)

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)

(IAW FAR 3.503-2)

52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)

(IAW FAR 3.502-3)

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR

IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(a))

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(b))

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(JUN 2020)

(IAW FAR 3.808(b))

52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY

AGREEMENTS OR STATEMENTS (JAN 2017)

(IAW FAR 3.909-3 (b))

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS

(SEP 2011)

(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))

252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER

DEFENSE-CONTRACT-RELATED FELONIES (JAN 2023)

(IAW DFARS 203.570-3)

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS

(DEC 2022)

(IAW DFARS 203.970)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (JUN 2020)

(IAW FAR 4.1403(a))

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)

(IAW FAR 4.1105(b))

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)

(IAW FAR 4.1804(c), FAR 12.301(d))

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS

(DEC 2014)

(IAW FAR 4.1202(b))

52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS

(NOV 2021)

(IAW FAR 4.1903)

52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES

DEVELOPED OR PROVIDED BY KASPERSKY LAB COVERED ENTITIES

(DEC 2023)

(IAW FAR 4.2004)

52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND

VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

(IAW 4.2105(b))

52.204-27 PROHIBITION ON A BYTEDANCE COVERED APPLICATION (JUN 2023)

(IAW FAR 4.2203)

52.204-30 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS- PROHIBITION

(DEC 2023)

(IAW FAR 4.2306(c))

252.204-7002 PAYMENT FOR SUBLINE ITEMS NOT SEPARATELY PRICED (APR 2020)

(IAW DFARS 204.7109(a))

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

(IAW DFARS 204.404-70(b))

252.204-7009 LIMITATIONS ON THE USE OR DISCLOSURE OF THIRD-PARTY CONTRACTOR

REPORTED CYBER INCIDENT INFORMATION (JAN 2023)

(IAW DFARS 204.7304(b))

252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT

REPORTING (JAN 2023)

(IAW DFARS 204-7304(c))

252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT

REPORTING DEVIATION 2024-O0013, REVISION 1 (MAY 2024)

(IAW Class Deviation 2024-O0013 Rev. 1)

252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION

SUPPORT (JAN 2023)

(IAW DFARS 204.7403(b), DFARS 212.301(f)(i)(F))

252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE

TELECOMMUNICATIONS EQUIPMENT OR SERVICES (JAN 2023)

(IAW DFARS 204.2105(c))

252.204-7020 NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV 2023)

(IAW DFARS 204.7304(e))

252.204-7022 EXPEDITING CONTRACT CLOSEOUT (MAY 2021)

(IAW DFARS 204.804-70)

52.209-1 QUALIFICATION REQUIREMENTS (FEB 1995)

(IAW FAR 9.206-2)

Item No Agency Name/Address

52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT

(IAW FAR 9.409)

52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS

(NOV 2015)

(IAW FAR 9.108-5(b))

252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE

GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM

(MAY 2019)

(IAW DFARS 209.409)

52.211-5 MATERIAL REQUIREMENTS (AUG 2000)

(IAW FAR 11.302)

52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)

(IAW FAR 11.604(b))

252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)

(IAW DFARS 211.274-5(a), DFARS 212.301(f)(xii))

Definitions

Unique item identifier.

52.215-2 AUDIT AND RECORDS--NEGOTIATION (JUN 2020)

(IAW FAR 15.209(b)(1))

52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)

(IAW FAR 15.209(h))

52.215-14 INTEGRITY OF UNIT PRICES (NOV 2021)

(IAW FAR 15.408(f)(1))

52.216-19 ORDER LIMITATIONS (OCT 1995)

(IAW FAR 16.506(b)) Minimum order

Maximum order i.e

52.216-21 REQUIREMENTS (OCT 1995)

(IAW FAR 16.506(d)(1))

52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(IAW FAR 17.208(g))

252.217-7001 SURGE OPTION (DEC 2018)

(IAW DFARS 217.208-70(b))

General

252.217-7028 OVER AND ABOVE WORK (DEC 1991)

(IAW DFARS 217.7702)

52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS

CONCERNS (OCT 2022)

(IAW FAR 19.1309(b))

Waiver of evaluation preference.

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (SEP 2023)

(IAW FAR 19.309(c))

[Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.]

[Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.]

[Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.]

[Complete only if the Contractor represented itself as a veteran-owned small business concern in paragraph (h)(6) of this clause.]

[Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.]

[Contractor to sign and date and insert authorized signer’s name and title.]

52.222-19 CHILD LABOR--COOPERATION WITH AUTHORITIES AND REMEDIES (FEB 2024)

(IAW FAR 22.1505(b))

52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)

(IAW FAR 22.1310(a)(1), DFARS 222.1310(a)(1))

52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)

(IAW FAR 22.1408(a))

52.222-37 EMPLOYMENT REPORTS ON VETERANS (JUN 2020)

(IAW FAR 22.1310(b))

52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR

RELATIONS ACT (DEC 2010)

(IAW FAR 22.1605)

52.222-50 COMBATING TRAFFICKING IN PERSONS (NOV 2021)

(IAW FAR 22.1705(a)(1))

52.223-10 WASTE REDUCTION PROGRAM (MAY 2024)

(IAW FAR 23.406(c))

52.223-23 SUSTAINABLE PRODUCTS AND SERVICES (MAY 2024)

(IAW 23.109(a))

52.223-23 SUSTAINABLE PRODUCTS AND SERVICES (DEVIATION 2025-O0004) (MAR 2025)

(IAW 23.109(a))

252.223-7008 PROHIBITION OF HEXAVALENT CHROMIUM (JAN 2023)

(IAW DFARS 223.7306, DFARS 212.301(f)(xxi))

252.223-7009 PROHIBITION OF PROCUREMENT OF FLUORINATED AQUEOUS FILM-FORMING

FOAM FIRE-FIGHTING AGENT FOR USE ON MILITARY INSTALLATIONS

(MAR 2024)

(IAW DFARS 223.7404)

52.224-3 PRIVACY TRAINING (JAN 2017)

(IAW FAR 24.302(a))

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (FEB 2021)

(IAW FAR 25.1103(a))

252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (APR 2022)

(IAW DFARS 225.7002-3(a))

252.225-7048 EXPORT-CONTROLLED ITEMS (JUN 2013)

(IAW DFARS 225.7901-4)

252.225-7052 RESTRICTION ON THE ACQUISITION OF CERTAIN MAGNETS, TANTALUM, AND

TUNGSTEN (MAY 2024)

(IAW DFARS 225.7018-5)

252.225-7061 RESTRICTION ON THE ACQUISITION OF PERSONAL PROTECTIVE EQUIPMENT

AND CERTAIN OTHER ITEMS FROM NON-ALLIED FOREIGN NATIONS (JAN 2023)

(IAW DFARS 225.7023-4)

252.225-7967 PROHIBITION REGARDING RUSSIAN FOSSIL FUEL BUSINESS OPERATIONS

(DEVIATION 2024-O0006, REVISION 1) (FEB 2024) (FEB 2024)

(IAW CLASS DEVIATION 2024-O0006, REVISION 1)

252.225-7972 PROHIBITION ON THE PROCUREMENT OF FOREIGN-MADE UNMANNED AIRCRAFT

SYSTEMS (AUG 2024) (DEVIATION 2024-O0014) (AUG 2024)

(IAW Deviation 2024-O0014)

52.226-7 DRUG-FREE WORKPLACE (MAY 2024)

(IAW FAR 26.506)

52.226-8 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE

DRIVING (MAY 2024)

(IAW FAR 26.605)

52.227-1 AUTHORIZATION AND CONSENT (JUN 2020)

(IAW FAR 27.201-2(a)(1))

52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT

INFRINGEMENT (JUN 2020)

(IAW FAR 27.201-2(b))

52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

(IAW FAR 29.401-3(a))

52.229-12 TAX ON CERTAIN FOREIGN PROCUREMENTS (FEB 2021)

(IAW 29.402-3(b))

252.229-7014 FULL EXEMPTION FROM TWO-PERCENT EXCISE TAX ON CERTAIN FOREIGN

PROCUREMENTS. (OCT 2022)

(IAW DFARS 229-402(k))

52.232-1 PAYMENTS (APR 1984)

(IAW FAR 32.111(a)(1))

52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)

(IAW FAR 32.111(b)(1))

52.232-11 EXTRAS (APR 1984)

(IAW FAR 32.111(c)(2))

52.232-17 INTEREST (MAY 2014)

(IAW FAR 32.611(a), FAR 32.611(b))

52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

(IAW FAR 32.806(a)(1))

52.232-25 PROMPT PAYMENT (JAN 2017)

(IAW FAR 32.908(c)) Invoice payments—

Computing penalty amount.

7th

52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD

MANAGEMENT (OCT 2018)

(IAW FAR 32.1110(a)(1))

52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)

(IAW FAR 32.706-3)

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS

SUBCONTRACTORS (MAR 2023)

(IAW FAR 32.009-2)

252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS

(DEC 2018)

(IAW DFARS 232.7004(a)) e.g.

252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)

(IAW DFARS 232.7102)

52.233-1 DISPUTES (MAY 2014)

(IAW FAR 33.215)

52.233-3 PROTEST AFTER AWARD (AUG 1996)

(IAW FAR 33.106(b))

52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

(IAW FAR 33.215(b))

52.240-1 PROHIBITION ON UNMANNED AIRCRAFT SYSTEMS MANUFACTURED OR

ASSEMBLED BY AMERICAN SECURITY DRONE ACT-COVERED FOREIGN

ENTITIES (NOV 2024)

(IAW FAR 40.202-8)

52.242-13 BANKRUPTCY (JUL 1995)

(IAW FAR 42.903)

52.243-1 CHANGES--FIXED-PRICE (AUG 1987)

(IAW FAR 43.205(a)(1))

252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)

(IAW DFARS 243.205-70)

252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2022)

(IAW DFARS 243.205-71)

52.244-6 SUBCONTRACTS FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

(DEVIATION 2025-O0003) (MAR 2025)

(IAW FAR 44.403)

252.244-7000 SUBCONTRACTS FOR COMMERCIAL ITEMS AND COMMERCIAL COMPONENTS

(DOD CONTRACTS) (NOV 2023)

(IAW DFARS 244.403)

52.245-1 GOVERNMENT PROPERTY (SEP 2021)

(IAW FAR 45.107(a), DFARS 237.7003(c), DFARS 245.107)

52.245-9 USE AND CHARGES (APR 2012)

(IAW FAR 45.107(c))

252.245-7003 CONTRACTOR PROPERTY MANAGEMENT SYSTEM ADMINISTRATION (APR 2012)

(IAW DFARS 245.107(3))

252.245-7004 REPORTING, REUTILIZATION, AND DISPOSAL (DEVIATION 2022-O0006)

(IAW Deviation 2022-O0006)

252.245-7005 MANAGEMENT AND REPORTING OF GOVERNMENT PROPERTY (JAN 2024)

(IAW DFARS 245.107(4))

52.246-23 LIMITATION OF LIABILITY (FEB 1997)

(IAW FAR 46.805(a)(1))

52.247-1 COMMERCIAL BILL OF LADING NOTATIONS (FEB 2006)

(IAW FAR 47.104-4(a), FAR 47.104-4(b))

252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA--BASIC (OCT 2024)

(IAW DFARS 247.574(a) and (a)(1))

52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE)

(APR 2012)

(IAW FAR 49.502(b)(1)(i))

52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984)

(IAW FAR 49.504(a)(1))

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

(IAW FAR 52.107(b))

Also, the full text of a clause may be accessed electronically at this/these address(es):

NOTE:

FIND regulation reference

52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

(IAW FAR 53.111)

PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J

LIST OF ATTACHMENTS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

SECTION K

REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS

OF OFFERORS OR RESPONDENTS

252.203-7005 REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS

(SEP 2022)

(IAW DFARS 203.171-4(b))

52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEVIATION 2025-O0003 and

2025-O0004) (MAR 2025)

(IAW FAR 4.1202(a))

52.204-29 FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS -

REPRESENTATION AND DISCLOSURES (DEC 2023)

(IAW FAR 4.2306(b))

252.204-7007 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)

(IAW DFARS 204.1202)

[Contracting Officer check as appropriate.]

252.204-7008 COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION

CONTROLS (OCT 2016)

(IAW DFARS 204.7304(a))

252.204-7016 COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES --

REPRESENTATION (DEC 2019)

(IAW 204.2105(a))

252.204-7017 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE

TELECOMMUNICATIONS EQUIPMENT OR SERVICES--REPRESENTATION

(MAY 2021)

(IAW DFARS 204.2105(b))

252.204-7019 NOTICE OF NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS

(NOV 2023)

(IAW DFARS 204.7304(d))

12.

Summary level scores.

Basic Assessments.

Medium and High Assessments.

Accessibility.

52.207-4 ECONOMIC PURCHASE QUANTITY--SUPPLIES (AUG 1987)

(IAW FAR 7.203)

OFFEROR RECOMMENDATIONS

ITEM QUANTITY QUOTATION PRICE TOTAL

52.209-11 REPRESENTATION BY CORPORATIONS REGARDING DELINQUENT TAX LIABILITY

OR A FELONY CONVICTION UNDER ANY FEDERAL LAW (FEB 2016)

(IAW FAR 9.104-7(d)) is [ ] is not [ ] is [ ] is not [ ]

52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS--CERTIFICATION

(IAW FAR 9.109-5)

252.209-7011 REPRESENTATION FOR RESTRICTION ON THE USE OF CERTAIN INSTITUTIONS

OF HIGHER EDUCATION (OCT 2023)

(IAW DFARS 209.170-4)

THE FOLLOWING IS FILL-IN DATA FOR PROVISION 52.204-8 PARA (c)(2)(iii):

52.222-18 CERTIFICATION REGARDING KNOWLEDGE OF CHILD LABOR FOR LISTED END PRODUCTS (FEB 2021)

Listed end products

Certification

52.225-18 PLACE OF MANUFACTURE (AUG 2018)

(IAW FAR 25.1101(f))

[ ] In the United States

[ ] Outside the United States

252.225-7966 PROHIBITION REGARDING RUSSIAN FOSSIL FUEL BUSINESS

OPERATIONS-REPRESENTATION (DEVIATION 2024-O0006, REVISION 1)

(MAR 2024)

(IAW CLASS DEVIATION 2024-O0006, REVISION 1)

52.229-11 TAXES ON CERTAIN FOREIGN PROCUREMENTS - NOTICE AND

REPRESENTATION (JUN 2020)

(IAW FAR 29.402-3(a))

PART IV - REPRESENTATIONS AND INSTRUCTIONS

SECTION L

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS OR RESPONDENTS

52.204-7 SYSTEM FOR AWARD MANAGEMENT (OCT 2018)

(IAW FAR 4.1105(a)(1))

52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING (AUG 2020)

(IAW FAR 4.1804(a), FAR 12.301(d))

52.204-22 ALTERNATIVE LINE ITEM PROPOSAL (JAN 2017)

(IAW FAR 4.1008)

52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO

SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

(IAW FAR 4.2105(a))

Definitions.

Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, substantial or essential component

Prohibition.

Procedures.

https://www.sam.gov

Representations.

Disclosures.

52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES -

REPRESENTATION (OCT 2020)

(IAW FAR 4.2105(c))

Definitions.

Procedures.

Representations.

252.204-7024 NOTICE ON THE USE OF THE SUPPLIER PERFORMANCE RISK SYSTEM

(MAR 2023)

(IAW DFARS 204.7604)

52.211-14 NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY

PREPAREDNESS, AND ENERGY PROGRAM USE (APR 2008)

(IAW FAR 11.604(a))

52.215-1 INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (NOV 2021)

(IAW FAR 15.209(a))

252.215-7008 ONLY ONE OFFER (DEC 2022)

(IAW DFARS 215.408(3))

252.215-7013 SUPPLIES AND SERVICES PROVIDED BY NONTRADITIONAL DEFENSE

CONTRACTORS (JAN 2023)

(IAW DFARS 215.408(6))

52.216-1 TYPE OF CONTRACT (APR 1984)

(IAW FAR 16.105)

(see individual line item)

252.225-7973 PROHIBITION ON THE PROCUREMENT OF FOREIGN-MADE UNMANNED AIRCRAFT

SYSTEMS-REPRESENTATION (AUG 2024) (DEVIATION 2024-O0014) (AUG 2024)

(IAW DEVIATION 2024-O0014)

52.233-2 SERVICE OF PROTEST (SEP 2006)

(IAW FAR 33.106(a)) (See page 1 Issuing Office)

52.247-46 SHIPPING POINT(S) USED IN EVALUATION OF F.O.B. ORIGIN OFFERS (APR 1984) (IAW FAR 47.305-3(b)(4)(ii))

52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

(IAW FAR 52.107(a))

NOTE:

FIND regulation reference

Section L – Instructions to Offerors

13.

Remanufacture of KC-135 Flutter Dampener.

sole

A score of 110 must be in SPRS, if assessment score is less than 110 a contractor must submit a plan with their proposal to become compliant.

PART IV - REPRESENTATIONS AND INSTRUCTIONS

SECTION M

EVALUATION FACTORS FOR AWARD

EVALUATION CRITERIA FOR AWARD (OCT 1997)

(IAW FAR 13.106-2(b), FAR 14.201-5(c), FAR 15.204-5(c))

Evaluation Factors Order of Importance

NOTICE FOR OPTIONS:

52.247-47 EVALUATION-F.O.B. ORIGIN (JUN 2003)

(IAW FAR 47.305-3(f)(2))

ITEM NO MODE OF TRANSPORTATION

Section M - Evaluation Factors for Award

1.0. Price-Only Competition

Basis for Contract Award This acquisition will utilize price as the only evaluated factor. Award will be made to the offeror with the lowest total evaluated price (TEP) and whose proposal conforms to the solicitation requirements (to include all stated terms, conditions, representations, and certifications). In order to be eligible for award, the offeror must be an approved source IAW FAR 52.209-1, Qualification Requirements. The Government reserves the right to award without discussions. However, the Government reserves the right to conduct discussions if determined necessary by the Contracting Officer.

1.1. Solicitation Requirements (Terms and Conditions)

Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, Statement of Work (SOW) requirements, in addition to the price factor. Failure to comply with the terms and conditions of the solicitation may result in the Offeror being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and must provide complete supporting rationale. The Government reserves the right to determine any such exceptions unacceptable, and the proposal, therefore, ineligible for award.

1.2 Number of Contracts to Be Awarded

The Government intends to select one contractor for this acquisition. However, the Government reserves the right not to award a contract at all, depending on the quality of the proposals and prices submitted and the availability of funds.

1.3 Competitive Range Determination

If discussions are conducted, the Government shall establish a competitive range comprised of the most highly rated proposals, in accordance with (IAW) FAR 15.306(c). During the evaluation process multiple competitive range determinations may be made that eliminate Offerors from the competition IAW FAR 15.505. A competitive range determination may eliminate Offerors based on their initial proposal evaluation results, after discussions (if necessary), prior to issuance of the Final Proposal Revision (FPR) request, or for efficiency. If Offerors are excluded from the competitive range they may request a debriefing IAW FAR 15.505.

1.4 Discussions

The Government intends to award without discussions, but reserves the right to conduct discussions if necessary.

Therefore, it is imperative that Offerors submit their best terms initially. However, if during the evaluation period it is determined to be in the best interest of the Government to hold discussions, the contracting officer may request, or allow for offerors to provide, proposal revisions to clarify and document understandings reached during discussions.

At the conclusion of discussions, each offeror still in the competitive range shall be given an opportunity to submit a FPR. The Request for FPR letter will include specific instructions on how offerors will submit FPRs.

2.0. Evaluation Factor

2.1. Factor 1- Price

Price proposals will be evaluated as follows:

2.1.1. Completeness

Proposals will be reviewed for completeness. Incomplete proposals will be considered ineligible for award.

2.1.2. Price Reasonableness

The proposed prices will be evaluated for reasonableness. Reasonableness must represent a price to the Government a prudent person would pay in the conduct of competitive business. Normally, price reasonableness is established through adequate price competition, but may also be determined through price analysis techniques as described in FAR 15.404-1(b)(2).

2.1.3. Price Realism-

The Government intends to determine price realism based on adequate price competition. In the event the Government cannot determine price realism based on adequate price competition, the Government reserves the right to conduct a more detailed price realism evaluation using one or more of the price analysis techniques described in FAR 15.404-1(b)(2). The Government may also use other evaluation techniques, as needed. To be realistic, the proposed price must demonstrate an adequate understanding of the requirement. All documentation submitted to support price realism will be considered in the evaluation. Offerors who fail to submit a price rationale in accordance with Section L, para 3.2 and/or whose price is determined unrealistically low based on an inadequate understanding of requirements will be ineligible for award).

2.1.4. Unbalanced pricing

Offerors’ proposals will be reviewed for unbalanced pricing. The Government will evaluate any supporting information provided by the Offeror explaining variances that appear unbalanced. Evaluated offers that are determined to be unbalanced may be deemed ineligible for award by the Contracting Officer if a determination is made that lack of balance poses an unacceptable risk to the Government. Unbalanced pricing exists when, despite an acceptable total price, the price of one or more line items (including sub line items) is significantly over or understated as demonstrated by application of price analysis techniques, such that:

a) There is reasonable doubt the offer would result in the lowest overall cost to the Government, even though it is the lowest priced Offeror; or

b) The offer is so grossly unbalanced; its acceptance would be tantamount to allowing an advanced payment.

2.1.5. Total Evaluated Price (TEP):

The TEP will be calculated as the sum of the total proposed prices for all separately priced line items (including sub line items). The total proposed price for each separately priced line item shall be calculated as the proposed unit price multiplied by the corresponding quantity/BEQ.

The total proposed price for all options will be added to the total proposed price for the basic requirement as a part of the TEP calculation.

TEP will be used for evaluation purposes only. Evaluation of options shall not obligate the Government to exercise such options.

The TEP will be calculated as the sum of the offeror’s proposed prices for the base period and all option periods, plus the 6 month extension period in accordance with 52.217-8.

The TEP will be calculated as the sum of the offeror’s proposed prices for the base period and all option periods to include the six (6)-month extension period in accordance with FAR 52.217-8 “Option to Extend Services.” The six (6)-month extension period unit prices will be based on the 19July 2030 unit prices. The six (6)-month extension period under FAR 52.217-8 will only be utilized if necessary.

File details come from the government source that posted it. Updated .