UPDATEDCDRL.pdf
PDF 152 KB Posted
- Attached to
- Overhaul/Modification of B-1 Right/Left Hand Gear Sweep Actuator and Angle Drive Gearbox Assembly
- Solicitation number
- FA811818R0039
About this file
NEW CDRL A003, B003, C003, D003, E003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| DID80255.pdf | ||
| REVISEDPWS24JAN2019.pdf | ||
| FA811818R0039_0007.pdf | ||
| FA811818R0039_0006.pdf | ||
| FA811818R0039_0004.pdf | ||
| FA811818R0039_0003.pdf | ||
| FA811818R0039_0002.pdf | ||
| FA811818R0039_0001.pdf | ||
| WG20155030.pdf | ||
| CDRL.pdf | ||
| SPI012765888.pdf | ||
| PACKAGING.pdf | ||
| WG20155614.pdf | ||
| PWS2OCT2018.pdf | ||
| TRANSPORTATION.pdf | ||
| FA811818R0039.pdf | ||
| DID81995.pdf | ||
| WG20155234.pdf | ||
| GFPUPDATED.pdf | ||
| DID81634.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-1 / Multiple Items
E. CONTRACT / PR NO.
FD20301700657
F. CONTRACTOR
1. DATA ITEM NO.
A003
2. TITLE OF DATA ITEM
Failure Summary and Analysis Report
3. SUBTITLE
N/A
4. AUTHORITY
DI-SESS-80255A
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
N/A
6. REQUIRING OFFICE
423 SCMS/GUMF
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
MTHLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 04 FEB 2019DATE:
1. End Item and Component failure data shall be collected and recorded for each overhauled Gear Sweep Actuators. A failed item is defined as one that fails specific test/inspection criteria or no longer meets the requirements of the original design.
2. For all replacement item Transducers, NSN 6685-01-182-8835SX, P/N 41SG16-5, minimum data requirements shall include:
a. Failed Item Serial or Lot number (if applicable)
b. Date of failure discovery
c. Failure Mode
d. Parts replaced
3. Additional failure data may be added as agreed upon by the contractor and the government.
4. Contractor format is acceptable but must enable efficient Reliability and Failure Trend Analysis.
BLOCK 11: Last day of the month
BLOCKS 12 and 13: First report shall be submitted for the month initial delivery order or assets are received after contract award. All reports shall be e-mailed so as to arrive at 423 SCMS/GUMF no later than the tenth (10th) calendar day of the month following the reporting period.
BLOCK 14: E-mail to: edwin.mitchell@us.af.mil melodee.sharbutt.1@us.af.mil
COORDINATORS:
423 SCMS/GUEA 0 1 0
423 SCMS/GUMF 0 1 0
0 2 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
05 FEB 2019
I. APPROVED BY
//DIGITALLY SIGNED//
SHARBUTT.MELODEE.RENEE.1038750468
423 SCMS / GUMF 405-582-9055 / 852-9055
J. DATE
04 FEB 2019
Page 3 of 3DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 06 Feb 2019
PREVIOUS EDITION MAY BE USED.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-1 / Multiple Items
E. CONTRACT / PR NO.
FD20301700657
F. CONTRACTOR
1. DATA ITEM NO.
B003
2. TITLE OF DATA ITEM
Failure Summary and Analysis Report
3. SUBTITLE
N/A
4. AUTHORITY
DI-SESS-80255A
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
N/A
6. REQUIRING OFFICE
423 SCMS/GUMF
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
MTHLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 04 FEB 2019DATE:
1. End Item and Component failure data shall be collected and recorded for each overhauled Gear Sweep Actuators. A failed item is defined as one that fails specific test/inspection criteria or no longer meets the requirements of the original design.
2. For all replacement item Transducers, NSN 6685-01-182-8835SX, P/N 41SG16-5, minimum data requirements shall include:
a. Failed Item Serial or Lot number (if applicable)
b. Date of failure discovery
c. Failure Mode
d. Parts replaced
3. Additional failure data may be added as agreed upon by the contractor and the government.
4. Contractor format is acceptable but must enable efficient Reliability and Failure Trend Analysis.
BLOCK 11: Last day of the month
BLOCKS 12 and 13: First report shall be submitted for the month initial delivery order or assets are received after contract award. All reports shall be e-mailed so as to arrive at 423 SCMS/GUMF no later than the tenth (10th) calendar day of the month following the reporting period.
BLOCK 14: E-mail to: edwin.mitchell@us.af.mil melodee.sharbutt.1@us.af.mil
COORDINATORS:
423 SCMS/GUEA 0 1 0
423 SCMS/GUMF 0 1 0
0 2 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
05 FEB 2019
I. APPROVED BY
//DIGITALLY SIGNED//
SHARBUTT.MELODEE.RENEE.1038750468
423 SCMS / GUMF 405-582-9055 / 852-9055
J. DATE
04 FEB 2019
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-1 / Multiple Items
E. CONTRACT / PR NO.
FD20301700657
F. CONTRACTOR
1. DATA ITEM NO.
C003
2. TITLE OF DATA ITEM
Failure Summary and Analysis Report
3. SUBTITLE
N/A
4. AUTHORITY
DI-SESS-80255A
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
N/A
6. REQUIRING OFFICE
423 SCMS/GUMF
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
MTHLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 04 FEB 2019DATE:
1. End Item and Component failure data shall be collected and recorded for each overhauled Gear Sweep Actuators. A failed item is defined as one that fails specific test/inspection criteria or no longer meets the requirements of the original design.
2. For all replacement item Transducers, NSN 6685-01-182-8835SX, P/N 41SG16-5, minimum data requirements shall include:
a. Failed Item Serial or Lot number (if applicable)
b. Date of failure discovery
c. Failure Mode
d. Parts replaced
3. Additional failure data may be added as agreed upon by the contractor and the government.
4. Contractor format is acceptable but must enable efficient Reliability and Failure Trend Analysis.
BLOCK 11: Last day of the month
BLOCKS 12 and 13: First report shall be submitted for the month initial delivery order or assets are received after contract award. All reports shall be e-mailed so as to arrive at 423 SCMS/GUMF no later than the tenth (10th) calendar day of the month following the reporting period.
BLOCK 14: E-mail to: edwin.mitchell@us.af.mil melodee.sharbutt.1@us.af.mil
COORDINATORS:
423 SCMS/GUEA 0 1 0
423 SCMS/GUMF 0 1 0
0 2 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
05 FEB 2019
I. APPROVED BY
//DIGITALLY SIGNED//
SHARBUTT.MELODEE.RENEE.1038750468
423 SCMS / GUMF 405-582-9055 / 852-9055
J. DATE
04 FEB 2019
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-1 / Multiple Items
E. CONTRACT / PR NO.
FD20301700657
F. CONTRACTOR
1. DATA ITEM NO.
D003
2. TITLE OF DATA ITEM
Failure Summary and Analysis Report
3. SUBTITLE
N/A
4. AUTHORITY
DI-SESS-80255A
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
N/A
6. REQUIRING OFFICE
423 SCMS/GUMF
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
MTHLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 04 FEB 2019DATE:
1. End Item and Component failure data shall be collected and recorded for each overhauled Gear Sweep Actuators. A failed item is defined as one that fails specific test/inspection criteria or no longer meets the requirements of the original design.
2. For all replacement item Transducers, NSN 6685-01-182-8835SX, P/N 41SG16-5, minimum data requirements shall include:
a. Failed Item Serial or Lot number (if applicable)
b. Date of failure discovery
c. Failure Mode
d. Parts replaced
3. Additional failure data may be added as agreed upon by the contractor and the government.
4. Contractor format is acceptable but must enable efficient Reliability and Failure Trend Analysis.
BLOCK 11: Last day of the month
BLOCKS 12 and 13: First report shall be submitted for the month initial delivery order or assets are received after contract award. All reports shall be e-mailed so as to arrive at 423 SCMS/GUMF no later than the tenth (10th) calendar day of the month following the reporting period.
BLOCK 14: E-mail to: edwin.mitchell@us.af.mil melodee.sharbutt.1@us.af.mil
COORDINATORS:
423 SCMS/GUEA 0 1 0
423 SCMS/GUMF 0 1 0
0 2 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
05 FEB 2019
I. APPROVED BY
//DIGITALLY SIGNED//
SHARBUTT.MELODEE.RENEE.1038750468
423 SCMS / GUMF 405-582-9055 / 852-9055
J. DATE
04 FEB 2019
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY
TDP TM OTHER X
D. SYSTEM / ITEM
B-1 / Multiple Items
E. CONTRACT / PR NO.
FD20301700657
F. CONTRACTOR
1. DATA ITEM NO.
E003
2. TITLE OF DATA ITEM
Failure Summary and Analysis Report
3. SUBTITLE
N/A
4. AUTHORITY
DI-SESS-80255A
(Data Acquisition Document No.) 5. CONTRACT REFERENCE
N/A
6. REQUIRING OFFICE
423 SCMS/GUMF
7. DD 250 REQ
NO
8. APP CODE
N/A
9. DIST STATEMENT
REQUIRED
N/A
10. FREQUENCY
MTHLY
11. AS OF DATE
See Block 16
12. DATE OF FIRST
SUBMISSION
See Block 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Block 16
a. ADDRESSEE
Draft Final
ReproReg
b. COPIES
14. DISTRIBUTION
16. REMARKS
Zilar, Dale NNAME: 04 FEB 2019DATE:
1. End Item and Component failure data shall be collected and recorded for each overhauled Gear Sweep Actuators. A failed item is defined as one that fails specific test/inspection criteria or no longer meets the requirements of the original design.
2. For all replacement item Transducers, NSN 6685-01-182-8835SX, P/N 41SG16-5, minimum data requirements shall include:
a. Failed Item Serial or Lot number (if applicable)
b. Date of failure discovery
c. Failure Mode
d. Parts replaced
3. Additional failure data may be added as agreed upon by the contractor and the government.
4. Contractor format is acceptable but must enable efficient Reliability and Failure Trend Analysis.
BLOCK 11: Last day of the month
BLOCKS 12 and 13: First report shall be submitted for the month initial delivery order or assets are received after contract award. All reports shall be e-mailed so as to arrive at 423 SCMS/GUMF no later than the tenth (10th) calendar day of the month following the reporting period.
BLOCK 14: E-mail to: edwin.mitchell@us.af.mil melodee.sharbutt.1@us.af.mil
COORDINATORS:
423 SCMS/GUEA 0 1 0
423 SCMS/GUMF 0 1 0
0 2 015. TOTAL
G. PREPARED BY
Zilar, Dale N
424 SCMS / GUBAB
405-736-7976
H. DATE
05 FEB 2019
I. APPROVED BY
//DIGITALLY SIGNED//
SHARBUTT.MELODEE.RENEE.1038750468
423 SCMS / GUMF 405-582-9055 / 852-9055
J. DATE
04 FEB 2019
| UPDATEDCDRLA003 |
| UPDATEDCDRLB003 |
| UPDATEDCDRLC003 |
| UPDATEDCDRLD003 |
| UPDATEDCDRLE003 |
File details come from the government source that posted it.