4820013789062TP_TECH_ORDER_CHANGE_REQUEST_252.pdf

PDF 56 KB Posted

Attached to
REMANUFACTURE OF B-1 TEMP VALVE
Solicitation number
FA8118-16-R-0012
Issued by

View the file

Other files

Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B. REASON: _____________________________

PAGE _____ OF _____ PAGES1 2

TECHNICAL ORDER PUBLICATION CHANGE REQUEST

DATE PREPARED DATE RECEIVED

1. TO 2. FROM

3. PUBLICATION NUMBER 4. PUBLICATION DATE (Basic)

LATEST CHANGE NUMBER AND DATE

5. PROJECT NUMBER(S)

6. PUBLICATION TITLE

7. TYPE

RAC

TCTO SUP

TCTO

CHANGE

REVISION

8. NEED DATE 9. HARDNESS CRITICAL ITEM

YES NO N/A

10. TCTO NUMBER

11. CODES

A. DISTRIBUTION CODE:________________

C. EXPORT CONTROL YES NO

12. SAFETY REVIEW (OSHA)(Signature) 13. WPNS SAFETY/NUCLEAR SURETY TECHNICAL EVAL (Signature)

14a. FOREIGN DISCLOSURE (FDO) (Signature) 14b. AUTHORIZED TO (Country Codes as Applicable)

15. RGL CERTIFICATION 16a. ENVIRONMENTAL IMPACT 17. VERIFICATION

18. REMARKS/COORDINATION

19. ORIGINATOR 20. APPROVING OFFICIAL

21a.

PAGE NUMBER

21b. 21c.

INSTRUCTIONS

(Include below specific paragraph rewording, instructions for changing illustrations, new or changed listings in Parts Breakdown, N/A

AFTO FORM 124 PREPARED

N/A

ENVIRONMENTAL ASSESSMENT

PREPARED

N/A

BY PERFORMANCE

BY SIMULATION/DESKTOP

N/A N/A

N/A

X

X

X

ADD: Para. 5.4.1.c "Attempts to repair bent flanges are approved using the following guidelines:

1. Gradually heat the flange in the area that needs to be worked.

2. Attempt to straighten flange. This must be done very slowly, and only a little at one time.

3. Repeat steps 1 and 2 as required.

4. This is a very slow process, and if the unit cracks during this repair, a request to BER the unit will need to be submitted."

5.4.15-1

Lorrie Shappie

406 SCMS/GUEE

X

XX

Brady Stott

423 SCMS/GUMC

Per SATODS

X

X

X

ADMINISTRATIVE/OPERATION

D

16b. SPECIAL PACKAGING

INSTRUCTIONS (SPI)

N/A

REVIEWED BY PACKAGING

SPECIALIST

X

NAME

OFFICE SYMBOL

SIGNATURE

PHONE

Stott, Brady

PARAGRAPH NUMBER

PHONE

NAME

OFFICE SYMBOL423 SCMS/GUMC

Engineering Coordination: RFA Number:

51M00OCCOM696011/01/2010

15A2-3-109-3

OVERHAUL INSTRUCTIONS WITH IPB -- RAM AIR FLOW CONTROL VALVE, PN 735342, L5361651-001 (SUNSTRAND)

//Signed// Dena Jenkins, CIV, 405-582-9977, 423 SCMS/GUEA (Eng)

Priority: ROUTINE Route to engineering

405-734-4838

AFTO FORM 252, 20120627 PREVIOUS EDITION IS OBSOLETE

PAGE _____ OF _____ PAGES2 2

CONTINUATION

DATE PREPARED

3. PUBLICATION NUMBER 5. PROJECT NUMBER(S)

6. PUBLICATION TITLE

21a.

PAGE NUMBER INSTRUCTIONS

21c.21b.

PARAGRAPH NUMBER

(Include below specific paragraph rewording, instructions for changing illustrations, new or changed listings in Parts Breakdown, OVERHAUL INSTRUCTIONS WITH IPB -- RAM AIR FLOW CONTROL VALVE, PN 735342, L5361651-001 (SUNSTRAND)

15A2-3-109-3 51M00OCCOM6960

AFTO FORM 252, 20120627 CONTINUATION PAGE

File details come from the government source that posted it. Updated .