4820013789062TP_TECH_ORDER_CHANGE_REQUEST_252.pdf
PDF 56 KB Posted
- Attached to
- REMANUFACTURE OF B-1 TEMP VALVE
- Solicitation number
- FA8118-16-R-0012
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B. REASON: _____________________________
PAGE _____ OF _____ PAGES1 2
TECHNICAL ORDER PUBLICATION CHANGE REQUEST
DATE PREPARED DATE RECEIVED
1. TO 2. FROM
3. PUBLICATION NUMBER 4. PUBLICATION DATE (Basic)
LATEST CHANGE NUMBER AND DATE
5. PROJECT NUMBER(S)
6. PUBLICATION TITLE
7. TYPE
RAC
TCTO SUP
TCTO
CHANGE
REVISION
8. NEED DATE 9. HARDNESS CRITICAL ITEM
YES NO N/A
10. TCTO NUMBER
11. CODES
A. DISTRIBUTION CODE:________________
C. EXPORT CONTROL YES NO
12. SAFETY REVIEW (OSHA)(Signature) 13. WPNS SAFETY/NUCLEAR SURETY TECHNICAL EVAL (Signature)
14a. FOREIGN DISCLOSURE (FDO) (Signature) 14b. AUTHORIZED TO (Country Codes as Applicable)
15. RGL CERTIFICATION 16a. ENVIRONMENTAL IMPACT 17. VERIFICATION
18. REMARKS/COORDINATION
19. ORIGINATOR 20. APPROVING OFFICIAL
21a.
PAGE NUMBER
21b. 21c.
INSTRUCTIONS
(Include below specific paragraph rewording, instructions for changing illustrations, new or changed listings in Parts Breakdown, N/A
AFTO FORM 124 PREPARED
N/A
ENVIRONMENTAL ASSESSMENT
PREPARED
N/A
BY PERFORMANCE
BY SIMULATION/DESKTOP
N/A N/A
N/A
X
X
X
ADD: Para. 5.4.1.c "Attempts to repair bent flanges are approved using the following guidelines:
1. Gradually heat the flange in the area that needs to be worked.
2. Attempt to straighten flange. This must be done very slowly, and only a little at one time.
3. Repeat steps 1 and 2 as required.
4. This is a very slow process, and if the unit cracks during this repair, a request to BER the unit will need to be submitted."
5.4.15-1
Lorrie Shappie
406 SCMS/GUEE
X
XX
Brady Stott
423 SCMS/GUMC
Per SATODS
X
X
X
ADMINISTRATIVE/OPERATION
D
16b. SPECIAL PACKAGING
INSTRUCTIONS (SPI)
N/A
REVIEWED BY PACKAGING
SPECIALIST
X
NAME
OFFICE SYMBOL
SIGNATURE
PHONE
Stott, Brady
PARAGRAPH NUMBER
PHONE
NAME
OFFICE SYMBOL423 SCMS/GUMC
Engineering Coordination: RFA Number:
51M00OCCOM696011/01/2010
15A2-3-109-3
OVERHAUL INSTRUCTIONS WITH IPB -- RAM AIR FLOW CONTROL VALVE, PN 735342, L5361651-001 (SUNSTRAND)
//Signed// Dena Jenkins, CIV, 405-582-9977, 423 SCMS/GUEA (Eng)
Priority: ROUTINE Route to engineering
405-734-4838
AFTO FORM 252, 20120627 PREVIOUS EDITION IS OBSOLETE
PAGE _____ OF _____ PAGES2 2
CONTINUATION
DATE PREPARED
3. PUBLICATION NUMBER 5. PROJECT NUMBER(S)
6. PUBLICATION TITLE
21a.
PAGE NUMBER INSTRUCTIONS
21c.21b.
PARAGRAPH NUMBER
(Include below specific paragraph rewording, instructions for changing illustrations, new or changed listings in Parts Breakdown, OVERHAUL INSTRUCTIONS WITH IPB -- RAM AIR FLOW CONTROL VALVE, PN 735342, L5361651-001 (SUNSTRAND)
15A2-3-109-3 51M00OCCOM6960
AFTO FORM 252, 20120627 CONTINUATION PAGE
File details come from the government source that posted it. Updated .