ContractRequirementsDataList.pdf

PDF 36 KB Posted

Attached to
Remanufacture FAN, VANEAXIAL NSN 4140-00-184-4812TP
Solicitation number
FA8118-15-R-0045
Issued by

About this file

Contract Data Requirements List

View the file

Other files

File Type Posted
FA811815R0045_______0001.pdf PDF
SGFP.pdf PDF
FA811815R0045.pdf PDF
CAVAFSOW.docx DOCX document
DID81634B.pdf PDF
DID80728A.pdf PDF
StatementOfWork.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of11 10

FD20301400269B-52H / Fan, Vaneaxial

A001

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

Depot Manintenance Production Report N/A

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-ALSS-80728A N/A 423 SCMS/GUMA

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

SD

8. APP Code:

N/A A

11. As of Date: 13. Date of Subsequent Submission:

See Block 16

See Block 16

MTHLY

a. Addressee:

b. Copies:

Final

Draft Reg Repro See Block 16

G. Prepared By: H. Date I. Approved By: J. Date:

423 SCMS/GUMA

3001 Staff Drive Tinker AFB, OK 73145-3041 Attn: Natalie Barry

ACO

See Block 16

15. Total: 0 2 0

16. Remarks:

NAME: Zilar, Dale N DATE: 15 SEP 2014

BLOCK 11: LAST DAY OF THE MONTH

BLOCKS 12 AND 13: FIRST REPORT SHALL BE SUBMITTED FOR THE MONTH INITIAL

DELIVERY ORDER OR ASSETS ARE RECEIVED AFTER CONTRACT AWARD. ALL

REPORTS SHALL BE MAILED SO AS TO ARRIVE AT 423 SCMS/GUMA NO LATER THEN

THE TENTH (10TH) CALENDAR DAY OF THE MONTH FOLLOWING THE REPORTING

PERIOD.

BLOCK 14A: E MAIL COPIES TO ADDRESSEES PER ATTACHED DISTRIBUTION

MATRIX.

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

15 SEP 2014 //DIGITALLY SIGNED//

COORDINATORS:

423 SCMS / GUMA

MCGUIREBARRY.NATALIE.P.1230898665

405-734-7592 / 884-7592

15 SEP 2014

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of21 10

A002

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

Commercial Asset Visibility Air Force (CAV AF) / Government Furnished Material Report

CAV AF

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-MGMT-81634B N/A 423 SCMS/GUMA

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

NO

8. APP Code:

N/A N/A

11. As of Date: 13. Date of Subsequent Submission:

See Block 16

See Block 16

See Block 16

a. Addressee:

b. Copies:

Final

Draft Reg Repro See Block 16

G. Prepared By: H. Date I. Approved By: J. Date:

423 SCMS/GUMA

3001 Staff Drive Tinker AFB, OK 73145-3041 Attn: Natalie Barry

OC-ALC

15. Total: 0 2 0

16. Remarks:

NAME: Zilar, Dale N DATE: 04 AUG 2014

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 448 SCMW/FMA in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF.

Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training is provided by 448 SCMW/FMA, (405) 734-1318 or (405) 734-1329.

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

15 SEP 2014 //DIGITALLY SIGNED//

COORDINATORS:

423 SCMS / GUMA

MCGUIREBARRY.NATALIE.P.1230898665

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of31 10

B001

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

Depot Manintenance Production Report N/A

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-ALSS-80728A N/A 423 SCMS/GUMA

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

SD

8. APP Code:

N/A A

11. As of Date: 13. Date of Subsequent Submission:

See Block 16

See Block 16

MTHLY

a. Addressee:

b. Copies:

Final

Draft Reg Repro See Block 16

G. Prepared By: H. Date I. Approved By: J. Date:

423 SCMS/GUMA

3001 Staff Drive Tinker AFB, OK 73145-3041 Attn: Natalie Barry

ACO

See Block 16

15. Total: 0 2 0

16. Remarks:

NAME: Zilar, Dale N DATE: 15 SEP 2014

BLOCK 11: LAST DAY OF THE MONTH

BLOCKS 12 AND 13: FIRST REPORT SHALL BE SUBMITTED FOR THE MONTH INITIAL

DELIVERY ORDER OR ASSETS ARE RECEIVED AFTER CONTRACT AWARD. ALL

REPORTS SHALL BE MAILED SO AS TO ARRIVE AT 423 SCMS/GUMA NO LATER THEN

THE TENTH (10TH) CALENDAR DAY OF THE MONTH FOLLOWING THE REPORTING

PERIOD.

BLOCK 14A: E MAIL COPIES TO ADDRESSEES PER ATTACHED DISTRIBUTION

MATRIX.

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

15 SEP 2014 //DIGITALLY SIGNED//

COORDINATORS:

423 SCMS / GUMA

MCGUIREBARRY.NATALIE.P.1230898665

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of41 10

B002

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

Commercial Asset Visibility Air Force (CAV AF) / Government Furnished Material Report

CAV AF

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-MGMT-81634B N/A 423 SCMS/GUMA

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

NO

8. APP Code:

N/A N/A

11. As of Date: 13. Date of Subsequent Submission:

See Block 16

See Block 16

See Block 16

a. Addressee:

b. Copies:

Final

Draft Reg Repro See Block 16

G. Prepared By: H. Date I. Approved By: J. Date:

423 SCMS/GUMA

3001 Staff Drive Tinker AFB, OK 73145-3041 Attn: Natalie Barry

OC-ALC

15. Total: 0 2 0

16. Remarks:

NAME: Zilar, Dale N DATE: 04 AUG 2014

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 448 SCMW/FMA in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF.

Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training is provided by 448 SCMW/FMA, (405) 734-1318 or (405) 734-1329.

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

15 SEP 2014 //DIGITALLY SIGNED//

COORDINATORS:

423 SCMS / GUMA

MCGUIREBARRY.NATALIE.P.1230898665

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of51 10

C001

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

Depot Manintenance Production Report N/A

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-ALSS-80728A N/A 423 SCMS/GUMA

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

SD

8. APP Code:

N/A A

11. As of Date: 13. Date of Subsequent Submission:

See Block 16

See Block 16

MTHLY

a. Addressee:

b. Copies:

Final

Draft Reg Repro See Block 16

G. Prepared By: H. Date I. Approved By: J. Date:

423 SCMS/GUMA

3001 Staff Drive Tinker AFB, OK 73145-3041 Attn: Natalie Barry

ACO

See Block 16

15. Total: 0 2 0

16. Remarks:

NAME: Zilar, Dale N DATE: 15 SEP 2014

BLOCK 11: LAST DAY OF THE MONTH

BLOCKS 12 AND 13: FIRST REPORT SHALL BE SUBMITTED FOR THE MONTH INITIAL

DELIVERY ORDER OR ASSETS ARE RECEIVED AFTER CONTRACT AWARD. ALL

REPORTS SHALL BE MAILED SO AS TO ARRIVE AT 423 SCMS/GUMA NO LATER THEN

THE TENTH (10TH) CALENDAR DAY OF THE MONTH FOLLOWING THE REPORTING

PERIOD.

BLOCK 14A: E MAIL COPIES TO ADDRESSEES PER ATTACHED DISTRIBUTION

MATRIX.

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

15 SEP 2014 //DIGITALLY SIGNED//

COORDINATORS:

423 SCMS / GUMA

MCGUIREBARRY.NATALIE.P.1230898665

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of61 10

C002

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

Commercial Asset Visibility Air Force (CAV AF) / Government Furnished Material Report

CAV AF

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-MGMT-81634B N/A 423 SCMS/GUMA

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

NO

8. APP Code:

N/A N/A

11. As of Date: 13. Date of Subsequent Submission:

See Block 16

See Block 16

See Block 16

a. Addressee:

b. Copies:

Final

Draft Reg Repro See Block 16

G. Prepared By: H. Date I. Approved By: J. Date:

423 SCMS/GUMA

3001 Staff Drive Tinker AFB, OK 73145-3041 Attn: Natalie Barry

OC-ALC

15. Total: 0 2 0

16. Remarks:

NAME: Zilar, Dale N DATE: 04 AUG 2014

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 448 SCMW/FMA in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF.

Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training is provided by 448 SCMW/FMA, (405) 734-1318 or (405) 734-1329.

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

15 SEP 2014 //DIGITALLY SIGNED//

COORDINATORS:

423 SCMS / GUMA

MCGUIREBARRY.NATALIE.P.1230898665

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of71 10

D001

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

Depot Manintenance Production Report N/A

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-ALSS-80728A N/A 423 SCMS/GUMA

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

SD

8. APP Code:

N/A A

11. As of Date: 13. Date of Subsequent Submission:

See Block 16

See Block 16

MTHLY

a. Addressee:

b. Copies:

Final

Draft Reg Repro See Block 16

G. Prepared By: H. Date I. Approved By: J. Date:

423 SCMS/GUMA

3001 Staff Drive Tinker AFB, OK 73145-3041 Attn: Natalie Barry

ACO

See Block 16

15. Total: 0 2 0

16. Remarks:

NAME: Zilar, Dale N DATE: 15 SEP 2014

BLOCK 11: LAST DAY OF THE MONTH

BLOCKS 12 AND 13: FIRST REPORT SHALL BE SUBMITTED FOR THE MONTH INITIAL

DELIVERY ORDER OR ASSETS ARE RECEIVED AFTER CONTRACT AWARD. ALL

REPORTS SHALL BE MAILED SO AS TO ARRIVE AT 423 SCMS/GUMA NO LATER THEN

THE TENTH (10TH) CALENDAR DAY OF THE MONTH FOLLOWING THE REPORTING

PERIOD.

BLOCK 14A: E MAIL COPIES TO ADDRESSEES PER ATTACHED DISTRIBUTION

MATRIX.

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

15 SEP 2014 //DIGITALLY SIGNED//

COORDINATORS:

423 SCMS / GUMA

MCGUIREBARRY.NATALIE.P.1230898665

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of81 10

D002

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

Commercial Asset Visibility Air Force (CAV AF) / Government Furnished Material Report

CAV AF

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-MGMT-81634B N/A 423 SCMS/GUMA

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

NO

8. APP Code:

N/A N/A

11. As of Date: 13. Date of Subsequent Submission:

See Block 16

See Block 16

See Block 16

a. Addressee:

b. Copies:

Final

Draft Reg Repro See Block 16

G. Prepared By: H. Date I. Approved By: J. Date:

423 SCMS/GUMA

3001 Staff Drive Tinker AFB, OK 73145-3041 Attn: Natalie Barry

OC-ALC

15. Total: 0 2 0

16. Remarks:

NAME: Zilar, Dale N DATE: 04 AUG 2014

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 448 SCMW/FMA in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF.

Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training is provided by 448 SCMW/FMA, (405) 734-1318 or (405) 734-1329.

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

15 SEP 2014 //DIGITALLY SIGNED//

COORDINATORS:

423 SCMS / GUMA

MCGUIREBARRY.NATALIE.P.1230898665

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of91 10

E001

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

Depot Manintenance Production Report N/A

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-ALSS-80728A N/A 423 SCMS/GUMA

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

SD

8. APP Code:

N/A A

11. As of Date: 13. Date of Subsequent Submission:

See Block 16

See Block 16

MTHLY

a. Addressee:

b. Copies:

Final

Draft Reg Repro See Block 16

G. Prepared By: H. Date I. Approved By: J. Date:

423 SCMS/GUMA

3001 Staff Drive Tinker AFB, OK 73145-3041 Attn: Natalie Barry

ACO

See Block 16

15. Total: 0 2 0

16. Remarks:

NAME: Zilar, Dale N DATE: 15 SEP 2014

BLOCK 11: LAST DAY OF THE MONTH

BLOCKS 12 AND 13: FIRST REPORT SHALL BE SUBMITTED FOR THE MONTH INITIAL

DELIVERY ORDER OR ASSETS ARE RECEIVED AFTER CONTRACT AWARD. ALL

REPORTS SHALL BE MAILED SO AS TO ARRIVE AT 423 SCMS/GUMA NO LATER THEN

THE TENTH (10TH) CALENDAR DAY OF THE MONTH FOLLOWING THE REPORTING

PERIOD.

BLOCK 14A: E MAIL COPIES TO ADDRESSEES PER ATTACHED DISTRIBUTION

MATRIX.

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

15 SEP 2014 //DIGITALLY SIGNED//

COORDINATORS:

423 SCMS / GUMA

MCGUIREBARRY.NATALIE.P.1230898665

DD Form 1423-1, JUN 90 (EF) Generated By PRPS Using Oracle Reports Version Page of101 10

E002

CONTRACT DATA REQUIREMENTS LIST Form Approved

OMB NO.0704-D188

(1 Data Item)

Public reporting burden for this collection of information will reflect 110 hours per data item (5 data items would be 550 hours), including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. Contract Line Item No.: B. Exhibit: C. Category:

TDP TM OTHER X

D. System/Item: E. Contract/Pr No.: F. Contractor:

1. Data Item No.: 2. Title of Data Item: 3. Subtitle:

Commercial Asset Visibility Air Force (CAV AF) / Government Furnished Material Report

CAV AF

4. Authority(Data Acquisition Document No.): 5. Contract Reference: 6. Requiring Office:

DI-MGMT-81634B N/A 423 SCMS/GUMA

7. DD250 Req: 9. Dist.Statement Required:

10. Frequency: 12. Date of First Submission:

14. Distribution:

NO

8. APP Code:

N/A N/A

11. As of Date: 13. Date of Subsequent Submission:

See Block 16

See Block 16

See Block 16

a. Addressee:

b. Copies:

Final

Draft Reg Repro See Block 16

G. Prepared By: H. Date I. Approved By: J. Date:

423 SCMS/GUMA

3001 Staff Drive Tinker AFB, OK 73145-3041 Attn: Natalie Barry

OC-ALC

15. Total: 0 2 0

16. Remarks:

NAME: Zilar, Dale N DATE: 04 AUG 2014

1. The contractor shall report End Item transactional data through electronic submission in CAV AF using the CAV AF web site or CICA XML IAW the referenced DID IAW and/or CAV AF CFM SOW. This information will be accessed by the program office PMS and by 448 SCMW/FMA in order to ascertain production status.

2. Transactions and data will be submitted by the contractor daily IAW CAV AF User Guide, Version 8.0.1 or higher. The Contractor shall obtain a valid DoD PKI certificate to log into CAV AF.

Each user shall be required to have an Identity Certificate only; an encryption certificate is not required.

3. Training is provided by 448 SCMW/FMA, (405) 734-1318 or (405) 734-1329.

4. This DD Form 1423-1 applies to Contractor Furnished Materiel (CFM) type contracts.

Block 10:

a. Contractor reporting requirements to CAV AF shall be accomplished daily and/or within 24 hrs of a supply or maintenance action occurrence IAW Contractor Users Guide.

b. The method of communication from the contractor to the Air Logistics Complex (ALC) will be mechanized using the CAV AF Online web site IAW CAV AF Contractor Users Guide.

Block 11: Data shall be current within 24 hours of last End Item maintenance occurrence.

Block 12: Date of first submission shall be within 24 hours following a supply or maintenance transaction after the contract award date and government training as specified in IAW CAV AF Users Guide.

Block 13: Same as remarks regarding Block 10 above.

Zilar, Dale N

424 SCMS / GUBAA

405-736-7976

15 SEP 2014 //DIGITALLY SIGNED//

COORDINATORS:

423 SCMS / GUMA

MCGUIREBARRY.NATALIE.P.1230898665

File details come from the government source that posted it. Updated .