FA811724R0021_Attach_1_Exhibit_A_CDRL.pdf

PDF 5 MB Posted

Attached to
Repair of B-1 Push Pull Switch Federal contract opportunity
Solicitation number
FA811724R0021
Issued by
Department of the Air Force Materiel Command Air Force Sustainment Center

About this file

This document contains several Data Item Descriptions (DIDs) related to a federal contract opportunity for the repair of B-1 Push Pull Switches.

The key details are:

  • The contract is a competitive acquisition IDV Requirements contract for the repair of B-1 Push Pull Switches (NSN: 5930-01-180-9566JY).
  • The anticipated award is for one Base Year and two One Year Options.
  • The estimated award date is 24 June 2024.
  • Qualification Requirements (QRs) apply to this requirement. Vendors must submit a Source Approval Request (SAR) to be considered.
  • The DIDs cover requirements for Commercial Asset Visibility (CAV) Reporting, Government Property (GP) Inventory Report, Acquisition and Sustainment Data Package (ASDP) Teardown Deficiency Report, Counterfeit Prevention Plan, Bill of Materials (BOM), Engineering Change Proposals (ECPs), and Contract Depot Maintenance (CDM) Monthly Production Reporting.

View the file

Other files for this federal contract opportunity

Other files attached to Repair of B-1 Push Pull Switch, newest first.
File Type Posted
FA811724R0021_Attach_6_Transportation_Data.pdf PDF
FA811724R0021_Attach_5_Packaging.pdf PDF
FA811724R0021_Attach_2_GFP.pdf PDF
FA811724R0021.pdf PDF
WD_Attach_3.pdf PDF
FA811724R0021_Attach_4_PWS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA811724R0021

REPAIR OF B-1 Push Pull Switch

PWS Appendix 1

Contract Data Requirements List (CDRL)

CDRL DID Description Frequency A001 DI-MGMT-81838 Commercial Asset Visibility (CAV)

Reporting See CDRL

A002 DI-PSSS-80441D Government Property (GP) Inventory Report Annual

A003 DI-PSSS-81534B Acquisition and Sustainment Data Package (ASDP) Teardown Deficiency Report

See CDRL

A004 DI-MISC-81832 Counterfeit Prevention Plan See CDRL A005 DI-MGMT-80969 Production Surge Plan See CDRL A006 DI-PSSS-81656B Bill of Materials (BOM) for Logistics and

Supply Chain Risk Management Annual

A007 DI-SESS-80639E Engineering Change Proposal (ECP) ASREQ A008 DI-PSSS-81995A Contract Depot Maintenance (CDM)

Monthly Production MTHLY

DATA ITEM DESCRIPTION

Title: COMMERCIAL ASSET VISIBILITY (CAV) REPORTING

Number: DI-MGMT-81838 Approval Date: 20110914 AMSC Number: N9211 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: N/A Office of Primary Responsibility: SA/WSS 071.02 Applicable Forms: N/A

Use/relationship:

The Commercial Asset Visibility (CAV) application provides a web-based, automated method of tracking Government owned reparable assets as they flow through the repair cycle at the contractor's repair facility. The main purpose of CAV is to provide an inventory management system for reparable assets while they are at commercial repair vendors. CAV on the World Wide Web allows the contractor to report transactions as they occur. These transactions automatically update the CAV database. An integrated, relational database allows the commercial repair vendors to access their repair data to produce all of the required status and activity reports.

This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement, as delineated in the contract.

Requirements:

1. Format. The CAV System transactions are processed via the World Wide Web. Input formats and methodology are defined in the Contract Statement of Work.

2. Content. The Contractor reporting shall contain the following transactions, status code changes and report types, as described in the Contract Statement of Work:

A. Receipt of Asset

1) On Contract

2) Not on Contract

3) Procurement

4) "A" Condition

5) Rotable Pool

6) Loaned Asset

B. Inductions C. Items Awaiting Parts D. Re-inductions E. Completions F. Shipments

DI-MGMT-81838

G. Bulk Shipments H. Proof of Shipment I. Items that are Beyond Economic Repair (BER) J. Survey/Scrap Items K. Reversals L. Report of Discrepancies M. Print DD Form 1348's N. Print Material Movement Documents O. Print CAV Inventory Labels P. Print Item Action Reports Q. Print Repair History Reports R. Print Condition Code Reports S. Print Awaiting Parts Report T. Print Proof of Shipment Reports U. Perform Item Maintenance V. Print Report of Discrepancies (RODs) W. Add and Delete Carriers

3. End of DI-MGMT-81838.

Title: Government Property (GP) Inventory Report Number: DI-MGMT-80441D Approval Date: 20200609 AMSC Number: 10184 Limitation: N/A DTIC Applicable: No GIDEP Applicable:

Preparing Activity: MDA Project Number: MGMT-2020-012 Applicable Forms: None

Use/Relationship: The Government Property (GP) Inventory Report enables the contractor to periodically provide to the Department of Defense (DoD) Service or Agency an inventory listing of GP (i.e., both Government Furnished Property (GFP) and Contractor Acquired Property (CAP)) in the contractor’s possession (to include subcontractors) by contract.

This Data Item Description (DID) is applicable to all contracts where GP will be furnished by the Government (i.e., GFP) or acquired, fabricated, or otherwise provided by a contractor (i.e., CAP) in performance of a contract.

This DID contains the format, content, and intended use information for the data deliverable resulting from the work task described in the solicitation.

This DID supersedes DI-MGMT-80441C.

Requirements:

Reference documents. None.

Format. The report shall be in an electronic .xls or .xlsx compatible format.

Content. The report shall contain the following column headers (i.e., data fields):

Contract Number Agency or Service Asset Identification Number (GFP Only) Contractor Asset Identification Number Item Description Manufacturer Part Number Manufacturer Model Number Manufacturer Serial Number National Stock Number (NSN) (if applicable) Quantity Unit of Measure Unit Acquisition Cost Unique Item Identifier (if registered in the Item Unique Identification (IUID) Registry;

GFP only) Asset Location Asset Sub-Location (if applicable) Type of Government Property (i.e., Government Furnished Property (GFP) or Contractor Acquired Property (CAP) Classification of Government Property (i.e., Communication Security (COMSEC), Equipment (EQP), Material (MAT), Special Test Equipment (STE), or Special Tooling

DI-MGMT-80441D

(ST))

Date of Last Physical Inventory

Federal Condition Code

END OF DI- MGMT- 80441D

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A CONTRACT LINE ITEM NO.

D. SYSTEM / ITEM

B-1 / Switch, Push-Pull

1. DATA ITEM NO.

A003

4. AUTHORITY (Data Acquisition Document No.)

DI-PSSS-81534B

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

B. EXIIlBIT

E. CONTRACT I PR NO.

FD20302401111

2. TITLE OF DATA ITEM

Acquisition and Sustainment Data Package (ASDP) Teardown Deficiency Report

5. CONTRACT REFERENCE

PWS

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

Form Approved

0MB No. 0704-0188

C.CATEGORY

TDP TM

F. CONTRACTOR

3. SUBTITLE

ASDP TDR

6. REQUIRING OFFICE

422 SCMS/GUME

14. DISTRIBUTION

OTIIER X

LT D See Block 16 See Block 16 b. COPIES

8.APP CODE 11.AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Final

NIA See Block 16 See Block 16 Draft

16.REMARKS

NAME: Zilar, Dale N DATE: 18 MAR 2024

THIS CDRL WILL SERVE BASIC YEARS AND ALL OPTION YEARS.

Changes to the office symbols shall be made by letter through the PCO/ACO without revision to this CDRL.

BLOCK 9: Distribution Statement D: Distribution authorized to the Department of Defense and US DOD Contractors only, Critical Technology. Other requests shall be referred to 848 SCMG/EN, Tinker Air Force Base, Oklahoma. (1 February 2024) Control Warning Notice: Warning - This document contains technical data whose export is restricted by the Arms Export Control Act (Title 22, USC, Sec 2751 Et Seq) or the Export Administration Act of 1979, Title 50, USC, App 240 I Et Seq, as amended. Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.

DESTRUCTION NOTICE: For classified documents, follow the procedures IAW DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), Section 5-705, and DoDM 5200.01 Vol 3, DoD Information Security Program: Protection of Classified Information, Enclosure 3, paragraph 17.

For unclassified, destroy by any method that will prevent disclosure of contents or reconstruction of the document IAW DoDI 5230.24 Enclosure 3, Paragraph 17.

BLOCKS 10, 11, 12, and 13: To be negotiated upon government's request.

COORDINATORS:

422 SCMS/GUME 0

3001 Staff Drive, Annex 4, Suite # lAG 1 92B Tinker Air Force Base, Oklahoma 73145 Attention: Jeremy P. Marshall

15. TOTAL 0

G. PREPARED BY

Zilar, Dale N

H.DATE

19 MAR 2024

I. APPROVED BY

//ELECTRONICALLY SIGNED//

424 SCMS / GUBAB

405-736-7976

DD FORM 1423-1, FEB 2001

Marshall, Jeremy P

422 SCMS / GUME

PREVIOUS EDITION MAY BE USED.

Generated by PRPS using Jasper Reports on 29 Mar 2024

405-734-5839 I 884-5839

Version 1

Reg

J.DATE

18-MAR-24

Page 3 of9

Repro

Title: Acquisition and Sustainment Data Package (ASDP) Teardown Deficiency Report

Number: DI-PSSS-81534B Approved Date: 20220809

AMSC Number: F10348 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: 11 (AFLCMC/EZSC) Project Number: PSSS-2022-004

Applicable Forms: N/A

Use/Relationship: The Acquisition and Sustainment Data Package (ASDP) Teardown Deficiency Report provides a factual narrative analysis of a deficiency which has been noted on equipment.

a. This Data Item Description (DID) is applicable when contractors are responsible for maintaining custodial records for government property being repaired, or, when detailed analysis is required for components undergoing a teardown investigation.

b. This DID contains the format, content, and intended use information for the data deliverable resulting from the work task described in the solicitation.

c. This DID supersedes DI-PSSS-81534A.

Requirements:

1. Reference documents. None.

2. Format. The ASDP Teardown Deficiency Report shall be in a text searchable format. If a model (e.g., Cameo, CAD, etc.) is used for the analysis or resolution of problems, the model shall be embedded in its native format. The Data Objects/Attributes and Associated Metadata (DOAM) listing shall be in Microsoft Excel spreadsheet format in accordance with the template provided in the DOAM Specification attached to the contract. All data shall be in the English language.

3. Content. The Teardown Deficiency Report shall include an analysis of the deficiency which includes cause of failure, recommended corrective action and recommendations for actions to prevent recurrence of the failure/deficiency, and the applicable category of the failure defined as follows:

a. Workmanship and non-conformance. Any deficiency (e.g., physical, chemical, electrical, functional) noted in materiel which is attributed to non-conformance to applicable specifications, drawing, standards, or Technical Order (TO); or workmanship during manufacture, repair modification or maintenance.

b. Material failure. The failure of an end item which was attributable to neither the repair nor the manufacturing process, but was due to an unpredictable failure of an internal component or sub-assembly.

c. No defect found/could not duplicate: Investigation of the exhibit revealed no deficiency.

Equipment conforms to specifications and TO standards and procedures.

d. Technical data, deficiency: Technical data (including TOs, drawings, and work specifications) was deficient or inadequate so as to cause the deficiency/failure on the item.

DI-PSSS-81534B

e. Field induced deficiency. Deficiency confirmed by the investigation to have been caused by operator error, i.e., wrong voltage applied, misaligned, maladjusted, mishandling, or not used for intended purpose.

f. Maintenance deficiency. An unfavorable characteristic of an item that impedes the accomplishment of maintenance operations which results in excessive maintenance operations and/or in excessive maintenance man-hour consumption.

g. Design deficiency. A condition that limits or prevents the use of material for purpose intended or required where the material meets all other specifications.

h. Handling or shipping deficiency. A deficiency induced by improper handling or shipping, i.e., improper packaging, which prohibits the use for intended purpose.

i. Packaging specifications inadequate - not complied with. Unsatisfactory conditions including item damage resulting from improper packaging.

3.1 DOAM. The completed Teardown Deficiency Report template, provided in the DOAM Specification attached to the contract, shall comply with the format requirements (see 2. above) so that it can be ingestible into a Product Lifecycle Management (PLM) solution to ensure proper tying, tracing, and linking to the lowest component of the end item to which the delivered Teardown Deficiency Report Information is applicable. Any field that is not applicable shall be

End of DI-PSSS-81534B.

TITLE: COUNTERFEIT PREVENTION PLAN

Number: DI-MISC-81832 Approval Date: 20110121 AMSC Number: 9181 Limitation:

DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NRO Applicable Forms: N/A

Use/Relationship: The Counterfeit Prevention Plan will be used by the procurement activity to determine and evaluate the effectiveness of the contractor’s counterfeit protection plan and award fee.

a. This Data Item Description contains the format and content preparation instructions for the data product generated by the specific and discrete task requirements delineated in the statement of work.

b. This DID is related to Parts, Materials and Processes Selection List (PMPSL).

c. This DID is related to “As Designed” and “As Built” Parts List.

d. The Counterfeit Prevention Plan will be updated as counterfeiting methods evolve to include any new indicators, as well as new prevention processes needed (either discovered directly or provided by the Government).

Requirements:

1. The Counterfeit Prevention Plan shall be in contractor format and shall include the following, as a minimum:

a. Procurement practices and procedures to include procurement of all parts and materials from original qualified parts/materials equipment manufacturer (OEM) or it franchised/authorized distributor.

b. Procurement practices and internal processes used for exceptions to buying from OEM or OEM franchised distributors in cases where items are no longer available including a process to qualify/certify non-OEM parts & materials.

c. Monitoring procedures to include the delivery of test results from random sampling and supply chains surveillance that does not assume any source is safe to identify possible penetration of OEM supply chain.

d. Training/certification program for receiving inspectors.

e. Process to verify counterfeit.

DI-MISC-81832

- 2 -

f. Processes to identify, store, and report counterfeit parts.

g. Process to ensure subcontracts contain the following requirements (As a minimum):

(1) Requirements to procure only from Original Equipment Manufacturer (OEM) or OEM franchised distributors

(2) Procurement practices and internal processes used for exceptions to buying from OEM or OEM franchised distributors including a process to qualify/certify non-OEM parts & materials obtained

(3) Requirements to monitor supply (including delivery of test results from random sampling and supply chain surveillance that does not assume any source is safe) to identify possible penetration of OEM supply chain

(4) Training/certification program for receiving inspectors

(5) Process to verify counterfeit

(6) Processes to identify, store, and report counterfeit parts.

(7) Notification procedure (tailored to specific sub-contractor based on following Notification Procedure)

h. Self-audit of internal processes.

i. Monitor processes at all subcontractor levels processes and verify compliance through on-site audits.

j. Notification Procedure:

(1) Step 1: The contractor shall quarantine all suspect products pending further direction. The contractor shall provide a statement, with problem description, justifying why this is considered suspect and how it was detected. The contractor shall NOT notify the supplier that the items are suspected as being counterfeit items. However, consultation with the OEM is authorized. Make certain the parts and all members of the lot procured for use on this contract are stored in correct environmental controls. These parts need to be protected as evidence.

(2) Step 2: Contractors that identify suspect items shall immediately notify their customer that is the next link toward the prime contractor.

Notification shall be passed up the customer chain until reaching the prime contractor. The prime contractor shall immediately notify the cognizant Contracting Officer (CO) and Contracting Office Technical Representative (COTR) of all suspect items identified.

DI-MISC-81832

- 3 -

(3) Step 3: The contractor shall make certain that the original documentation is secured as evidence and maintain any and all documentation associated with the part to include:

a. Part information such as part identifying number, lot date code, manufacturer information and originator/point of contact information

b. Any information reflecting part procurement/acquisition traceability which should include a copy of the purchase order, any and all correspondence between the buyer and the supplier to include: e-mails, records of phone conversations and paper letters of correspondence

c. Part documentation from the purported original manufacturer, distributors and suppliers (certificate of compliance and certificate of conformance)

d. All visual examination and physical analysis/testing results and the technical data package showing that the parts passed the required screening and qualification tests

e. List of company products affected

(4) Step 4: Determine that the part is or is not counterfeit (Usually accomplished as part of root cause analysis of non-conforming parts and/or materials)

(5) Step 5: If the parts are found to be counterfeit, they shall be isolated and controlled pending direction from law enforcement.

(6) Step 6: The contractor shall provide any additional required information to the government’s investigation team

END OF DI-MISC-81832

Title: BILL OF MATERIALS (BOM) FOR LOGISTICS AND SUPPLY CHAIN RISK

MANAGEMENT

Number: DI-PSSS-81656B Approval Date: 20160901 AMSC Number: N9724 Limitation: N/A DTIC Applicable: N/A GIDEP Applicable: No Preparing Activity: SA Project Number: PSSS-2016-021 Applicable Forms: N/A

Use/relationship: The Bill of Materials (BOM) will provide information that can be used to establish the production status of parts used in a system. The BOM will also provide Diminishing Manufacturing Sources and Material Shortages (DMSMS) management essential information that enables the identification, forecasting, mitigation, and management of Hardware and Software obsolescence as a part of System Life Cycle Management responsibilities. The data will be used in DMSMS forecasting tools to allow for standard and efficient sharing of information on common items.

The BOM will also provide logisticians and supply chain risk managers with additional data they require to ensure supportability requirements and supply chain risks are identified or mitigated during the development of a system.

This Data Item Description (DID) contains the format, content, and intended use of information for the data product resulting from the work task described by the contract.

The data may be obtained during any program life cycle phase.

This DID supersedes DI-PSSS-81656A.

Requirements:

1. Format. The BOM shall be in a format similar to that of Figure 1.

2. Content. The BOM shall contain all of the information specified in Figure 1, with the path to the system level identified using the part/Next Higher Assembly method detailed in the table.

All fields shall be included. Fields which do not require data shall be left blank. The information shall be included to the lowest indenture level (component level) specified in the contract

Title: ENGINEERING CHANGE PROPOSAL (ECP)

Number: DI-SESS-80639E Approval Date: 20200211

AMSC Number: N10140 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: NM Project Number: SESS-2020-003

Applicable Forms: DD Form 1692, Engineering Change Proposal (ECP)

Use/relationship: An Engineering Change Proposal (ECP) provides the documentation in which the engineering change is described and specifies how the proposed change will be implemented.

a. This DID contains the format, content, and intended use information for the data deliverable resulting from the work task described in EIA-649-1 and the principles of EIA-649 (Copies of these standards are available online at www.sae.org or from SAE International, 400 Commonwealth Drive, Warrendale, PA 15096-0001, Tel 877-606-7323 [inside USA and Canada] or 724-776-4970 [outside

USA]).

b. This DID may be used in conjunction with DI-SESS-80642, Notice of Revision (NOR). A requirement for NORs and Specification Change Notices (SCN) should be contractually imposed in conjunction with this DID.

c. This DID supersedes DI-SESS-80639D.

d. An electronic version of DD Form 1692, Engineering Change Proposal (ECP), is available online at https://www.esd.whs.mil/dd/.

Requirements:

1. Reference Documents. The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

2. Format. The ECP shall be in one of the following formats:

a. DD Form 1692, Engineering Change Proposal (ECP),

b. or

c. format.

3. Content. The ECP shall contain all the information required by DD Form 1692.

End of DI-SESS-80639E

DISTRIBUTION STATEMENT A. Approved for public release. Distribution is unlimited.

Title: CONTRACT DEPOT MAINTENANCE (CDM) MONTHLY PRODUCTION REPORT

Number: DI-PSSS-81995A Approved Date: 20201130

AMSC Number: F10209 Limitation: N/A

DTIC Applicable: No GIDEP Applicable: No

Preparing Activity: 70 (419 SCMS/GUBA) Project Number: PSSS-2020-012

Applicable Forms: N/A

Use/Relationship: The Contract Depot Maintenance (CDM) Monthly Production Report provides the Government with monthly maintenance production figures, status and accountability of assets at the contractor facility, performance to schedule, anticipated production for the next month, and a summary of unresolved problems at the end of the report period.

This Data Item Description (DID) contains the format, content, and intended use information for the data deliverable resulting from the work task described in the contract.

a. This DID may be used on any depot level maintenance contract.

b. This DID supersedes DI-PSSS-81995.

Requirements:

1. Reference documents. None.

2. Format. The CDM Monthly Production Report shall be in the Table I format below.

3. Content. The CDM Monthly Production Report shall include the following data, provided by the Production Management Specialist (PMS) and the Contractor, through the end of the month:

3.1 Part I: Blocks 1 through 4 of the report shall contain the following information provided by the PMS:

a. As of date: The day, month, and year (DDMMMYYYY) applicable to the report. Data shall be through the end of the month.

b. Block 1: PMS’s name, PMS’s code, PMS’s email address, and PMS’s phone number.

c. Block 2: Contractor name, the Department of Defense Activity Address Code (DoDAAC) assigned to the contractor for shipment of material, the contractor’s Commercial and Government Entity (CAGE) code, the contractor’s email address, and the contractor’s phone number.

d. Block 3: Contract number and Program (PRGM) or Weapon System (WS) supported.

e. Block 4: Government item manager’s or technical Point of Contact’s (PoC’s) name.

3.2 Blocks A through O of the report shall contain the following information:

a. Block A: Item identification, which shall include the Federal Supply Class (FSC) under A-1, and the National Item Identification Number (NIIN) of the item being reported under A-2.

b. Block B: Delivery/Call Order number. When the awarded contract is a delivery/call order type, this is the applicable order number. When an item is awarded on more than one order, the order number is repeated for each order until completed. If the current report completes the call, the word “completed” shall be added.

c. Block C: The contract line item number (CLIN), which shall be the CLIN assigned to the National Stock Number (NSN) in the contract.

DI-PSSS-81995A

d. Block D: Q uantity on contract or delivery order (DO)/call

e. Block E: Reparables received, which shall be the number of reparable items received for repair, and shall include the q uantity of reparables received during the report month under E-1 and the cumulative q uantity of reparables received from the start of the contract through the report month under E-2.

f. Block F: Miscellaneous (Misc.) assets received that are not part of the contract, in various condition codes, which shall include the q uantity received during the report month under F-1 and the cumulative total received from the start of the contract through the report month under F-2.

g. Block G: Reparables (REPS) on hand, which shall be the number of reparables on hand waiting for induction into repair.

h. Block H: Total number of reparables currently inducted (IND) into work.

i. Block I: Q uantity of reparables awaiting parts (AWP).

j . Block J : Q uantity (Q TY) produced (PROD), which shall include the q uantity that completed repair and was produced during the report month under J -1 and the cumulative total that completed repair and was produced from the start of the contract through the report month under J -2.

k. Block K : Serviceables (SERV ) on hand, which shall be the q uantity of serviceables on hand awaiting shipping action.

l. Block L: Serviceables shipped, which shall be the number of serviceables shipped from the repair facility, and shall include the number of serviceables shipped during the report month under L-1 and the cumulative number of serviceables shipped from the start of the contract under L-2.

m. Block M: Q TY condemned, which shall include the q uantity of reparables condemned during the report month under M-1 and the cumulative q uantity of reparables condemned from the start of the contract under M-2.

n. Block N: Misc. Shipped/Condemned Shipped, which shall include the misc. assets received in Block F that are not part of the contract, in various condition codes or condemned assets shipped during the report month under N-1 and the misc. or condemned assets shipped from the start of the contract through the report month under N-2.

o. Block O: Next Month Forecast PROD, which shall be the q uantity of items scheduled to be produced next month.

3.3 Part II, Production Summary. A Production Summary shall be included only if:

a. The previously reported production forecast was not shipped,

b. The current production forecast does not eq ual the contract scheduled q uantity, or

c. The Contractor anticipates a problem with production in the near future.

File details come from the government source that posted it. Updated .