Attachment 6 Section L Instructions to Offerors.pdf
PDF 14 KB Posted
- Attached to
- Repair Rate of Flow Transmitter Federal contract opportunity
- Solicitation number
- FA811720R0009
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers for Amendment 0002.pdf | ||
| FA811720R0009_______0002.pdf | ||
| Attachment 7 Pricing Matrix.xlsx | XLSX spreadsheet | |
| FA811720R0009_______0001.pdf | ||
| Exhibit 3 DID 80441C.pdf | ||
| Exhibit 6 DID 81534A.pdf | ||
| Exhibit 2 DID 80229.pdf | ||
| Attachment 2 Transportation Data for Solicitations.pdf | ||
| Exhibit 8 DID 81656B.pdf | ||
| Exhibit 9 DID 81832.pdf | ||
| Exhibit 10 DID 81838.pdf | ||
| Attachment 3 Performance Work Statement (PWS).pdf | ||
| Exhibit 5 DID 80969.pdf | ||
| Attachment 1 PackagingRequirements.pdf | ||
| Exhibit 11 DID 81995.pdf | ||
| Exhibit 1 CDRLS.pdf | ||
| Attachment 5 GFPFD203019S23941.pdf | ||
| Exhibit 4 DID 80639D.pdf | ||
| Attachment 4 2810497_WAGEDET.pdf | ||
| FA811720R0009.pdf | ||
| Exhibit 7 DID 81535A.pdf |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 6 - INSTRUCTIONS TO OFFERORS (ITO)
Section L
INSTRUCTIONS TO OFFERORS
1.0 Program Structure and Objective
The Government plans to award a single contract for the Repair of the Rate of Flow Transmitter.
1.1. Award will be made on the basis of best value utilizing the evaluation factors for award. Award will be made to the contractor who provides the best value to the Government over the entire period of performance.
2.0 General Instructions
2.1. This section of the Instructions to Offerors (ITO) provides general guidance for preparing proposals as well as specific instructions on the format and content of the proposal. The Offeror’s proposal must include all data and information requested by the ITO and must be submitted in accordance with these instructions.
2.2. The proposal acceptance period is specified on Page 1, Block 17 of the model contract/solicitation. The Offeror shall make a clear statement in Section A of the proposal documentation volume that the proposal is valid until this date.
3.0. Contract Documentation
3.1. Model Contract/Representations and Certifications
The offeror's proposal shall include a signed copy of the Model Contract, and
3.2. Solicitation/Contract Form
- Completion of blocks 13, 17 and signature, Name and Title of Signer and date for blocks 27 of the SF1447.
- Completed estimated unit and total price information in Section B on the line item.
- Signature by the offeror on the SF1449 constitutes an offer, which the Government may accept.
- Any amendments to the RFP must be signed and submitted with the proposal.
- Completed Attachment 7, Pricing Matrix.
- Contractor’s completed proposal.
3.3. Contract Clauses (Section I)
The offeror shall provide required information to complete clauses as required.
3.4. Representations, Certifications, and other Statements of Offerors (Section K) The offeror has completed the annual representations and certification electronically via the System for Award Management (SAM) website at https://beta.sam.gov/.
ATTACHMENT 6 - INSTRUCTIONS TO OFFERORS (ITO)
After reviewing the SAM database information, the offeror verifies by submission of this offer that the representation and certifications currently posted electronically at FAR 52.212-3, Offeror Representations and Certifications—Commercial Items are correct.
File details come from the government source that posted it. Updated .