Questions_and_Answers.pdf

PDF 337 KB Posted

Attached to
PHSTS HVAC Replacement Federal contract opportunity
Solicitation number
FA8110-18-Q-0001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Tinker Air Force Base

About this file

Questions and Answers

View the file

Other files for this federal contract opportunity

Other files attached to PHSTS HVAC Replacement, newest first.
File Type Posted
Operation_and_Maintenance_Manual.pdf PDF
Installation_Drawings.pdf PDF
FA811018Q0001_(1).pdf PDF
Performance_Work_Statement.pdf PDF
DOL_WD.pdf PDF
GFP_Attachment.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q1: 1.1 - 9, What unaffected electrical systems will need to be checked to make sure they are working correctly?

A1: With the air-conditioning system running, will acquire known data before and during operation to make sure no transient spikes are present......we have a large transient protection transformer that will handle, largest concern is for compressor start up while data is being acquired......hence the constant run requirement

Q2: Will the base shops disable the fire alarm suppression system before & after construction along with any testing required?

A2: The Government will disable fire suppression system before and after work

Q3: Copy of the owner's manual

A3: See the attachments within the package.

Q4: Do we have to ship that unit both to California and back or do we only pay for one way?

A4: Per PWS paragraph 1.0: “The Contractor shall provide all labor, tools, materials, transportation, supervision, and associated items associated with this contract. The Contractor shall be responsible for shipping the PHSTS from Palmdale, CA to Tinker AFB building 1027 for modification to the HVAC system and then return the PHSTS back to Palmdale, CA.

File details come from the government source that posted it.