AppendixD2017.doc
DOC document 63 KB Posted
- Attached to
- B-2 Low Level Continuous Wave Test Federal contract opportunity
- Solicitation number
- FA8110-17-R-0002
About this file
Appendix D
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AppendixA2017.xls | XLS spreadsheet | |
| SGFPHMHS.xlsx | XLSX spreadsheet | |
| AppendixD2017.doc | DOC document | |
| PWS2017HMHS.doc | DOC document | |
| SGFPHMHS.xlsx | XLSX spreadsheet | |
| PWS2017HMHS.doc | DOC document | |
| AppendixA2017.xls | XLS spreadsheet |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix D
ESTIMATED WORKLOAD DATA
1. This is an estimated workload for the contract period. The estimated data is provided as a guide to the contractor in estimating manpower, workload, and for scheduling requirements.
2. The following workload data represents the Government’s best estimate of the volume of work shown for each category listed. This exhibit is not intended to cover all of the workload items, but list the major categories of work.
B-2 HCI Test Schedule
| Aircraft Tail |
| AV# |
| Induction |
Test 1
Mar 2017
Test 2
Sep 2017
SERVICE
ESTIMATED QUANTITY
Technical Engineering Support for Aircraft HM/HS Surveillance Tests CY (Calendar Year) 2017 Test Preparation
2 times yearly
Test Conduct
Post Test Activity
Pre/ Post-Test Field Mapping
The Contractor personnel shall team with 559 SMXS/MXDED personnel to carry out the data acquisition portion of the test plan provided by the Test Director. The contractor shall provide a senior engineer and two electronic technicians as technical support for each test.
The following is an estimate of contractor support to be expended for each Aircraft test at Palmdale during the test period.
Test 1 Senior Engineer
10 days including 2 days for travel.
Estimated 90 hours
First Technician
11 days including 2 days for travel.
Estimated 110 hours
Second Technician
11 days including 2 days for travel.
Estimated 110 hours
Test 2 Senior Engineer
10 days including 2 days for travel.
Estimated 90 hours
First Technician
11 days including 2 days for travel.
Estimated 110 hours
Second Technician
11 days including 2 days for travel.
Estimated 110 hours
The contractor shall provide miscellaneous materials and supplies and shipping of parts and equipment for test periods with total expenditures not to exceed $5,000.00. Shipping of the During this period of performance, the Contactor shall refurbish PHSTS and/or GFP equipment (included in Appendix B) for testing periods to and from Palmdale, CA shall be necessary to accommodate maintenance, calibration, training and upgrades. The Contractor shall provide for shipment of the PHSTS as directed by the COR. The Contractor shall also provide manpower and travel, when necessary, to accommodate calibration of test equipment at location of PHSTS upon annual calibration due date.
The COR will notify the contractor if the test plan is expanded requiring more support hours or if there is a requirement for test planning meetings. The Contractor shall respond to the COR with a proposed cost for the increased need for technical support on a Time and Material basis and a contract modification will be issued for the additional support needed.
MAINTENANCE ACTIONS
| SERVICE |
| ESTIMATED QUANTITY |
| 1. Fiber Optic Transmitter repair |
| 12 ACTIONS (6 actions per test) |
| 2. Fiber Optic Receiver module repair |
| 5 ACTIONS (2.5 actions per test) |
| 3. Active Signal Divider(ASD) module repair |
| 2 ACTIONS (1 action per test) |
| 4. Sensor repair |
| 4 ACTIONS (2 action per test) |
| 5. APS-23 or APS-33 Battery pack repair |
| 6 ACTIONS (3 actions per test) |
| 6. Current Probe repair |
| 2 ACTIONS (1 action per test) |
| 7. Fiber Optic cable repair |
| 20 ACTIONS (10 actions per test) |
| 8. ECU PM |
| 2 ACTIONS (per year) |
| 9. PHSTS PM |
| 1 ACTION (per year) |
| 10. Power Amplifier repair |
| 1 ACTION (over 3 years of the contract) |
| 11. ABC-15 Battery Charger |
| 3 ACTIONS (1 action per test) |
| 12. Ellipticus Antenna Repair and PM |
| 1 ACTION |
| 13. Antenna Support Structure Repair and PM |
| 1 ACTION |
Preventative Maintenance Activities and Intervals for the PHSTS ECU’s
| PM Activity |
| Minimum Required Interval |
| Inspect the ECU access panels and fasteners for sealing ability |
| After transporting the PHSTS |
| Check sight gauge for appearance of bubbles |
| After transporting the PHSTS |
| Inspect, clean, adjust, and lubricate electric motors |
| Before transporting the PHSTS |
| Clean air conditioner compartment, condenser fan blades, evaporator fan wheels, cooling and condenser coils, and condensate drains |
| Before transporting the PHSTS |
| Check all filters, electrical connections; tighten and clean connections |
| After transporting the PHSTS |
Preventative Maintenance Activities and Intervals for the PHSTS Trailer
| PM Activity |
| Minimum Required Interval |
| Perform a certified DOT inspection on the Trailer (includes brake testing, tire pressure and condition, external lighting, compressed air lines and fittings, suspension system, and external reflectors). |
| Annually |
| Perform roadworthiness inspection. |
| Prior to each transport of PHSTS |
| Replace individual tires. |
| As needed if indicated during Annual inspection |
| Preform fire extinguisher checkout |
| Annually |
Preventative Maintenance Activities and Intervals for the Antenna System
| PM Activity |
| Minimum Required Interval |
| Inspect and verify impedance of antenna terminations |
| Annually |
| Inspect and verify condition of ferrite loads and securing hardware. |
| Annually |
| Inspect Balun mounting and connection hardware |
| Annually |
System & Component Performance Testing Requirements & Intervals
| PM Activity |
| Minimum Required Interval |
| Data Acquisition System Operations (all channels) |
| After any software modifications, and prior to any Operational Test Period |
| Safety Lighting – Manufacturer’s Test Procedure |
| Prior to each Operational Test Period |
| Network speed and data transfer rates |
| Prior to each Operational Test Period |
Note: Variation in workload: (A) If at the end of six month period, the total work, considering complexity, difficulty, and cost of the various outputs in Appendix B varies above or below five (5) percent from the total estimated contract workload, negotiations for an equitable price adjustment may be initiated by the Contractor or the Government. Any increase or decrease in price shall be based on the net increases or decreases of this workload during the specified period. (B) The Contractor shall notify the Contracting Officer in writing of all expected work variations as described in this clause which may result in a request by the Contractor for an equitable price increase and shall provide the estimated amount of such prices increase. Such notice shall be provided at the earliest practicable time, but in no event later than prior to performance of such work variances. The Government shall have no obligation under this provision unless a modification has been negotiated to cover such work variance and an estimated amount of funds obligated to cover such work variances.
File details come from the government source that posted it. Updated .