Appendix-C-Safety-Requirements.pdf
PDF 221 KB Posted
- Attached to
- Engineering Support Services Federal contract opportunity
- Solicitation number
- FA8106-16-R-0005
View the file
Other files for this federal contract opportunity
Show all 22
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Umbrella Engineering Support Services
FA8106-16-D-0005
APPENDIX C
SAFETY REQUIREMENTS DOCUMENTS
SECTION I - GENERAL REQUIREMENTS
A. Safety Program Requirements.
1. The contractor shall implement a Safety Program that ensures protection of Government personnel and property. As a minimum, the subjects listed in Safety Program Elements, Section II will be used during performance of the work described in the contract. Safety requirements listed herein that do not concern contractor’s operations or services shall be deleted as mutually agreed by the contractor and the procuring office.
2. While performing work under this contract, the contractor is solely responsible for compliance with all federal, state and local laws, the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable, and the protection of their employees. Additionally, the contractor is responsible for the safety and health of all subcontractor employees while in the contractor’s facility.
3. The contractor shall include a clause in all subcontracts requiring the subcontractors to comply with the safety provisions of this contract, as applicable.
B. Mishap Notification
1. The contractor shall notify the procuring Safety Office and the designated Government Flight Representative (GFR), or designated Government Representative (GR) within one (1) hour of all mishaps or events that may result in damage to government property. A written report of the mishap/event shall be sent within three calendar days to the GFR/GR, who will forward it to the procuring Safety Office. For information not available at the time of initial written report, the contractor shall provide the remaining information and all corrective action plans to the GFR/GR no later than 20 calendar days after the mishap, unless extended by the Procuring Contracting Officer (PCO), Administrative Contracting Officer (ACO) or designated GFR/GR. The contractor shall provide status every 30 days until the final written report is provided to the PCO, ACO or designated GFR/GR.
2. Mishap Notification Process:
Any mishap/event that may exceed most current Department of Defense Classification for Mishap Reporting (Class A, B, C, D, and E) must include the following information as a minimum and transmitted to the designated GFR/GR within 4 hours.
http://www.osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=STANDARDS&p_toc_level=0 http://www.osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=STANDARDS&p_toc_level=0
a. Contract, Contract Number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of damage/incident
c. Brief Narrative of damage/incident to include events leading to damage/incident
d. Root Cause of damage/incident, if known
e. Estimated and final cost of damage/incident (material and labor to repair/replace)
f. Nomenclature of equipment and personnel involved in damage/incident
g. Corrective Actions Plans to prevent re-occurrence
h. Toxicology Testing accomplished (YES or NO)
i. Other pertinent information
C. Impoundment Procedures:
The Contractor shall develop procedures to isolate scene/damaged property, identify an impounding official and control/restrict access. The following government personnel may direct the contractor to immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, fluid samples, etc. until released by GFR/GR.
a. Procuring Contracting Officer (PCO)
b. Administrative Contracting Officer (ACO)
c. Defense Contract Management Agency – Government Flight Representative (GFR)
d. Defense Contract Management Agency – Quality Assurance Representative (QAR)
e. Designated Government Representative
AFI 91-204 Terms:
1. Aviation Flight Mishap—Any mishap in which there is intent for flight and reportable damage to a DoD aircraft. Explosives and chemical agents or guided missile mishaps that cause damage in excess of $20,000 to a DoD aircraft with intent for flight are categorized as aircraft flight mishaps to avoid dual reporting. This is the only aviation mishap subcategory that contributes to the flight mishap rate.
2. Aviation Ground Operations Mishap—Aviation Ground Operations are mishaps that involve DoD aircraft with no intent for flight that result in reportable damage to DoD aircraft, injury, or fatality. Damage to an aircraft when it is being handled as a commodity or cargo is not reportable as an aircraft mishap.
3. Causal Finding—Causal findings are those, which, singly or in combination with other causal findings, logically result in damage or injury. They are identified with the word "Causal" at the start of the text of the finding and supported by factors within the analysis.
4. Cause—A cause is a deficiency, which if corrected, eliminated, or avoided, would likely have prevented or mitigated the mishap damage or significant injury.
5. Class A Mishap—The resulting total cost of damages to Government and other property is $2 million or more, a DoD aircraft is destroyed (excluding UAS Groups 1, 2, or 3), or an injury or occupational illness results in a fatality or permanent total disability.
6. Class B Mishap—The resulting total cost of damages to Government and other property is $500,000 or more, but less than $2 million. An injury or occupational illness results in permanent partial disability, or when three or more personnel are hospitalized for inpatient care (which, for mishap reporting purposes only, does not include just observation or diagnostic care) as a result of a single mishap.
7. Class C Mishap—The resulting total cost of property damages to Government and other property is $50,000 or more, but less than $500,000; or a nonfatal injury or illness that results in 1 or more days away from work, not including the day of the injury.
8. Class D Mishap—The resulting total cost of property damage is $20,000 or more, but less than $50,000; or a recordable injury or illness not otherwise classified as a Class A, B, or C mishap. A Class D mishap is any nonfatal injury or occupational illness that does not meet the definition of Lost Time. These are cases where, because of injury or occupational illness, the employee only works partial days, has restricted duties or was transferred to another job, required medical treatment greater than first aid. Loss of consciousness (not including G-induced loss of consciousness, which are considered Class E) is considered a Class D Mishap when they are direct result of a nonfatal injury or occupational illness.
9. Class E Event—An unplanned occurrence, or series of occurrences, that does not meet the reporting criteria of a mishap, but are deemed important to investigate/report for hazard identification and mishap prevention.
10. Contractor Mishap—A mishap resulting from contractor operations that involves injury to DoD personnel and/or damage to DoD resources. Note: When determining if a contractor employee’s injury or illness requires reporting for recordkeeping requirements under 29 CFR 1904 refer to Chapter 1 of this instruction.
11. MISHAP—A mishap is an unplanned occurrence, or series of occurrences, that results in damage or injury and meets Class A, B, C, D and Class E event reporting criteria IAW paragraph
1.10 Damage or injury includes: damage to DoD property (excluding normal wear and tear or aging); occupational illness to DoD military or civilian personnel; injury to DoD military personnel on- or off-duty; injury to on-duty DoD civilian personnel; damage to public or private property, or injury or illness to non-DoD personnel caused by Air Force operations.
12. MISHAP COSTS—Mishap costs consist of two parts: Direct mishap costs ONLY include property damage costs (DOD and Non-DOD) and environmental cleanup costs. Injury and illness costs are part of the TOTAL mishap costs and are automatically calculated in AFSAS.
13. PROPERTY DAMAGE—Damage to facilities, equipment, property, materiel, or resources. If the occurrence meets mishap reporting criteria, then the cost of environmental cleanup shall be included in property damage costs. NOTE: For mishap reporting purposes, inadvertent releases of ozone depleting substances are reported when they meet mishap reporting criteria.
SECTION II – SPECIFIC REQUIREMENTS
The contractor’s Safety Program will clearly define procedures, personnel qualifications, facilities and required equipment necessary to fulfill the following elements:
Element/Requirement
Referenced Benchmark
Mishap Notification/Reporting
AFI 91-204
Housekeeping
AFI 91-203
Material Handling Equipment (MHE) AFI 91-203
Handling, Storage and Use of Flammable/Combustible Liquid
Vehicle Operations
AFI 91-207
Tool Control
AFI 21-101, AFMC Sup
Foreign Object Damage (FOD)
AFI 21-101, AFMC Sup
Tobacco Use
AFI 40-102
Hazardous Energy Control
Confined Spaces
Electromagnetic Field Radiation (EMFR) Occupational and Environmental Health Program
AFI 48-109
LASER and Optical Radiation Protection
AFI 48-139
Occupational Noise and Hearing Conservation
AFI 48-127
Respiratory Protection AFI 48-137
SECTION III – BIBLIOGRAPHY OF PUBLICATIONS/DIRECTIVES
These publications/directives and all supplements/changes thereto apply to the extent required by the provisions of Sections I and II.
Publication Basic Date
Change Date Title
AFI 91-204 12 Feb 2014
AFI91-204_AFGM2016-02,
11 Jan 2016 Safety Investigations and Reports
AFI 91-207 12 Sep 2013
AFI91-207_AFGM2015-02,
17 Nov 2015
The US Air Force Traffic Safety
AFI 91-203 15 Jun 2012
AFI91-203_AFGM2015-04,
17 Sep 2015
Air Force Consolidated Occupational Safety Instruction
AFI 21-101 21 May 15
Aircraft and Equipment Maintenance Management
AFI 21-101,
AFMC Sup 26 Jul 2010
AFI21-
101_AFMCSUP_AFMCGM2
015-02 16 July 2015
Aircraft and Equipment Maintenance Management
AFI 40-102 4 Mar 2015
AFI40-102_AFGM2015-01,
14 July 2015 Tobacco Free Living
AFI 48-109 1 Aug 2014
Electromagnetic Field Radiation (EMFR) Occupational and Environmental Health Program
AFI 48-139 30 Sep 2014
LASER and Optical Radiation Protection Program
AFI 48-127 26 Feb 2016
Occupational Noise and Hearing Conservation Program
AFI 48-137 15 Jul 2014
Respiratory Protection Program
File details come from the government source that posted it. Updated .