PWS - AIU Modernization Integration Installation - Rev 2_FINAL.pdf

PDF 999 KB Posted

Attached to
Maintenance, Repair, and Rebuilding of Equipment
Solicitation number
FA8106-12-R-0003
Issued by

About this file

Final Performance Work Statement (PWS) for Audio Infrastructure Upgrade (AIU) Installation

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT (PWS)

FOR

AIU MODERNIZATION INTEGRATION INSTALLATION

SPO PWS CONTROL NUMBER: E4B-PWS-FY12-02

PREPARATION DATE: JAN 04, 2012

REVISION NUMBER: DATE:

PURCHASE REQUEST NUMBER OR CONTRACT NUMBER

PREPARING ORGANIZATION: OC-ALC/GKSSA TINKER AFB OK 73145

REVISION RECORD

REVISION CHANGE DATE CHANGE DESCRIPTION

1 XX XXX XXXX ORIGINAL PWS

2 03-27-2012 INCOPORATED INPUTS FROM CONTRACTING

TABLE OF CONTENTS

1 SECTION I – DESCRIPTION OF SERVICES

1.1 REQUIREMENTS

1.1.1 GENERAL

1.1.2 MANAGEMENT PLAN. D001

1.1.3 RECURRING SERVICE REQUIREMENTS

1.1.4 CDRL DELIVERY CRITERIA

1.1.5 DATA ACCURACY

1.1.6 CONTRACTOR IDENTIFICATION

1.1.7 MISSION ESSENTIAL SERVICES. N/A

2 SECTION II – SERVICE SUMMARY

2.1 SERVICE SUMMARY REQUIREMENTS

2.1.1 PERFORMANCE OBJECTIVES AND THRESHOLDS

2.1.2 SURVEILLANCE METHODS

2.2 CONTRACTOR PERFORMANCE EVALUATION

2.2.1 SERVICE SUMMARY TABLE 2-1

3 SECTION III – GOVERNMENT FURNISHED MATERIAL (GFM). D002

3.1 DATA

3.2 PHYSICAL AND ENDING INVENTORY. D003

3.3 REPLACEMENT OF GFM

3.4 WORK HOURS AND HOLIDAY OBSERVANCES

4 SECTION IV – GENERAL INFORMATION

4.1 ENGINEERING

4.1.1 SYSTEMS ENGINEERING

4.1.2 SYSTEM DEFINITION

4.1.3 FAA CERTIFICATION/AIRWORTHINESS CERTIFICATION. D004

4.1.4 INSTALLATION OF SYSTEM DESIGN

4.1.5 ENGINEERING DRAWINGS

4.1.6 NAMEPLATES AND PRODUCT MARKING

4.1.7 MODIFICATION/DEVELOPMENT TESTING

4.2 LOGISTICS

4.2.1 IN-PROCESS REVIEWS (IPRs). D001, DO21

4.2.2 CONTRACTOR QUALITY ASSURANCE (CQA) & VERIFICATION SUPPORT

4.2.3 MARKED-UP SOURCE DATA

4.2.4 EXCESS EQUIPMENT DISPOSITION

4.2.5 SPARES, SUPPORT EQUIPMENT, TRAINING, & VENDOR MANUALS

4.3 PROGRAM MANAGEMENT. D001

4.3.1 MONTHLY STATUS REPORT. D001

4.3.2 COST, WBS and IMS. D001, D021

4.3.3 RISK MANAGEMENT. D001

4.3.4 GOVERNMENT ACCESS TO CONTRACTOR FACILITY

4.3.5 CONTRACTOR ACCESS TO GOVERNMENT FACILITY

4.3.6 QUALITY ASSURANCE

4.3.7 LONG LEAD TIME PROCUREMENT ISSUES

4.3.8 LIFE CYCLE COST CONSIDERATIONS

4.3.9 OZONE DEPLETING SUBSTANCES

4.3.10 REVIEWS. D021

4.3.11 MODIFICATION READINESS REVIEW. D001, D021

4.3.12 TEST READINESS REVIEW. D001, D021

4.4 DEPOT FIELD MODIFICATION GUIDELINES

4.5 SECURITY REQUIREMENTS

4.5.1 CONTRACTOR IDENTIFICATION BADGES AND VEHICLE PASSES

4.5.2 SAFEGUARDING CLASSIFIED INFORMATION

4.6 ENVIRONMENTAL REQUIREMENTS

4.6.1 COMPLIANCE WITH LAWS AND REGULATIONS

4.7 MANAGER REQUIREMENTS

4.7.1 PROGRAM MANAGER. D001

4.8 MEETINGS. D021

4.8.1 Bi-Weekly Status Meetings

4.8.2 Requirements Review

4.8.3 Engineering Review

4.8.4 Working Groups

4.9 QUALITY SYSTEM AND QUALITY PROGRAM REQUIREMENTS

4.9.1 QUALITY SYSTEM

4.9.2 QUALITY PROGRAM

4.9.3 GOVERNMENT QUALITY ASSURANCE SURVEILLANCE SUPPORT

4.10 OVER AND ABOVE

ATTACHMENT A – ACRONYMS

ATTACHMENT B – DEFINITIONS

ATTACHMENT C – APPLICABLE DOCUMENTS

ATTACHMENT D – CONTRACT DATA REQUIREMENTS LIST (CDRLs)

ATTACHMENT E – ENTRY/EXIT CRITERIA

ATTACHMENT F – E-4B AIU MODERNIZATION ENVIRONMENTAL REQUIREMENTS

ATTACHMENT G – DEPOT FIELD MODIFICATION GUIDELINES

1 SECTION I – DESCRIPTION OF SERVICES.

The purpose of this Audio Infrastructure Upgrade (AIU) Modernization Performance Work

Statement (PWS) is to define the requirements for the installation of the AIU Modernization

Kits for E-4B Aircraft tail numbers 1676, 1677 and 0125. This PWS also defines the requirements for Non-Recurring Engineering (NRE) to resolve differences in aircraft configuration and obsolescence.

1.1 REQUIREMENTS.

The Contractor shall ensure the following requirements are accomplished as follows:

1.1.1 GENERAL.

The Contractor shall adhere to this PWS for the installation of the AIU Modernization Kit.

The Contractor shall meet all (non-recurring services requirements) major milestones as identified in the Integrated Master Schedule (IMS).

1.1.1.1 INSTALLATION OF AIU MODERNIZATION TCTO.

The Contractor shall perform one TCTO installation in FY13 with RTS of November 2013.

The Contractor shall provide priced options for:

FY14 TCTO installation with RTS of June 2014.

FY15 TCTO installation with RTS of February 2015.

Note: The provided dates are in accordance with the current proposed aircraft schedule.

Should the dates change, the contractor will be notified and provided the opportunity to adjust to the new dates. The scheduled installation of the AIU Modernization Kit is expected to be six (6) months per aircraft.

1.1.1.2 AIRCRAFT CONFIGURATION.

The Contractor shall provide any drawing changes as a result of the configuration changes between aircraft. The TCTO data shall be red-lined and incorporated into the data package.

The red-lined packages shall be reviewed and approved through the E-4B System Program

Office (SPO).

1.1.1.3 OBSOLESCENCE.

The Contractor shall modify aircrafts 1676, 1677 and 0125 in accordance with the AIU

Obsolescence Upgrade modification CDR and as installed on aircraft 0787. New hardware shall be compatible with existing AIU operating system and application software.

1.1.2 MANAGEMENT PLAN. D001

The Contractor shall maintain and follow the management plan developed under contract

No. FA8106-11-C-0003. The plan shall address the following areas:

1. Work Breakdown Structure (WBS)

2. Integrated Master Schedule (IMS)

3. Configuration Management Plan (CMP)

4. Risk Management Plan (RMP)

5. Quality System Plan (QSP)

6. Spend Plan

1.1.3 RECURRING SERVICE REQUIREMENTS.

The Contractor shall meet all recurring service requirements as specified in Table 2-1.

1.1.4 CDRL DELIVERY CRITERIA.

The Contractor shall deliver all Contract Data Requirements List (CDRL) items on or before the due date and as specified in Attachment D. CDRLs shall be delivered electronically in

Contractor format. CDRL due dates are in business days unless otherwise noted.

Government review and acceptance or rejection to be provided in 10 business days after receipt otherwise the CDRL is considered accepted.

1.1.5 DATA ACCURACY.

Data submissions shall be accurate and in accordance with Contractor processes, established Government policies and as specified in Table 2-1.

Note: Unless otherwise stated, all deliverables shall be submitted to the OC-ALC/GKSKH

Procurement Contracting Officer (PCO), OC-ALC/GKSSA Modification Manager, OC-

ALC/GKSSA Project Manager and the OC-ALC/GKSSB Lead Engineer and Project Engineer.

Physical products shall be sent to the Government POC at:

OC-ALC/GKSS

3001 Staff Drive

Suite 1AE1104A

Tinker AFB, OK 73145

NOTE: PCO Authority. The PCO is the only person authorized to approve changes in any of the requirements under this PWS and any provisions contained elsewhere in this contract. In the event the Contractor implements any such change at the direction of any person other than the PCO, the change will be considered to have been made without authority.

1.1.6 CONTRACTOR IDENTIFICATION.

Contractor employees shall identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, contractor personnel shall appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.

1.1.7 MISSION ESSENTIAL SERVICES. N/A

2 SECTION II – SERVICE SUMMARY.

The Contractor shall be aware that in the absence of any contract requirement from the

Service Summary (SS) does not detract from its enforceability nor limit the rights or remedies of the Government under any other provision of the contract. The Contractor shall ensure the following Service Summary requirements are accomplished:

2.1 SERVICE SUMMARY REQUIREMENTS.

The Contractor shall ensure the Performance Objectives, Performance Thresholds, and support for surveillance methods are achieved as follows:

2.1.1 PERFORMANCE OBJECTIVES AND THRESHOLDS.

The Contractor shall achieve Performance Thresholds identified in Table 2-1 of this PWS.

NOTE 1: The performance thresholds are designed to:

a. Align Contractor performance with objectives.

b. Focus on critical success factors in meeting Performance Objectives.

c. Promote continuous improvement in performance.

NOTE 2: The SPO and Defense Contract Management Agency (DCMA) will exercise surveillance over the Performance Thresholds.

2.1.2 SURVEILLANCE METHODS.

The Contractor shall support the Government’s surveillance methods as identified below:

a. Random sampling of service outputs.

b. One hundred (100) percent inspection of the output.

c. Periodic inspection of the process or output.

d. Customer Complaints provided to the PCO or DCMA.

e. Third Party Audits.

f. Compliance with Technical Orders (TOs) and Air Force Materiel Command (AFMC)

Form 202 disposition.

g. Contractor Metrics.

h. Monthly Status Reports

NOTE 3: The Government may use a combination of surveillance methods to monitor

Contractor’s performance although the specific surveillance method is not specified in

Table 2-1.

2.2 CONTRACTOR PERFORMANCE EVALUATION.

The Contractor shall be aware that the evaluation of performance occurs whenever the

Government Contracting Officer Representative (COR) evaluates the service of the

Contractor to determine whether or not it meets the performance measures of the contract.

The Contractor shall sign COR notification of non-compliance, this signature does not indicate agreement with the COR finding, but the fact the COR has notified the Contractor of the deficiency.

NOTE: The COR will notify the Contractor of non-compliance through written reports or evaluations requesting correction and request Contractor signature for receipt. When more than one Performance Threshold is not met by the Contractor and notified by the

COR, the COR will forward the information for PCO action.

2.2.1 SERVICE SUMMARY TABLE 2-1

Performance Objective (PO) PWS

Paragraph

Performance Threshold

1. Install E-4B AIU Modernization kit prior to Return To Service (RTS) date. Meet all (non-recurring services requirements) major milestones as identified in the IMS

NOTE 1: A single schedule slip which affects major milestones or

RTS will be considered as one complaint or deviation.

NOTE 2: For this objective, a complaint is defined as a schedule slip, entry criteria failure, or exit criteria failure of major milestones that adversely affects schedule completion. Schedule extensions initiated by the Government shall not be considered a complaint against the Contractor.

NOTE 3: For this objective, 100%

Inspection occurs during Aircraft

Installation Functional Test

Procedures (AIFTP).

1.1.1

1.1.1.1

1.1.1.2

4.3.2

4.3.11

4.3.12

Attch E

No more than one (1) verified complaint in milestone execution.

Performance Objective (PO) PWS

Paragraph

Performance Threshold

2. Maintain and follow a management plan:

Maintain the Configuration

Management Plan (CMP).

Execute a Quality System compliant with International Standard ISO

9001-2000, Quality Management

Systems – Requirements and IAW with Contractor QSP.

NOTE: For this objective, a complaint is defined as a single, documented incidence of non-compliance and constitutes a Level

II Corrective Action Request (CAR).

1.1.2

4.1.1

4.2.1

4.3

4.3.1

4.3.3

4.9.1

4.10

No more than two (2) findings of

CMP non-compliance in a quarter.

No more than one (1) CAR Level II per quarter due defects or quality assurance issues.

3. Meet all recurring services requirements as defined in this table. Items 4-8 in this table.

NOTE 1: For this objective, a complaint is defined as a single, documented incident with implications to program cost, schedule, performance, risk or quality. It does not include minor items such as typos, grammatical errors, or unusual font usage.

1.1.3 No more than four (4) verified

complaints or deviations from Plans or Reports received in a quarter.

Performance Threshold

4. Deliver all CDRL items on or before due date.

NOTE 1: For purposes of calculating performance threshold requirements when percentages result in a fraction, round up to the next whole number.

1.1.4

4.7.1

4.10

Attch D

Non-T&M Efforts

95% of CDRLs delivered on time with the remaining 5% of CDRLs delivered no more than ten (10) business days late per quarter.

T&M Efforts

Routine: 85% of CDRLs delivered on time with the remaining 15% of

CDRLs delivered no more than ten

(10) business days late per quarter.

Urgent: 75% of CDRLs delivered on time with the remaining 25% of

CDRLs delivered no more than ten

(10) business days late per quarter.

5. Data submitted is accurate and in accordance with Contractor processes and established

Government policies.

NOTE 1: For this objective, a complaint is defined as a rejected data submittal which is returned to the contractor for rework due to accuracy and noncompliance with requirements. Disagreements based on engineering judgment or deviations in the first submittal, but not identified, will not be considered a valid complaint.

1.1.5

For each submittal, no more than one (1) submittal returned for re-work in response to original

Government comments of

Contractor submitted documentation complying with

Contractor established processes. If more than one (1) submittal return is required, the Contractor shall perform the additional re-write at no additional cost to the

Government.

Performance Threshold

6. Notify the Government of the finalized list of required GFM.

Perform an Ending Inventory no earlier than 20 business days prior to the end of the last performance period, document condition of GFM and provide notification the

Government within five (5) business days of completion of the inventory.

NOTE 1: For this objective, a complaint is defined as a rejected data submittal which is returned to the Contractor for rework due to accuracy and noncompliance with requirements. Disagreements based on engineering judgment or deviations in the first submittal, but not identified, will not be considered a valid complaint.

3.0

3.2

3.3

No more than one (1) submittal returned for re-work in response to original Government comments of

Contractor submitted documentation complying with

Contractor established processes.

7. Deliver the FAA drawing/

Certification paperwork to the

Government 30 business days after

Return to Service (RTS).

NOTE 1: For this objective, a complaint is defined as a rejected data submittal which is returned to the Contractor for rework due to accuracy and noncompliance with requirements. Disagreements based on engineering judgment or deviations in the first submittal, but not identified, will not be considered a valid complaint.

4.1.3 No more than one (1) verified

complaint in milestone execution in a quarter. Complaints or deviations must be corrected or action resolution provided within ten (10) business days of notification of complaint or deviation.

Performance Threshold

8. Handle and safeguard all classified materials and data circuits IAW

DoD 5220.22.M.

4.5.2 100% compliance required for each contract quarter.

3 SECTION III – GOVERNMENT FURNISHED MATERIAL (GFM). D002

The Contractor shall provide and notify the Government with a finalized list of any required GFM. The GFM request should include a cover letter and Microsoft Excel spreadsheet detailing the following: Part Number, Nomenclature, Quantity, and Need Date.

This shall include equipment, crypto and personnel required for test and installation. The

Contractor shall identify aircraft configuration and equipment needs required to support all installation and test activities. The Government will supply any Government-owned design data, purchased material, and equipment from contract No. FA8106-11-C-0003.

3.1 DATA.

At the request of the Contractor, the Government will make available data and drawings, owned or in its possession, to aid in PWS requirements evaluation. The Government will provide the reference designator(s) no later than two weeks after request.

3.2 PHYSICAL AND ENDING INVENTORY. D003

The Contractor shall support an inventory of Government property. The Contractor shall complete, with the COR, an inventory no earlier than 20 business days prior to the end of the performance period. During the inventory, the Contractor shall determine the working order and condition of all GFM and obtain COR concurrence. The Contractor shall document the condition of all GFM and notify the PCO in writing within five (5) business days of completion of the inventory. The Contractor shall resolve discrepancies between the inventory and official Government records with the COR.

3.3 REPLACEMENT OF GFM.

The Contractor shall submit requests for replacement of GFM to the Government. The

Contractor shall ensure requests specify the reason for the replacement, justification for the continued need of GFM and potential cost impacts.

3.4 WORK HOURS AND HOLIDAY OBSERVANCES.

For installation planning, it is the expectation that the Contractor will have access to the aircraft from 2300 Sun – 2300 Fri, excluding Federal Holidays. Weekend, Holiday or ACC

Family Day support from the 55 WG will be coordinated on a case-by-case basis between the SPO and 55 AMXS. Contractor work on weekends or Holidays that is accomplished in a power off configuration may continue. As there will be other modifications ongoing on board the aircraft at any given time during installation, the Contractor shall coordinate all modification work through the On-site SPO Representatives/Authorized Government

Technical Representative (AGTR). Real-world mission requirements may affect aircraft availability. Any impacts to the RTS date due to real-world mission impacts or other a/c modifications not defined by the AIU Modernization will not be considered Raytheon deficiencies as per the performance thresholds.

4 SECTION IV – GENERAL INFORMATION.

It is the Government’s intention for the Contractor to update and revise the work that was completed in contract No. FA8106-11-C-0003. The deliverables from that contract will be provided as Government furnished information and material. To the maximum extent possible, the requirements listed below are consistent with the requirements of contract No. FA8106-11-C-0003. Any changes to the baseline design will require joint evaluation by Contractor and Government to determine appropriate action per Section IV of this PWS.

The Contractor shall update, revise, and maintain the management system and the Management Plan. The Contractor shall establish and maintain a risk management program for the purpose of early identification of program risk and mitigation of risk such that minimal acceptable contract performance is not impacted. The Contractor shall brief risk management status during program reviews and other meetings.

4.1 ENGINEERING

The Contractor shall integrate, install, test and document the system to meet the requirements of this PWS.

The Contractor shall ensure their installed engineering solutions will not diminish the existing hardening/survivability levels of the previously installed systems. The Contractor shall install engineering solutions that meet or exceed the aircraft’s electromagnetic requirements and shall be compatible with available aircraft power generators and environmental control systems. The Contractor shall apply engineering solutions that minimize installation and acceptance test times on the aircraft to the maximum extent possible. To minimize aircraft downtime, the Contractor shall successfully test the installation kit equipment and any developed software in the laboratory prior to installation.

4.1.1 SYSTEMS ENGINEERING

The Contractor shall provide updates, as needed, to the documented systems engineering approach submitted under contract No. FA8106-11-C-0003, in Contractor format, to the

Government within 30 calendar days After Receipt of Order (ARO) as applicable.

4.1.2 SYSTEM DEFINITION

The Contractor shall perform this modification as defined in this PWS and the Functional

Performance Specification (FPS) delivered by contract No. FA8106-11-C-0003.

4.1.3 FAA CERTIFICATION/AIRWORTHINESS CERTIFICATION. D004

The Contractor shall obtain a completed FAA Form 337, Major Repair & Alteration

(Airframe, Power plant, Propeller, or Appliance) for this E-4B Modification. The contractor shall deliver the FAA approved drawing/Certification paperwork to the Government 30 business days after RTS. FAA forms 337 and 8110-3 shall be approved at RTS.

4.1.4 INSTALLATION OF SYSTEM DESIGN.

The approved design as developed under contract No. FA8106-11-C-0003 shall be provided by the Government. The Contractor shall ensure engineering design and analysis is complete prior to installation. No changes will be made to the verification matrix without

Government approval. The Contractor shall maintain and update the Government specifications and ensure that the operations and functionality of newly installed equipment are not adversely date sensitive (e.g. leap year, etc).

4.1.5 ENGINEERING DRAWINGS

The Contractor shall utilize approved engineering drawings developed in contract No.

FA8106-11-C-0003 and identified redline changes.

4.1.6 NAMEPLATES AND PRODUCT MARKING.

All assemblies and equipment shall be assigned a nomenclature/part number and identified by permanently attached markings. Marking shall not adversely affect the equipment appearance, operation or performance.

All assemblies will be marked with an IUID label in accordance with DFAR clause 252-211-

7003 for items greater than $5,000.

4.1.7 MODIFICATION/DEVELOPMENT TESTING.

The Contractor shall utilize the Aircraft Installation Functional Test Procedure (AIFTP) developed under contract No. FA8106-11-C-0003. The Contractor shall execute the AIFTP

Procedure with Government witnesses to verify functionality. Following testing, the

Contractor shall deliver a test report to the Government within 30 calendar days, describing anomalies noted, and including a marked-up as-run copy of the test procedure.

4.2 LOGISTICS

4.2.1 IN-PROCESS REVIEWS (IPRs). D001, DO21

The Contractor shall conduct and provide minutes for an IPR of the TCTO with the option of a second IPR as needed. IPRs will be held at the contractor facility with the first of a duration of two (2) days and the optional of a duration of one (1) day. T.O. 00-5-3 provides guidance of what is expected at reviews. The Contractor shall provide an agenda in electronic format to the Government at least 10 business days prior to each meeting. The

Contractor shall deliver meeting minutes in electronic format to the Government and attendees within 10 business days after the meetings.

4.2.2 CONTRACTOR QUALITY ASSURANCE (CQA) & VERIFICATION SUPPORT.

Contractor shall conduct CQA prior to verification for the TCTO and source data. Contractor shall provide on-site support during the verification of the source data.

4.2.3 MARKED-UP SOURCE DATA.

The Contractor shall update source data delivered under contract No. FA8106-11-C-0003.

The Contractor shall provide four (4) paper copies to the Government one (1) week prior to Aircraft RTS.

4.2.4 EXCESS EQUIPMENT DISPOSITION.

Any excess Contractor Furnished Equipment (CFE) shall be processed and dispositioned by the Contractor in accordance with the PCO’s instructions.

All unused equipment removed will be provided to the Government directed Air Force personnel for appropriate disposition.

4.2.5 SPARES, SUPPORT EQUIPMENT, TRAINING, & VENDOR MANUALS

4.2.5.1 SPARES.

The Contractor shall maintain and update the list of long lead-time spares developed under contract No. FA8106-11-C-0003. The Contractor shall conduct spares reviews as necessary. The Contractor shall notify the Government, at status meetings, of upgrades to the list and provide the updated comprehensive list of individually part-numbered modification components and assemblies upon Government request. When existing hardware is modified, the list of recommendations for spares shall include the modification of any like items stocked in COMBS. Modification of COMBS hardware stock will be accomplished under a separate contract.

4.2.5.2 SUPPORT AND TEST EQUIPMENT. D018

The Contractor shall provide, in the Contractor’s format, recommendations for the development, procurement, and use of organizational level support and test equipment required to maintain the new installation or modification, as required. The Contractor shall provide 2 paper copies or one electronic copy of the Support and Test Equipment recommendations to the Government at each review. As required if changes in parts from approved design from contract FA8106-11-C-0003.

4.2.5.3 VENDOR MANUALS/ITEM SPECIFICATIONS.

The Contractor shall deliver to the Government any vendor developed item specifications and vendor manuals 60 calendar days after receipt. Contractor shall supply the

Government with copies of available applicable vendor manuals that instruct in the operation and organizational level maintenance of newly installed or modified hardware or software. Approved electronic format is acceptable. Distribution instructions will be provided by the Government. The Contractor shall add the distribution recipients, as advised by the Government, to the document revision list to receive future revisions and vendor manual updates. For any appropriate vendor service literature (Service Bulletin, Service Letters, etc.) provided at no direct costs, the Contractor shall add the distribution recipients to the document revision list to receive future service literature. If the updates are available, the Contractor will notify the Government where the electronic update can be accessed. As required if changes in parts from approved design from contract FA8106-11-

C-0003.

4.3 PROGRAM MANAGEMENT. D001

The Contractor shall generate and make available the data identified herein in Contractor electronic format for deliverables. Draft documents shall be delivered in Microsoft Word document format, presentations in Power Point and Microsoft Project for schedules. Final documents shall be delivered as Adobe PDFs. All items shall be transmitted to a distribution list provided by the Government.

4.3.1 MONTHLY STATUS REPORT. D001

The Contractor shall provide a Monthly Status Report (MSR) to the Government in electronic format. The MSR shall be due monthly. As a minimum the MSR shall include the following areas:

1. Integrated Master Schedule/Integrated Master Plan

2. Financial Spend Plan, showing projected and actual expenditures

3. Man-hours, showing projected and actual man-hour expenditures

4. Risk Management Plan assessments

4.3.2 COST, WBS and IMS. D001, D021

The Contractor shall prepare, produce and maintain a WBS, and IMS including major milestones that specify the requirements to be accomplished for the program as defined in the PWS and specification. The IMS shall be traceable down to the rack level and shall support aircraft integration. Tier I defined as AIU Modernization, with milestone dates for all deliverables in the IMS. Schedule data shall be coordinated with the Government. The

Government shall be notified for review and approval of any changes to the IMS which affect the major milestones or RTS. The Contractor shall develop a Financial Spend Plan to manage, track and provide associated cost data and man-hour predications/expenditures for the E-4B AIU Modernization program.

The Contractor shall collect and report cost and related data.

4.3.3 RISK MANAGEMENT. D001

The Contractor shall update and maintain the Risk Management Plan delivered under contract No. FA8106-11-C-0003 in order to identify and mitigate program cost, schedule, and performance risks. Risk data shall be coordinated with the Government. Contractor shall provide monthly status updates on all risk items, including any new risk identified and document the updates as part of the MSR.

4.3.4 GOVERNMENT ACCESS TO CONTRACTOR FACILITY.

Government and Government Representatives will have access to the

Contractor/Subcontractor’s facilities as required in the performance of this contract. The

Government will notify the Contractor/Subcontractor prior to the visit and provide appropriate visit request documentation. Access to classified data will require the personnel have the appropriate level of security clearance and need to know.

4.3.5 CONTRACTOR ACCESS TO GOVERNMENT FACILITY.

Contractor personnel will have access to the Government facilities as required in the performance of this contract. The Contractor shall request access prior to the visit. Access to classified data will require the Contractor’s personnel to have the appropriate level of security clearance and need to know.

4.3.6 QUALITY ASSURANCE.

The Contractor shall apply its internal Quality Assurance (QA) policies and procedures to this effort.

4.3.7 LONG LEAD TIME PROCUREMENT ISSUES.

The Contractor shall identify any long lead time items that do not support the program schedule and notify the Government.

4.3.8 LIFE CYCLE COST CONSIDERATIONS.

The Contractor shall choose materials, processes, and parts in accordance with industry accepted standards or the Contractor’s standard practices taking into account life cycle cost considerations. As required if changes in parts from approved design from contract

FA8106-11-C-0003.

4.3.9 OZONE DEPLETING SUBSTANCES.

The Contractor shall review all drawings to ensure that the install kits do not contain any

Class I or Class II Ozone Depleting Substances or require any for operation or maintenance.

As required if changes in parts from approved design from contract FA8106-11-C-0003

4.3.10 REVIEWS. D021

The Contractor shall establish an electronic means of tracking all Action Items. The

Contractor shall provide this information in an electronic format that is accessible with standard Microsoft applications. The Action Item tracking method shall include the following: date Action Item was opened, Action Item Narrative Description, Current status of the Action Item, a record of all steps taken to resolve the Action Item, Contact

Information of the person who opened the Action Item, and the Contact Information for the person/office assigned to work the Action Item. The Contractor shall provide either copies of the Action Items or a real-time means to access the records for the Action Items to the

Government. The Contractor shall be responsible for conducting follow-up actions on the action items assigned to their company, and shall provide a means to the Government and associate Contractors to update the status of their assigned Action Items.

4.3.11 MODIFICATION READINESS REVIEW. D001, D021

The Contractor shall participate in a Modification Readiness Review (MRR) to be held at the Contractor’s facility once the Entrance Criteria have been met. Expected Duration of the

MRR is two (2) days. With Government concurrence, the MRR can be accomplished via telecom. The Contractor shall develop the meeting agenda, presentation materials, and meeting minutes. A successful MRR will be declared with written Government concurrence when all MRR Exit Criteria have been met.

4.3.12 TEST READINESS REVIEW. D001, D021

The Contractor shall participate in a Test Readiness Review (TRR) to be held at the

Contractor’s facility once the Entrance Criteria have been met. Expected Duration of the

TRR is two (2) days. With Government concurrence, the TRR can be accomplished via telecom and may be held in conjunction with the MRR if desired. The Contractor shall develop the meeting agenda, presentation materials, and meeting minutes. A successful

TRR will be declared with written Government concurrence when all of the Exit Criteria have been met.

4.4 DEPOT FIELD MODIFICATION GUIDELINES.

The Contractor shall follow the OC-ALC/GKSS and Contractor Guidelines For E-4B Depot

Field Modification Efforts at Offutt AFB, NE as detailed in Attachment G.

4.5 SECURITY REQUIREMENTS.

The Contractor shall provide information and documentation to comply with the requirements identified in DD Form 254, DoD Contract Security Classification Specification. The highest classification for these requirements is “SECRET”. The Contractor shall obtain all security clearances and badges for entry into controlled areas IAW Attachment G.

4.5.1 CONTRACTOR IDENTIFICATION BADGES AND VEHICLE PASSES.

The Contractor shall ensure all Contractor employees obtain identification badges and vehicle passes as follows:

The Contractor shall comply with local procedures and directives that will be provided at post award conference for obtaining installation identification badges and vehicle passes.

4.5.2 SAFEGUARDING CLASSIFIED INFORMATION.

The Contractor shall conform to the provisions of DoD 5220.22-M for safeguarding classified information and material as well as AFI 21-401 and AFI 31-401. The Contractor shall ensure only those persons who have the proper security clearance and a need to know according to the performance of work under this contract shall be given access to classified information or material.

4.6 ENVIRONMENTAL REQUIREMENTS.

4.6.1 COMPLIANCE WITH LAWS AND REGULATIONS.

The Contractor shall be knowledgeable of and comply with all applicable Federal, State, and Local laws, regulations, and requirements regarding environmental protection. In the event environmental laws and regulations change during the term of this contract, the Contractor shall be required to comply with such laws when they come into effect. If there is an increase or decrease in cost as a result of the change, the Contractor shall inform the PCO of the change and the PCO will determine if an equitable adjustment is required. The Contractor shall provide a copy of their internal Hazardous Materials Management Program (HMMP) or equivalent.

4.7 MANAGER REQUIREMENTS.

The Contractor shall ensure the following manager requirements are accomplished:

4.7.1 PROGRAM MANAGER. D001

The Contractor shall provide a Program Manager and alternate who shall be responsible for the performance of the work and shall have full authority to act for the Contractor on all matters relating to the performance of this contract. The Program Manager shall develop, maintain, and deliver a Management Plan, which incorporates the requirements in this PWS. The Program Manager shall:

a. Be responsible for all work performed under this PWS.

b. Provide in writing to the PCO, within ten (10) business days after contract award, the Program Manager and alternate names with both duty hour and non-duty hour telephone numbers.

c. Maintain a program management structure to accomplish administrative planning and integration of program requirements to optimize workflow actions by organizing, directing, and controlling overall program requirements, to include the following:

1. Develop, maintain, and deliver an organizational chart, which reflects key personnel with a line of responsibility between the organizational elements.

2. Develop, maintain, and deliver a recall roster of all Contractor personnel for purposes of emergency notification and provide a copy and any subsequent changes to the Government.

d. Be available to be contacted by telephone during duty hours to discuss issues pertaining to the services provided and attend meetings requested by the Government.

e. Be available to be contacted by telephone during non-duty hours to discuss and resolve critical issues pertaining to the services provided and to perform work on the installation if deemed necessary by the PM and approved by the PCO.

f. Develop, maintain, and deliver a contact list of individuals who can address routine questions and provide data and status information during duty hours.

g. Deliver all plans, reports, correspondence, briefings, and documents required by this PWS, including forms, CDRLs, and required notifications in Microsoft Office format via e-mail unless otherwise directed by the PCO.

h. Support conference calls and provide agendas.

i. Establish and maintain a risk management program for the purpose of early identification of program risk and mitigation of risk such that minimal acceptable contract performance is not impacted.

j. Brief risk management status during program reviews and other meetings.

k. Identify, review, analyze, and forecast all budgetary and financial impacts to program (i.e. Cost Estimates and Budget Analysis).

4.8 MEETINGS. D021

The Contractor shall support via teleconference, unless otherwise specified in this PWS, specified meetings to support requirements contained within this PWS.

4.8.1 Bi-Weekly Status Meetings

The Contractor shall host bi-weekly status meetings with the government. Every other meeting shall include subcontractors.

4.8.2 Requirements Review

The Contractor shall host a requirements review to clarify items identified in this PWS.

Expected duration of the requirements review is one (1) day.

4.8.3 Engineering Review

The Contractor shall host two (2) engineering reviews at the Contractor’s facility. Expected duration of engineering review is two (2) days.

4.8.4 Working Groups

The Contractor shall host one (1) working group at the Contractor’s facility. Expected duration of working group is two (2) days.

4.9 QUALITY SYSTEM AND QUALITY PROGRAM REQUIREMENTS.

The Contractor shall ensure the quality system and quality program meets the following requirements:

4.9.1 QUALITY SYSTEM.

The Contractor shall provide and maintain a quality system that adheres to the requirements of International Standard ISO 9001-2000, Quality Management Systems – Requirements. The Contractor shall develop, maintain, and deliver a Quality System Plan.

The Contractor shall ensure the quality system procedures, planning, and other documentation and data comprise the quality system and is made available to the Government for review. The Contractor shall utilize existing quality documents that meet the requirements of the contract. The Contractor shall support the Government’s requested quality audit for inspections, verifications, and evaluations to ascertain conformance to requirements and the adequacy of implementing procedures. The Contractor shall allow on a non-interference basis Government audits to be performed on Contractor maintained files. Upon completion of the Government’s quality audit, the Contractor shall incorporate into the repair process corrective action(s) to eliminate the cause of the defects. The Contractor shall ensure all material purchased or subcontracted from other contractors meets all technical requirements of this contract. The Contractor shall develop, maintain, and deliver a Quality Assessment Report.

4.9.2 QUALITY PROGRAM.

The Contractor shall ensure the quality program is designed to detect and correct conditions adverse to quality. The Contractor shall investigate all Deficiency Reports (DRs) submitted against defective items manufactured, repaired, or overhauled by the

Contractor. The Contractor shall ensure each deficiency report is processed IAW T.O. 00-

35D-54, USAF Deficiency Reporting and Investigating System. When the Contractor receives a DR or Quality Deficiency Report (QDR), the Contractor shall ensure deficiency reports include: analysis of data to determine extent and cause of deficiencies; analysis of trends in processes or performance of work to prevent recurrence; and introduction of required improvement, corrections, and monitoring of the effectiveness of corrective action taken.

4.9.2.1 DEFICIENCY REPORTS.

If the Contractor receives defective items, the Contractor shall develop and deliver a DR or QDR. The Contractor shall report IAW TO 00-35D-54 GFM found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the Contractor shall determine and record probable cause.

4.9.3 GOVERNMENT QUALITY ASSURANCE SURVEILLANCE SUPPORT.

The Contractor shall support Government quality assurance surveillance to periodically evaluate the Contractor’s performance IAW the Government’s Surveillance Plan.

NOTE: For those requirements listed in Section II, Service Summary, the COR will follow the methods of surveillance specified in the Surveillance Plan. The COR is the Government’s authorized representative for the PCO and will participate in the administration of this contract.

4.10 OVER AND ABOVE.

The requirements listed below have been identified as potential over-and-above candidates:

a. Shipping Costs Associated with GFM.

b. Engineering Support Tasks

ATTACHMENT A – ACRONYMS.

AFMC Air Force Materiel Command AGTR Authorized Government Technical Representative AIFTP Aircraft Installation Functional Test Procedure AIU Audio Infrastructure Upgrade ARO After Receipt of Order CAR Corrective Action Request CDRL Contract Data Requirements List CFE Contractor Furnished Equipment CMP Configuration Management Plan COMBS Contractor Operated & Maintained Base Supply COR Contracting Officer Representative CQA Contractor Quality Assurance DCMA Defense Contract Management Agency DFAR Defense Federal Acquisition Regulation DoD Department of Defense DR Deficiency Report DVS Digital Voice System FAA Federal Aviation Administration FOD Foreign Object Damage FPS Functional Performance Specification FY Fiscal Year GFM Government Furnished Material HMMP Hazardous Materials Management Program IAW In Accordance With ILSP Integrated Logistics Support Plan IMP Integrated Master Plan IMS Integrated Master Schedule IPR In-Process Review ISO International Standards Organization IUID Item Unique Identification MSR Monthly Status Report NLT No Later Than NRE Non-Recurring Engineering O&A Over and Above PCO Procurement Contracting Officer PO Performance Objective PWS Performance Work Statement QA Quality Assurance QDR Quality Deficiency Report QSP Quality System Plan RMP Risk Management Plan RTS Return to Service SPO System Program Office SS Service Summary

T&M Time & Material TCTO Time Compliance Technical Order TO Technical Order WBS Work Breakdown Structure

ATTACHMENT B – DEFINITIONS.

Federal Holiday: Federal law (5 U.S.C. 6103(a)) establishes the following public holidays for Federal employees. Most Federal employees work on a Monday through Friday schedule. For these employees, when a holiday falls on a non-workday -- Saturday or Sunday -- the holiday usually is observed on Monday (if the holiday falls on Sunday) or Friday (if the holiday falls on Saturday). These holidays include New Years Day, Birthday of Martin Luther King, Jr., Washington’s Birthday, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas Day.

Government Property: All property owned by or leased to the Government or acquired by the Government under the terms of the contract. It includes both Government-furnished property and Contractor-acquired property.

Government Furnished Material: Property that may be incorporated into or attached to a deliverable end item or that may be consumed or expended in performing a contract. It includes, assemblies, components, parts, raw materials, and small tools, and supplies that may be consumed in normal use in performing a contract.

Government Furnished Property: Property in the possession of, or directly acquired by the Government and subsequently made available to the Contractor.

Hazardous Material: Any material which by virtue of its potentially dangerous nature, requires controls to assure adequate protection. This excludes ammunition, weapons, explosives, actuated devices, propellants, pyrotechnics, chemical and biological warfare materials, medical and pharmaceutical supplies, and bulk fuels.

ATTACHMENT C – APPLICABLE DOCUMENTS

The following documents of the exact issue shown form a part of this PWS to the extent specified herein. In the event of conflict between the documents referenced and the contents of this PWS, the contents of this PWS shall take precedence

GOVERNMENT DOCUMENTS

Number Revision or Date Title

T.O. 00-5-3 1 May

AF Technical Manual Acquisition Procedures

STANDARDS

Number Revision or Date Title

DD 254 Mar 2012 DoD Contract Security Classification Specification MIL-STD-704 9 Aug

Electric Power, Aircraft, Characteristics and Utilization Of

OTHER

Revision or Date Title

RTCA/DO-160F Environmental Conditions and Test Procedures for Airborne Equipment

The following documents are for reference use and shall be used as guidelines for this effort.

REFERENCE DOCUMENTS

Revision or Date Title

D226-39067-1 28 Nov

E-4B electromagnetic interference/compatibility

D226-39068-1 28 Nov

E-4B TEMPEST/emissions security (EMSEC) control plan

D226-40246-1 Volume 1

30 Mar

E-4B Hardness Maintenance/Hardness Surveillance Program Plan

D226-40329-1 22 Dec

E-4B Nuclear Hardness Requirements

D226-40329-2 27 Nov

Transient Radiation Effects on Electronics Analysis Guidelines

MIL-STD-1472 23 Aug

Human Engineering Design Criteria For Military Systems, Equipment and Facilities

MIL-DTL-7700 13 May

Flight Manuals, Air Refueling Procedures, and Abbreviated Checklists

MIL-STD-38784 15 Nov

Manuals, Technical: General Style and Format Requirements

MIL-STD-461F 10 Dec

Requirements for the Control of Electromagnetic Interference Characteristics of Subsystems and Equipment

MIL-STD-882D 10 Feb

Department of Defense Standard Practice for System Safety

MIL-STD-464 1 Dec

Electromagnetic Environmental Effects Requirements for Systems

RTCA/DO-178B Software Considerations in Airborne Systems and Equipment Certifications

RTCA/DO-254 19 Apr

Design Assurance Guidance for Airborne Electronic Hardware

SAE ARP 4754 Nov 1996 Certification Considerations for Highly Integrated or Complex Aircraft Systems

SAE ARP 4761 Dec 1996 Guidelines and Methods for Conducting the Safety Assessment Process on Civil Airborne Systems and Equipment

SAWE-RP7 Mass Properties Management and Control for Military Aircraft

ATTACHMENT D – CONTRACT DATA REQUIREMENTS LIST (CDRLs)

Note: Government approved electronic format for deliverables is preferred unless stated otherwise.

The Contractor shall generate and make available the data identified herein. Refer to the following table for specific deliverable requirements. All items identified for delivery to the Government shall be delivered to the OC-ALC/GKSSA Primary Contracting officer (PCO), AIU Modernization Program Manager, Program Engineer, and Modification Manager, unless otherwise specified. When CDRL delivery is in the form of a CD, the copy will be delivered to the PCO.

CDRL Description PWS

Para

Date of First

Submittal

Frequency

D001 Management Plan:

1. Work Breakdown Structure (WBS)

2. Integrated Master Schedule (IMS)

3. Configuration Management Plan (CMP)

Update

4. Risk Management Plan (RMP) Update

5. Quality System Plan (QSP) Update

6. Spend Plan

In-Process Reviews (IPR)

1.1.2

4.2.1

4.3

4.3.1

4.3.2

4.3.3

4.3.11

4.3.12

4.7.1

Items 1,2,4,5,6,7,8,9:

First submittal under contract No.

FA8106-11-C-0003

IPR: In conjunction with TRR.

Items 1, 3, 6, & 9:

Updates provided

Monthly as part of status report

D002 Government Furnished Material (GFM) 3.0 Final list of required

GFM at MRR.

Once unless corrections are required.

D003 Ending Inventory 3.2 No earlier than 20 calendar days prior to end of performance period.

Once unless corrections are required.

D004 FAA Certification Package 4.1.3 30 business days after RTS.

Once unless corrections are required.

CDRL Description PWS

Para

Date of First

Submittal

Frequency

D021 Meeting Agendas, Presentations and

Minutes

4.2.1

4.3.2

4.3.10

4.3.11

4.3.12

4.8 a). Agendas - 10 business days prior to meeting b). Presentations –

10 business days prior to meeting c). Draft Minutes –

10 business days after meeting d). Government has

5 business day review e). Final Minutes – 5 business days after

Government feedback

ATTACHMENT E – ENTRY/EXIT CRITERIA

TEST READINESS REVIEW (TRR)

Entry Criteria:

1. Contractor has provided specified deliverables as outlined in the PWS.

2. Contractor is ready to begin initiation of formal configuration item testing.

Exit Criteria:

1. Contractor has demonstrated adequate understanding and progress on test procedures and compliance with test plans and descriptions for hardware and software items.

2. Government has approved closure of the TRR.

MODIFICATION READINESS REVIEW (MRR)

Entry Criteria:

1. Contractor has met all applicable requirements and provided specified deliverables as outlined in the PWS.

2. 100% of production drawings are released.

3. Contractor has 100% parts on dock.

4. If 100% of parts are not on dock, the Contractor has provided a by-item delivery plan for each item showing that delivery will occur in time to support the modification schedule.

5. Preliminary ground/flight test plans and test procedures are in place and agreed to by SPO and user.

6. Government has been notified of any Government equipment or personnel required for support during the modification and when such equipment or personnel support is required.

Exit Criteria:

1. Finalized list of required GFM has been identified.

2. Contractor has completed engineering drawings and installation planning.

3. Government concurrence that the Contractor has manpower available to ensure successful completion of installation effort within schedule.

4. Contractor has needed parts on-hand and plans for delivery of all others prior to installation.

5. Government has approved closure of the MRR.

ATTACHMENT F – E-4B AIU MODERNIZATION ENVIRONMENTAL REQUIREMENTS

The AIU Modernization effort is required to meet all of the environmental requirements established under contract No. FA8106-11-C-0003. The contractor shall not degrade the hardness of other E-4B equipment against the ESD-481B-1B00000B threat and MIL HDBK-

2169B (S).

ATTACHMENT G – DEPOT FIELD MODIFICATION GUIDELINES.

OC-ALC/GKSS and Contractor Guidelines

For

E-4B Depot Field Modification Efforts at Offutt AFB, NE

28 Feb 2011

1. These directions are not meant to supersede US Air Force or Offutt Air Force Base Instructions or rules of operation, but to clarify and complement those rules and procedures. All previous editions are superseded by this document.

1.1. If this document conflicts with an US Air Force or Offutt direction the US Air Force or Offutt direction will take precedence.

1.2. If this document conflicts with contractual direction, contact the PCO for clarification.

2. Restricted Area Access:

2.1. When applicable, restricted Area Badges (RAB) will be coordinated through the OC-

ALC/GKSS IAW 1 ACCS Contractor Restricted Area Badge Operating Instructions.

Contractors should request badges with escort privileges.

2.2. Upon request of the Security Manager through which the RAB was coordinated or OC- ALC/GKSS, Contractors will return the RABs to the Security Manager or a designated representative.

2.3. Contractors will immediately report any lost or misplaced badges to the issuing Security Manager and OC-ALC/GKSS.

2.4. If a security incident occurs it will be reported immediately to the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .