AIU_Modernization_Integration_JA_(Rev_10)_FINAL_Redacted.pdf

PDF 552 KB Posted

Attached to
Maintenance, Repair, and Rebuilding of Equipment
Solicitation number
FA8106-12-R-0003
Issued by

About this file

Justification and Approval document for contract number FA8106-13-C-0001 awarded on 28 Feb 13.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JUSTIFICATION FOR OTHER THAN

FULL AND OPEN COMPETITION

I. CONTRACTING ACTIVITY

AFLCMC/WLKLC

3001 Staff Drive Ste 1AE1-104A Tinker AFB, OK 73145-3020

PR Number: TBD

II. NATURE AND/OR DESCRIPTION OF THE ACTION BEING PROCESSED

The proposed action is a Cost Plus Fixed Fee effort at an estimated cost of $21,707,000. This effort is anticipated to be awarded as a new, stand-alone C type contract to the Raytheon Corporation with a tentative award date of 28 February 2013. The period of performance for this acquisition will be from contract award until .

III. DESCRIPTION OF THE SUPPLIES/SERVICES REQUIRED TO MEET THE

AGENCY’S NEEDS

1) Installation and certification of the Prototype Audio Infrastructure Upgrade (AIU) Modernization on the first aircraft was performed on a previous contract. The kits for the final three AIU installations will be provided under a different Ogden ALC contract. Under the contemplated contract, the Raytheon Corporation will provide installation and certification of the Audio Infrastructure Upgrade (AIU) Modernization for the remaining three aircraft.

Installation on the second aircraft will occur between and .

Installation on the third aircraft will occur between and .

Installation on the fourth aircraft will occur between and . All efforts will be funded with 3010 appropriations.

2) This AIU Modernization effort consists of highly specialized equipment which provides access to the Defense Red Switch Network (DRSN). DRSN is the Department of Defense’s (DoD) global senior level secure voice telephone and conferencing system. The AIU Modernization brings the fleet to a common configuration and mission capability. In addition, this installation and certification will provide the E-4B aircraft with continuing secure voice and conferencing capabilities.

IV. STATUTORY AUTHORITY PERMITTING OTHER THAN FULL AND OPEN

COMPETITION

10 USC 2304 (c)(1), as implemented by FAR 6.302-1(a)(2).

V. DEMONSTRATION THAT THE CONTRACTOR’S UNIQUE QUALIFICATIONS OR

NATURE OF THE ACQUISITION REQUIRES THE USE OF THE AUTHORITY CITED

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/af_afmc/far/Far06.doc#b63032

ABOVE (APPLICABILITY OF AUTHORITY)

1) Raytheon Network Centric Systems developed and currently sustains the Digital Voice System (DVS) capability (also known as the E-4B Audio Infrastructure Upgrade Sub Kit or AIU SK; Part Number: ) through the integration of highly modified Commercial Off The Shelf (COTS) Information Technology systems and commercial fasteners with Raytheon proprietary hardware and software. Specifically, Raytheon provides a proprietary Time Divisional Multiple Access (TDMA) Backplane to allow processing at multiple classifications simultaneously, Enhanced Command Console software to configure the Red Switch with preloaded and on-the-fly mission profiles for Secret and Top Secret point-to-point secure communications. Raytheon maintains the rights for all systems connected to the Defense Red Switch Network (DRSN) both land based and airborne to maintain integrity of communications. Additionally, Raytheon maintains multiple exclusive agreements with subcontractors that have proprietary rights to key elements. For example, they have an agreement with to provide system level database implementation/design and another one with to provide the TXP-A phone with interface. Compatibility issues make these elements necessary for this requirement and a contract with Raytheon is the only possible action since the two companies have an exclusive agreement.

2) As the designer and producer of the AIU Modernization for the prototype install, Raytheon is the sole owner of proprietary engineering data and software to manufacture the equipment, specialized knowledge/training to perform integration, and technical expertise/experience to complete testing and insure operational viability. Raytheon is not willing to sell the government purpose rights for this system to the Government (See Part VI). Contract award to someone other than Raytheon would result in cost duplication and schedule delays. Any contractor other than Raytheon would be required to reverse engineer the entire system to become proficient in the technology and the implementation on the E-4B. At a minimum this would take five years to accomplish with exorbitant costs. It has taken over five years to develop the parts and configuration of the AIU system, with over unique parts and kits associated with this modification.

3) Projected Raytheon installation costs for three aircraft are approximately $22M. If another company were to reverse engineer the effort, with dedicated engineers for 5 years, contract costs and associated overheads the projected additional costs would be as follows:

Engineers at $ Year = $ /Year Contracting Overhead/Year = $ /Year Estimated Time to Reverse Engineer = 5 Years Total Estimated Additional Cost = $

With a High Demand-Low Density fleet like the E-4B aircraft, availability is paramount to the accomplishment of aircraft modifications. A five year delay and $ in additional costs is unacceptable to the E-4B program.

4) Raytheon has produced all of the previous AIU modifications for the E-4B which requires proprietary software to manufacture the equipment, specialized knowledge of how the system interacts with the aircraft and the ground networks for multiple modes of communication, specific system level training to perform integration of the kit components and E-4B experience to in flight and ground testing to insure operational viability. Raytheon is also currently under contract for development, assembly, and installation of the AIU Modernization prototype kit for aircraft 74-0787. This contract, FA8106-12-C-0003, awarded 24 February 2012 includes requirements for initial Technical Orders (TOs), draft training package and a notional installation schedule.

VI. DESCRIPTION OF EFFORTS MADE TO ENSURE THAT OFFERS ARE SOLICITED

FROM AS MANY POTENTIAL SOURCES AS DEEMED PRACTICABLE

The Government has limited rights to use Raytheon’s proprietary technology because it was developed exclusively with private funding. Government representatives from Hill AFB approached Raytheon approximately three years ago to purchase the intellectual property rights. Hill AFB negotiated with Raytheon on this matter because the contract for the Defense Red Switch Network was and is managed by Hill AFB. AIU contracts issued for the E-4B through Tinker AFB contracting (including this effort) are for the purpose of integrating DRSN technologies already in-service at ground locations onto the E-4B aircraft. When approached by Hill AFB personnel, Raytheon was not willing to entertain the option of selling the rights at that time and a verbal confirmation of that stance was reaffirmed in April 2012. To date the Government has been unsuccessful in its attempts to purchase additional rights which limits competition. This requirement, FA8106-12-R-0003, has been synopsized on 17 April 2012 through FedBizOpps as a sole source effort to The Raytheon Company and no viable responses have been received. The solicitation will be posted to FedBizOpps.

VII. DETERMINATION BY THE CONTRACTING OFFICER THAT THE ANTICIPATED

COST TO THE GOVERNMENT WILL BE FAIR AND REASONABLE

The Procurement Contracting Officer (PCO) will obtain Certified Cost and Pricing Data for this requirement. Defense Contract Management Agency (DCMA), Defense Contract Audit Agency (DCAA), and OC-ALC technical and pricing experts will assist the PCO in evaluating Raytheon’s proposed costs. The PCO will consider all inputs and formally determine proposed costs are fair and reasonable before contract award. Furthermore, these are the last production installations, therefore actual costs for the previous installations are known and will aid in the establishment of a fair and reasonable price.

VIII. DESCRIPTION OF THE MARKET RESEARCH CONDUCTED AND THE RESULTS

The E-4B program office leverages DRSN program initiatives but maintains market awareness of secure communication capabilities. Raytheon Network Centric Systems develops and sustains the AIU capability (also known as the E-4B Audio Infrastructure Upgrade Sub Kit or AIU SK; Part Number: ) through the integration of Commercial Off The Shelf (COTS) Information Technology systems and commercial fasteners with Raytheon proprietary hardware and software.

The program office has historically procured the AIU Modifications through Boeing from Raytheon as a subcontractor. Since Raytheon Network Centric Systems is required to accomplish this upgrade, continuing the contract strategy of procuring these services through another contract will drive significant added expense (up to 40% additional cost) but not significant value to the execution of the modification. The previous acquisition history coupled with the proprietary nature of the AIU design validates that Raytheon is the only responsible source to procure the AIU Modernization due to the proprietary software. As described in Section VI above, and in accordance with FAR Part 10, market research was conducted by synopsis of the proposed acquisition, advising industry of the pending acquisition. While competitive opportunities are unlikely due to the proprietary nature of the software/hardware provided by Raytheon, this effort was nevertheless synopsized in an attempt to increase potential subcontracting opportunities and raise market awareness of the requirement.

IX. ANY OTHER FACTS SUPPORTING THE USE OF OTHER THAN FULL AND OPEN

COMPETITION

None.

X. LIST OF SOURCES, IF ANY, THAT EXPRESSED INTEREST IN THE ACQUISITION

Raytheon Company- Cage Code 00724 8333 Bryan Dairy Road Largo, FL 33777

XI. A STATEMENT OF THE ACTIONS, IF ANY, THE AGENCY MAY TAKE TO

REMOVE OR OVERCOME ANY BARRIERS TO COMPETITION BEFORE MAKING

SUBSEQUENT ACQUISITIONS FOR THE SUPPLIES OR SERVICES REQUIRED

Currently there is no other technology that provides the capabilities being performed by the Raytheon proprietary systems. Future technologies will be developed to duplicate the capabilities provided by the Raytheon equipment which would allow competition; however, development and availability of the technology cannot be predicted. Negotiations with Raytheon concerning data and intellectual rights are being conducted through the Ogden ALC at Hill AFB because the DRSN contract is managed there. Since this is an Ogden ALC program effort, we are not privy to the picture of future need beyond our project and we must assume that Ogden has assessed those needs in developing their plans to increase competition. However, this requirement is to install the DRSN system on the final three (3) aircraft and is the only contemplated use of this data since there is not an expectation that there will be any future requirements for these services. As noted above in Part V, although it may be possible for another company to re-engineer the system it would cost an additional $ and take an additional five (5) years. This system needs to be complete by so it is not feasible to have another contractor re-engineer the data and meet the time of need requirement. It is also not in the best interest of the Government due to the excessive costs associated with another company re-engineering the data.

XII. CONTRACTING OFFICER’S CERTIFICATION

The contracting officer’s signature on the Coordination and Approval Document evidences that he has determined this document to be both accurate and complete to the best of his knowledge and belief (FAR 6.303-2(a)(12)).

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/10.htm

XIII. TECHNICAL/REQUIREMENTS PERSONNEL’S CERTIFICATION

As evidenced by their signatures on the Coordination and Approval Document, the technical and/or requirements personnel have certified that any supporting data contained herein which is their responsibility is both accurate and complete (FAR 6.303-2(b)).

File details come from the government source that posted it. Updated .