FA810522R0001.pdf
PDF 418 KB Posted
- Attached to
- KC135 Engineering Sustainment Support Federal contract opportunity
- Solicitation number
- FA810522R0001
About this file
This solicitation is for an indefinite delivery indefinite quantity contract to provide C/KC-135 engineering sustainment support services for 10 years. Key details include:
-
The contractor shall perform all services defined in the performance work statement to support a base period of 2 years and 4 additional 2-year option periods.
-
Recurring engineering services include program management, maintenance line support, engineering maintenance support, response to technical inquiries, aircraft structural integrity program support, and weapon system integrity program support.
-
The minimum order amount is $5 million for recurring engineering services.
-
Proposal preparation costs shall be applied to specific contract line items for base year 1 and option year 1.
-
The contractor must complete rate tables for time and materials contract line items, a contract line item breakdown summary, and asserted rights categories as defined in attachments to the solicitation.
-
The solicitation is issued by the Department of the Air Force Materiel Command Lifecycle Management Center located at Tinker Air Force Base. Proposals are due on June 20, 2022.
View the file
Other files for this federal contract opportunity
Show all 50
KC135 Engineering Sustainment Support has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)
PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)
23. ACCOUNTING AND APPROPRIATION DATA
SEE SCHEDULE
24. TOTAL AWARD AMOUNT (For Government Use Only)
TELEPHONE NUMBER
UNIQUE ENTITY
IDENTIFIER
CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
NO COLLECT CALLS
4. SOLICITATION NUMBER
FA8105-22-R-0001
6.SOLICITATION ISSUE DATE
8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOSB PROGRAM
HUBZONE SMALL
BUSINESS EDWOSB
SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS NAICS: 541330
8(A) SIZE STANDARD: $16.50
DATE SIGNED
28. UNITED STATES OF AMERICA (Signature of Contracting Officer)
26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER
SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH
ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
FMS REQUIREMENT
Routine Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.
Ten-Year Contract, Two-Year Base, and Four Two-Year Options
ORDERING PERIODS
2-YR BASE 01 APR 2023 - 31 MAR 2025
2-YR OPT 1 01 APR 2025 - 31 MAR 2027
2-YR OPT 2 01 APR 2027 - 31 MAR 2029
2-YR OPT 3 01 APR 2029 - 31 MAR 2031
2-YR OPT 4 01 APR 2031 - 31 MAR 2033
SEE LINE ITEM SCHEDULE
22.
AMOUNT
16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253
FULL AND OPEN COMPETITION (c) (1 ) (c) ( )
DATE SIGNED
27. SIGNATURE OF OFFEROR/CONTRACTOR
20.
UNIT
21.
UNIT PRICE
19.
QUANTITY
13. CONTRACTOR OFFEROR CODE FACILITY CODE
11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR
DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9
ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS
SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND
CONDITIONS STATED HEREIN. *120
RATING
DO: A1
3. AWARD/EFFECTIVE DATE
FA8105
2. CONTRACT NUMBER
X
17.
ITEM NUMBER
12. ADMINISTERED BY CODE
Total
SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14
SCD:C
NAME AND TITLE OF SIGNER (Type or Print) NAME OF CONTRACTING OFFICER
5. SOLICITATION TYPE
SEALED BIDS NEGOTIATED
(IFB) (RFP)
15. PROMPT PAYMENT DISCOUNT
25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH
OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT
THE TERMS AND CONDITIONS SPECIFIED HEREIN.
10. ITEMS TO BE PURCHASED (Brief Description)
SUPPLIES SERVICES Engineering Services
9. (Agency Use)
LATE OFFERS ARE SUBJECT TO LATE PROPOSAL PROVISIONS INCORPORATED HEREIN. ALL OFFERS ARE SUBJECT TO SUCH PROVISIONS, REPRESENTATIONS, CERTIFICATIONS AND SPECIFICATIONS AS ARE ATTACHED OR INCORPORATED BY REFERENCE.
SOLICITATION: OFFERS WILL BE RECEIVED AT THE ISSUING OFFICE UNTIL
20-JUN-2022 4:30PM
X
18.
SCHEDULE OF SUPPLIES/SERVICES
14. PAYMENT WILL BE MADE BY CODE
X
7. ISSUED BY CODE
DEPARTMENT OF THE AIR FORCE, AFLCMC WLTK
3001 STAFF DR STE 2AI 85A
TINKER AFB OK 73145-3303
BUYER: David Farrow/AFLCMC/WLT david.farrow.2@us.af.mil Phone: (405) 739- 2697
X
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)SOLICITATION/CONTRACT
BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.
JLSUVY
STANDARD FORM 1447 (REV. 8/2016) BACK
NO RESPONSE FOR REASONS CHECKED
TYPE OR PRINT NAME AND TITLE OF SIGNER
SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)
WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF
ITEMS INVOLVED
WE DO
OTHER (Specify)
UNABLE TO IDENTIFY THE ITEM(S)
CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT
DO NOT REGULARILY MANUFACTURE OR SELL THE TYPE
OF ITEMS INVOLVED
DATE AND LOCAL TIME 20 JUN 2022 4:30 PM
SOLICITATION NUMBER FA810522R0001
FROM: AFFIX
STAMP
HERE
TO:
ATTN: David Farrow/AFLCMC/WLT
DEPARTMENT OF THE AIR FORCE, AFLCMC WLTK
3001 STAFF DR STE 2AI 85A
TINKER AFB OK 73145-3303
FA8105-22-R-0001
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
This Indefinite Delivery Indefinite Quantity (IDIQ) contract is in support of C/KC-135 Engineering Sustainment Support (ESS). The contractor shall perform all services in the Performance Work Statement (PWS) to support this ten-year contract described as follows:
Ten-Year Contract, Two-Year Base, and Four Two-Year Options
ORDERING PERIODS (estimated)
2-YR BASE 01 APR 2023 - 31 MAR 2025
2-YR OPT 1 01 APR 2025 - 31 MAR 2027
2-YR OPT 2 01 APR 2027 - 31 MAR 2029
2-YR OPT 3 01 APR 2029 - 31 MAR 2031
2-YR OPT 4 01 APR 2031 - 31 MAR 2033
RFP Information & Instructions:
FIRST: The following CLIN identifier defines the sequence of numbering of line items from year to year.
BASE YEARS 0001 - 0182
OPTION 1 1001 - 1182
OPTION 2 2001 - 2182
OPTION 3 3001 - 3182
OPTION 4 4001 - 4182
SECOND: CLINS XX18 – XX28 are reserved for future use over the life of the 10-year contract. They will be created when the need arises.
THIRD: The contract minimum order amount is $5 million of recurring engineering services.
FOURTH: Unit of Issue “ZP” on CLINS X012 – X016 means number of pages
FIFTH: All CLINS for option years will be created post-award. All CLINS on the RFP are established on the summary spreadsheet attached in Section J, “Attachment D – CLIN Breakdown”. The contractor is required to complete the summary tabs for Base Years 1 & 2 in Attachment D – CLIN Breakdown.
Schedule B is not required to be completed by the contractor.
SIXTH: The contractor is required to complete the DFARS 252.215-7009 Proposal Adequacy Checklist as part of the proposal submission.
SEVENTH: Rates for T&M CLINS 0029 & 0129 for years 2023 & 2024 shall be summarized in Attachment E – T&M Labor Rate Table. The spreadsheet may be tailored by the contractor to add or subtract information as needed. The overall format of the spreadsheet must stay the same to summarize the rates for the contract upon award.
EIGHTH: Proposal preparation costs in response to this RFP shall be applied to CLIN 0017 for Base Year 1.
Proposal preparation costs for Option 1 shall be applied to CLIN 0117 to be funded in Base Year 2 when the solicitation for Option 1 is requested by the government. These CLINS may be re-used on future orders for proposal preparation costs.
NINTH: Contractor shall complete the “Asserted Rights Category” based on definitions included in DFARS 252.227-7013 and 252.227-7014. Contractor shall complete Attachments G and H per the instructions and submit them with the proposal.
CONTRACT APPEARANCE: The resulting contract may be awarded using a different contract writing system which may result in a different format or appearance. This contract may also be bi-laterally re-issued after award at the exercise of an option with a different format or appearance.
Base - Year 1
Program Manager (PM) Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Estimated Total Price
12 LO
CLIN ACRN ACRN Total
0001 AA
R425 Recurring Engineering Services (USAF) The contractor will perform activities and tasks described in the PWS. The applicable PWS paragraphs are described in the Microsoft Excel spreadsheet attachment in Section J titled "Attachment D - CLIN breakdown".
Single Point of Contact; Status Reports and Closing Letters Telephone Logs; Conference Attendance/Support;Program Management Meetings;24/7 Emergency support;GIDEP;7X7 Airworthiness/Service Publication;Maintenance of C/KC135 Inspection Requirements Documents; andSEMP
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
ISO 9001-2008 2008
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Base - Year 1
Program Manager (PM) Required Period of Performance
12 LO TBC
Proposed Period of Performance
12 LO
Base - Year 1
Maintenance Line Support Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Estimated Total Price
12 LO
CLIN ACRN ACRN Total
0002 AA
R425 Recurring Engineering Services (USAF) The contractor will perform activities and tasks described in the PWS. The applicable PWS paragraphs are described in the Microsoft Excel spreadsheet attachment in Section J titled "Attachment D - CLIN breakdown".
PDM On-Site Liason Engineers , Backshop On-Site Liason Engineers;Engineering Drawing / Data Management;
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
12 LO TBC
Proposed Period of Performance
12 LO
Base - Year 1
Engineering Maintenance Support Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Estimated Total Price
12 LO
CLIN ACRN ACRN Total
0003 AA
R425 Recurring Engineering Services (USAF) The contractor will perform activities and tasks described in the PWS. The applicable PWS paragraphs are described in the Microsoft Excel spreadsheet attachment in Section J titled "Attachment D - CLIN breakdown".
Liason Engineering Support for Advanced PDM Evaluation and Planning;Conversion of Duplicate AFMC Form 202;Maintenance /Sustainment of Historical Files
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
12 LO TBC
Proposed Period of Performance
12 LO
Base - Year 1
Response to Technical Inquiries (RTIs) Item No.
Cost Plus Fixed Fee Estimated Quantity
U/I Estimated Cost Fixed Fee Est Total Cost
12 LO
CLIN ACRN ACRN Total
0004 AA
R425 Recurring Engineering Services (USAF)
Base - Year 1
Response to Technical Inquiries (RTIs) The contractor will perform activities and tasks described in the PWS. The applicable PWS paragraphs are described in the Microsoft Excel spreadsheet attachment in Section J titled "Attachment D - CLIN breakdown".
Liason Engineering Support for Advanced PDM Evaluation and Planning;Conversion of Duplicate AFMC Form 202;Maintenance /Sustainment of Historical Files
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
12 LO TBC
Proposed Period of Performance
12 LO
Base - Year 1
RTI Material Item No.
Cost Reimbursement - No Fee Estimated Quantity
U/I Est Unit Cost Total Estimated Cost
12 LO
CLIN ACRN ACRN Total
0005 AA
R425 Recurring Engineering Services (USAF) The contractor will perform activities and tasks described in the PWS. The applicable PWS paragraphs are described in the Microsoft Excel spreadsheet attachment in Section J titled "Attachment D - CLIN breakdown".
The contractor may be required to perform RTI efforts such as site surveys, engineering design, technical data development, TCTO preparation, fabrication, kit procurement, installation, testing, military certification efforts, and delivery of reports that require the procurement of material.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF
Base - Year 1
RTI Material Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
12 LO TBC
Proposed Period of Performance
12 LO
Base - Year 1
Aircraft Structural Integrity Program (ASIP) Item No.
Cost Plus Fixed Fee Estimated Quantity
U/I Estimated Cost Fixed Fee Est Total Cost
12 LO
CLIN ACRN ACRN Total
0006 AA
R425 Recurring Engineering Services (USAF) The contractor will perform activities and tasks described in the PWS. The applicable PWS paragraphs are described in the Microsoft Excel spreadsheet attachment in Section J titled "Attachment D - CLIN breakdown".
ASIP; IATP Minor Mods
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of
Base - Year 1
Aircraft Structural Integrity Program (ASIP)
12 LO TBC
Proposed Period of Performance
12 LO
Base - Year 1
Weapon System Integrity Program (WSIP) Support Item No.
Cost Plus Fixed Fee Estimated Quantity
U/I Estimated Cost Fixed Fee Est Total Cost
12 LO
CLIN ACRN ACRN Total
0007 AA
R425 Recurring Engineering Services (USAF) The contractor will perform activities and tasks described in the PWS. The applicable PWS paragraphs are described in the Microsoft Excel spreadsheet attachment in Section J titled "Attachment D - CLIN breakdown".
WSIP (Weapon System Integrity Program Support);CPCP (Corrosion Prevention Control Program);SWG (Structures Working Group); MECSIP (Mechanical Systems Integrity Program) AST
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
12 LO TBC
Proposed Period of
Base - Year 1
Training Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Estimated Total Price
2 EA
CLIN ACRN ACRN Total
0008 AA
R425 Recurring Engineering Services (USAF) The contractor will perform activities and tasks described in the PWS. The applicable PWS paragraphs are described in the Microsoft Excel spreadsheet attachment in Section J titled "Attachment D - CLIN breakdown".
The contractor shall instruct a 40-hour KC-135 Liaison Engineering Training Class to incoming government employees with a program curriculum of concepts and principles of structural repairs to the KC-135 airframe.
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
2 EA TBC
Proposed Period of Performance
2 EA
Base - Year 1
Support for Big Safari Aircraft Item No.
Cost Plus Fixed Fee Estimated Quantity
U/I Estimated Cost Fixed Fee Est Total Cost
12 LO
CLIN ACRN ACRN Total
0009 AA
Base - Year 1
Support for Big Safari Aircraft The contractor will perform activities and tasks described in the PWS. The applicable PWS paragraphs are described in the Microsoft Excel spreadsheet attachment in Section J titled "Attachment D - CLIN breakdown".
Support for Big Safari Aircraft (NC/RC/TC/WC-135/KC-135R)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
12 LO TBC
Proposed Period of Performance
12 LO
Base - Year 1
Big Safari RTI Material Item No.
Cost Reimbursement - No Fee Estimated Quantity
U/I Est Unit Cost Total Estimated Cost
1 LO
CLIN ACRN ACRN Total
0010 AA
R425 Recurring Engineering Services (USAF) The contractor will perform activities and tasks described in the PWS. The applicable PWS paragraphs are described in the Microsoft Excel spreadsheet attachment in Section J titled "Attachment D - CLIN breakdown".
The contractor may be required to perform RTI efforts such as site surveys, engineering design, technical data development, TCTO preparation, fabrication, kit procurement, installation, testing, military certification efforts, and delivery of reports that require the procurement of material.
Limitations of Liability: Other Than High Value Item
Inspection: Destination
Base - Year 1
Big Safari RTI Material Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
DATA
Information Only Item No.
Not Separately Priced Quantity U/I Unit Price
12 LO NSP
DATA
Associated with LI: AA01 Data Contractor shall provide the data identified in Section J, Exhibit AA in accordance with the Performance Work Statement hereof.
The Government shall have unlimited rights to all test materials, documents, notes, records, and software documentation meeting the criteria specified in DFARS 252.227-7015 (b)(1). The costs associated with data are included in CLINS 0001, 0002, 0003, 0004, 0005, and 0006.
Exhibit: AA
Base - Year 1
Tech Order Pages Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Estimated Total Price
230 ZP
CLIN ACRN ACRN Total
0012 AA
R425 Recurring Engineering Services (USAF) The contractor will perform activities and tasks described in the PWS. The applicable PWS paragraphs are described in the Microsoft Excel spreadsheet attachment in Section J titled "Attachment D - CLIN breakdown".
Unit of Issue ZP = page
Base - Year 1
Tech Order Pages
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
230 ZP TBC
Proposed Period of Performance
230 ZP
Base - Year 1
Tech Order Pages Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Estimated Total Price
230 ZP
CLIN ACRN ACRN Total
0013 AA
R425 Recurring Engineering Services (USAF) The contractor will perform activities and tasks described in the PWS. The applicable PWS paragraphs are described in the Microsoft Excel spreadsheet attachment in Section J titled "Attachment D - CLIN breakdown".
Unit of Issue ZP = page
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Base - Year 1
Tech Order Pages Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
230 ZP TBC
Proposed Period of Performance
230 ZP
Base - Year 1
Tech Order Pages Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Estimated Total Price
230 ZP
CLIN ACRN ACRN Total
0014 AA
R425 Recurring Engineering Services (USAF) The contractor will perform activities and tasks described in the PWS. The applicable PWS paragraphs are described in the Microsoft Excel spreadsheet attachment in Section J titled "Attachment D - CLIN breakdown".
Unit of Issue ZP = page
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
230 ZP TBC
Proposed
Base - Year 1
Tech Order Pages
230 ZP
Base - Year 1
Tech Order Pages Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Estimated Total Price
230 ZP
CLIN ACRN ACRN Total
0015 AA
R425 Recurring Engineering Services (USAF) The contractor will perform activities and tasks described in the PWS. The applicable PWS paragraphs are described in the Microsoft Excel spreadsheet attachment in Section J titled "Attachment D - CLIN breakdown".
Unit of Issue ZP = page
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
230 ZP TBC
Proposed Period of Performance
230 ZP
Base - Year 1
Travel in Support of Recurring Engineering Services (CR-NF) Item No.
Cost Reimbursement - No Fee Estimated Quantity
U/I Est Unit Cost Total Estimated Cost
Base - Year 1
Travel in Support of Recurring Engineering Services (CR-NF)
12 LO
CLIN ACRN ACRN Total
0016 AA
R425 Recurring Engineering Services (USAF) The contractor will perform activities and tasks described in the PWS. The applicable PWS paragraphs are described in the Microsoft Excel spreadsheet attachment in Section J titled "Attachment D - CLIN breakdown".
Contractor shall travel in accordance with Joint Travel Regulations
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
12 LO TBC
Proposed Period of Performance
12 LO
Proposal Preparation
See CLIN 0117 Item No.
Firm Fixed Price Quantity U/I Unit Price Amount 1 LO To be Negotiated
CLIN ACRN ACRN Total
0017 AA
R425 Recurring Engineering Services (USAF) The contractor will perform activities and tasks described in the PWS. The applicable PWS paragraphs are described in the Microsoft Excel spreadsheet attachment in Section J titled "Attachment D - CLIN breakdown".
Pricing for this effort will be established on CLIN 0117 for BASE YEAR 2.
Limitations of Liability: Other Than High Value Item
Proposal Preparation
See CLIN 0117
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of Performance
1 LO
Base - Year 1 -- Time & Material (T&M)
Non-Recurring Engineering Services Item No.
Time & Material Estimated Quantity
U/I Fixed Rate Ceiling Price
1 LO To be Negotiated
R425 This CLIN is to support emergency situations.
The proposal shall include pricing input into Attachment E.
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
1 LO TBC
Proposed Period of
1 LO
Base - Year 1 -- Firm Fixed Price (FFP)
Non-Recurring Engineering Services Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Estimated Total Price
12 LO To be Negotiated
CLIN ACRN ACRN Total
0030 AA
R425
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Firm Fixed Price (FFP)
Non-Recurring Engineering Services Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Estimated Total Price
12 LO To be Negotiated
CLIN ACRN ACRN Total
0031 AA
R425
Limitations of Liability: Other Than High Value Item
Inspection: Destination
Base - Year 1 -- Firm Fixed Price (FFP)
Non-Recurring Engineering Services Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Firm Fixed Price (FFP)
Non-Recurring Engineering Services Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Estimated Total Price
12 LO To be Negotiated
CLIN ACRN ACRN Total
0032 AA
R425
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of
+ TBC LO TBC
Base - Year 1 -- Firm Fixed Price (FFP)
Non-Recurring Engineering Services Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Firm Fixed Price (FFP)
Non-Recurring Engineering Services Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Estimated Total Price
12 LO To be Negotiated
CLIN ACRN ACRN Total
0033 AA
R425
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Firm Fixed Price (FFP)
Non-Recurring Engineering Services Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Estimated Total Price
12 LO To be Negotiated
Base - Year 1 -- Firm Fixed Price (FFP)
Non-Recurring Engineering Services CLIN ACRN ACRN Total
0034 AA
R425
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Fixed Price Incentive Fee (FPIF)
Non-Recurring Engineering Services Item No.
Incentive Firm Target Estimated Quantity
U/I Target Cost Target Profit Target Price
12 LO To be Negotiated
CLIN ACRN ACRN Total
0035 AA
R425
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Base - Year 1 -- Fixed Price Incentive Fee (FPIF)
Non-Recurring Engineering Services Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Fixed Price Incentive Fee (FPIF)
Non-Recurring Engineering Services Item No.
Incentive Firm Target Estimated Quantity
U/I Target Cost Target Profit Target Price
12 LO To be Negotiated
CLIN ACRN ACRN Total
0036 AA
R425
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of
+ TBC LO
Base - Year 1 -- Fixed Price Incentive Fee (FPIF)
Non-Recurring Engineering Services Item No.
Incentive Firm Target Estimated Quantity
U/I Target Cost Target Profit Target Price
12 LO To be Negotiated
CLIN ACRN ACRN Total
0037 AA
R425
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Fixed Price Incentive Fee (FPIF)
Non-Recurring Engineering Services Item No.
Incentive Firm Target Estimated Quantity
U/I Target Cost Target Profit Target Price
12 LO To be Negotiated
CLIN ACRN ACRN Total
0038 AA
R425
Limitations of Liability: Other Than High Value Item
Inspection: Destination
Base - Year 1 -- Fixed Price Incentive Fee (FPIF)
Non-Recurring Engineering Services Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Fixed Price Incentive Fee (FPIF)
Non-Recurring Engineering Services Item No.
Incentive Firm Target Estimated Quantity
U/I Target Cost Target Profit Target Price
12 LO To be Negotiated
CLIN ACRN ACRN Total
0039 AA
R425
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of
Base - Year 1 -- Fixed Price Incentive Fee (FPIF)
Non-Recurring Engineering Services Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Cost Plus Fixed Fee (CPFF)
Non-Recurring Engineering Services Item No.
Cost Plus Fixed Fee Estimated Quantity
U/I Estimated Cost Fixed Fee Est Total Cost
12 LO To be Negotiated
CLIN ACRN ACRN Total
0040 AA
R425
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Cost Plus Fixed Fee (CPFF)
Non-Recurring Engineering Services Item No.
Cost Plus Fixed Fee Estimated Quantity
U/I Estimated Cost Fixed Fee Est Total Cost
Base - Year 1 -- Cost Plus Fixed Fee (CPFF)
Non-Recurring Engineering Services CLIN ACRN ACRN Total
0041 AA
R425
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Cost Plus Fixed Fee (CPFF)
Non-Recurring Engineering Services Item No.
Cost Plus Fixed Fee Estimated Quantity
U/I Estimated Cost Fixed Fee Est Total Cost
12 LO To be Negotiated
CLIN ACRN ACRN Total
0042 AA
R425
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Base - Year 1 -- Cost Plus Fixed Fee (CPFF)
Non-Recurring Engineering Services Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Cost Plus Fixed Fee (CPFF)
Non-Recurring Engineering Services Item No.
Cost Plus Fixed Fee Estimated Quantity
U/I Estimated Cost Fixed Fee Est Total Cost
12 LO To be Negotiated
CLIN ACRN ACRN Total
0043 AA
R425
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of
Base - Year 1 -- Cost Plus Fixed Fee (CPFF)
Non-Recurring Engineering Services Item No.
Cost Plus Fixed Fee Estimated Quantity
U/I Estimated Cost Fixed Fee Est Total Cost
12 LO To be Negotiated
CLIN ACRN ACRN Total
0044 AA
R425
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Cost Plus Incentive Fee (CPIF)
Non-Recurring Engineering Services Item No.
Cost Plus Incentive Fee Estimated Quantity
U/I Est Target Cost Target Fee Total Estimated Cost
12 LO To be Negotiated
CLIN ACRN ACRN Total
0045 AA
R425
Limitations of Liability: Other Than High Value Item
Inspection: Destination
Base - Year 1 -- Cost Plus Incentive Fee (CPIF)
Non-Recurring Engineering Services Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Cost Plus Incentive Fee (CPIF)
Non-Recurring Engineering Services Item No.
Cost Plus Incentive Fee Estimated Quantity
U/I Est Target Cost Target Fee Total Estimated Cost
12 LO To be Negotiated
CLIN ACRN ACRN Total
0046 AA
R425
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of
Base - Year 1 -- Cost Plus Incentive Fee (CPIF)
Non-Recurring Engineering Services Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Cost Plus Incentive Fee (CPIF)
Non-Recurring Engineering Services Item No.
Cost Plus Incentive Fee Estimated Quantity
U/I Est Target Cost Target Fee Total Estimated Cost
12 LO To be Negotiated
CLIN ACRN ACRN Total
0047 AA
R425
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Cost Plus Incentive Fee (CPIF)
Non-Recurring Engineering Services Item No.
Cost Plus Incentive Fee Estimated Quantity
U/I Est Target Cost Target Fee Total Estimated Cost
Base - Year 1 -- Cost Plus Incentive Fee (CPIF)
Non-Recurring Engineering Services CLIN ACRN ACRN Total
0048 AA
R425
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Cost Plus Incentive Fee (CPIF)
Non-Recurring Engineering Services Item No.
Cost Plus Incentive Fee Estimated Quantity
U/I Est Target Cost Target Fee Total Estimated Cost
12 LO To be Negotiated
CLIN ACRN ACRN Total
0049 AA
R425
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Base - Year 1 -- Cost Plus Incentive Fee (CPIF)
Non-Recurring Engineering Services Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Firm Fixed Price (FFP)
FMS -- France RTI / Rapid Response Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Estimated Total Price
12 LO To be Negotiated
CLIN ACRN ACRN Total
0050 AA
R425
FMS
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Foreign Military Sales :FMS Case:
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of
Base - Year 1 -- Firm Fixed Price (FFP)
FMS -- France ASIP Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Estimated Total Price
12 LO To be Negotiated
CLIN ACRN ACRN Total
0051 AA
R425
FMS
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Cost Plus Fixed Fee (CPFF)
FMS -- France RTI / Rapid Response Item No.
Cost Plus Fixed Fee Estimated Quantity
U/I Estimated Cost Fixed Fee Est Total Cost
12 LO To be Negotiated
CLIN ACRN ACRN Total
0052 AA
R425
FMS
Base - Year 1 -- Cost Plus Fixed Fee (CPFF)
FMS -- France RTI / Rapid Response
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Cost Plus Fixed Fee (CPFF)
FMS -- France ASIP Item No.
Cost Plus Fixed Fee Estimated Quantity
U/I Estimated Cost Fixed Fee Est Total Cost
12 LO To be Negotiated
CLIN ACRN ACRN Total
0053 AA
R425
FMS
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Place of Perf Quantity (U/I) To be cited on individual orders issued
Base - Year 1 -- Cost Plus Fixed Fee (CPFF)
FMS -- France ASIP Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Firm Fixed Price (FFP)
FMS -- France -- Program Manager (PM) Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Estimated Total Price
12 LO To be Negotiated
CLIN ACRN ACRN Total
0054 AA
R425
FMS
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of
Base - Year 1 -- Cost Plus Fixed Fee (CPFF)
FMS -- France -- Program Manager (PM) Item No.
Cost Plus Fixed Fee Estimated Quantity
U/I Estimated Cost Fixed Fee Est Total Cost
12 LO To be Negotiated
CLIN ACRN ACRN Total
0055 AA
R425
FMS
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Firm Fixed Price (FFP)
FMS -- France -- Proposal Preparation Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Estimated Total Price
12 LO To be Negotiated
CLIN ACRN ACRN Total
0056 AA
R425
Base - Year 1 -- Firm Fixed Price (FFP)
FMS -- France -- Proposal Preparation
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Firm Fixed Price (FFP)
FMS -- France Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Estimated Total Price
12 LO To be Negotiated
CLIN ACRN ACRN Total
0057 AA
R425
FMS
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Place of Perf Quantity (U/I) To be cited on individual orders issued
Base - Year 1 -- Firm Fixed Price (FFP)
FMS -- France Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Fixed Price Incentive Fee (FPIF)
FMS - France Item No.
Incentive Firm Target Estimated Quantity
U/I Target Cost Target Profit Target Price
12 LO To be Negotiated
CLIN ACRN ACRN Total
0058 AA
R425
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of
Non Recurring Engineering Services - Cost Plus Fixed Fee (CPFF)
FMS - France Item No.
Cost Plus Fixed Fee Estimated Quantity
U/I Estimated Cost Fixed Fee Est Total Cost
12 LO To be Negotiated
CLIN ACRN ACRN Total
0059 AA
R425
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Cost Plus Incentive Fee (CPIF)
FMS - France Item No.
Cost Plus Incentive Fee Estimated Quantity
U/I Est Target Cost Target Fee Total Estimated Cost
12 LO To be Negotiated
CLIN ACRN ACRN Total
0060 AA
Base - Year 1 -- Cost Plus Incentive Fee (CPIF)
FMS - France
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Firm Fixed Price (FFP)
FMS -- Turkey -- RTI / Rapid Response Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Estimated Total Price
12 LO To be Negotiated
CLIN ACRN ACRN Total
0061 AA
R425
FMS
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Place of Perf Quantity (U/I) To be cited on individual orders issued
Base - Year 1 -- Firm Fixed Price (FFP)
FMS -- Turkey -- RTI / Rapid Response Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Firm Fixed Price (FFP)
FMS -- Turkey -- ASIP Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Estimated Total Price
12 LO To be Negotiated
CLIN ACRN ACRN Total
0062 AA
R425
FMS
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of
Base - Year 1 -- Cost Plus Fixed Fee (CPFF)
FMS -- Turkey -- RTI / Rapid Response Item No.
Cost Plus Fixed Fee Estimated Quantity
U/I Estimated Cost Fixed Fee Est Total Cost
12 LO To be Negotiated
CLIN ACRN ACRN Total
0063 AA
R425
FMS
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Cost Plus Fixed Fee (CPFF)
FMS -- Turkey -- ASIP Item No.
Cost Plus Fixed Fee Estimated Quantity
U/I Estimated Cost Fixed Fee Est Total Cost
12 LO To be Negotiated
CLIN ACRN ACRN Total
0064 AA
R425
Base - Year 1 -- Cost Plus Fixed Fee (CPFF)
FMS -- Turkey -- ASIP
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Base - Year 1 -- Firm Fixed Price (FFP)
FMS -- Turkey -- Program Manager (PM) Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Estimated Total Price
12 LO To be Negotiated
CLIN ACRN ACRN Total
0065 AA
R425
FMS
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Place of Perf Quantity (U/I) To be cited on individual orders issued
Base - Year 1 -- Firm Fixed Price (FFP)
FMS -- Turkey -- Program Manager (PM) Required Period of Performance
+ TBC LO TBC
Proposed Period of Performance
+ TBC LO
Non Recurring Engineering Services - Cost Plus Fixed Fee (CPFF)
FMS -- Turkey -- Program Manager (PM) Item No.
Cost Plus Fixed Fee Estimated Quantity
U/I Estimated Cost Fixed Fee Est Total Cost
12 LO To be Negotiated
CLIN ACRN ACRN Total
0066 AA
R425
FMS
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Place of Perf Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Period of Performance
+ TBC LO TBC
Proposed Period of
Base - Year 1 -- Firm Fixed Price (FFP)
FMS -- Turkey -- Proposal Preparation Item No.
Firm Fixed Price Estimated Quantity
U/I Unit Price Estimated Total Price
12 LO To be Negotiated
CLIN ACRN ACRN Total
0067 AA
R425
FMS
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below.