This document is a Performance Work Statement (PWS) for the disassembly, transport, and staging of fitness equipment from three fitness centers located at Tinker Air Force Base, Oklahoma to the 72nd Force Support Squadron (FSS) warehouse.
The key requirements include disassembling 62 pieces of aerobic equipment from three fitness centers and transporting them to the 72nd FSS warehouse located within 3 miles. The contractor will be responsible for providing all necessary personnel, equipment, tools, materials, vehicles, and supervision to complete the services. The work is to be performed during normal business hours, Monday through Friday, with the option for weekend work if agreed upon with the government. The contractor must have employees certified to handle the material handling, transportation, loading, unloading, and installation tasks in compliance with OSHA and base safety requirements. The contractor will also be required to secure the work area, retrieve identification media, and comply with base security and safety protocols. The government will provide access, storage/staging space, and coordination of the installation schedule. The contract duration is from September 10, 2024 to November 19, 2024.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE-BASED WORK STATEMENT (PWS)
FOR
72ND FSS FITNESS CENTERS EQUIPMENT MOVE SERVICE
72ND FSS/FSVS TINKER AFB, OK 73145
10 SEPTEMBER 2024
19 November 2024 Version 2
Revision Date Description of Revision Paragraphs Affected
001 11.4.24 Added Equipment List Page 4 & 6
002 11.19.24 Revise 2.3.2 & 8.1 Delete 8.2 Page 6
PERFORMANCE-BASED WORK STATEMENT
TABLE OF CONTENTS
SECTION PAGE
1 DESCRIPTION OF SERVICES 3
2 REQUIREMENTS 3
3 GOVERNMENT FURNISHED EQUIPMENT (GFE) 4
4 DELIVERABLES 4
5 SPECIAL REQUIREMENTS 4
6 SECURITY REQUIREMENTS 4
7 SAFETY 5
8 DELIVERY 6
9 APPENDICES 6
1. DESCRIPTION OF SERVICES.
1.1. OBJECTIVE. The objective is to purchase a service from a vendor to remove aerobics equipment from bldg. 216, 3705 and 6004. The equipment will be moved to 72d FSS Warehouse at bldg 478 located no more than 3 miles from the three Fitness Centers. The total number of pieces to be disassemble moved is 62.
1.2. SERVICES: The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items necessary for the disassemble, removal/load, transport, and unload of all aerobics equipment at bldg. 478. The total number of pieces to be moved is 62.
1.3. BASIC SERVICES. The contractor shall be responsible to provide all necessary services for equipment removal and relocation for 72d FSS/FSVS. Contractor will perform a pre and post-performance inspection with customer after completion of outlined work contained in
PWS.
2. REQUIREMENTS:
2.1. Disassemble of equipment, removal/load, and transport from Gerrity Fitness Center bldg.
6004, 3705 Fitness Center, Bldg. 216 Annex Fitness center, and the equipment will be moved to bldg.478. With the distances from each location being a mile, a half mile and 3 miles respectively.
2.2. Disassemble, Remove/Load, Transport, and Unload and moved to bldg.478.
2.2.1 Contractor shall prepare ALL designated fitness equipment for removal from above-listed facilities.
2.2.2. Contractor shall safely secure removed equipment on contractor-provided vehicle in preparation for transport to designated receiving facility bldg.478.
2.3.1. Contractor will be available and provide Technical Services when requested by customer during normal duty hours 8:00am to 5:00pm Monday through Friday, excluding federal holidays.
2.3.2. Service will be scheduled in advance with the base. It will occur during Normal business hours, Monday through Friday from 8:00 am to 5:00pm, and Weekends if agreed upon with POC.
2.3.4. Any issues causing a delay or work stoppage shall be addressed within 24 hours of notification to minimize down-time and reduce the risk to AF resources.
3. GOVERNMENT FURNISHED EQUIPMENT (GFE) and SUPPORT:
3.1. Contractor will acquire any related permits that may be necessary for work performed.
3.2. Arrange access for installation into all applicable facilities in conformance with the installation schedule.
3.3. Provide storage space/staging area and adequate operating space for the move/disassemble team until completion of the contract.
3.4. Government Observations, other government personnel with Contracting Officer coordination, may observe Contractor operations. However, these personnel may not interfere with Contractor performance or make any changes to the contract.
4. DELIVERABLES:
Contractor format for the deliverables is subject to Government acceptance. All deliverables shall be produced using recommended and/or specified software tools/versions as accepted by the Government. All documentation, data generation, data, test materials, documents notes, records, software tools acquired and/or software produced by the Contractor under this PWS shall become the property of the U.S, Government which shall have unlimited rights to all materials and determine the scope of publication and distribution. The contractor shall be required to deliver electronic copies of all documents, notes, records and software to the Government upon termination of the contract services or expiration of the contract period. To the fullest extent possible, the Contractor shall use processes taking full advantage of electronic storage, distribution and manipulation of information.
5. SPECIAL REQUIREMENTS:
5.1. The Contractor will assign employees who possess certification to handle all required material handling, transportation, loading, unloading and product installation tasks to meet OSHA, base safety requirements and certification standards. The Contractor will ensure product meets required safety standards at the time the project is finished and accepted by the customer. If applicable, Contractor shall provide the standard commercial product warranty certificate specifying warranty period for work performed.
6. SECUIRTY REQUIREMENTS:
6.1. Ten duty days prior to arrival, the Contractor shall mail or fax a visit authorization Letter to the installation site POC listing the name, driver’s license number and state of issue, date of birth and place of birth of the individuals who will be working on the base.
Contractor will be responsible for obtaining written permission/signature from each person’s name submitted for a background check to be completed. If a background check cannot be completed, entry onto the installation cannot be granted. Contact the installation site POC for further guidance.
6.2. Retrieving Identification Media. The Contractor shall be responsible for retrieving all identification media including vehicle passes from employees who depart for any reason before the contract expires e.g. terminate for cause, retirement, etc.
6.3. Contractor and employees shall comply with base traffic regulations.
6.4. Weapons, Firearms, Ammunition. Contractor employees are prohibited from possessing weapons, firearms or ammunition on themselves or within their contractor or privately owned vehicles while on base.
6.5. The Contractor shall be responsible for safeguarding all government property and controlled forms provided for contractor use. At the end of each work period, Contractor shall secure all Government facilities, equipment and materials.
7. SAFETY:
7.1. Safety. The Contractor shall have a safety plan for their employees. The Contractor shall instruct each employee in the recognition and avoidance of unsafe conditions and regulations to his or her work environment to control or eliminate any hazards or other exposure to illness or injury.
7.2. Accident/Incident Reporting and Investigation. Contractor shall record and report to the Dining Facility POC all available facts relating to each instance of accidental damage to Government property or injury to either Contractor or Government personnel.
The Contractor shall secure the accident scene and wreckage until released by the accident investigative authority through the Dining Facility POC. If the Government elects to conduct an investigation of the incident, the Contractor shall cooperate fully and assist the Government personnel until the investigation is completed.
8. DELIVERY:
8.1.Upon award, the contractor shall have 24 hours to coordinate a schedule with the
Point of Contact (POC).
9. APPENDICES
A. ACRONYMS AND ABBREVIATIONS LIST
APPENDIX A
ACRONYMS AND ABBREVIATIONS LIST
Acronym/Abbreviation Definition
AF Air Force
AFB Air Force Base
AFMC Air Force Material Command
CAC Common Access Card
CFR Code Federal Regulation
DEPT Department
DOD Department of Defense
FAR Federal Acquisition Regulation
GR Government Representative
OSHA Occupational Safety and Health Act
PWS Performance-Based Work Statement
QA Quality Assurance
USAF United States Air Force
Equipment List 3705 Fitness Center (Bldg. 3705)
Gerrity Fitness Center (Bldg. 6004) 216 Annex (Bldg. 216)
Life Fitness Treadmills 9 3 8 Life Fitness Ellipticals 7 3 13 Life Fitness Recumbent Bike 5 1 4 Life Fitness Upright Bike 4 0 4