SLIDES_NEXTGEN IACMAC_INDUSTRY DAY_VIRTUAL_261104.pptx

PPTX presentation 14 MB Posted

Attached to
NextGen IACMAC Industry Day - VIRTUAL
Solicitation number
FA807527R0001-NextGen_IACMAC_Industry_Day
Issued by

About this file

This file contains presentation slides from a virtual industry day briefing for the NextGen IACMAC (Information Analysis Centers Multiple Award Contract), hosted by the Defense Technical Information Center on November 4, 2026. The NextGen IACMAC is a $160 billion IDIQ contract ceiling vehicle designed to accelerate research and development delivery across six Critical Technology Areas: Applied Artificial Intelligence (AAI), Quantum & Battlefield Information Dominance (Q-BID), Contested Logistics Technologies (LOG), Scaled Hypersonics (SHY), Scaled Directed Energy (SCADE), and Biomanufacturing (BIO). The contract includes 35 Technical Focus Areas across these CTAs plus 11 foundational areas supporting all CTAs. The vehicle builds upon the existing $48 billion IACMAC IDIQ and targets accelerated research awards with a 5-month-or-less timeframe from requirement to task order award.

The contract structure includes two pools: Pool 1 (Full and Open) for offerors responding to a minimum of two CTAs or the BIO CTA with certified lab requirements, and Pool 2 (Small Business Set-Aside) for offerors responding to a minimum of one CTA or providing SBIR/STTR evidence. Task orders will be issued under both Cost-Plus-Fixed-Fee and Firm-Fixed-Price arrangements with periods of performance up to 48 months and a 10-year ordering period. Mandatory requirements include facility clearance (Interim or Top Secret), small business participation thresholds based on obligated dollars, approved accounting systems (for CPFF task orders), CMMC Level II certification (Pool 1 only), and acceptable past performance ratings on submitted CTAs. The Government intends to award to all qualifying offerors based on past performance ("Substantial" rating minimum), technical approach ("Good" or "Outstanding" minimum), and mandatory requirements; cost/price will not be evaluated. The acquisition timeline includes Draft RFP release November 20, 2026; Final RFP release December 14, 2026; proposal due date February 1, 2027; and target awards June 24, 2027. Expanded access provisions eliminate some MAC-level certification requirements (ISO 9000, approved accounting systems at MAC level), allow non-government past performance references, and include on-ramp opportunities for SBIR/STTR firms and small businesses with defined scope requirements or successful Pool 2 performance.

View the file

Other files

File Type Posted
NextGen-IACMAC-Flyer.pdf PDF
CT Event - Oct 2026.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Virtual Industry Day | 4 November 2026

NEXTGEN

IACMAC

Defense Technical Information Center | Brent Ishizaki and Rebecca Robeson The next chapter of DoW research, development, and innovation. Built with industry.

NEXTGEN IACMAC | Virtual Industry Day | 4 November 2026

Today's Agenda

The case for NEXTGEN IACMAC What is changing Roadmap and evaluation How to prepare Q&A

The Bottom Line

NEXTGEN IACMAC puts the nation's best research talent on the warfighter's toughest problems, faster. We want you in it.

Why now The pace of technology outruns legacy contracting.

What changes A faster, more open vehicle built around performers.

How you win Clear pools, clear criteria, clear timeline.

Why Now

The threat is moving fast Strategic competitors are racing ahead. Speed is now a capability.

Discovery must reach the field Too many breakthroughs stall between the lab and the warfighter. We are here to close that gap.

Knowledge is a force multiplier A connected research enterprise lets every dollar of R&D work harder for the Department.

A Foundation Built Together

Significant Deliveries Deliveries already span all six Critical Technology Areas

Deliveries already span all six Critical Technology Areas

Deliveries Scaled Directed Energy (SCADE) Scaled Hypersonics (SHY) Biomanufacturing (BIO) Contested Logistics Tech (LOG) Quantum & Battlefield Info Dominance (Q-BID) Applied AI (AAI) Multiple / cross-cutting 1.9E-2 1.9E-2 4.8000000000000001E-2 0.114 0.17100000000000001 0.30499999999999999 0.32400000000000001

Significant Types of Deliveries

Deliveries Other (process, authorizations) Test and evaluation results Analyses, models, data packages Fielded or integrated systems Prototypes and demonstrators Software, tools, algorithms 3.9215686274509803E-2 7.8431372549019607E-2 0.12418300653594772 0.13725490196078433 0.27450980392156865 0.34640522875816993 The Scale of the Opportunity

[$48B] [$160B] IACMAC IDIQ value today The foundation we are building on.

NEXTGEN IACMAC ceiling

What Is Changing

Purpose-built Pools Align research requirements with qualified technical performers

Accelerated Research Awards

Target: 5 Months or less Streamlined Task Order processes reduce the time from requirement to award.

Broader Access to Innovation

Deliberate pathways for small businesses, nontraditional firms, and SBIR/STTR performers.

Research Integrity

Acquisition safeguards reinforce substantive R&D performance and technical accountability.

Get the right research capability to the right warfighter problem, faster, while preserving the value of the research investment.

NEXTGEN IACMAC:

CTAs and Foundational Areas

Layer 1: Critical Technology Areas — 35 TFAs, priority portfolios from research to scaled production

AAI

Applied Artificial Intelligence 6 TFAs

Q-BID

Quantum & Battlefield Information Dominance

LOG

Contested Logistics Technologies

SHY

Scaled Hypersonics 5 TFAs

SCADE

Scaled Directed Energy

BIO

Biomanufacturing

Layer 2: Foundational Areas — Foundations that serve every CTA M&S & Digital Engineering Cybersecurity Software, Data & Knowledge Management Autonomous & Unmanned Systems C4ISR & Sensing Weapons, Energetics & Survivability Advanced Materials RMQSI & Test/Evaluation CBRNE & WMD Defense Biometrics Medical & Human Performance

Pool 1 Pool 2 Full and Open Small Business Set-Aside

Former Pool 3 - no longer a separate pool or vehicle -Lab requirements will be addressed at the Task Order level. FOPRs will specify what is required, what regulatory requirements prime must have or whether subcontractor access will do.

-Qualification purposes, companies with certified laboratories can qualify by providing evidence of such certification and need only respond to the BIO CTA.

X# of TFAs Requirements over $35M with scheduled automatic increase mechanism CPFF and FFP requirements 10-year ordering period - Periods of performance up to 48 mos BIO Lab requirements at TO X# of TFAs Requirements under $35M with scheduled automatic increase mechanism CPFF and FFP requirements 10-year ordering period - Periods of performance up to 48 mos BIO Lab requirements at TO Evidence of SB status required for TO award Contract Structure

What Is Changing

The NEXTGEN IACMAC will deliver tailored dashboards that give each stakeholder timely, accurate, and relevant insights enabling faster task-order issuance, smarter resource allocation, stronger performance oversight, and better-aligned decisions across the ecosystem.

Strategic overview designed for DoW senior leaders and DTIC leadership. Focuses on enterprise-level performance, value delivered, risks, and high-level trends.

Operational dashboard for DoW Program Managers, CORs, Technical POCs, and Contracting personnel who actively use the IAC MAC vehicle to award and manage task orders.

Simple, self-service dashboard that allows each vendor to view their own task order data, performance, and metrics.

Every kind of innovator belongs here.

Established primes

Scale, integration, and proven delivery.

Small businesses

Agility and fresh ideas, including SBIR and STTR firms.

Universities and nonprofits

Deep research and emerging talent.

Nontraditional entrants

New technology from outside the usual defense base.

Who We Need

All dates are planning targets and subject to change.

Draft RFP release 20 Nov 2026

Industry feedback 30 Nov 2026 Final RFP release 14 Dec 2026 Proposals due 1 Feb 2027 Awards 24 Jun 2027 Industry Day (Virtual) 4 Nov 2026

You are here The Road to Award

Intend to Award to All Qualifying Offerors

Draft approach. The final criteria and their relative importance are set in the RFP.

Mandatory Requirements

Acceptable/Pass on each requirement

Past performance

"Substantial" Rating on the minimum number of CTA response

Technical approach

“Good” or “Outstanding” on minimum number of CTA response

Cost/Price

Will not be evaluated

Framework of CTA paths to qualify

Pool 1 Pool 2 Full and Open Partial Small Business Set-Aside Offeror chooses minimum of 2 CTA to provide response (provide scenario response and PP reference for each CTA)

OR

Offeror responds to BIO CTA and provides evidence of meeting lab requirement

Offeror choose minimum of 1 CTA to provide response (provide scenario response and PP reference for each CTA)

OR

Offeror provides SBIR/STTR evidence

Mandatory Requirements

Small Business Participation Based on Obligated Dollars Facility Clearance Interim or Top Secret Facility Responsibility Financial, NIST, SPRS, Subcontracting Plan, Sam/ Fapiis Approved Purchasing System Other than Small Business Only Approved Accounting System

Pool 1 Only Certifications CMMC Level II (Self)

Past Performance Submission aligns with chosen CTA Separate submission for each CTA Identify applicable TFAs Evidence of delivery of technological innovation IDIQ References not accepted Offeror-only references; must show that offeror itself did the work Prioritize Similarity in scope to NEXTGEN IACMAC Non-Government contract references accepted

Technical Approach

NEXTGEN IACMAC | Industry Day | 4 November 2026

Separate scenario for each CTA

Project based scenario

Cost/Price not submitted

Expanding Access

01. Approved Accounting System Not required at MAC Level, BUT will be required for CPFF task orders

02. SBIR/STTR On-ramp opportunities

03. Non-government Past Performance References Will Be Accepted

04. Certifications like ISO 9000 No longer mandatory for MAC qualification Will be addressed at TO if required, or opportunity for strength Small Business and Non-Traditionals

On-Ramp and Off-Ramp

01. SBIR/STTR evaluation

02. Pool 2 SB which grow: Single on-ramp: Meet Pool 1 requirements or evidence of some threshold of successful Pool 2 performance.

03. Defined scope specific on-ramp

04. Total scope PWS On-Ramp Opportunities At Discretion of Government Off-Ramp

01. Mergers and acquisitions

02. TO win rates or submission/participation minimums: with cure period

03. Awardee Non-Responsiveness: (e.g., Failure to provide No Bid responses to FOPRs)

04. Technical performance degradation: CPARs outcomes – no marginal or unsatisfactory ratings, > [TBD]% CPARS very good or exceptional

05. Pool 2: Awardees who lose SB status and have no TOs will be off-ramped, and those with TOs will be off-ramped at end of TO POP

Build What’s Next.

Join us The mission is URGENT. The opportunity is REAL.

QUESTIONS

Submit questions today

Via the TEAMS CHAT or

55cons.pkc.iacmac@us.af.mil

Official updates A faster, more open vehicle built around performers.

Point of contact Rebecca Robeson Kelly Lybolt Jessica Stednitz 55cons.pkc.iacmac@us.af.mil image5.png image6.png image7.png image3.png image1.png image2.png image4.png image8.png

Microsoft_Excel_Worksheet.xlsx Sheet1

Deliveries

Scaled Directed Energy (SCADE) 1.9% 1.9% 1.9%

Scaled Hypersonics (SHY) 1.9% 1.9% 1.9%

Biomanufacturing (BIO) 4.8% 4.8% 4.8%

Contested Logistics Tech (LOG) 11.4% 11.4% 11.4%

Quantum & Battlefield Info Dominance (Q-BID) 17.1% 17.1% 17.1%

Applied AI (AAI) 30.5% 30.5% 30.5%

Multiple / cross-cutting 32.4% 32.4% 32.4%

Microsoft_Excel_Worksheet1.xlsx Sheet1

Deliveries

Other (process, authorizations) 3.9% 0.0% 0.0256311675 3.9%

Test and evaluation results 7.8% 0.1% 0.051262335 7.8%

Analyses, models, data packages 12.4% 0.1% 0.0811653637 12.4%

Fielded or integrated systems 13.7% 0.1% 0.0897090862 13.7%

Prototypes and demonstrators 27.5% 0.2% 0.1794181725 27.5%

Software, tools, algorithms 34.6% 0.2% 0.2264086462 34.6%

100.00% image9.svg image10.svg image11.svg

File details come from the government source that posted it. Updated .