Responses to Questions 13 Aug 13
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_4-Required_Inspections_and_Schedule.docx | DOCX document | |
| Attachment_1-PWS_Dated_08_August_2013.docx | DOCX document | |
| Q_and_A_8AUG13.docx | DOCX document | |
| Q_and_A_5AUG13.docx | DOCX document | |
| Attachment_5-C12_and_Contract_Flight_Price_Schedule.pdf | ||
| Attachment_2-AF_FORM_1222-AF_EQUIVALENT_(7-12-13).docx | DOCX document | |
| Attachment_3-_INSTRUCTIONS_FOR_COMPLETING_AF_FORM_1222_(7-12-2013)_(2).docx | DOCX document | |
| Attachment_4-Required_Inspections_and_Schedule.docx | DOCX document | |
| Attachment_6-WD_05-2017_Rev_17_eff_25JUN13.pdf | ||
| Attachment_1-PWS_Dated_30_July_2013.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers for FA8051-13-RFQ-AlaskaBoilerInspections, 13AUG13
Question 1: On Attachment 4: FY13 Passenger/Cargo Tarrifs sheet, the one way fares are listed. My question is and I will give an example: If we are flying to Tin City the fee would be $935 times 2 for the return trip giving a total of $1870.00 correct?
Answer 1: Yes, those fares are one-way. So for Tin City example, for your “round-trip” fare, it would be a total of $1870. $935 to get there, $935 to return.
Question 2: In the SOW it says: Travel on Government C-12/contract flights will be invoiced to the contractor by AMC per the attached cost schedule (Attachment 4). Does that mean, we would get an invoice for that flight once our inspector is done or do we pay upfront?
Answer 2: This question is still be researched. An answer will be provided before award of the contract.
Question 3: Is there a two page Inspection Report that can be provided, including one that is not cut off or can another form that includes all the requested information be used?
Answer 3: Only the AF 1222 provided by this solicitation can be used.
Question 4: Can it be interpreted that the requested inspections alternate year to year (ex. the previous year for National Board #64639641 at 773 CEG Elmendorf AFB was a BB, BC, BD or BE inspection)?
Answer 4: The inspection type are as noted in the solicitation.
Question 5: PWS, paragraph 1.3.4 the following questions are presented:
| a. Attachment 4 is presumed to require (Type of Inspection) a VE inspection but the PWS paragraph 1.3.4 states the VE inspection will be recommended by the inspector when an unfired pressure vessel’s shell thickness has thinned to a potentially unsafe level. | |
| Question 5-1: Please clarify if a VE Inspection is or is not being performed? If not, what inspection per paragraph 1.3.1 is being performed (VA, VB, VC or VD)? | |
| Answer 5-1: Disregard paragraph 1.3.4. Its purpose was to provide instructions if as a result of performing a VA or VB inspection it was suspected that shell thickness had thinned to potentially unsafe levels. No VA or VB inspections are required under this solicitation. Objects specified to receive VE inspections are to receive VE inspections. | |
| Question 5-2: If it is, has the Contracting Officer and or Program Manager approval been received (para 1.3.4)? | |
| Answer 5-2: N/A | |
| Question 5-3: If it is required are you in the possession of the Original Manufacturers Data Reports in order to determine if the shell thicknesses have thinned to a potentially unsafe level? | |
| Answer 5-3: N/A |
Question 6: Have there been any repairs to any of the vessels?
Answer 6 : The MAJCOM/base or site will identify any repairs made since the last inspection. Contact POC identified in attachment 4.
Question 7: If the VE inspection is required are any of the vessels completely insulated? If so, has test on the insulation been conducted to determine that no asbestos is present? Who is responsible for removing the insulation, if needed?
Answer 7: VE inspections are required per solicitation schedule. Vessels will be prepared for inspection. If insulation is present and needs to be removed, the site will be responsible for its removal and replacement.
Question 8: Para 1.3.4 references shell thickness but does not include head thicknesses. Are the heads being evaluated as part of this contract?
Answer 8: References to shell thickness refers to the thickness of the wall and heads that create the pressure envelop of the vessel.
Question 9: Is there any daily compensation wage, to the Contractor, for any governmental schedule delays (para 2.3); this includes, travel equipment mechanical duties, flight delays or cancellations, national emergencies, changes in inspection quantities (para. 2.5), etc?
Answer 9: Unexcusable delays will have to be addressed at the time that they occur.
Question 10: Per para 2.7, Can you provide the 611 sites lodging names and phone numbers?
Answer 10: Site lodging and phone numbers will be forwarded upon award.
Question 11: What is the Passenger/Tariff fees for flights to King Salmon, Fort Yukon, Point Barrow, Oliktok, Cold Bay, Sparrevohn and Barter Island?
Answer 11: If site is not listed on FY13 Passenger/Cargo Tariffs, then commercial aircraft is available.
Question 12: Are the One Way fees circled, specifically ICAO - PASY, PAEI, PAIM, PASV, PATL and PATC), on Attachment 4 the one way fees that will be invoiced to the Contractor as per 2.7 or are these fees based on flying in from the U.S?
Answer 12: The fees circled on Attachment 5 are one-way fees. The C12/Contract flights originate from and return to Elmendorf AFB, and only the C12/Contract flights, listed in para. 2.7 of the PWS, will be invoiced to the contractor.
Question 13: Does ICAO - PALU, PAEH, PACZ, fees apply to this contract?
Answer 13: No. Only the locations listed in Attachment 4, Required Inspection and Schedule, apply to this contract. These locations are also listed in para. 2.7 of the PWS.
Question 14: Will the Cargo Weight charts also be invoiced to the Contractor? If so, which Chart is the Contractor subject to?
Answer 14: Yes, the cargo weight cost will also be invoiced to the contractor. The correct chart to use is the one directly below the chart of one-way fees. The correct column to use is the Non Fed (Contractors).
Question 15: Do the DOD SAAM RATES apply to this Contract?
Answer 15: No, the DOD SAAM Rates do not apply to this contract.