The purpose of this amendment is to include a revised Attachment 1 PWS dated 8 August 2013 a revised Attachment 4 Required Inspections and Schedule and Q A 8AUG13 . The revised section of the PWS is denoted by left sidebar. The revisions to the PWS and Inspections and Schedules deletes the following locations Cold Bay and Barter Island.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

AIR FORCE BOILER

and

UNFIRED PRESSURE VESSEL INSPECTION

(OCONUS)

08 AUGUST 2013

30 JULY 2013

(OCONUS)

TABLE OF CONTENTS

SECTION A, DESCRIPTION OF SERVICES/GENERAL INFORMATION

1. Description of Services3
1.1. Inspection Criteria3
1.2. Boiler Inspections3
1.3. Unfired Pressure Vessels4
1.4. Deliveries and Performance5
2.0 General Information6
2.1. Definitions6
2.2. Qualification of Inspectors6
2.3. Site Preparation and Schedule7
2.4. Witness to Inspection7
2.5. Changes in Inspection Quantities7
2.6. Non-chargeable Delays7
2.7. Travel and Lodging7
2.8. Inspections8

(OCONUS)

SECTION A

DESCRIPTION OF SERVICES/GENERAL INFORMATION

1.0. DESCRIPTION OF SERVICES: The contractor shall provide technical expertise required to support the Air Force Civil Engineer Center (AFCEC) Boiler and Unfired Pressure Vessel inspection program.

1.1. INSPECTION CRITERIA. At selected overseas locations inspections of American Society of Mechanical Engineers (ASME) stamped boilers and unfired pressure vessels shall be accomplished in accordance with the rules for inspections in the latest edition of the National Board Inspection Code and addenda published by the National Board of Boiler and Pressure Vessel Inspectors, 1055 Crupper Avenue, Columbus OH 43229, ASME CSD-1, NFPA 85, and the requirements contained in the Inspection and Testing requirements listed in AFI 32-1068, dated 14 May 2013 and the Instructions for Completing AF Form 1222.

1.2. BOILER INSPECTIONS.

1.2.1. Description of Inspection Types

1. Type BA: Internal and external inspection

1. Type BB: Internal and external inspection, followed or preceded by external inspection while boiler is under hydrostatic test

1. Type BC: External inspection while boiler is operational under pressure

1. Type BD: External inspection while under hydrostatic test

1. Type BE: Internal and external inspection of expansion tanks used with high temperature hot water boilers

1.2.2. Exclusions. The following items are excluded from inspection.

1. Steam boilers with safety valves set at 15 pounds per square inch gauge (psig) or less and hot water boilers with safety valves set at less than 160 psig

1. Pressure vessels of less than one boiler horsepower which are especially constructed for laboratory purposes

1. Non ASME Stamped Boilers

1.2.3. Boiler Inspection Requirements. The list of ASME boiler inspection requirements are provided in Attachment 1 and include the following information:

1. Points of contact at the base and commercial phone number(s)

1. The name and location of the Air Force installation

1. The building number where the boiler is located

1. The National Board number for each boiler (if not listed on Attachment 1, it will be provided prior to the inspection)

1. The required dates of inspection are variable except for inspections dates noted on the schedule at selected sites

1. The type of inspection(s) required

1.2.4. Scheduled Boiler Inspections. The contractor shall supply to the Government the necessary services, reports, supplies and equipment to perform inspection of high pressure steam boilers (above 15 psig) , high temperature hot water boilers (above 160 psig and/or 250 degrees F) , and associated expansion tanks at Air Force installations outside the continental United States. The required inspections are listed on the Inspection Schedule Form (see Attachment 1).

1.3. UNFIRED PRESSURE VESSELS

1.3.1 Description of Inspection Types

1. Type VA: Internal and external inspection

1. Type VB: Internal and external inspection, followed or preceded by external inspection during which the pressure vessel is under hydrostatic test

1. Type VC: External inspection while under operating conditions and pressure

1. Type VD: External inspection while under hydrostatic test

1. Type VE: Internal and external inspection with an ultrasonic thickness test of the pressure vessel shell

1.3.2. Exclusions. The following items are excluded from inspection.

1. Non ASME stamped UPVs

1.3.3. Unfired Pressure Vessel Inspection Requirements. The list of ASME pressure vessel inspection requirements are provided in Attachment 1 and includes the following information:

1. Points of contact at the base and commercial phone number(s)

1. The name and location of the Air Force installation

1. The building number where the pressure vessel is located

1. The Serial number or National Board number for each pressure vessel (if not listed on Attachment 1, it will be provided prior to the inspection)

1. The required dates of inspection are variable except for inspections dates noted on the schedule at selected sites

1. The type of inspections required

1.3.4. Special Requirements. A type VE inspection will be recommended by the inspector when an unfired pressure vessel’s shell thickness has thinned to a potentially unsafe level. Approval from the Contracting Officer (CO) and/or Program Manager (PM) is required to perform the VE inspection. Shell thickness measurements shall include, but not be limited to, any suspect areas, areas of weld joints, and a minimum of half of the shell. Exact locations and quantity of thickness measurements will be at the discretion of the inspector. Hydrostatic tests shall be performed on air receiver tanks when inspections and/or calculations indicate a condition which is questionable for safety valve setting. Hydrostatic tests shall also be performed after a repair has been made to any pressure vessel which could affect its safety.

1.3.5. Scheduled Unfired Pressure Vessels Inspections. The contractor shall supply to the Government the necessary services, reports, supplies, and equipment to perform inspections of unfired pressure vessels (above 15 psig) and jacketed steam kettles at Air Force installations outside the continental United States. The requested inspections are on the Inspection Schedule Form (see Attachment 1).

1.4. DELIVERIES and PERFORMANCE

1.4.1. Reports. The Contractor’s Authorized Inspector shall prepare an AF Form 1222- AF Equivalent for each boiler inspected and each unfired pressure vessel inspected in accordance with the report format and instructions outlined in Attachments 2 and 3 to the contract.

1.4.1.1. Each report shall describe the physical condition of the boiler or pressure vessel inspected and list any deficiencies and necessary repairs or changes required for the boiler or pressure vessel to meet applicable codes, standards, and the requirements of good engineering practice. If the boiler or pressure vessel is determined to be unsafe to operate, it must be immediately conveyed by positive notification to CO, the base and MAJCOM POC’s, and annotated on the AF Form 1222-AF Equivalent (7-12-13) (Attachment 2).

The inspection report shall be typed or printed legibly in ink. Each report shall be individually signed by the Inspector performing the inspection attesting they had performed the inspection to the requirements of the NBIC, ASME, CSD-1, NFPA 85, and in compliance with the Instructions for Completing AF Form 1222 (Attachment 3). The on-site base Boiler Plant Operator or designated representative witnessing the inspection will sign the AF 1222. Each report shall include the inspector's National Board Certification Number.

1.4.1.2. Before leaving each Air Force installation following inspections, the Inspector shall provide one (1) copy of each completed and signed AF Form 1222 for each boiler inspection and one (1) copy of each completed and signed AF Form 1222 for each unfired pressure vessel inspected to the Government representative. After completion of an inspection, one (1) copy of the report shall be e-mailed, faxed, or mailed to the CO, PM, and the POC’s listed on the contract.

2.0. GENERAL INFORMATION

2.1. DEFINITIONS. Definitions shall be as found in the following publications:

1. The Constitution and Bylaws of the National Board of Inspection Code

1. The latest edition of the National Board Inspection Code and all addenda

1. American Society of Mechanical Engineers (ASME) Codes

1. ASME CSD-1: Controls and Safety Devices for Automatically Fired Boilers

1. NFPA 85: Boiler and Combustion Systems Hazards Code

2.1.1. Boilers

2.1.1.1. Steam Boiler. A pressure vessel in which steam is generated by application of heat resulting from the combustion of fuel (solid, liquid, or gaseous).

2.1.1.2. Power Boiler. A boiler in which steam or other vapor is generated at a pressure greater than 15 psig for use external to itself.

2.1.1.3. High Temperature Hot Water Boiler. A pressure vessel intended to heat water to temperatures in excess of 250 F at pressures in excess of 160 psig. The heat is applied as a result of combustion.

2.1.1.4. Electric Boiler. A power or high temperature hot water boiler with electricity as a source of heat.

2.1.1.5. Portable Boiler. A power boiler or a high temperature hot water boiler used primarily for temporary location and the construction and usage of which is obviously portable.

2.1.1. Unfired Pressure Vessels.

2.1.1.2. Pressure Vessels. Receptacles used for the containment of pressure, either internal or external. The pressure may be obtained from an external source, or by the application of heat from a direct or indirect source, or any combination thereof.

2.2. QUALIFICATION OF INSPECTORS. The qualification of inspectors shall be as outlined in the Constitution and Bylaws of the National Board of Boiler and Pressure Vessel Inspectors and the National Board Inspection Code. The Contractor shall provide National Board Commissioned Inspectors who hold a valid National Board Commission, and who have qualified by written examination under the laws, rules and regulations of a jurisdiction of a state of the United States and are regularly employed as an inspector by an Authorized Inspection Agency as defined in the references listed above. A National Board Commission shall be effective only, when the holder is regularly employed as an inspector of boilers and pressure vessels by a Jurisdictional Authority of the United States or as an inspector regularly employed by an Authorized Inspection Agency meeting the requirements of the Constitution and Bylaws referenced above. In accordance with the Bylaws referenced above, a holder of a National Board Commission who is not regularly employed as stipulated by those Bylaws or a person who carries out inspections on a fee basis shall not be considered regularly employed as an inspector. The Contractor shall provide the Contracting Officer with evidence of compliance with the above requirements as requested in the contract.

2.3. SITE PREPARATION AND SCHEDULE. The necessary preparation for equipment inspections shall be at the sole expense and responsibility of the Government. In case of weather or travel delays, the 611th CES will coordinate all C-12 flights with the installation/site as required to meet inspection requirements.

2.4. WITNESS TO INSPECTION. The Boiler Plant Foreman, Maintenance Foreman, Mechanical Superintendent, Maintenance Engineer, Base Civil Engineer, Deputy Base Civil Engineer or Mechanical Engineer responsible for boilers shall accompany the inspector to the inspection site and witness the inspection. This representative shall sign the inspection report certifying that the work has been accomplished. Therefore, the inspection report will serve as a receiving document.

2.5. CHANGES IN INSPECTION QUANTITIES. In the event a boiler/UPV was scheduled for inspection, but is not available for inspection, the contractor shall contact the CO or PM for approval of a substitution, and coordinated with the MAJCOM POC. The boiler/UPV substituted for the inspection must be annotated and identified on the schedule and a completed AF Form 1222 submitted.

2.6. NON-CHARGABLE DELAYS. No charge shall be made for delays due to no fault of the Government such as weather conditions or acts of god preventing the preparation or shutdown of boilers/UPVs.

2.7. TRAVEL AND LODGING. Lodging and food are available at the various 611th radar sites (King Salmon, Indian Mountain, Eareckson AFS, Tatalina, Tin City, Fort Yukon, Sparrevohn, Point Barrow, and Oliktok). The per diem for lodging and food at the radar sites is as follows: Eareckson is $167 per day, King Salmon is $163 per day, and all other 611th radar sites are $208 per day. Travel on Government C-12/contract flights will be invoiced to the contractor by AMC per the attached cost schedule (Attachment 4). The Contractor shall provide the name, social security number and baggage requirements for the inspector(s) to arrange military air to C-12 locations and contract flights within seven days after contract award. For C-12 locations, which are Indian Mountain, Tatalina, Tin City, and Sparrevohn, flights only occur once a day, Monday through Friday. The C-12 flights depart and return from Elmendorf AFB. The Contractor shall stay overnight at C-12 flight locations and will be picked up the next day to return to Elmendorf AFB for flights to next location. For Eareckson AFS, which is a contract flight, those flights only occur on Monday and Wednesday, which will require the contractor to stay overnight on Monday and Tuesday. The contract flight also departs and returns from Elmendorf AFB. The only radar site that requires a rental car is Oliktok. The Government will provide transportation for all other radar sites. The contractor is responsible for their own transportation for the Elmendorf AFB and Eielson AFB inspections.

2.8. INSPECTIONS. Attachment 1 provides a list of boiler/UPV inspections and locations. Inspection dates at the various sites are variable except that the boiler inspection dates noted at selected sites have priority since they must be completed early in the performance period.