HG Massif Jackets SOW.pdf
PDF 105 KB Posted
- Attached to
- USAF Honor Guard MASSIF Jackets Federal contract opportunity
- Solicitation number
- FA706024Q0004
About this file
The attached Statement of Work (SOW) outlines requirements for USAF Honor Guard MASSIF Jackets under Solicitation Number FA706024Q0004 issued by the Department of the Air Force Headquarters District Washington. The SOW specifies delivery of 1,000 custom-designed, high-quality wool jackets with Air Force Honor Guard insignia by December 31, 2023. Offerors must demonstrate experience providing similar products to military or government customers. Pricing is to be provided on a firm fixed price basis. The anticipated award date is August 15, 2024 following evaluation of proposals submitted by July 15, 2024.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combined Synopsis Solicitation.pdf | ||
| HG Massif Jackets Spec Sheet.pdf | ||
| HG Massif Jackets SOW.pdf | ||
| Combined Synopsis Solicitation.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
TITLE: Cold Weather Gear – MASSIF Jackets for United States Air Force Honor Guard
1.0 Background: The U.S. Air Force (USAF) Honor Guard has a requirement for outdoor training in the winter months to stay proficient in presenting ceremonial honors. The procurement of MASSIF Jackets is to assure safety in the winter months from 15 October through 15 April as well as uniformity. This requirement is for the procurement of commercial MASSIF Jackets for the USAF Honor Guard located at Bolling Air Force Base, DC. These jackets are used on an as needed training basis for presidential ceremonies, funerals, and other high visibility ceremonies. The USAF Honor Guard intends to have this be a single purchase.
2.0 SCOPE OF WORK
The contractor shall manufacture and deliver jackets in the quantities of 350 jackets provided for the United States Honor Guard and shall meet the requirements of:
- OCP shell design
- Full flame-resistant construction with proprietary Massif® fabrics
- 4-way stretch fabric
- Battleshield X® softshell fabric features windproof, waterproof, and breathable membrane
- High, fleece-lined collar
- Zippered chest pocket
- Zippered sleeve cargo pocket
- Zippered hand-warmer pockets
- Adjustable drawcord at hem
- Two flapped double pen pockets
- Two concealable IFF tabs
- Internal wrist cuffs
- Velcro loop for name, rank, flag, and unit tape
- Pass-through flap for CVC extraction strap
- Machine washable
- Be available in sizes REG XS-XL and LNG S-XL
3.0 DELIVERY
Order shall be delivered within 60 days of contract award.
4.0 PERIOD OF PERFORMANCE: Single purchase.
5.0 TECHNICAL POINT OF CONTACT (ON-SITE)
The following persons will receive each order:
Primary POC:
Jacob L Hale 50 Duncan Ave Bldg 7100 Joint Base Anacostia-Bolling, Washington DC 202-404-1348 Jacob.hale.8@us.af.mil
Secondary POC:
Samantha Cole 50 Duncan Ave Bldg 7100 Joint Base Anacostia-Bolling, Washington DC 202-284-3180 Samantha.cole.3@us.af.mil mailto:Jacob.hale.8@us.af.mil mailto:Samantha.cole.3@us.af.mil
6.0 SCHEDULE
Delivery date and time for each order shall be coordinated with the Technical Point of Contact noted in section 5.0 on a case by case basis.
7.0 ACCEPTANCE PLAN
Work will be reviewed by the TPC or their designated individual(s). The TPC has the responsibility for the government Inspection and Acceptance (I&A) at the places of performance.
| STATEMENT OF WORK |
| 2.0 SCOPE OF WORK |
| The contractor shall manufacture and deliver jackets in the quantities of 350 jackets provided for the United States Honor Guard and shall meet the requirements of: |
| - OCP shell design |
| 3.0 DELIVERY |
| Order shall be delivered within 60 days of contract award. |
| 4.0 PERIOD OF PERFORMANCE: Single purchase. |
| 6.0 SCHEDULE |
| Delivery date and time for each order shall be coordinated with the Technical Point of Contact noted in section 5.0 on a case by case basis. |
File details come from the government source that posted it. Updated .