Statement of Work (SOW) Exercise Court 31 Jul 26.pdf
PDF 134 KB Posted
- Attached to
- AFOTEC Exercise Court
- Solicitation number
- FA704626QRJS2
- Issued by
-
Department of the Air Force
About this file
This Statement of Work describes the construction of a recreational court complex at Kirtland Air Force Base in New Mexico. The project involves demolition of 120 feet by 130 feet (15,600 square feet) of existing asphalt, removal and reinstallation of perimeter fencing, and installation of new wind/privacy netting on all four sides. The contractor must install 120 feet by 130 feet by 4 inches of concrete with fiber mesh reinforcement, construct nine pole footings (2 feet by 2 feet by 2 feet deep with rebar cages), install six poles for three pickleball courts with netting, install two poles for a volleyball court with netting, and provide footing and pole base for a basketball half court. All materials, poles, striping, pickleball coating, and basketball goal must be contractor-furnished, along with complete striping for all court types.
The on-site performance period is 90 workdays, with all work to be completed in a professional and workmanlike manner. Work must comply with the International Building Code, National Electric Code, ADA accessibility standards, Air Force Instructions 91-202 and 91-203, AFOSH Standards, and applicable OSHA regulations (29 CFR 1910 and 1926). The contractor is responsible for daily removal of demolition waste and materials in accordance with local, state, and federal regulations, maintaining a clean and safe work site, protecting adjacent areas, obtaining submittal approvals, and replacing any items damaged during construction. Project managers are Robert Montaño (505-846-1572) and Victor Napolitano (505-846-5106) of AFOTEC A-4F Engineering, Facilities and Logistics Division.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions And Answers 1 - FA704626QRJS2 - Exercise Court.pdf | ||
| 1000001957.jpg | JPG image | |
| 1000001951.jpg | JPG image | |
| Visitor-Prenotification-Form.pdf | ||
| 1000001954.jpg | JPG image | |
| 1000001952.jpg | JPG image | |
| Statement of Work (SOW) Exercise Court.pdf | ||
| 1000001956.jpg | JPG image | |
| 1000001950.jpg | JPG image | |
| WD NM20260044 18 May 2026.pdf | ||
| 1000001949.jpg | JPG image | |
| 1000001955.jpg | JPG image | |
| 1000001960.jpg | JPG image | |
| 1000001953.jpg | JPG image |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Date: 31 Jul 2026 Revision: 3 Original Date: 18 May 2026
Project Title: Pickleball/Basketball/Volleyball recreational court complex. Recreational court complex is located on the North West corner of Wyoming Blvd. and D Ave. Demo and remove 120’ by 130’ (15,600) sq ft of existing asphalt. Demo existing fence for construction access.
Reinstall fence and provide/install wind/privacy netting to all 4 sides of the fence upon project completion. Install 120’ x 130’ x 4” of concrete with Fiber mesh reinforcement. Install 9 new pole footings 2 feet wide by 2 feet deep with rebar cages. Install 6 new poles for 3 pickleball courts with nettings. Install 2 new poles for volleyball court with netting. Install footing and pole base for basketball half court. Provide all poles, striping material, pickleball coating and basketball goal.
Install striping for pickleball, basketball and volleyball courts.
The contractor shall furnish all materials, labor, coordination and supervision necessary to accomplish the work in the recreational court complex located on the NW corner of Wyoming Blvd. and D Ave., Kirtland AFB, NM. Work shall be performed in a neat, substantial and a workmanlike manner.
1. Division 01 GENERAL CONDITIONS
1.1. All work shall meet the current versions of International Building Code, National Electric Code, ADA and all applicable commercial codes and standards.
1.2. Maintain the work site in a clean and orderly manner so that the safest possible site is provided for workers.
1.3. QUANTITIES: The Contractor shall field verify project requirements. A site visit where conditions may be field verified by the Contractor will be arranged by AFOTEC/A-4F.
1.4. REGULATIONS AND REQUIREMENTS: Contractor activities shall follow Federal, AFOTEC and Kirtland AFB regulations and directives for security, safety, traffic, fire, and personnel clearances.
1.5. PROTECTION AND CLEAN UP: Protect adjacent areas with appropriate coverings.
Clean the job area at the completion of each workday, including intervening spaces used for transporting goods and materials. Protect floors, walls and ceilings in areas affected by the work.
1.6. DEMOLITION: Demolition material and waste generated under this contract shall be removed from the building daily by the Contractor. Disposal of these materials and wastes shall be off-base in accordance with all local, state and federal regulations.
1.7. SUBMITTAL REQUIREMENTS: The Contractor shall obtain approval for submitted materials prior to incorporating them into the work.
1.8. SAFETY: Compliance with the current versions of Air Force Instructions (AFI) 91-202, AFI 91-203, and AFOSH Standards, 29 CFR 1910 and 29 CFR 1926 is mandatory. Contractor shall provide as a minimum, signs, barriers, and or caution tape as a safety precaution around the work site. Contractors are subject to inspections of job sites by the Department of Labor.
Resolution of Department of Labor Citations for Violations of Occupational Safety and Health Standards is a contractor responsibility.
1.9. DAMAGES: Features outside of the work area that are damaged by the Contractor shall be repaired and finished to match existing area at the Contractor’s expense. The Contractor shall be responsible for replacement of any items damaged during the construction performance period of this contract.
1.10. PERFORMANCE: The on-site performance period is 90 workdays for all work in Building 20130. All work shall be completed in a professional manner and without delay once the on-site work period is started.
1.11. CHANGES: Changes to this Statement of Work shall be requested in writing to and approved prior to execution. The Contractor shall notify the AFOTEC/A-4F of differing site conditions as they are found and obtain approval for any changes required.
1.12. SALVAGE: All salvageable materials and equipment shall be the property of the Contractor unless otherwise noted in this SOW and/or drawings. The Contractor is responsible for the removal of all salvageable materials and equipment from the job site.
1.13. MATERIALS: All materials shall meet applicable specifications, standards, and codes.
1.14. EXECUTION: All work shall be performed in accordance with manufacturers’ published specification, shall meet accessibility standards (ADA) and shall conform to applicable current versions of International Building Code and all applicable local commercial codes.
1.15. POINT OF CONTACT:
1.15.1. Project managers for this project are Robert Montaño of Engineering, Facilities and Logistics Division (AFOTEC A4F), office # 505-846-1572, cell # 505-307-2459, e-mail robert.montano.2@us.af.mil and Victor Napolitano of Engineering, Facilities and Logistics Division (AFOTEC/A-4F), office # 505-846-5106, cell # 505-263-3772, e-mail victor.Napolitano.1@us.af.mil.
1.16. REFERENCES:
1.16.1. NFPA 101, 2009, Life Safety Code
2. Division 02 SITE CONSTRUCTION
2.1. Protect existing surfaces from damage.
3. Division 03 CONCRETE.
4. Division 04 MASONRY (Not used).
5. Division 05 METALS (Not used).
6. Division 06 WOODS & PLASTICS (Not used.)
7. Division 07 THERMAL & MOISTURE PROTECTION (Not used).
8. Division 08 DOORS & WINDOWS.(Not used)
9. Division 09 FINISHES.(Not used)
10. Division 10 SPECIALTIES (Not used).
11. Division 11 EQUIPMENT. (Not used).
mailto:robert.montano.2@us.af.mil mailto:victor.Napolitano.1@us.af.mil
12. Division 12 FURNISHINGS. (Not used).
13. Division 13 SPECIAL CONSTRUCTION (Not used).
14. Division 14 CONVEYING SYSTEMS (Not used).
15. Division 15 MECHANICAL (Not used).
16. Division 16 ELECTRICAL.
16.1 Equipment, material, installation, and workmanship shall be in accordance with mandatory and advisory provisions of NFPA 70 unless more stringent requirements are specified or indicated.
END SCOPE OF WORK