This document is a Question and Answer (Q&A) update for Solicitation FA704624Q0001 for the repair and restoration of a 1/5 scale F-22 model display at Kirtland Air Force Base. The solicitation requires repainting of the model, repair of minor damages, and preventative maintenance of the support pole and base. Specifically, the contractor must use automotive paint capable of withstanding local environmental conditions and at a minimum clean, seal, and paint the support pole and base. The Q&A clarifies the exact scope of work, including that only minor filling of cracks is required, not major structural repairs. The solicitation is being issued by the Department of the Air Force.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation FA704624Q0001 UFR F-22 Model Display Repair and Restoration Q&A.

Updated 12 Jun 24

1. Do we know exactly type of refurbishment will be needed? Blasting, patching, rusting? Etc?

a. We require repainting of the model up to specs mentioned in the PWS, repair of any minor damages (e.g. minor filling of cracks that are not structural), and preventative maintenance of support pole and base including cleaning, sealing of base, and painting of pole support. Please refer to Sections 1.1.1-1.1.4 of the PWS.

2. For paint material, will this take an epoxy, acrylic or automotive paint?

a. The contractor shall use automative paint as referenced in the Performance Work Statement in Section 1.1.3 Repaint the entire surface area using approved materials in the Government approved aesthetics. The contractor shall use an automative, type paint product capable of withstanding local environmental conditions.

3. I am writing to ask you about the preventative maintenance, what the exact work needs to be done for the PM?

a. As stated in section 1.1.4, the expectation at the minimum is that the support pole and base be cleaned, base is sealed, and the pole support painted. Only repair and fortify if needed.