Attach_1_v2.3-PWS-FINAL_TSRS_Follow-On.docx

DOCX document 70 KB Posted

Attached to
Technical Sensor Radar Support
Solicitation number
FA7022-17-R-0004_Final
Issued by

View the file

Other files

File Type Posted
FA7022-17-R-0004-0003.pdf PDF
Attach_4_Labor_Rates_Rev_1.xlsx XLSX spreadsheet
FA7022-17-R-0004-0002.docx DOCX document
FA7022-17-R-0001-0001.docx DOCX document
Exhibit_A_CDRLs_A001_to_A006.pdf PDF
Attach_5_PPQ.pdf PDF
Attach_2_DD_254.pdf PDF
Attach_3_Labor_Category_Description.pdf PDF
Attach_4_Rates.xlsx XLSX spreadsheet
FA7022-17-R-0004.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLASSIFICATION: UNCLASSIFIED//FOUO

PERFORMANCE WORK STATEMENT (PWS)

FOR

TECHNICAL SENSOR RADAR SUPPORT (TSRS) PROGRAM

Air Force Technical Applications Center (AFTAC) Technical Operations Squadron (TOPS)

1 April 2016 (v2.3)

Table of Contents

1DESCRIPTION OF SERVICES………………………….…………………….……3
1.1INTRODUCTION………………………………………………………………….…3
1.2BACKGROUND……………………………………………………………………..3
1.3SCOPE………………………………………………………………………………..3
1.4PERIOD OF PERFORMANCE…………………………………………….….…… 3
2SPECIFIC TASKS…………………………………………… …………………… 4
2.1OPERATIONS……………………………… …………………………………… 4
2.2LOGISTICS…………………………………………………………………………….4
2.3ENGINEERING……………………………………………………………. …… 5
2.4SOFTWARE INTEGRATION…………………………………………………… … 6
2.5SPECIAL ANALYSIS AND INVESTIGATIONS ……………………………… 6

3 SERVICES SUMMARY (SS)……………………………………………………… 7

4GOVERNMENT FURNISHED PROPERTY AND SERVICES…...…….…. 10
4.1SERVICES………………………………………………………………………....…10
4.2FACILITIES………………………………………………………………………..…10
4.3TRANSPORTATION……………………………………………………………...…10
4.4UTILITIES……………………………………………………………………..…......10
4.5EQUIPMENT………………………………………………………………...…….....10
5GENERAL INFORMATION……………………………… ..………………….… 11
5.1CONTRACTOR IDENTIFICATION IN THE GOVERNMENT WORKPLACE…..11
5.2INDUSTRIAL SECURITY…………………………………………………………..11
5.3PHYSICAL SECURITY…………………………………………..…………….........11
5.4PRIVACY ACT……………………………………………………………………....12
5.5LOCATION OF WORK….……………......................................................................12
5.6HOURS OF OPERATION............................................................................................12
5.7CONSERVATION OF UTILITIES…………………………………………………..12
5.8RECORDS MANAGEMENT.......................................................................................12
5.9SPECIAL TRAINING, CERTIFICATIONS AND QUALIFICATIONS……………13
5.10CONTRACTOR TRAVEL...........................................................................................13
5.11DELIVERABLES.........................................................................................................14
5.12CONTRACTOR MANPOWER REPORTING………................................................14
5.13ENVIRONMENTAL CONTROLS…………………………………………………..15
5.14TRANSITION ………………………………………………………………………15

6 ACRONYMS AND ABBREVIATIONS LIST……………………………………16

1DESCRIPTION OF SERVICES.
1.1Introduction.

This is non-personal services contract. The Government will neither supervise contractor employees nor control the method by which the contractor performs the required tasks. The contractor shall manage its employees and guard against any actions that are of the nature of personal services, or give the perception of personal services. The contractor shall notify the Contracting Officer (CO) immediately if they perceive any actions constitute personal services. These services shall not be used to perform any Inherently Governmental Functions

1.2Background.
1.2.1The Technical Sensors Radar Support (TSRS) Program Office is engaged in: radar sustainment support, COBRA KING radar mission support, radar data analysis, radar performance monitoring, radar engineering support, logistics support, new software build testing support, and specific investigation of radar issues and troubleshooting upon TOPS/DOY request. In conducting this support software coding and investigation may be required.
1.2.2The Government Program Office (PO) has varying degrees of responsibility for multiple radar systems. Responsibilities include operations, programming, maintenance, logistics, engineering, sustainment planning and execution. The radar systems are currently identified as GRAY STAR, hereinafter referred to as GS, and COBRA KING, hereinafter referred to as CK. The rapidly changing threat environment, coupled with the current and ongoing need for cost effective system operations, maintenance, engineering, and sustainment may require the TSRS Program Office to assume responsibilities for additional contractual requirements and advisory services. Responsibility for these additional requirements may be added to the Performance Work Statement (PWS) by using a bilateral modification to the contract; however the overall responsibility for the engineering and logistics support for the current sensors and all additional sensors will remain with the PO.
1.3Scope.

This PWS establishes the requirements for providing Engineering, Radar Data Analysis, and Software Sustainment Support for the TSRS Program Office. The contractor shall provide operations, logistics, maintenance, engineering, software integration, sustainment, and budget support to the PO for two (2) radar sensors, GS and CK, and for any replacement or additional sensors that may be developed during this contract period.

1.4 Period of Performance (PoP).

The period of Performance shall be for one six (6) month base with four (4) option years and one (1) six (6) month option period, for a total of five (5) years.

2SPECIFIC TASKS.
2.1Operations Support.
2.1.1The contractor shall provide a technical advisor to the Air Force Mission Commander (MC) whenever CK deploys. It is anticipated CK will be deployed approximately 40-45 weeks during the course of a year. Mission need may dictate the work be performed in a declared hazardous duty area. The contractor shall provide mission planning support, recommendations on data collection and support in the subsequent data reduction and analysis efforts. The contractor shall maintain close liaison with national level Government and support organizations. The contractor technical advisor shall provide to the PO a detailed report on the sensor and the report shall be delivered at the end of each technical advisor’s rotation. (CDRL A003)

2.1.2 The contractor shall provide support onboard CK and shall participate in all facets of mission operations. The contractor shall provide technical inputs to the MC for the purpose of making real time decisions relative to the operation of the on board sensors and to optimize the data collection against priority targets. The contractor shall maintain knowledge of current missile systems, current missile databases and the collection priorities relative to current information deficiencies.

2.1.3 The contractor shall provide support in sensor data analysis and exploitation efforts associated with gathered data of each assigned sensor. The contractor shall provide support in mission planning for all types of missions and shall include Missile Defense Agency (MDA) missions. The contractor shall maintain close working relationships with the United States Army Space & Missiles Command (USASMDC), Massachusetts Institute of Technology /Lincoln Labs (MIT/LL), and other national level Government organizations required to maintain mission success.

2.1.4 The contractor shall have and maintain current knowledge of data collection needs and priorities and shall provide recommendations for improving data collection plans and procedures, and shall support data exploitation efforts for each of the assigned radar systems. The contractor shall provide technical analysis of sensor performance and capabilities in support of mission planning. (CDRL A001, A004)

2.1.5The contractor shall provide support to the MC in preparing a quick-look analysis and reporting of events and data collected during sensor operations. The MC transmits the data provided to the PO by message traffic. A detailed “CK Operations Report” shall be provided upon return to the PO following a CK deployment. (CDRL A006)
2.2Logistics Support.
2.2.1The contractor shall focus on integrated logistics support for the assigned systems and shall ensure optimization of total system performance and the reduction of life cycle ownership costs. The contractor shall provide support to the PO in the development of an overall logistic strategy. (CDRL A005)

2.2.2 The contractor shall support the PO in coordinating specific planned upgrades and maintenance activities for each sensor. This support may require travel by the contractor to various locations. The contractor shall perform analysis and investigations continuously throughout the life of the contract. These activities shall include the evaluation of alternative approaches for the resolution of unforeseen anomalies and analysis of system performance. These special studies shall include maintaining an awareness of radar hardware, software and operational efforts related to the task. (CDRL A005)

2.2.3 Special studies (such as life extension) of existing sensors required during the life of this contract may be added to the PWS by bilateral modification under a Special Analysis and Investigations contract line item number in the contract. (CDRL A005)

2.2.4The contractor shall provide guidance and support in developing procedures to improve the reliability and maintainability of the assigned sensors as a member of the Integrated Product Team (IPT). Travel may be required by the contractor at the POs discretion to support the IPT meetings. The contractor shall identify reliability and maintainability problems, assess the root cause of the problems and develop corrective actions. (CDRL A004)
2.3Engineering Support.
2.3.1The contractor shall assess the impact of all planned and implemented sensor system modifications and enhancements. The contractor shall interface with all sensor users and support agencies, operators, data analysts, operations and maintenance contractor personnel to collect required data. The contractor shall identify potential additional missions or utilities for the assigned sensors. The contractor shall identify areas of potential commonality and applicability in technology, acquisition or sustainment between each individual sensor and all similar sensors. The contractor shall support the development of recommendations for future upgrades, modifications and acquisition programs (sensor replacements) required to meet equivalent sensor performance requirements and ensure cost effective operations and support. The contractor shall support the PO in developing and assessing specific approaches to meet future mission collection requirements in response to specific information requests (e.g., development of technical performance requirements, identification of applicable technologies, and alternative system design approaches for meeting future mission collection requirements). (CDRL A004)

2.3.2 The contractor shall assess potential modifications to the assigned systems which shall improve the value of the sensor’s data to current or potential users and improve operating efficiency. The contractor shall provide engineering and technical support during on-site installation and testing of system modifications for each sensor.

2.3.3 The contractor shall provide monthly sensor performance monitoring. The contractor shall review all system performance reports (daily and weekly reports) to collect, track and continuously monitor sensor system performance parameters, system calibrations and data quality. The contractor shall investigate the causes and recommend corrective action to identified adverse performance trends and anomalous system operations. (CDRL A004)

2.3.4The contractor shall provide engineering during this contract period for the acquisition of a new and replacement sensor system. The contractor shall evaluate and provide written technical recommendations on the implementation of new, replacement, systems development, and current system modifications as presented by third party contractors. This shall include supporting the PO in identifying and documenting redundancies among systems and recommending efficient use of resources within the PO and the specific sensors. (CDRL A004, A005)
2.4Software Integration Support.
2.4.1The contractor shall identify major cost drivers and shall provide support in refining requirements and ensure technical feasibility of the operations and maintenance contractor proposed system architecture. The contractor shall consider alternative system designs and perform a marginal analysis to recommend selection of an architectural approach to balance the cost, performance, risk and schedule of anticipated data collection requirements. The contractor shall define and coordinate with the PO an optimized test scenario for regression testing and this test shall encompass the system’s key performance parameters. The contractor shall develop a test concept and shall encompass the regression test scenario and shall include validation of performance upon satellites and other targets of opportunity. (CDRL A005)

2.4.2 The contractor shall support coordination of the software sustainment activities and this shall be accomplished at diverse locations and by multiple agencies. The contractor shall support the transition of preliminary software design information between contractors and shall support coordination efforts between contractors for any required changes to the software translator. (CDRL A004)

2.4.3 The contractor shall travel to operational sites to test and diagnose software in the operational environment as required by the PO. The contractor shall oversee development and operational acceptance testing of new software packages provided by other contractors.

2.4.4 The contractor shall, in coordination with the PO, develop a software sustainment strategy and coordinate sustainment planning to minimize system down time. The contractor shall analyze the functionality and structures of upgraded or modified software and the flow of information from the system to the final users and ensure existing functionality is properly replicated. The contractor shall provide the PO with specific recommendations for integration of the proposed system architecture with the existing architecture. The contractor shall monitor regression testing and ensure the driving system performance parameters are achieved. (CDRL A004)

2.4.5 The contractor shall provide a Monthly Progress Status Report (MSR). Each MSR shall address all operations and sustainment engineering efforts completed, progress against planned efforts, identification of issues and problems, software issues and problems, and an assessment of requirements in relationship to their impact on the radar systems operations and maintenance. (CDRL A001)

2.4.6The contractor shall prepare and deliver a monthly Funds and Man-hours Expenditure Report outlining labor and travel costs.(CDRL A002)
2.5Special Analysis and Investigations Support (Reference PWS paragraph 2.2.3).

The contractor shall evaluate the specific system identified in this PWS as explained in paragraph 2.2.3. These evaluations will be used by the Government to determine sustainment engineering required to keep the mission equipment, ship, and end-user equipment operational and maintainable.

3 SERVICES SUMMARY

The contract service requirements are summarized in performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The Services Summary (SS) provides information on contract requirements and the expected level of contractor performance to be successful. These thresholds are critical to mission success. Procedures as set forth in the applicable Inspection clause in the contract will be used to remedy all deficiencies. The Government retains the right to inspect any item included in the contract. All timeliness thresholds will be cumulatively calculated per performance period upon receipt of each report.

Performance Outcome
PWS PARA
Performance Threshold

SS # 1.

The contractor shall develop and provide detailed reports for work performed. (CDRL A003, A005)

2.1.1, 2.2.1, 2.2.3, 2.3.4, 2.4.1
The contractor shall provide all reports by the 15th calendar day of the month for previous month’s activity (100% of the time). No more than two (2) of reports submitted shall be returned for correction. Corrected reports shall be returned within 15 business days of receipt.

SS # 2.

The contractor shall develop, draft and provide reports which document procedures to successfully improve the reliability and maintainability of the assigned sensors (CDRL A004)

2.1.4, 2.2.4, 2.3.1, 2.3.3, 2.3.4, 2.4.2, 2.4.4
The contractor shall provide all reports by the 15th calendar day of the month for previous month’s activity (100% of the time).

The contractor shall have no more than one (1) validated customer complaint per month for content of reports. No more than two (2) of reports submitted shall be returned for correction. Corrected reports shall be returned within 15 business days of receipt.

SS # 3.

The contractor shall develop, draft and provide reports for all completed special analysis and investigations. Support the development of an overall logistics strategic plan. (CDRL A005)

2.2.1, 2.2.2, 2.2.3, 2.4.1
The contractor shall provide reports by specific due date requested. No more than two (2) reports submitted shall be returned for correction. Corrected reports shall be returned within 15 business days.
Performance Outcome
PWS PARA
Performance Threshold

SS # 4.

The contractor shall provide sensor performance monitoring and provide recommendations for the Government to successfully identify all adverse performance trends and anomalous system operations. (CDRL A004)

2.1.4, 2.2.4, 2.3.1, 2.3.3, 2.4.2
The contractor shall provide reports by the 15th calendar day of the month. No more than two (2) of reports submitted shall be returned for correction. Corrected reports shall be returned within 15 business days.

SS # 5.

The contractor shall successfully coordinate on and support all software sustainment activities between the sensor and multiple agencies. The contractor shall develop and provide reporting for all software sustainment activities. (CDRLs A004, A005)

2.1.4, 2.2.1, 2.2.2, 2.2.3, 2.2.4, 2.3.1, 2.3.3, 2.3.4, 2.4.1, 2.4.2, 2.4.4
The contractor shall provide reports by the 15th calendar day of the month (100% of the time) and all software migrations shall be properly and fully coordinated with all stakeholders. Reports shall contain 100% of all migrated activities. No more than two (2) reports submitted returned for correction. Corrected reports shall be returned within 15 business days.

SS#6.

The contractor shall develop and provide monthly status report. (CDRL A001)

2.4.5
The contractor shall provide reports by the 15th calendar day of the month. No more than two (2) of reports submitted shall be returned for correction. Corrected reports shall be returned within 15 business days.

SS#7.

The Contractor shall provide funds and man hours expense report. (CDRL A002)

2.4.6
The contractor shall provide reports by the 15th calendar day of the month. No more than 10% of reports submitted shall be returned for correction. Corrected reports shall be returned within 15 business days.
4GOVERNMENT FURNISHED PROPERTY AND SERVICES.
4.1Services.

The Government will provide room, board, and meals for shipboard employees while onboard deployable units. Contractor employees will have access to all shipboard services normally provided to regularly assigned crewmembers while deployed.

4.2 Facilities.

The Government will provide the necessary workspace, computers, telephones and other items necessary to maintain an office environment for the shipboard employees while onboard deployable units, and provide the necessary workspace, computers, telephones and other items necessary to maintain an office environment for the employees while they are not on ship and located at the TSRS Program Office.

4.3 Transportation.

The Government will provide Government transportation to remote locations if required and if available.

4.4 Utilities.

The Government will provide all utilities for the contractor’s use in performance of tasks outlined in this PWS while onboard deployable units or while at the TSRS Program Office.

4.5 Equipment.

The Government will provide access to computers, telephones, scanners, faxes, printers and other equipment necessary to perform the tasks outlined in the PWS for the shipboard employees while onboard deployable assets or while working at the TSRS Program Office.

5GENERAL INFORMATION.
5.1Contractor Identification in the Government Workplace.

When conversing with Government personnel during business meetings, over the telephone or via electronic mail, the contractor shall identify themselves as such to avoid situations arising where sensitive topics might be better discussed solely between Government employees. The contractor shall identify themselves on any attendance sheet or any coordination documents they may review. Electronic mail signature blocks shall identify their company affiliation.

5.2 Industrial Security.

The contractor shall have and maintain requirements identified on the DD Form 254. Overarching security requirements and contractor access to classified information will be as specified in the DD Form 254, Department of Defense Security Classification attached to the contract. The contractor shall have a final U.S. Government issued TOP SECRET (TS) security clearance and be DCID 6/4 eligible with a current single scope background investigation.

5.3 Physical Security.

The contractor shall safeguard all Government property provided for contractor use.

5.3.1 Key Control. The contractor shall establish and implement methods to ensure all keys and key cards issued to the contractor by the Government are not lost or misplaced and are not used by unauthorized persons. The contractor shall immediately report the occurrences of a lost or duplicate key to the Contracting Officer’s Representative (COR). In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon written direction of the CO, rekey or replace the affected lock or locks; however, the Government, at its option, may replace the affected lock or locks or perform rekeying. When the replacement of locks or rekeying is performed by the Government, the total cost of rekeying or the replacement of the lock or locks shall be deducted from the monthly payment due the contractor. In the event a master key is lost or duplicated, all locks and keys for that system will be replaced by the Government and the total cost shall be deducted from the monthly payment due the contractor. The contractor shall prohibit the use of keys issued by the Government by any persons other than the contractor’s employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contractor’s employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the COR.

5.3.2Combinations and Codes. The contractor shall establish and implement methods to ensure all combinations and codes are not revealed to unauthorized persons. The contractor shall ensure all lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. Access lock combinations are “For Official Use Only” and shall be protected from unauthorized personnel. Combinations to security containers, secure rooms, or vaults are classified information and shall properly safeguarded. Only the contractor employees with proper security clearance and need-to-know will be given combinations to security containers, secure rooms, or vaults. Security alarm access codes are “For Official Use Only” and shall be protected from unauthorized personnel. Security alarm access codes will be given to contractor employees who require entry into areas with security alarms. The contractor shall properly safeguard alarm access codes to prevent unauthorized disclosure.
5.4Privacy Act.

Work on this contract requires the contractor to have access to Privacy Information. The contractor shall adhere to the Privacy Act, Title 5 of the US Code, Section 552a and applicable agency rules and regulations.

5.5 Location(s) of Work.

The work to be performed under this contract will be performed at Air Force Technical Applications Center (AFTAC), TSRS Program Office, 10989 South Patrick Drive, Patrick AFB, FL 32925-3002, and onboard Mobile Sensor platforms deployed throughout the world.

5.6Hours of Operation.
5.6.1Normal Hours of Operation. Normal work hours shall be eight (8) hours a day, five (5) days per week, Monday through Friday. Workday may be set up to begin and end any time between 0600 and 1800. Note: Deployed Technical Advisors work schedules are dictated by mission requirements.
5.7Conservation of Utilities.

The contractor shall operate under conditions which prevent the waste of utilities which shall include the following:

5.7.1 Lights shall be used only in areas where and when work is actually being performed.

5.7.2 Mechanical equipment controls for heating, ventilation, and air conditioning (ac) systems shall not be adjusted by the contractor unless authorized.

5.7.3 Water faucets or valves shall be turned off after the required use has been accomplished.

5.7.4Government telephones shall be used only for Official Government Business.
5.8Records Management.

Records management oversight of a contractor’s records is necessary to ensure Air Force records keeping requirements are met. All records created as a result of processes prescribed in this PWS and resulting contract shall be maintained in accordance with Air Force Manual 33-363, Management of Records, Air Force Instruction (AFI) 33-364, Records Disposition-Procedures and Responsibilities, the Air Force Electronic Records Management Solution, AFTAC’s supplements to each of the fore mentioned publications, and are disposed of in accordance with the Air Force Records Disposition Schedule. At the conclusion and termination of this contract, all records shall be returned to the AFTAC Office of Primary Responsibility (OPR) for proper disposition. Contractors who create and receive official records on behalf of the Air Force and are performing records management support are referred to as records professionals. Contractor records professionals shall be appointed in writing to the AFTAC Records Manager and shall meet the training and performance requirements identified in AFI 33-322, Records Management Program and applicable AFTAC supplement. Contact the AFTAC Records Manager for specific guidance and procedures.

5.9 Special Training, Certification and Qualifications.

5.9.1 Contractor personnel requiring access to a Department of Defense (DoD) Information System shall obtain initial Information Assurance (IA) awareness orientation as a condition of access and thereafter shall complete annual IA refresher awareness, as required by DoD Directive 8570.01, Information Assurance Training, Certification, and Workforce Management or the appropriate governing directive at the time of contract award.

5.9.2 DoD 5570 Registration. The contractor shall register all DoD 8570 certificates into the Defense Workforce Certification Application (DWCA) using the following web address: https://www.dmdc.osd.mil/appj/dwc/index.jsp

5.9.3DWCA is the authoritative database of the DoD Military, Civilian and contractor personnel who hold active 8570 certifications used by the DoD Chief Information Officer’s office to validate, monitor and report on certification status of certified IA workforce members.
5.10Contractor Travel.

The contractor shall travel under the terms and conditions of this contract. Travel shall be required in accordance with (IAW) Federal Acquisition Regulations (FAR) Part 31 and the Joint Travel Regulation (JTR) for the performance of the contract requirements. The contractor shall obtain travel pre-approval authorization from the COR. The travel required is to maintain awareness of ongoing field operations at remote sites and for rotation of the technical advisors (TA). Costs for travel shall be billed on a strictly cost reimbursable basis IAW the regulatory implementation of Public Law 99-234, FAR subpart 31.205-46 entitled Travel Costs and Limitation of Funds specified in this contract. For budgeting purposes, the following series of trips is representative of the support anticipated for each period of performance of this contract. The exact location, dates, and number of trips may be changed under the direction of the PO.

· Two (2) round trips for one (1) person for approximately four (4) working days from Patrick AFB, FL to Dayton, OH

· Two (2) round trips for one (1) person for approximately four (4) working days from Patrick AFB, FL to Washington DC

· Seven (7) round trips for one (1) person for approximately four (4) working days from Patrick AFB, FL to Japan

· Two (2) round trips for one (1) person for approximately three (3) working days from Boston, MA to Melbourne, FL

· Two (2) round trips for one (1) person for approximately three (3) working days from Boston, MA to Washington, DC

· Two (2) round trips for one (1) person for approximately four (4) working days from Boston, MA to Dayton, OH

· One (1) round trip for one (1) person for approximately four (4) working days from Boston, MA to Japan

· One (1) round trip for one (1) person for approximately seven (7) working days from Boston, MA to location in the Mid-East

5.11 Deliverables.

Reports and other data required in this PWS shall be submitted in accordance with the Contract Data Requirements List (CDRL) in Exhibit A of this contract.

CDRL Data Item Number
Title Description
PWS Para.
Delivery Schedule
A001
Monthly Status Report

2.1.4, 2.4.5 Shall be provided by the 15th calendar day of the month for the previous month’s activity.

A002
Funds and Man-Hours Expenditure Report
2.4.6

Shall be provided by the 15th calendar day of the month for the previous months activity

A003
Technical Advisor Reports
2.1.1
Shall be provided by the 15th calendar day of the following month after event requiring report.
A004
Engineering Report
2.1.4, 2.2.4, 2.3.1, 2.3.3, 2.3.4, 2.4.2, 2.4.4
Shall be provided by the 15th calendar day of the following month after event requiring report.
A005
Special Analysis and Investigations
2.2.1, 2.2.2, 2.2.3, 2.3.4,

2.4.1 Submission date will vary and will be assigned by the PO

A006
CK Operations Report
2.1.5
Shall be provided within 30 calendar days of completion of deployment.

5.12 Contractor Manpower Reporting. The below information is for informational purposes only and shall not be initiated by the contractor without written direction from the Contracting Officer:

5.12.1. Overview. In accordance with Section 8108 of the National Defense Appropriations Act of Fiscal Year 2011, the contractor shall report, annually, for performing services on Department of Defense installations in support of this contract, all required prime contract and subcontract data, or require any subcontractors to report separately using the Enterprise-wide Contractor manpower Reporting Application (eCMRA) located at http://www.ecmra.mil. There are four separate eCMRA tools: Army, Air Force, Navy and All Other Defense Components. The appropriate eCMRA reporting tool to use if determined by the requiring activity being supported (e.g., if DISA awards a contract for an Air Force requiring activity, the contractor shall load the required reporting data in the “Depart of the Air Force CMRA” tool). The contractor shall report ALL contractor direct labor hours and direct labor dollars (including subcontractor labor hours) required for performance of services provided under this contract. The contractor is only responsible for entering the Contract and Loca5tion Data. The contractor may view user manuals and frequently asked questions (FAQs) at https://cmra.army.mil/Help/help.html.

5.12.2. Initial Contract Creation. The contractor shall enter initial data (Contract Data only) into the appropriate eCMRA tool to establish the basic contract record no later than 30 calendar days after receipt of contract award. The contractor shall notify the COR and the CO when the basic contract record has been established in the appropriate eCMRA tool.

5.12.3. Annual Reporting: Reporting inputs will be for the direct labor executed during the period of performance (PoP) for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October of each calendar year. The contractor shall provide reporting inputs for the final PoP of this contract no later than 30 calendar days after contract expiration. The contractor may direct technical questions about the eCMRA tool to the CMRA help desk at dodcmra@pentagon.af.mil.

5.12.4. Uses and Safeguarding of Information: Information from the secure website is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor’s name and contract number associated with the data.

5.13 Environmental Controls.

5.13.1 Compliance with Laws and Regulations. The contractor shall be knowledgeable of and comply with all applicable Interstate, Federal, State and Local laws, regulations and regulations regarding environmental protection. In the event these laws changed during the term of this contract, the contractor shall comply as such laws come into effect. If there is an increase or decrease in costs as a result of this change, the contractor shall inform the CO pursuant to notice requirements and negotiate a modification to the contract.

5.14 Transition.

5.14.1. In the event the incumbent is not the successful contractor for the follow-on contract award, the incumbent contractor hereby agrees to cooperate with the successor and to allow the successor to conduct interviews with its employees. If said employees are agreeable to the change and are accepted by the successor, then the incumbent contractor shall release them at a mutually acceptable date. Further, the contractor shall turn over to the successor contractor all administrative records and technical data acquired or formulated during the life of this contract.

5.14.2. The incumbent contractor’s own work shall carefully fit into the successor contractor’s phase-in schedule. The incumbent contractor shall not commit or permit any act which will interfere with the performance of work by the successor contractor or by the Government. The incumbent contractor shall take reasonable steps to aid in the transition of the successor’s work force into the environment, on a non-interference basis with the incumbent contractor’s responsibilities.

5.14.3. On a non-interference basis the successor shall be allowed to observe all activities which occur during the phase-in period. These activities shall include as a minimum over-the-shoulder observance of daily activities and other requests mutually agreed to by the involved parties.

APPENDIX A: ACRONYMS AND ABBREVIATIONS LIST

Acronym/Abbreviation Definition

AFTAC Air Force Technical Applications Center

CDRL Contract Data Requirements List

CK COBRA KING

CO Contracting Officer

COR Contracting Officer’s Representative

DoD Department of Defense eCMRA Enterprise Wide Contractor Manpower Reporting Application

FAR Federal Acquisition Regulation

FY Fiscal Year

GS GRAY STAR

IA Information Assurance

IAW In accordance with

IPT Integrated Product Team

IT Information Technology

JTR Joint Travel Regulation

MC Mission Commander

MDA Missile Defense Agency

MIT/LL Massachusetts Institute of Technology/ Lincoln Labs

OPR Office of Primary Responsibility

PoP Period of Performance

PO Program Office

PWS Performance Work Statement

SS Services Summary

TA Technical Advisor

TS TOP SECRET

TSRS Technical Sensors Radar Support

USASMDCUnited States Army Space & Missiles Defense
Command

File details come from the government source that posted it. Updated .