Attachment_5_QASP.pdf
PDF 258 KB Posted
- Attached to
- Business, Engineering & Technical Assistance (BETA) Federal contract opportunity
- Solicitation number
- FA7014-15-R-5012
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA7014-15-R-5012-0001.doc | DOC document | |
| Attachment_3_PPQ.pdf | ||
| FA7014-15-R-5012.doc | DOC document | |
| Attachment_1_Pricing_Sheet.xlsx | XLSX spreadsheet | |
| Attachment_2_PPQ_Cover_Letter.pdf | ||
| Attachment_4_DD_FORM_254.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan
Quality Assurance Surveillance Plan (QASP)
Under Secretary of the Air Force, Office of Business Transformation and
Deputy Chief Management Officer
Business, Engineering, and Technical Assistance (BETA)
Solicitation No. FA7014-15-R-5012
Contract No. FA7014-16-D-XXXX
COMPLIANCE WITH THIS DOCUMENT IS MANDATORY
OPR: SAF/US(M)S Reviewed by: SAF/US(M)S
GS-15, Mr. Jordan Wescott GS-15, Mr. J.R. Tillery
Contracting Officer Representative Deputy Director
Reviewed by: AFDW/PKQ Accepted by: AFDW/PKS
Mrs. MARY LAWRENCE Ms. Karen Cimorelli
Quality Assurance Program Coordinator Contracting Officer
TABLE OF CONTENTS
Section Page
1.0 SCOPE 3
1.1 Purpose 3
1.2 Application 3
2.0 MANAGEMENT LOCATIONS AND KEY PERSONNEL 3
2.1 Contract Management Locations 3
2.2 Contract Management Team 3
2.3 Contractor Key Personnel 4
3.0 CONTRACT SURVEILLANCE 4
3.1 Surveillance Methods 5
3.2 Surveillance Documents 6
3.3 Assessing Performance 7
4.0 WIDE AREA WORK FLOW (WAWF) 10
4.1 Validating Receiving Reports 10
4.2 Certifying Receiving Reports 11
4.3 Rejecting Receiving Reports 11
5.0 CONTRACTING OFFICER REPRESENTATIVE (COR) FOLDER 12
TABLES
1 Services Summary 6
2 Non-Conformance Notifications 8
3 Quarterly Performance Assessment Report Evaluation Categories 9
4 Performance Rating Definitions 9
5 COR Folder Tabs and Contents 12
ATTACHMENTS
1 First or Second Notice Template 13
2 Corrective Action Report (CAR) Template 14
3 Quarterly Performance Assessment Report (PAR) Template 15
1.0 SCOPE.
The Quality Assurance Surveillance Plan (QASP) is applicable to personnel performing contract surveillance audits in accordance with (IAW) Federal Acquisition Regulation (FAR) Part 46, Quality
Assurance; Department of Defense FAR Supplement (DFARS) Subpart and PGI 201.602-2, Contracting Officer Responsibilities; Air Force FAR Supplement (AFFARS) Mandatory Procedures
(MP) 5346-103, Contracting Office Responsibilities, The Quality Assurance Program; Air Force
Instruction (AFI) 63-501, Air Force Acquisition Quality Program; and organizational policy. It is designed to provide the Contracting Officer Representative (COR) a systematic surveillance method for each service identified in the Performance Work Statement (PWS) for each contract. The owning
Functional Director (FD) and COR develop the methods for administering and evaluating contract performance. The Quality Assurance Program Coordinator (QAPC) and Program Manager (PM) or
Contracting Manager (CM), will review these methods, which are then accepted or rejected by the
Contracting Officer (CO).
1.1 Purpose. This document defines the surveillance policy, procedures, and associated methods used by CORs and Program Managers (PM) for planning, preparing, performing, analyzing, and reporting Contractor performance. This QASP provides a systematic surveillance method to evaluate the services received from the Contractor, and NOT to address the details of how the Contractor accomplishes the work.
1.2 Application: This QASP is used by all parties involved with assessing Contractor performance and is for the use of FDs, CORs and CO. The Contractor may receive a courtesy copy in order to further enhance communications with the Contractor, but shall not be considered as part of the contract.
2.0 MANAGEMENT LOCATIONS AND KEY PERSONNEL.
2.1 AFDW/PKS: The address for Contracting Management is:
1500 W. Perimeter Rd
Suite 2720
Joint Base Andrews, MD 20762
2.2 Contracting Management Team.
Contracting Officer (CO) –: CO duties are detailed in FAR subpart 1.602-2. The CO is the only
Government agent authorized to award or modify contracts; therefore, the CO is the only person authorized to contractually obligate the Government. The CO is also the individual who will sign any notifications to Contractors regarding performance issues and accepts Government surveillance methods utilized for each TO. The CO approves/appoints all CORs assigned by the Functional
Director/Functional Commander.
The CO can be reached at DSN: 612-6118 or Commercial 240-612-6118.
2.2.1 Contract Manager (CM) –: The CM is the Government agent within the contracting office who performs day-to-day administration of the contract.
The CM can be reached at DSN: 612-6263 or Commercial 240-612-6263.
2.2.2 Program Manager (PM) –: The PM assists customers with requirements development and definition, PWS modifications, deficiency resolution, and portfolio management.
The PM can be reached at DSN: 256-0444 or Commercial 571-256-0444
2.2.3 Quality Assurance Program Coordinator (QAPC)-: The QAPC assists the CO and QAM in managing the overall QA program and supports customers in developing and adhering to TO-specific
QASPs.
The QAPC can be reached at DSN: 612-6140 or Commercial 240-612-6040
2.2.4 Functional Director (FD)/Functional Commander (FC). The FC/FD Identifies mission essential services, reviews contract performance documentation, by the COR, on a regular basis to ensure performance is compatible with contract mission objectives and nominates COR(s) for contract oversight. The FC/FD receives contract specific training by the QAPC.
2.2.5 Contracting Officer Representative (COR): The COR is ultimately responsible for implementing all QA matters and procedures. COR(s) should be at a level where other duties don’t prevent proper oversight of Contractor performance. The COR must maintain both technical competency and evaluation proficiency in Contractor surveillance procedures. The COR must also have enough knowledge of Contractor activities to properly review and disposition monthly invoices.
The COR cannot assume duties until assigned by the requiring agency (FC/FD), completed COR required training (CO/QAPC and CO led training), and appointed by the CO .
2.2.6 Contracting Officer Representative (COR) Alternate: The COR is ultimately responsible for implementing all QA matters and procedures. COR(s) should be at a level where other duties don’t prevent proper oversight of Contractor performance. The COR must maintain both technical competency and evaluation proficiency in Contractor surveillance procedures. The COR must also have enough knowledge of Contractor activities to properly review and disposition monthly invoices.
The COR cannot assume duties until assigned by the requiring agency (FC/FD), completed COR required training (CO/QAPC and CO led training), and appointed by the CO .
2.3 Contractor Key Personnel. TBD
2.3.1 Project Manager. The Contractor’s Project Manager is responsible for the overall execution of the task order. This individual will serve as the focal point for the PM/COR assigned to the contract and may interface with the customer, as needed.
2.3.2 Project Manager. The Project/Task Lead is responsible for technical or quality control oversight, this individual may be the Project Manager.
3.0 CONTRACT SURVEILLANCE. The COR function is responsible for a wide range of surveillance requirements that effectively measure and evaluate Contractor performance. The
Contractor, not the Government, is responsible for task order management and Quality Control (QC) actions to meet the terms of the contract. However, because of the non-commercial nature of the work performed by Contractors, the Government cannot rely solely on the Contractor’s quality program but must have a method to oversee the entire contracting process. The Government does this through the
QASP and can inspect or test all services called for by the contract, to the extent practicable, at all times and places, during the term of the contract. The COR contribution is comprised of professional, non-adversarial relationships, which include positive and open communications with the CO, PM, QAPC, and the Contractor. The foundation of this relationship is built upon regular, objective, fair, and consistent COR evaluations of Contractor performance against contract requirements, and the ability to discuss inspection results, trends, and items of mutual interest with the Contractor. The COR uses the methods in this QASP and the PWS to achieve this goal.
3.1 Surveillance Methods. Three primary methods of surveillance are normally used: one hundred percent inspection, periodic audits and customer complaints. Other methods of surveillance must be fully documented and approved by the CO and QAPC before implementation. Information obtained from these activities may be used by the FD/FC to ascertain whether or not Contractor performance is compatible with contract and mission objectives and by the CO for actions relating to the Contractor.
3.1.1 One Hundred Percent Inspection. This method will be used for Contractor submissions, products, and deliverables (tangible items). CORs will use the One Hundred Percent Inspection method to evaluate all reports delivered under Part III of the PWS. The COR, with assistance from the
FD and CO if necessary, accepts or rejects these products based on the criteria and performance standards as outlined in the PWS. The COR also documents all results of inspections actions, and subsequent Contractor re-performance taskings, if applicable.
3.1.2 Periodic Audit. This type of surveillance consists of evaluating products/services not surveyed via one hundred percent inspection or by customer survey, and is implemented at a pre-defined frequency. An example of periodic audit is performing monthly inspections of class training conducted by the Contractor or weekly inspection of a Contractor’s process in developing training manuals.
3.1.3 Customer Survey or Customer Complaint. Although usually not a primary method, this is a valuable supplement to other, more systematic methods of surveillance. For example, in a case where random sampling indicates unsatisfactory service, customer complaints can be used as substantiating evidence. In certain situations, where customers complain consistently when the quality of performance is poor (e.g., dining facilities, custodial services), customer surveys and customer complaints may be a primary surveillance method, and customer satisfaction an appropriate performance standard. In all cases, complaints will be documented, preferably on a standard form. All customer complaints shall be forwarded to the COR. Information obtained from customer complaint activities may be used by the
CO for actions relating to the Contractor.
3.2 Surveillance Documents.
3.2.1 Deliverables. All deliverables shall be reviewed for timeliness, accuracy and format. If a deliverable due date falls on a weekend or holiday, the Contractor shall submit the deliverable on the work day following the due date. 95% of deliverables must be received in format/by due date in accordance with the PWS. Remaining 5% or any documents needing correction must be submitted within three (3) business days.
3.2.1.1 Phase Out Transition Plan
3.2.1.2 OCI and NDA
3.2.1.3 Deliverables/ Ad-hoc
3.2.13 Quality Control Plan
3.2.2 Services Summary. The Services Summary is a list of critical tasks that must be performed by the Contractor, the performance threshold, and the method of surveillance the COR will use to validate/inspect these tasks. Performance of each task shall be documented in the quarterly
Performance Assessment Report (PAR).
Table 1
Performance
Objective PWS Reference
Performance
Threshold Frequency
Evaluation
Method
Monthly
Progress Report
1.10 on BASE
IDIQ PWS
Updates: Monthly by the 15h of each month
There is no more than one late deliverable per year.
Monthly monitoring with feedback
100%
Inspection
Progress Report is technically accurate and comprehensive
1.10 on BASE
IDIQ PWS
There is no more than one instance of a rejected report per year and all discrepancies are fixed within 5 days of notification from
COR of each month
Monthly monitoring with feedback
100%
Inspection
Qualified
Personnel are provided at task order start date
1.4-1.4.5 on
BASE IDIQ PWS
Resumes shall be submitted to the COR to ensure all candidates meet the minimum requirements of the
Task Order.
Monthly monitoring with feedback
100%
Inspection
3.2.3 Surveillance Checklist (Attachment 3). The COR is responsible for developing standard procedures for Surveillance Checklists and may request QAPC assistance; the Surveillance
Checklist serves as the guideline for all inspections. As a minimum, the Surveillance Checklist will include the items in the Services Summary and Deliverables Tables. The COR may also add other inspection activities/surveillance items to the Surveillance Checklist, with applicable PWS references, and obtain permission from the QAPC. These items may fluctuate throughout the course of the contract based on customer needs, identified risks, or issues related to Contractor performance. The COR will document all inspections conducted using the Surveillance
Checklist and maintain them in the COR folder.
3.3 Assessing Performance. CORs must document Contractor performance on each contract, as well as the scope and purpose of any inspections. Documentation will be maintained in the
COR’s folder. CORs will also assess and rate Contractor performance as it relates to contract requirements. Performance Assessment may take the form of notes, assessment results from the
Surveillance Checklist, non-conformance notifications, quarterly Performance Assessment
Reports (PAR) and annual Contract Performance Assessment Reports (CPAR). Each builds on the other and provides a thorough documented history of Contractor performance.
3.3.1 Inspections. The COR may perform inspection/surveillance at any time during contract performance IAW FAR 252.246-2 through 5, as applicable. The COR will retain all audit and inspection documentation until contract closeout, unless otherwise approved by the CO.
3.3.2 Non-conformances and Deficiencies. Audit or Inspection results that fall below contractual standards shall be identified as non-conformances or deficiencies. The COR will notify the contactor IAW para 3.3.3.2 and document all non-conformances, referencing the specific PWS requirement that the Contractor did not meet, document the name of the individual contacted, and date and time of notification. If the Contractor fails to take corrective actions in a reasonable time-frame, the COR will notify the CM/CO and QAPC for further actions.
3.3.2.1 Types of Non-conformance.
3.3.2.1.1 Minor Non-conformance: A minor non-conformance is a non-conformance, which by itself does not adversely impact mission, safety of personnel and/or equipment, performance
(quality), schedule (delivery), or cost. A minor non-conformance normally does not increase risk to the Government.
3.3.2.1.2 Major Non-conformance: A major non-conformance is a non-conformance that adversely impacts mission, safety of personnel and/or equipment, performance (quality), schedule (delivery), or cost. A major non-conformance also increases risk to the Government.
An example of increasing risk would be recurring non-conformances, which indicates inadequate preventive measures or actions, thus lowering the Government’s confidence that quality services will be provided on time and at cost.
3.3.2.2 Non-conformance Notification: If a deficiency is found during inspection of the
Contractor’s performance, the COR will determine the type of notification based on the category of the non-conformance (see Table 3) and pursue non-conformance resolution per paragraph 3.4.
3.3.2.2.1 First or Second Notices (see Attachment 1). As shown in Table 3, First and Second
Notices provide written notification from the Government to the Contractor of minor non-conformances. Initial minor non-conformances should be addressed with a First Notice to the applicable Contractor representative. The COR will notify both the CM/CO and the QAPC of the issue, and prepare the notice for CO signature. The COR will provide a final, signed copy to the CM/CO and QAPC. The CO will provide the First notice to the contractor with a suspense date for the contractors reply. If the Contractor fails to respond by the specified due date, the
COR will notify the CO/QAPC for action and annotate the Contractor’s non-responsiveness in the quarterly PAR. If the Contractor fails to resolve the issue as documented in the Notice, the
COR should elevate the issue to the next level (CAR). Corrective/preventive actions initiated and/or completed by the Contractor will be verified by CORs on the scheduled inspection and documented accordingly.
3.3.2.2.2 Corrective Action Requests (CAR) (see Attachment 2). As shown in Table 3, a
CAR provides written notification from the Government to the Contractor of significant performance discrepancies. The COR will recommend to the CM/CO and QAPC that a CAR be issued when previous notifications failed to result in corrective actions or when severe deficiencies exist. If a CAR is deemed necessary, the QAPC will assist the COR in filling out the CAR. The draft CAR will be routed NLT ten duty days after the event to the CO for review and signature, as the CO is the only person who has authority to issue a CAR to the Contractor.
3.3.2.2.2.1 To satisfactorily close-out a CAR, the following criteria must be met: the
Contractor must meet the suspense; the corrective action must have already begun; and the
Contractor's actions must correct the deficiency and if applicable, be within specified standards.
3.3.2.2.2.2 If the corrective action is deemed UNSATISFACTORY by the COR, annotate the
CAR accordingly and forward it to the CO with a brief explanation, including an estimate of the
Government's loss due to the deficient performance. The estimate may account for loss or destruction of property, supplies, or equipment, and hours lost to re-perform the task. If the task cannot be re-performed, indicate the number of hours it ordinarily would have taken to do the task.
3.3.2.2.3 The COR will maintain a non-conformance log documenting all First Notices and
CARs. The log will include the date sent to the Contractor, issue, due date for response and actual response date. If a detailed response is required, include a link to the response and include the response in the applicable COR folder tab.
3.3.3 Quarterly Services Summary Reporting – CORs will perform services summary inspections (table 2) and document in PAR.
TABLE 2 – NON-CONFORMANCE NOTIFICATIONS.
Non-conformance Category Notification Type
Minor
Step 1: First Notice
Step 2: Corrective Action Request (CAR)
Major CAR
3.3.4 Quarterly Performance Assessment Report (PAR) (Attachment 4). The COR will accomplish quarterly PARs documenting Contractor performance for the preceding quarterly performance period. This is a critical document giving the CO performance oversight on all services and ensures all products during the quarterly period were provided to the Government
IAW all contract and TO requirements. The QAPC will notify/suspense the COR for providing information on the Contractor’s performance. The COR will provide the both QAPC and FD a copy of the completed report.
3.3.4.1 Quarterly PAR Evaluation Categories. The quarterly PAR will also provide a brief summary of Contractor performance covering, as applicable, the categories in Table 4 below.
3.3.4.2 Performance Rating Definitions. The COR rates each of the quarterly PAR categories, as applicable, based on the Contractor’s actual performance during the reporting period (see
Table 5 below). These ratings can also serve as a basis for CPARs. Ratings will not be arbitrary or reflect an emotional assessment of the Contractor’s performance. Any ratings other than
‘Meets Standards’ must be appropriately justified. For instance, if the COR rates the
Contractor’s performance as ‘Exceeds Standards,’ the COR must show what PWS was exceeded and how that benefitted the Government.
TABLE 4 – PERFORMANCE RATING DEFINITIONS
Rating Definition
Exceeds
Standards
Contractor performance meets contractual requirements and exceeds some/many to the Government’s benefit. A Contractor may still receive this rating if there were few minor performance problems for which corrective actions taken by the
Contractor were effective. Note: To justify this rating, identify significant events and state the benefit to the Government. However, a singular benefit could be of such magnitude that it alone constitutes an ‘Exceeds Standards’ rating. Also, there should be NO significant weaknesses identified in the category evaluated.
Meets Performance meets contractual requirements. There may be some minor
TABLE 3 – PERFORMANCE ASSESSMENT REPORT (PAR) EVALUATION
CATEGORIES
Category Criteria
Quality of Product or Services
Assess the Contractor’s conformance to contract requirements, specifications, and standards of good workmanship (e.g., commonly accepted technical, professional, or safety and health standards)
Schedule
Assess the timeliness of the Contractor against completion of the contract, TOs, milestones, delivery schedules, or administrative requirements (e.g., efforts that contribute to or effect a schedule variance).
Business Relations
Assess the Contractor’s ability to integrate and coordinate all activities needed to execute the contract; specifically the timeliness, completeness and quality of problem identification, corrective actions, the Contractor’s history of reasonable and cooperative behavior, customer satisfaction.
Management of
Key Personnel
Assess the Contractor’s performance in selecting, retaining, supporting, and when necessary, replacing key personnel.
Standards performance problems for which corrective actions taken by the Contractor appear or were satisfactory. Note: To justify this rating, there should have been only minor problems, or major problems from which the Contractor recovered without impact to the contract. Also there should be NO significant weaknesses identified.
Below
Standards
Performance does NOT meet some contractual requirements. Contractor performance reflects a serious problem(s) or more than three minor issues for which the Contractor has not yet identified corrective actions or corrective actions have not been successful. Any proposed actions appear only marginally effective, were not fully implemented, or were ineffective. Note: To justify this standard, identify an event(s) that the Contractor had trouble overcoming and state how it impacted the
Government. This rating should be supported by referencing any non-conformance notification sent to the Contractor.
3.3.5 Annual Contract Performance Assessment Reporting System (CPARS) –
The Contractor Performance Assessment Reporting System (CPARS) http://www.cpars.csd.disa.mil/cparsmain.htm ) is the Department of Defense (DoD) Enterprise
Solution for collection of Contractor Past Performance Information (PPI) as required by the
Federal Acquisition Regulation (FAR). CPARS is a web-enabled application that collects and manages a library of automated Contractor report cards. An annual CPAR will be written on all contracts that exceed $1M total contract value. The COR (or PM) will be designated as the
Assessing Official Representative (AOR) in CPARS; the written assessment in CPARS will begin annually from the start date of the contract and forwarded to the Contract Manager within
60 days of the contract start date anniversary. The AOR will use objective evidence from previous quarterly PARS, monthly Services Summary, inspection logs, 1 st notices, CARS, and correspondence letters for CPARs assessment. A CPARS quality checklist is available at the following link. http://www.cpars.csd.disa.mil/cparsfiles/pdfs/CPARSQualityChecklist.pdf.
4.0 WIDE AREA WORK FLOW (WAWF).
The COR will accept or reject all Receiving Reports submitted by the Contactor in WAWF within 15 days of submittal by the Contractor when possible. To access the receiving report, log into WAWF, select the Government, Acceptor, Acceptance Folder tab; then type in the contract and delivery order (task order) number. The Shipment Number column in WAWF is the
Receiving Report number
4.1 Validating Receiving Reports. The COR will review and validate all WAWF receiving reports (Shipment Number in WAWF) ensuring that:
The Contractor submitted a combination invoice/receiving report
The report reflects the correct contract
Beginning and ending dates being billed are stated and accurate
The correct CLINs are charged for billing period
A description of the services is provided
The correct amount is charged, to include applicable handling rates
Invoiced travel was pre-approved http://www.cpars.csd.disa.mil/cparsmain.htm http://www.cpars.csd.disa.mil/cparsfiles/pdfs/CPARSQualityChecklist.pdf
Back-up documentation is attached that includes a Contractor invoice with current and cumulative hours (for FFP LOE contracts) and amounts, as applicable
A breakout of any other charges, as agreed to by the CO or required by the contract, is attached in WAWF or has been provided to the COR
4.2 Certifying and Accepting Receiving Reports.
4.2.1 Certification of services is ALWAYS performed by the appointed COR. After validation of services is performed by the COR per paragraph 4.1 above, the COR will select the “CQA”
(Contract Quality Assurance) button to verify that the invoice was accurate, this step will normally select the Acceptance: button also. If anyone other than the COR (typically the
Resource Advisor (RA)) is accepting services for the task order, the COR MUST certify in writing to the acceptor that services have been inspected/validated, the acceptor must then state in the comments block (under Misc Info tab) that the COR has reviewed, validated and certified services/invoices. In all cases, the COR will retain documentation (electronic or hard copy) showing COR validation and certification, as well as final acceptance of Contractor invoices.
4.2.2 COR Expenditure Log. After certification of an invoice in WAWF, the Primary COR will update the expenditure log documenting/tracking certified invoice expenditures against funds allocated on the contract against each CLIN. The QAPC will provide a template, if requested. Funding belongs to the organization where the COR resides; the COR expenditure log allows the COR to ensure that funds are available for the work performed, to include travel and materials.
4.3 Rejecting Receiving Reports.
4.3.1 If a receiving report is rejected in WAWF, the COR will go to the Miscellaneous Info tab to complete the comments block as follows:
List details regarding all unsatisfactory services or incorrect invoice information
AND
Instruct the Contractor to contact DFAS to have the invoice rejected back to the
Contractor; this will allow the Contractor to make the same correction on both the receiving report and invoice, since combination invoices/receiving reports are required.
4.3.2 The rejecter will then return to the Header tab and click the “Reject to Initiator” block.
Anyone other than the COR may reject receiving reports in WAWF, but only when services/invoices have been reviewed and rejected by the COR in writing per the paragraph above. After rejecting the receiving report, e-mail the CM/CO the contract number, receiving report number, and reason for rejection.
5.0 COR FOLDER.
The Primary COR will establish and maintain a COR folder for each task order. The COR folder must contain the tabs and contents outlined below in Table 6. ALL surveillance records are considered FOR OFFICIAL USE ONLY documents, and must be marked and safeguarded as such. Documentation is kept for the life of the contract and provides necessary continuity should
COR duties transition during the course of the contract. The FD/FC and COR will receive instructions from the CO on disposition or archival procedures upon contract completion.
TABLE 5 – COR FOLDER TABS & CONTENTS
Tab Title Items to Include
1 General Correspondence
2 COR Appointment Letter(s) Assignment/nomination letter(s), appointment letter(s) and Government/Contractor relationships guidance
3 COR Training Training certificates for Phase I and Phase II training
4 Contract/Task Order, Modifications, PWS, Pricing
Contract for current level of effort, any modifications and most current PWS/amendment on contract, and Contractor’s contract/task order pricing
5 Quality Assurance Surveillance Plan, Surveillance Checklist
Contract/task order QASP, approved surveillance checklist, and completed surveillance checklists
6 Contractor’s Quality Control Plan If applicable
7 First & Second Notices, Corrective
Action Reports (CAR)
Non-conformance log, First and Second Notices and CARs issued to Contractor
8 Contractor Deliverables CDRLs, deliverable specified in contract/task order, reports, etc.
9 Quarterly Performance Assessment
Reports (PAR)
10 WAWF Invoices & Attachments If electronic, must be available upon request and for the life of the contract
11 COR Expenditure Log Updated with latest invoice and funding
12 DD Form 254 If applicable
13 Additional Documentation The COR will maintain a written or electronic log which can be used to assist in tracking burn rates, minor deficiencies and progress on the task order or any other information the COR deems necessary or appropriate.
Attachment 1
First or Second Notice Template
(January 15, 2016)
MEMORANDUM FOR (TBD)
FROM: (CO’s Name and Office Symbol)
SUBJECT: First/Second Notice for Contract for Business Engineering & Technical
Assistance on – contract (#TBD)
1. Contracting Officer Representative: (Mr. Jordan Wescott)
2. Office: (SAF/US(M)S)
3. Date response due from Contractor: (dd-mmm-yyyy)
4. Requirement Reference: (PWS section and paragraph; Deliverable, Services Summary (SS))
5. Performance Requirement: (State what action the Contractor should have performed IAW the reference above)
6. Description of Non-Conformity: (provide objective evidence of the Contractor’s performance discrepancy(ies))
(CO signature block))
Quality Assessment Surveillance Plan
Attachment 2 Corrective Action Request (CAR)
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY MAJOR MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (QAP)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. QAP RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. QAP DETERMINATION
ACCEPTED REJECTED
12. CLOSE DATE
Attachment 3
PAR
QUARTERLY PERFORMANCE ASSESSMENT REPORT (PAR)
COR: Report Month:
Organization: Date Submitted:
Contract No.: Contractor:
Contract Title:
Contractor Team Lead:
Method of Performance Evaluation
At least every month, performance will be evaluated by using one or more of the methods checked below. Check all that apply or may be used if deeper levels of scrutiny are required.
RATING: Exceptional Very Good Satisfactory Marginal Unsatisfactory
TRAVEL: Date______ Destination________________
(COR signature)
Attachment 3
PAR
PERFORMANCE SUMMARY
CRITERIA:
a. Quality –
b. Schedule –
c. Cost Control – N/A
d. Business Relations –
e. Management –
f. Small Business –
g. Other Areas –
a. Personnel Attraction/Retention:
b. Security
TECHNICAL PERFORMANCE:
DEFICIENCIES:
AREAS FOR IMPROVEMENT:
ADDITIONAL COMMENTS:
File details come from the government source that posted it. Updated .