QA_FA700019RA0001_-_dtd_20190219.docx

DOCX document 22 KB Posted

Attached to
Glass Cleaning Federal contract opportunity
Solicitation number
FA700019RA001
Issued by
Department of the Air Force Headquarters Air Force Academy

View the file

Other files for this federal contract opportunity

Other files attached to Glass Cleaning, newest first.
File Type Posted
Glass_Cleaning_Synopsis-Solicitation_Amendment_3.pdf PDF
Attachment_2_-_Rev._1_Price_Schedule.xlsx XLSX spreadsheet
Attachment_4_-__Financial_Reference.pdf PDF
Attachment_1_-_Rev._2_PWS_Glass_Cleaning.doc DOC document
Attachment_3_-SCA_WD_20190114.pdf PDF
Facility_2170.xlsx XLSX spreadsheet
Attachment_1_-_Rev._1_PWS_Glass_Cleaning.doc DOC document
Facility_2169.xlsx XLSX spreadsheet
Facility_2168.xlsx XLSX spreadsheet
Facility_2244.xlsx XLSX spreadsheet
Facility_49001.xlsx XLSX spreadsheet
Facility_2163.xlsx XLSX spreadsheet
Attachment_3_-SCA_WD_20190114.pdf PDF
Attachment_4_-__Financial_Reference.pdf PDF
Facility_2304.xlsx XLSX spreadsheet
Facility_10075.xlsx XLSX spreadsheet
Glass_Cleaning_Synopsis-Solicitation_Amendment_2.pdf PDF
Attachment_2_-_Price_Schedule.xlsx XLSX spreadsheet
Facility_2410.xlsx XLSX spreadsheet
Facility_2245.xlsx XLSX spreadsheet
Facility_2246.xlsx XLSX spreadsheet
Facility_2335.xlsx XLSX spreadsheet
Facility_2164.xlsx XLSX spreadsheet
Glass_Cleaning_Synopsis-Solicitation_Amendment_1.pdf PDF
Attachment_4_-__Financial_Reference.pdf PDF
Attachment_2_-_Price_Schedule.xlsx XLSX spreadsheet
Attachment_1_-_PWS_Glass_Cleaning.doc DOC document
Glass_Cleaning_Synopsis-Solicitation.pdf PDF
Attachment_3_-SCA_WD_20190114.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USAFA Glass Cleaning

FA700019RA001

Questions & Answers

1. What is the difference between “windows” and “interior/exterior” in the PWS Appendix A – Estimated Workload Data chart?

Answer:

Verbiage in Appendix A has been changed and changes have been highlighted. “Windows” has been changed to “exterior glass”. “Interior/exterior” has been changed to “Interior/Exterior Glass”. The spreadsheets provided explain how we were able to break it down. Unfortunately, we do not have spreadsheets for all the facilities, but will have them developed for future use.

2. Is there access to water at each facility?

Answer:

Yes

3. What is the frequency for roof anchor testing?

Answer:

USAFA tests in accordance with the OSHA requirements. An inspection is performed every year and a certification is performed, at a minimum, every ten years.

4. It was stated during the site visit that Charlie 1 and Charlie 2 only have exterior glass cleaned? Should the PWS Appendix A state “Exterior” under the type?

Answer:

The verbiage has been changed to Exterior Glass.

5. On interior partition glass – The assumption is that we will be cleaning both sides of the glass. Has this been factored into the square footage?

Answer:

Yes. See the breakdown in the excel spreadsheets. Interior represents one side of the glass and exterior represents the other side of the glass which results in capturing both sides. If both sides are not captured, a zero will be present in one of the columns.

6. The host indicated several exceptions in cleaning areas/locations. What are they?

Answer:

See the excel spreadsheet for breakdown of glass cleaning. All exceptions have been noted. Glass cleaning that is not required by the contract will have a zero in either the interior or exterior column. Interior represents one side of the glass and exterior represents the other side of the glass which results in capturing both sides.

File details come from the government source that posted it.