Attachment_1_-_Rev._2_PWS_Glass_Cleaning.doc
DOC document 109 KB Posted
- Attached to
- Glass Cleaning Federal contract opportunity
- Solicitation number
- FA700019RA001
About this file
Attachment 1 - Rev. 2 PWS Glass Cleaning
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
FOR
GLASS CLEANING SERVICES
United States Air Force Academy, Colorado Revision 2 22 February 2019
PERFORMANCE WORK STATEMENT
FOR
GLASS CLEANING SERVICES
1. DESCRIPTION OF SERVICES. The contractor shall provide all management, tools, supplies, equipment and labor necessary to ensure that glass cleaning services are performed at the United States Air Force Academy (USAFA), Colorado in a manner that will maintain a neat and professional appearance. The estimated workload data is at Appendix A.
1.1. CLIN 0001 – BASIC SERVICES. The contractor shall provide glass-cleaning services to the on-base locations designated in Appendix A. Individual task orders will be issued to define facilities to be cleaned, quantity (frequency), and period of performance. Glass-cleaning services will include washing the interior and exterior sides of all glass to include glass in doors, partitions, walls, windbreaks at entrances, mirrors, and etc. All glass, screens, and adjacent sills, frames, ledges, and etc. shall be free of dirt, film, smudges, streaks, debris, water, and other foreign matter. The contractor will be responsible for any damage to the screens caused by the contractor in the performance of this work. The services shall include complete cleanup of the work area, leaving no debris or cleaning supplies. The contractor shall perform the following services in accordance with the Occupational Safety and Health Administration (OSHA) and the American National Standards Institute (ANSI) safety guidelines:
· Wash and dry glass, windows, and/or spandrel panels.
· Inspect glass and seals of windows to ensure the seals have not failed and notify Contracting Officer’s Representative (COR) when glass/windows need to be repaired or replaced.
· Remove, clean, and replace screens as required. If screens are damaged or need repair, notify COR immediately.
· Remove foreign matter and clean frames, casings, and sills.
1.2. CLIN 0002 – ABOVE AND BEYOND and SPECIAL EVENT GLASS CLEANING SERVICES.
1.2.1. ABOVE AND BEYOND. The contractor will provide price per square foot, in accordance with the Attachment 2 – Price Schedule. Above and Beyond services will cover glass-cleaning services, as described in paragraph 1.1, for any facility at USAFA. This may include services for facilities identified in Appendix A or facilities not identified in Appendix A. The Government will request and the contractor will provide a proposal based on the price per square foot in Attachment 2 and the associated square footage. The Government will either execute a task order for the above and beyond service or will pay via Government Purchase Card (GPC).
1.2.2. SPECIAL EVENT GLASS CLEANING. Upon notification by the COR, the contractor shall perform special event glass cleaning services as required. Special event services will be performed at the proposed price for the appropriate facility. If the special event request causes services to be performed twice in one performance period (monthly, quarterly, etc.), the Government will pay for the additional service via GPC. If the service is to exceed the $25,000 threshold for GPC, prior to the requested service, the Government will issue a separate task order under CLIN 0002 Above and Beyond services. If this work involves only a part of the facility and not the whole facility, the Government will request and the contractor will provide a proposal based on the price per square foot in Attachment 2 and the associated square footage.
1.2.2.1. SCHEDULE. The COR will notify the contractor of these requirements not later than three (3) calendar days in advance of the date in which the work is to be done.
2. SERVICE DELIVERY SUMMARY.
| Performance Objective |
| SOW Para |
| Performance Threshold |
Clean glass, Screens, Sills, and Frames.
Glass-cleaning services will include washing the interior and exterior sides of all glass to include glass in doors, partitions, walls, windbreaks at entrances, mirrors, and etc. All glass, screens, and adjacent sills, frames, ledges, and etc. shall be free of dirt, film, smudges, streaks, debris, water, and other foreign matter.
| 1.1 |
| No more than 4 defects per month. |
| Performance Objective (Cont’d) |
| SOW Para |
| Performance Threshold |
| Identify Unserviceable Glass. Inspect glass and seals of windows to ensure the seals have not failed and notify Contracting Officer’s Representative (COR) when glass/windows need to be repaired or replaced. Remove, clean, and replace screens as required. If screens are damaged or need repair, notify COR immediately. |
| 1.1 |
| 0 deficiencies |
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES. The government will provide, without cost to the contractor, water and electricity. The contractor shall use electricity from existing outlets. The contractor shall conserve water to the maximum extent possible.
4. GENERAL INFORMATION.
4.1. QUALITY CONTROL. Contractor shall develop and maintain a quality program to ensure glass cleaning services are performed in accordance with commonly accepted commercial practices and OSHA/ANSI safety guidelines. The contractor shall develop and implement procedures to identify and prevent defective services from recurring. As a minimum, the contractor shall develop quality control procedures that address the areas identified in paragraph 2, Service Delivery Summary. The COR must have a specific quality control inspector to notify in case of customer complaints.
4.2. QUALITY ASSURANCE. The government will periodically evaluate the contractor’s performance in accordance with the Quality Assurance Surveillance Plan.
4.3. GOVERNMENT REMEDIES. The contracting officer shall follow the requirements of FAR 52.212-4, Contract Terms and Conditions for Commercial Items (Oct 2018), for contractor’s failure to correct nonconforming services.
4.4. WORK IDENTIFICATION AND SCHEDULING. The contractor shall schedule the work to be performed under this contract and obtain the Facility Manager’s coordination with that schedule. A Facility Manager’s listing will be provided upon award of the contract, then as updates occur. The contractor shall submit the work schedule for approval by the COR prior to implementation. The schedule shall list the specific buildings to be cleaned and the specific day when they will be cleaned. The contractor shall comply with the approved schedule except for delays beyond his control, e.g. inclement weather. The contractor shall notify the COR of any delays and coordinate the rescheduling of all delayed work with the appropriate facility manager. Changes to the schedule shall be submitted for COR approval prior to implementation. The Contracting Officer may direct changes to the schedule at any time during the life of the contract. Facilities and frequency of glass cleaning is in Appendix A, Workload Data.
4.4. HOURS OF OPERATION. Work under this contract shall be performed during the hours 7:30 A.M. through 4:30 P.M., Monday through Friday. However, the contractor shall coordinate exact days and times with each facility manager (reference Paragraph 4.4.) and provide a schedule of these coordinated dates and times to the COR at least five (5) days before the work begins. The government reserves the right to change the work schedules as long as the change is made no later than three (3) work days prior to original date.
4.4.1.
Holidays. The contractor is not required to provide services on the following Federal Holidays:
New Year’s Day Labor Day
Martin Luther King’s Birthday Columbus Day
President’s Day Veteran’s Day
Memorial Day Thanksgiving Day
Independence Day Christmas Day
4.5. PERFORMANCE OF SERVICES DURING CRISIS DECLARED BY THE NATIONAL COMMAND AUTHORITY OR OVERSEAS COMBATANT COMMANDER. The contractor shall not perform work during a crisis declared by the Secretary of Defense or the Overseas Combatant Commander.
4.6. CONTRACTOR FULL-TIME EQUIVALENT REPORTING. The contractor shall report all contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the United States Air Force Academy via a secure data collection site. The contractor is required to completely fill in all required data fields at http://www.ecmra.mil.
4.6.1. REPORTING INPUTS
Reporting inputs will be for the labor executed during the period of performance during each government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year. Contractors may direct questions to the Contractor Manpower Reporting Application (CMRA) help desk.
4.6.2 REPORTING PERIOD
Contractors are required to input data by 31 October of each year.
4.6.3 USE AND SAFEGUARDING OF INFORMATION
Information from the secure web site is considered to be proprietary in nature when the contract number and contractor identity are associated with direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.
4.6.4 USER MANUALS
Data for the Air Force service requirements must be input at the Air Force CMRA link http://www.ecmra.mil. However, user manuals for government personnel and contractors are available at the Army CMRA link.
5. APPENDICES.
A. Estimated Workload Data B. Environmental Management System Commitment Statement
APPENDIX A
ESTIMATED WORKLOAD DATA
| Facility |
| Facility Name |
| Type |
| Square Feet |
| Frequency |
| 2163 |
| Charlie 1 Traffic Check House |
| Exterior Entrance Doors |
| 61 |
| 1 x Weekly |
| 2163 |
| Charlie 1 Traffic Check House |
| Exterior Glass |
| 430 |
| Annually |
| 2164 |
| Holaday Athletic Center |
| Exterior Entrance Doors |
| 300 |
| Daily |
| 2164 |
| Holaday Athletic Center |
| Exterior Glass |
| 4,227 |
| Quarterly |
| 2164 |
| Holaday Athletic Center |
| Exterior Glass |
| 2,759 |
| Annually |
| 2168 |
| Falcon Athletic Center |
| Doors/Mirrors |
| 1,738 |
| Daily |
| 2168 |
| Falcon Athletic Center |
| Interior/Exterior Glass |
| 2,063 |
| Quarterly |
| 2168 |
| Falcon Athletic Center |
| Interior/Exterior Glass |
| 22,342 |
| Annually |
| 2169 |
| Cadet Field House |
| Doors/Mirrors |
| 1,429 |
| Daily |
| 2169 |
| Cadet Field House |
| Interior/Exterior Glass |
| 2,145 |
| Quarterly |
| 2169 |
| Cadet Field House |
| Interior/Exterior Glass |
| 6,694 |
| Annually |
| 2170 |
| Cadet Physical Education Facility |
| Doors/Mirrors |
| 6,182 |
| Daily |
| 2170 |
| Cadet Physical Education Facility |
| Interior/Exterior Glass |
| 12,561 |
| Quarterly |
| 2170 |
| Cadet Physical Education Facility |
| Interior/Exterior Glass |
| 35,103 |
| Annually |
| 2244 |
| Track Press Box |
| Doors/Partitions |
| 55 |
| Per Request |
| 2244 |
| Track Press Box |
| Exterior Glass |
| 438 |
| Per Request |
| 2245 |
| Soccer Press Box |
| Exterior Glass |
| 364 |
| Per Request |
| 2246 |
| Lacrosse Press Box |
| Exterior Glass |
| 168 |
| Per Request |
| 2300 |
| Center for Character & Leadership Development |
| Interior/Exterior Glass |
| 1257 |
| 1 x Weekly |
| 2302 |
| Arnold Hall |
| Interior/Exterior Glass |
| 16,318 |
| Per Request |
| 2302 |
| Arnold Hall |
| Exterior Entrance Doors |
| 2879 |
| 1 x Weekly |
| 2304 |
| Harmon Hall |
| Interior/Exterior Glass |
| 37,812 |
| Per Request |
| 2304 |
| Harmon Hall |
| Exterior Entrance Doors |
| 1,019 |
| 1 x Weekly |
| 2335 |
| Charlie 2 Traffic Check House |
| Exterior Entrance Doors |
| 61 |
| 1 x Weekly |
| 2335 |
| Charlie 2 Traffic Check House |
| Exterior Glass |
| 430 |
| Annually |
| 2346 |
| Visitor’s Center |
| Interior/Exterior Glass |
| 6,546 |
| Per Request |
| 2346 |
| Visitor’s Center |
| Exterior Entrance Doors |
| 982 |
| 1 x Weekly |
| 2350 |
| Mitchell Hall |
| Interior/Exterior Glass |
| 16,725 |
| Per Request |
| 2351 |
| Mitchell Hall Annex |
| Exterior Entrance Doors |
| 264 |
| 1 x Weekly |
| 2355 |
| CETF |
| Exterior Entrance Doors |
| 1148 |
| 1 x Weekly |
| 2354 |
| Fairchild Hall |
| Exterior Entrance Doors |
| 8855 |
| 1 x Weekly |
| 2410 |
| Aero Science Lab |
| Exterior Entrance Doors |
| 423 |
| 1 x Weekly |
| 2413 |
| Academic Training Facility |
| Exterior Entrance Doors |
| 308 |
| 1 x Weekly |
| 2416 |
| Observatory |
| Exterior Entrance Doors |
| 93 |
| 1 x Weekly |
| 3120 |
| Officer’s Club |
| Interior/Exterior Glass |
| 5,794 |
| Per Request |
| 9202 |
| RSU |
| Interior/Exterior Glass |
| 600 |
| Monthly |
| 9231 |
| Air Traffic Control Tower |
| Interior/Exterior Glass |
| 2,852 |
| Monthly |
| 10075 |
| Baseball Press Box |
| Exterior Glass |
| 68 |
| Per Request |
| 49001 |
| Falcon Stadium |
| Various Interior Glass |
| 3,897 |
| Per Request |
| 49001 |
| Falcon Stadium |
| Exterior Glass |
| 80,628 |
| Per Request |