Atch1PerformanceWorkStatement(04-25-07).doc
DOC document 171 KB Posted
- Attached to
- Carpet Cleaning Services Federal contract opportunity
- Solicitation number
- FA7000-07-R-0026
About this file
PWS
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attendance_Sheets_for_Site_Visit_9_June_2015f.pdf | ||
| MFR_for_Site_Visit_9_June_2015.pdf | ||
| Site_Visit_Slides_Construct_New_GC_Clubhouse.pptm | PPTM file | |
| FA7000-07-R-0026CarpetCleaningServicesQuestions Answers1.doc | DOC document | |
| FA7000-07-R-0026CarpetCleaningServicesSiteVisit.doc | DOC document | |
| FA7000-07-R-0026CarpetCleaningServicesQuestionsandAnswers.doc | DOC document | |
| FA7000-07-R-0026CarpetCleaningServicesQuestionsandAnswers2.doc | DOC document | |
| FA7000-07-R-0026Amendment0001.doc | DOC document | |
| FA7000-07-R-0026ConformedSolicitation.doc | DOC document | |
| Atch3PPQCoverltr.pdf | ||
| Atch3PPQ.doc | DOC document | |
| Solicitation.doc | DOC document | |
| Atch2WD05-2079REV5.doc | DOC document | |
| PWSsigcovrsheet.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA7000-07-R-0026
ATTACHMENT 1
PERFORMANCE WORK STATEMENT
FOR
CARPET CLEANING SERVICES
UNITED STATES AIR FORCE ACADEMY
COLORADO
25 APRIL 2007
TABLE OF CONTENTS
PARA
DESCRIPTION
PAGE
1.
General 1.1.
Service Calls
1.2.
Contractor Employees
1.3.
Communications
1.4.
Cleaning Preparation
1.5.
Cleaning 1.6.
Standards 1.7.
Emergency Cleaning 1.8.
Security Requirements 1.9.
Submittal and Approvals
1.10.
Vehicle Registration 1.11.
Environmental Requirements
2.
Method of Surveillance Appendices
Appendix A Workload Estimates
Appendix B Overarching Environmental Specifications
PERFORMANCE WORK STATEMENT
FOR
CARPET CLEANING SERVICES
1.
GENERAL. The contractor shall provide all personnel, equipment, tools, materials, supervision, and all other items and services necessary to perform carpet cleaning services at the Air Force Academy. Approximately 50% of the work is done during the hours 7:30 A.M. through 5:00 P.M., Monday through Friday. The other 50% is accomplished at night and on weekends.
1.1.
SERVICE CALLS.
1.1.1.
All service calls for carpet cleaning services shall be given to the contractor by the contract monitor. Upon receipt of a service call the contractor shall arrange the cleaning by contacting the building manager within two (2) workdays to schedule a specific date and time and to coordinate access to the building. The contractor shall notify the contract monitor of the specific date/time the cleaning is scheduled to be completed. A building managers listing shall be provided to the contractor upon award of contract.
1.1.2.
The government may change or cancel any previously scheduled cleaning no later than 24 hours prior to the time scheduled cleaning was to commence.
1.2.
CONTRACTOR EMPLOYEES.
1.2.1.
The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent, shall be designated in writing to the Contracting Officer. The contract manager or alternate shall be available during normal duty hours to meet on the installation with government representatives to discuss problem areas. Response time is one (1) hour.
1.2.2.
Carpet cleaning shall be accomplished by certified carpet cleaning technicians. The contractor shall ensure technicians have certified training to provide required services specified in the SOW during the life of the contract. Certification documentation shall be submitted to the contract monitor, to include when personnel changes occur.
1.3.
COMMUNICATIONS.
1.3.1.
The contractor shall provide telephone numbers of key personnel that may be contacted during and after normal duty hours.
1.4.
CLEANING PREPARATION.
1.4.1.
Carpeted areas to be cleaned may have tables, sofas, chairs, desks, etc. Where this is the case, the contractor shall move these items with caution to avoid damage. Upon completion of cleaning the carpet, the moved items shall be returned to their original location, using extreme caution. The carpet shall be protected from staining by the furniture.
1.4.2.
Items, such as chairs, wastebaskets, etc. shall not be placed or stacked on top of desks, tables, credenzas, or other furniture.
1.4.3.
The contractor will not be required to move filing cabinets, copying machines, bookshelves, conference room tables, refrigerators, or tables that have computers on them.
1.4.4.
All stains/spots must be pretreated and removed prior to the cleaning operation. The pretreatment and removal of stains/spots shall not jeopardize the serviceability or mar the appearance of the carpet. Any question about a stain being permanent or not will be handled on a case by case basis and determined by the Contract Monitor.
1.5.
CLEANING.
1.5.1.
Cleaning by Hot Water Extraction. The contractor shall thoroughly steam clean carpets. Hot water at the tank of the extraction unit must be at least 180 degrees Fahrenheit throughout the duration of the cleaning process. A portable heat exchanger or truck mounted unit may be used for this process. Portable extractors shall not be used. The carpet shall be dry and useable within 24 hours from the time of cleaning.
1.5.2.
Application of Static Proofing. The contractor shall apply static proof treatment to the carpet in office areas and conference rooms, only, after the carpet has been cleaned.
1.6.
STANDARDS.
1.6.1.
Cleaning Standards. Upon completion of cleaning, the carpet shall be free of spots/stains and shall present an overall clean and uniform appearance, free from all visible dirt, grime, and soil.
1.6.2.
Static proofing shall be applied in accordance with the manufacturer.
1.7.
EMERGENCY CLEANING.
1.7.1.
The contractor shall be available to respond to emergencies. Response time shall be no longer than two (2) hours. The contractor shall perform emergency cleaning in any building, area, or room. This shall include extracting water from carpet caused by water breaks, commode overflows, etc. After water has been extracted the contractor may be required to provide air movers with sufficient horsepower to expedite the drying process. The contractor may also be required to apply sanitizing and deodorizing solutions to affected carpet.
1.8.
SECURITY REQUIREMENTS.
1.8.1.
When contractor’s employees enter any building or area after it has been secured, i.e. locked, this security must be maintained to include the time during which work is being performed. Upon completing work and before leaving a building, employees shall ensure that all doors and windows are locked. At no time shall contractor’s employees violate building security by propping doors or windows open or leaving them unattended.
1.8.2.
Key Control. The contractor shall establish and implement methods of ensuring that all keys issued by the government are not lost or used by unauthorized persons. The contractor shall not duplicate any keys issued by the government. The contractor shall reimburse the government for replacement of all lost or duplicated keys. The contractor shall control access to all government provided lock combinations to preclude unauthorized entry.
1.8.2.1.
The contractor shall immediately report to the Contract Monitor or Contracting Officer any occurrences of lost keys.
1.9.
SUBMITTALS AND APPROVALS.
1.9.1.
The contractor shall submit to the Contracting Officer for approval, a list of each item of materials and equipment to be used under this contract. Equipment list shall be submitted on AF Forms 3000, provided by the government. In accordance with AFI 32-7086, the contractor shall submit an AF Form 3952 for approval to the HazMat Pharmacy identifying all materials to be used on the installation. The Material Safety Data Sheet (MSDS) for each product must accompany the AF Form 3952.
1.10.
VEHICLE REGISTRATION.
1.10.1.
All contractor employees are required to register their private vehicles on the Academy prior to entering the installation to perform work under this contract. The contractor shall provide the Contracting Officer a USAFA IMT 111 “Application for Personnel and Vehicle Passes” to work under this contract for each employee requiring registration. The employee(s) shall be required to provide proof of vehicle registration, driver’s license, and proof of insurance to the Pass & ID office when registering their vehicle on the Academy. The Pass & ID office is located in Building 8486.
1.10.2.
Employees assigned to the airfield buildings shall notify Base Operations personnel at Building 9206, phone number 333-2367, prior to starting work at any building located at the airfield.
1.11.
ENVIRONMENTAL REQUIREMENTS.
1.11.1.
Overarching Environmental Specifications. The contractor shall adhere to all federal, state, and local laws and regulations, to include but not limited to OSHA and EPA requirements and the Overarching Environmental Specifications at Appendix B.
2. METHOD OF SURVEILLANCE.
2.1. The Quality Assurance Personnel (QAP) will utilize validated customer complaints as the primary method of surveillance. In addition, the QAP may verify services by randomly inspecting facilities and tasks to ensure compliance of the requirements of the contract.
APPENDIX A
WORKLOAD ESTIMATES
EST. QTY
UNIT
1.
Clean Carpet by Hot Water Extraction 550,000
SF
2.
Apply Static Proofing to Carpet 16,500
SF
3.
Stair Cleaning
EA
4.
Emergency Cleaning
MH
Appendix B
OVERARCHING ENVIRONMENTAL SPECIFICATIONS
PART 1 – GENERAL
1.0 Scope
A.
The Overarching Environmental Specifications (Specifications) cover work performed on property owned or controlled by the U.S. Air Force Academy (AFA) to design, maintain, repair, install, or construct facilities or equipment.
B.
The Specifications apply to all work supported by appropriated or non-appropriated (NAF) funds.
C.
The Specifications cover environmental compliance requirements for Contractor work done at the AFA. Contractor must comply with all state, local, and federal environmental laws, regulations and operating standards during performance of work on the Air Force Academy. This includes Air Force Directives and Instructions. While this document may reference some of these requirements, it will not include all such requirements and the Contractor is required to demonstrate an understanding of these requirements as a condition of award of the contract.
D.
Compliance with the Specifications does not relieve the Contractor or other personnel from responsibility to comply with all applicable Federal, State, and local laws, regulations, and operating requirements. Contractor is responsible to pay all fines, penalties and judgments resulting from work performed on the Air Force Academy and may be subject to contracting sanctions set forth in the contract. Contractors will fully indemnify the government in the event the government is required to pay these fines, penalties or judgments and the government reserves the right to with hold payment from the Contractor to cover these expenses.
E.
Contractor shall cooperate with the government to take corrective action and clean up required by the Contractor’s failure to comply with all state, local, and federal environmental laws, regulations and operating standards during performance of work on the Air Force Academy. This includes Air Force Directives and Instructions.
1.1 Project/Site Conditions
The work site shall be maintained in a manner consistent with AFA standards. The technical representative of the CO or CEV will determine whether the site meets AFA standards.
Vehicular parking is authorized within designated paved parking areas. The Contractor agrees to comply with installation operating instructions regarding parking and may be subject to fines and penalties for violation of those local operating instructions.
C.
All Contractor vehicles shall comply with State of Colorado emission standards. All stationary air emission sources shall comply with State and Federal emissions criteria.
PART 2 – SPECIFIC REQUIREMENTS
2.0 Hazardous Materials
All hazardous materials (HAZMAT) brought on site by the Contractor shall be subject to pre-approval by the AFA. See Part 6.0 for definitions of HAZMAT.
The AFA may prohibit the use of HAZMAT it deems to be especially hazardous to human health or the environment or may result in excessive quantities of hazardous waste.
If AFA does not approve use of a HAZMAT, the AFA may provide the Contractor a list of suitable substitutes; however, the Contractor shall retain responsibility for finding an acceptable substitute.
The AFA promotes waste minimization and pollution prevention practices and the Contractor shall take appropriate actions to comply with this policy.
A minimum of ten working days prior to commencement of work on site, the Contractor shall submit to the HAZMART (Bldg 8110, Door 9) an AF Form 3952 for each process requiring the use of HAZMAT as outlined above.
1.
The Task Description, Block 18, must fully describe the task to be performed.
2.
The Contractor shall include a list of hazardous materials used in each process, as well as, a Material Safety Data Sheet (MSDS) for each HAZMAT.
3.
The Contractor shall at all times maintain a complete written hazard communication program, including labels and forms of warning for chemicals, an up-to-date hazardous material inventory with copies of MSDSs for all materials used on the job site, and employee information and training on hazardous chemicals in their work area.
4.
The Contractor shall transport all hazardous materials in accordance with all applicable
Federal, State, and local regulations. Applicable requirements may include packing and repacking, labeling, marking and placarding, handling, vehicle routing, and manufacturing of packaging and transportation containers. The Contractor shall classify the hazardous materials (Class 1 through Class 9) and comply with Department of Transportation requirements.
F.
HAZMAT Usage Reports for contracts with greater-than-90-day period of performance.
Within 10 business days from the end of every 90-day period from the start of work on site, the Contractor shall report to the HAZMART hazardous materials used in the previous 90-day period.
The report shall include a listing of the total quantity of HAZMAT used and a description of its disposition. For example, the Contractor used all of the HAZMAT during contract execution, saved it for future use, or disposed of it as hazardous waste in accordance with
Colorado’s hazardous waste regulations. See Section 2.2 for a description of hazardous waste management requirements.
G.
Final HAZMAT Usage Report
The Contractor shall submit a final inventory of all hazardous materials used since the last hazardous usage report and no later than 10 business days after completion of work.
The report shall include a listing of the total quantity of HAZMAT used and a description of its disposition. For example, the Contractor used all of the HAZMAT during contract execution, saved it for future use, or disposed of it as hazardous waste in accordance with
Colorado’s hazardous waste regulations. See Section 2.2 for a description of hazardous waste management requirements.
H.
HAZMAT Handling
The Contractor shall transport and store all known or potential HAZMAT in original containers with manufacturer labels meeting the Occupational Safety and Health
Administration (OSHA) Hazard Communication requirements found in Title 29 Code of
Federal Regulations Part 1910.1200 (29 CFR 1910.1200).
The Contractor shall clearly label containers into which bulk and repackaged materials have been placed in accordance with OSHA Hazard Communication requirements (29 CFR
1910.1200). The Contractor shall not bring materials to the AFA without proper, legible labeling.
The Contractor shall only use and store HAZMAT in areas that are free from obstructions or hazards such as tripping hazards, fire, standing water, or pests. All HAZMAT shall be separated in accordance with OSHA Material Handling requirements (29 CFR 1910.176[c]) and OSHA Hazard Communication requirements (1910.1200[b], and 1910.1200[f]).
The Contractor shall store HAZMAT in containers in good condition, with no leaks or rust.
5.
The Contractor shall remove all unused HAZMAT when the work is completed or when the material is no longer required. The Contractor may not transfer hazardous materials to
AFA without the authorization of the Installation Hazmat Management Process Team.
2.1.
Hazardous Waste
In coordination with CEV, the Contractor shall properly identify, characterize, manage, and dispose of all hazardous waste (HW) generated from the Contractor’s actions on AFA property.
The Contractor must dispose of all HW through the AFA’s HW management program. The AFA’s HW Accumulation Site can provide containers, labels, and will accept Contractor’s HW for integrated shipment/disposal at no cost to the Contractor.
If the Contractor anticipates generating hazardous waste on site during contract performance, it shall prepare a hazardous waste management plan (HWMP) describing how it will comply with Colorado Department of Public Health and Environment regulatory requirements and Department of Defense, Air Force, and AFA policies and instructions related to hazardous waste management.
The Contractor may request a copy of the AFA HWMP from CEV to use as a guide in preparing its HWMP.
The Contractor shall submit the HWMP to the CO for approval a minimum of 15 business days prior to commencement of work on site.
The Contractor HWMP shall include the following elements:
a) Waste descriptions, waste codes, and estimated quantities of specific hazardous wastes that will be generated on site, such as batteries, paints, solvents, aerosol cans and mercury-containing lamps.
b) Copies of letters appointing Contractor personnel to positions of primary and alternate hazardous waste managers.
c) Copies and descriptions of HW training the Contractor’s personnel have completed.
Contractor personnel shall have completed appropriate training that fully satisfies
Federal, State, and local regulatory requirements prior to managing hazardous waste.
d) Descriptions of HW storage containers and locations.
The Contractor, with CEV concurrence, shall determine if wastes generated are hazardous under applicable regulations for listed, characteristic, and universal wastes. The Contractor shall provide the CO and CEV proof of such determination (e.g., MSDS, process knowledge and/or analytical results). If the Contractor does not have sufficient information to properly characterize a waste as hazardous, then the Contractor shall, with CEV concurrence:
Arrange for sampling and analysis for proper characterization of the waste.
Pay for sampling and analysis costs.
Provide the CO and CEV with documentation of analytical results for each hazardous waste generated on site.
The Contractor shall accumulate HW in compliance with all applicable Federal, state, and local regulations; DoD, AF, and AFA policies; and in accordance with the Contractor’s (AFA-approved) HWMP.
All containers holding HW shall be in good condition, with no leaks or rust.
All containers holding HW shall be labeled with the words “Hazardous Waste” and the identity of the generator (Contractor).
To the maximum extent practical and where cost effective, the Contractor shall recycle HW in accordance with all applicable Federal, State, and local laws and regulations. Hazardous waste recycling/re-use shall be approved by CEV prior to start of the activity. Any waste recycled or re-used on or off site, over 100 lbs shall be reported to CEV for Air Force Solid Waste metrics.
Only authorized AFA personnel shall sign uniform HW manifests, land disposal restrictions, and bills of lading. The CEV Hazardous Waste Program Manager shall be the AFA’s representative regarding signing manifests, bill of lading, or related hazardous waste shipment paperwork. All manifests for waste generated on site shall list the AFA’s EPA generator identification number.
If the Contractor transports any HW off the AFA, it must be licensed to transport HW in Colorado. Transporters of hazardous wastes that operate in Colorado and have a transfer facility are required to obtain an EPA identification number and comply with additional requirements cited at 6 CCR 1007-3, Part 263.
2.2 Spill Prevention and Response Procedure (SPRP) Plan
The Contractor must develop a SPRP plan if it manages, stores, or uses HAZMAT (including fuels) or generates HW. If requested by the Contractor, CEV will provide the Contractor a copy of the AFA’s Integrated Contingency Plan (ICP) to use as a guide in preparing its SPRP. The Contractor may not adopt the AFA’s ICP as the Contractors SPRP without the addition of the following Contractor specific information:
Contractor name
Mailing address
Primary and alternate emergency contacts
Emergency phone numbers, including fax number, if applicable
List of spill prevention and response equipment
6.
Description of HAZMAT and HW managed on site
7.
Description of HAZMAT and HW storage containers
8.
A map showing locations of HAZMAT and HW containers and spill prevention and response equipment
9.
Description of actions the Contractor will take upon discovery of an incident to contain and clean up spills and dispose of spill residue
10.
Procedures for notification of the AFA after discovery of an incident (Note: Call AFA 911 and CEV Emergency Response Telephone at 491-3660)
11.
Description of how the Contractor shall coordinate and complete any required corrective actions
12.
Description of employee hazardous material and spill response training (Training to be provided to employees as required by all applicable Federal, state, and local regulations and copies of employee workplace hazard training program maintained on site at all times)
The Contractor shall manage, store, and use all HAZMAT and HW (including fuels) in accordance with good engineering practices and implement best management practices in order to prevent spills and releases. The Contractor shall report spills to the AFA and execute timely and appropriate actions to contain and cleanup all spills in accordance with the Contractor SPRP plan and the AFA ICP. The AFA does not authorize or expect the Contractor to provide emergency response or clean up actions beyond the level of training of its employees. Once a spill or release of a HAZMAT or HW managed, used, or stored by the Contractor has been contained, the AFA shall determine if additional cleanup is required and the extent of the Contractor’s responsibility. The Contractor shall be liable for any direct and indirect costs incurred during spill response and clean-up, including but not limited to administrative costs, materials, labor, equipment, shipping, packaging, testing, replacement equipment and materials, and disposal.
2.3 Wastewater and Storm Water
The Contractor is expected to be familiar with and comply with regulations including, but not limited to, 40 CFR 122.26 (EPA NPDES Permit Regulations-Storm Water and Point Source), 5 CCR 1002 (Colorado’s wastewater regulations), Executive Order 1165-2-304 (1976 Flood Plain Regulations for Flood Plain Management), EPA document 832-R-92-005 (Storm Water Management for Construction Activities), 5 CCR 1002-2, 6.1.0 (Colorado’s Storm water regulations), the El Paso County Policy Plan and the City/County Drainage Criteria Manual. The Contractor is also required to be familiar with AFA NPDES permits to determine if its activities are authorized by these permits.
Concerning wastewater discharges, the Contractor shall:
Be familiar with all relevant requirements of storm water, municipal, multisector, and individual NPDES permits held by the AFA.
Not discharge wastewater or water (including surface discharges and underground injection) that could impact the quality of the surface water or groundwater of Colorado without prior approval of CEV.
CEV shall ensure planned wastewater discharges are covered by a current AFA permit prior to authorizing the discharges, or determine if permitting is required.
Implement basic housekeeping provisions of the applicable wastewater discharge permit including applicable, monitoring, and sampling, inspections, reporting, and record keeping.
Coordinate with CEV to obtain required permits not already in place at the AFA including permits to cover discharges to surface water, land application discharges that impact groundwater, and underground injection activities.
To ensure compliance with other Clean Water Act requirements, the Contractor:
Shall not discharge any domestic, construction and/or industrial waste (including any hazardous material or hazardous waste) to the environment, sanitary or storm water sewer system without first securing CEV approval. Such materials include, but are not limited to the following:
a) Glycol-containing wastes drained from heating, ventilation, and air conditioning facilities
b) Cooling tower and chiller solutions
c) Fluids generated from in-situ or slip-lining sewer line repairs
d) Swimming pool and pool filter backwashing wastewater
e) Super-chlorinated solutions from drinking water line or other repairs and replacement
f) Septic and holding tank waste
g) Oil/water separator residue and grease trap residue
h) High-temperature hot water from line replacement or repair
i) Any other wastewater that may contain pollutants
Shall not use surface or underground water supplies for any contract-related activities without approval from the CO.
Shall not dispose of dredged or fill materials in wetlands, dispose of excavated materials into waters of the US, use fill for road crossings, or dispose of similar dredge or fill materials in the waters of the US without a permit obtained in coordination with CEV.
Shall not discharge groundwater from trenches during construction without a dewatering permit from EPA or permission from CEV.
PART 3 INSPECTIONS
3.0 Inspections
CEV conducts routine announced and unannounced inspections during the performance of the contract to ensure the regulatory requirements are met. Non-compliance or deficiencies noted during the inspection shall be appropriately corrected, and submitted in writing to the contract office. The AFA shall perform follow up visits to verify completion of corrective actions. Non-compliance can lead to complete halt in project activities, depending on the severity of the violation. The Contractor shall not be allowed any extension of time or compensation for damages by reason of or in connection with such work stoppages.
PART 4 POINTS OF CONTACT
4.0 CEV Points of Contact
Performance Requirement/Program Area Phone Project/Site Conditions 719.333.3233
Spill Prevention and Response 719.333.3233
Procedure Plan (Integrated Contingency Plan)
Spill Response and Reporting 719.333.3233
Procedures and Liability
Hazardous Materials 719.333.3224
Hazardous Waste 719.333.8394
Waste Water and Storm Water 719.333.8394
Wetlands, Waters of U.S./State 719.333.8394
Toxic Substances Asbestos, 719.333.3233
PCB, LBP, Radon, Pesticides
Petroleum, Oils, and 719.333.8367
Lubricants (POLs-Tanks)
Solid Waste 719.333.0812
Air Quality 719.333.6455
Natural Resources 719.333.3308
Cultural Resources 719.333.8408
Environmental Planning (NEPA) 719.333.8367
If you are unable to reach the necessary point of contact, call the CEV Flight Chief, 719.333.6455. If the concern is an environmental emergency, call the CEV Emergency Response number at 719.491.3660 and ask for immediate assistance.
PART 5 ADDITIONAL INFORMATION
5.0 REFERENCES – NOTE: These references are provided for information only and are not all inclusive. The Contractor is responsible for performing the work covered by the contract in compliance with all APPLICABLE STATE, local, AND FEDERAL ENVIRONMENTAL laws, regulations and operating standards during performance of work on the Air Force Academy. This includes Air Force Directives and Instructions.
United States Environmental Protection Agency (EPA) Regulations:
Resource Conservation and Recovery Act (RCRA) - 40 Code of Federal Regulation (CFR)
Parts 148, 244, 260, 261, 263, 264, 265, 266, 268, 270, 271, 272, 273, 279, 280, 281, 282, 355 and 745.
Clean Water Act – 40 CFR Parts 112, 122, 123, 124, 125, 129, 130, 131, and 401–471.
Clean Air Act – 40 CFR Parts 50, 52, 61, 63, 68, 70, 71, 86-89, 745.
EPCRA – SARA Title III Sections 301, 302, 303, 304, 311, 312, and 313.
Occupational Safety and Health Administration (OSHA) Regulations:
Hazard Communication – 29 CFR 1910.1200
Hazardous Waste Operations and Emergency Reponses (HAZWOPER) – 29 CFR
1910.120
Material Handling – 29 CFR 1910.176
Toxic and Hazardous Substances – 29 CFR 1910.1030
Department of Transportation (DOT) Regulations:
49 CFR Parts 171 – 173
Other Federal Regulations:
National Historic Preservation Act and related Acts
The American Indian Religious Freedom Act
Archeological Resources Protection Act
The Native American Graves Protection and Repatriation Act
National Environmental Policy Act
Endangered Species Act
Executive Order 13101, Greening the Government through Waste Prevention, Recycling and federal Acquisition
Executive Order 13148, Greening the Government through Leadership in Environmental
Management
State of Colorado Regulations:
Air Pollution Prevention and Control Act – 5 Code of Colorado Regulation (CCR) 1001
Regulations No. 1 -19
Hazardous Waste Regulations – 6 CCR 1007-3 Parts 260 – 279
Water Quality and Wastewater Regulations – 5 CCR 1002
Tank Regulations – 7 CCR 1101-14
Oil and Petroleum Spill Prevention Regulations – 7 CCR 1101 – 14
Solid Waste Regulations – 6 CCR 1007 – 2
Special Pollutants – 5 CCR 1001 and 6 CCR 1007
Pesticides, Herbicides, and Fungicides – 8 CCR 1203
EPA, Department of Defense (DoD), United States Army Corps of Engineers (COE), Air Force Instructions (AFI), Policies, Guidance Documents, Memoranda, AFA Regulations and associated guidance documents:
COE document EP 1165-2-314 (Flood Proofing Regulations).
EPA Document 832-R-92-005, Storm water Management for Construction Activities.
Department of Defense, Measure of Merit, Solid Waste Management.
US Department of Housing and Urban Development Guidelines for Evaluation and Control of Lead-based Paint Hazards in Housing.
AFI 32-4002, “Hazardous Material Emergency Planning and Response Program.”
AFI 32-7042, “Solid and Hazardous Waste Compliance.”
AFI 32-7080, “Pollution Prevention Program.”
AFI 32-7032, “Solid and Hazardous Waste Compliance.”
9.
AFI 32-7086, “Hazardous Materials Management.”
10.
AFA Asbestos Management Strategy.
11.
AFA Hazardous Waste Management Plan.
12.
AFA Compliance Assurance through Pollution Prevention Plan.
13.
AFA Spill Prevention and Response Plan.
14.
AFA Storm Water Pollution Prevention Plan.
15.
AFA Storm Water Training Manual.
16.
AFA Air Quality Management Plan.
17.
Flood Plain Regulations for Flood Plain Management - COE document EO 1165-2-304, 1976.
18.
Storm Water Management for Construction Activities - EPA NPDES General Permit No.
COR10000F.
19.
Storm Water Management for Municipalities (MS4s) – EPA NPDES General Permit No.
COR042000.
20.
Storm Water from Industrial Activities (MSGP) – EPA NPDES General Permit No.
COR05A12F.
21.
Waste Water Treatment Plant AFA NPDES Permit No. CO-0020974.
El Paso County Policy Plan
City/County Drainage Criteria Manual (City of Colorado Springs/El Paso County, Colorado) and updated storm intensity curves dated January 7, 2003.
I.
El Paso County Department of Health Fugitive Dust Regulations.
J.
El Paso County Individual Sewage Disposal System Regulations.
Copies of these regulations are available on the internet or from the organizations listed. It is the responsibility of all Contractors associated with the project to review and understand these regulations.
File details come from the government source that posted it. Updated .