Atch 1 DARB GA Repair Transient Parking Ramp 2048 Project No FGWB16-0020 Final Design Submittal 68 pages 16 August 2019.pdf
PDF 42 MB Posted
- Attached to
- Repair Transient Parking Ramp
- Solicitation number
- FA670320B0005
About this file
This document provides details on a pre-solicitation notice for repair work on a transient parking ramp at Dobbins Air Reserve Base in Georgia. The Department of the Air Force Reserve Command will solicit a firm-fixed-price contract for full depth doweled joint replacement and installation of anchors/mooring points in accordance with specifications. The requirement, valued between $10-25 million, is fully set aside for small businesses under NAICS code 237310 for general building construction. The solicitation and drawings will be posted on August 7, 2020, with bids due by September 8 at 2:00 PM Eastern. The work is required to be completed within 420 calendar days and must involve at least 15% self-performance by the contractor. Interested parties should monitor the beta.SAM.gov website for additional details and amendments.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C T
N
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A I R
F
R
E
S
E R
V
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
A U
G U
T
H
M
S G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
A D
H
U N
T
I N
C
W
A Z
S U
I T
E
D E
N V
E R
C
O
B E
N H
A M
S
K E
L L
C
O M
P A
N Y
N
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
M
T
Y
O
K
D O
B B
I N
S
A
S
E R
B
S
E
G
E O
R G
I A
R E
P A
A
N S
I E
P
R
K I N
G
R
A M
P
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
AIRPORT ELEVATION = 1068.5 FT
LATITUDE: 33°54'52"N
LONGITUDE: 84°30'51"W
COBB COUNTY
PROJECT
LOCATION
VICINITY MAPLOCATION MAP
N.T.S.N.T.S.
ISSUE DATE: AUGUST 16, 2019
SOLICITATION NO.:
CONTRACT NO.:
PROJECT
LOCATION
W
AIR FORCE RESERVE
COMMAND
DOBBINS AIR RESERVE BASE, GEORGIA
REPAIR TRANSIENT PARKING RAMP, 2048
PROJECT NO. FGWB16-0020
FINAL DESIGN SUBMITTAL
GI001
T I T
L
E
E T
D P
S
C S
K
D
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A
R
S
E R
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
A U
G U
G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
N
T
I N
C
Z
S U
I T
E
D E
N V
E R
C
O
B E
N H
A M
S
K E
L L
C
O M
P A
N Y
N
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
T
Y
O
K
D O
B B
I N
S
A
S
E R
S
E
G
E O
R G
I A
R E
P A
A
N S
I E
R
K I N
G
R
A M
P
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
GI002
S H
E E
T
I N
D E
X
D P
S
C S
K
D E
S
SHEET INDEX
SHEET NUMBER SHEET TITLE
GI001 TITLE SHEET
GI002 SHEET INDEX
GI003 LEGEND AND ABBREVIATIONS
GC111 PROJECT LAYOUT PLAN
GC121 SURVEY CONTROL PLAN
GC141 CONSTRUCTION OPERATIONS & PHASING PLANS
GC142 CONSTRUCTION OPERATIONS & PHASING PLANS
GC143 CONSTRUCTION OPERATIONS & PHASING PLANS
GC144 CONSTRUCTION OPERATIONS & PHASING PLANS
GC145 CONSTRUCTION OPERATIONS & PHASING PLANS PHASE 1
GC146 CONSTRUCTION OPERATIONS & PHASING PLANS PHASE 2
GC147 CONSTRUCTION OPERATIONS & PHASING PLANS PHASE 3
GC151 CONSTRUCTION OPERATIONS & PHASING NOTES
GC152 CONSTRUCTION OPERATIONS & PHASING NOTES
GC101 EROSION CONTROL PLAN
GC501 EROSION CONTROL DETAILS
BB101 SOIL BORINGS PLAN
BB102 SOIL BORING LOGS
BB103 SOIL BORING LOGS
BB104 SOIL BORING LOGS
CS101 EXISTING SITE PLAN
CS102 EXISTING SITE PLAN
CS111 PROJECT GEOMETRICS
CS112 PROJECT GEOMETRICS
CD101 DEMOLITION PLAN
CD102 DEMOLITION PLAN
CG111 GRADING AND DRAINAGE PLAN
CG112 GRADING AND DRAINAGE PLAN
CP121 JOINTING PLAN
CP122 JOINTING PLAN
CP123 JOINTING PLAN ENLARGED VIEWS
CP131 PAVEMENT ELEVATION PLAN
CP132 PAVEMENT ELEVATION PLAN
CP133 PAVEMENT ELEVATION PLAN
CP134 PAVEMENT ELEVATION PLAN
CP135 PAVEMENT ELEVATION PLAN
CP136 PAVEMENT ELEVATION PLAN
CP137 PAVEMENT ELEVATION PLAN
CP301 TYPICAL SECTIONS
CP302 TYPICAL SECTIONS
CP501 JOINTING DETAILS
CP502 JOINTING DETAILS
CU111 UNDERDRAIN PLAN
CU521 DRAINAGE AND UTILITY DETAILS
CU522 DRAINAGE AND UTILITY DETAILS
CS171 MARKING LAYOUT PLAN
CS172 MARKING LAYOUT PLAN
CS501 MARKING DETAILS
CI181 TIEDOWN AND STATIC GROUND LAYOUT PLAN
CI182 TIEDOWN AND STATIC GROUND LAYOUT PLAN
CI501 TIEDOWN AND STATIC GROUND POINT TABLE
CI502 TIEDOWN DETAILS
CX111 CROSS SECTION LOCATION PLAN
CX112 CROSS SECTIONS
CX113 CROSS SECTIONS
CX114 CROSS SECTIONS
CX115 CROSS SECTIONS
CX116 CROSS SECTIONS
CX117 CROSS SECTIONS
CX118 CROSS SECTIONS
CX119 CROSS SECTIONS
SHEET NUMBER
CS103 EXISTING PAVEMENT IDENTIFICATION PLAN
CS104 EXISTING PAVEMENT IDENTIFICATION PLAN
CU523 UNDERDRAIN DETAILS
CX121 UNDERDRAIN CROSS SECTIONS
CX122 UNDERDRAIN CROSS SECTIONS
CX123 UNDERDRAIN CROSS SECTIONS
CX124 UNDERDRAIN CROSS SECTIONS68
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A
R
S
E R
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
A U
G U
G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
N
T
I N
C
Z
S U
I T
E
D E
N V
E R
C
O
B E
N H
A M
S
K E
L L
C
O M
P A
N Y
N
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
T
Y
O
K
D O
B B
I N
S
A
S
E R
S
E
G
E O
R G
I A
R E
P A
A
N S
I E
R
K I N
G
R
A M
P
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
TAXIWAY EDGE LIGHT
SURVEY CONTROL POINT
SOIL BORING
CHAIN LINK FENCE
ELECTRIC LINE
PROJECT LIMITS
STORM DRAIN PIPE
LOW PROFILE BARRICADES
EXISTING PROPOSED
AB
AGGREGATE BASE
AC
ASPHALT CONCRETE
ALT
ALTERNATE
AOA AIR OPERATIONS AREA
APCH APPROACH
APPROX APPROXIMATE
ARFF AIR RESCUE AND FIRE FIGHTING
ATCT AIR TRAFFIC CONTROL TOWER
ATO AIR TRAFFIC ORGANIZATION
AWG AMERICAN WIRE GAUGE
BC BEGINNING OF CURVE
BLDG BUILDING
BM BENCHMARK
BOT BOTTOM
BVC BEGINNING OF VERTICAL CURVE
C-C CENTER TO CENTER
C CURVE
CB CATCH BASIN
CIPCP CAST-IN-PLACE CONCRETE PIPE
CJ CONSTRUCTION JOINT
CFS CUBIC FEET PER SECOND
CL, C/L
CENTERLINE
CLF CHAIN-LINK FENCE
CLR CLEAR
CMP CORRUGATED METAL PIPE
CONC CONCRETE
CONT CONTINUOUS
CRGO CARGO
CP CONTROL POINT
DB DIRECT BURIAL
DEG DEGREE
DI DROP INLET
DIA DIAMETER
DIM DIMENSION
DIP DUCTILE IRON PIPE
DP DEPTH
(E)
EXISTING
E
ELECTRICAL LINE, EASTING
EC END OF CURVE
EG EXISTING GRADE
ELEV ELEVATION
EOP EDGE OF PAVEMENT
EVC END OF VERTICAL CURVE
FAA FEDERAL AVIATION ADMINISTRATION
FBO FIXED BASE OPERATOR
FF FINISHED FLOOR
FG FINISHED GRADE
FH FIRE HYDRANT
FL FLOW LINE
FNC FENCE
FOD FOREIGN OBJECT DEBRIS
FPS FEET PER SECOND
FT FEET
G NATURAL GAS LINE
GAL GALLON
GALV GALVANIZED
GB GRADE BREAK
GND GROUND
GPM GALLONS PER MINUTE
GS GROUND SHOT
H HEIGHT
HDPE HIGH DENSITY POLYETHYLENE
HIRL HIGH INTENSITY RUNWAY LIGHT
HITHL HIGH INTENSITY THRESHOLD LIGHT
HORIZ HORIZONTAL
HMA HOT MIX ASPHALT
HWY HIGHWAY
IE INVERT ELEVATION
IN INCHES
IP IN-PAVEMENT
L
LENGTH, LEFT, LINE, LIGHT
LAT LATITUDE
LBS POUNDS
LED, (L)
LIGHT EMITTING DIODE
LF LINEAL FEET
LOC LOCALIZER
LONG LONGITUDE
LWL LOW WATER LEVEL
MH MANHOLE
MAX MAXIMUM
MG MILLED GRADE
MID MIDPOINT
MIN MINIMUM
MALS MEDIUM APPROACH LIGHTING SYSTEM
MIRL MEDIUM INTENSITY RUNWAY LIGHT
MITL MEDIUM INTENSITY TAXIWAY LIGHT
MPH MILES PER HOUR
MUTCD MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
(N)
NEW
N NORTHING
NAVAIDS NAVIGATION AIDS
NIC NOT IN CONTRACT
NO. OR # NUMBER
NOTAM NOTICE TO AIRMAN
NTS NOT TO SCALE
OFF, O/S
OFFSET
OC ON CENTER
OH OVERHEAD
PAPI PRECISION APPROACH PATH INDICATOR
PB PULL BOX
PC POINT OF CURVATURE
PCC PORTLAND CEMENT CONCRETE
PCF POUNDS PER CUBIC FOOT
PFC POROUS FRICTION COURSE
PERF PERFORATED
PI POINT OF INTERSECTION
POB POINT OF BEGINNING
POC POINT OF CURVE
POE POINT OF ENDING
PSI POUNDS PER SQUARE INCH
PSF POUNDS PER SQUARE FOOT
PT
POINT, POINT OF TANGENCY
PVC POINT OF VERTICAL CURVE
PVC POLYVINYL CHLORIDE
PVI POINT OF VERTICAL INTERSECTION
PVT POINT OF VERTICAL TANGENCY
QTY QUANTITY
R
RIGHT, RADIUS
R&R REMOVE AND REPLACE
RAIL RUNWAY ALIGNMENT INDICATOR LIGHT
RC RELATIVE COMPACTION
REL RELOCATE EXISTING
REIL RUNWAY END IDENTIFIER LIGHT
RCP REINFORCED CONCRETE PIPE
REQ REQUIRED
RGL RUNWAY GUARD LIGHT
RPR RESIDENT PROJECT REPRESENTATIVE
ROW RIGHT OF WAY
RTR REMOTE TRANSMITTER/RECEIVER
RWA RESTRICTED WORK AREA
RWAPP RUNWAY APPROACH LIGHT
RWY RUNWAY
S
SANITARY LINE, SALVAGED
SF SQUARE FOOT
SG STRAIGHT GRADE
SH SHOULDER
SIDA SECURITY IDENTIFICATION DISPLAY AREA
SMGS
SURFACE MOVEMENT GUIDANCE AND
CONTROL SYSTEM
SPCD SAFETY PLAN COMPLIANCE DOCUMENT
SS STAINLESS STEEL
SD STORM DRAIN
STA STATION
STD STANDARD
STL STEEL
SY SQUARE YARDS
T TELEPHONE LINE
TC TOP OF CURB
TG TOP OF GRATE
T/L TAXILANE
TOE TOE OF BANK
TOP TOP OF BANK
TDZ TOUCHDOWN ZONE
TWY TAXIWAY
TYP TYPICAL
UD
UNDERDRAIN
OFA OBJECT FREE AREA
UG UNDERGROUND
UON UNLESS OTHERWISE NOTED
USA UNITED STATES OF AMERICA
V VELOCITY
V VOLT
VC VERTICAL CURVE
VERT VERTICAL
VG VALLEY GUTTER
VIF VERIFY IN FIELD
VASI VISUAL APPROACH SLOPE INDICATOR
W
WIDTH, WEST, WATER LINE
W/
WITH
W/O WITHOUT
WSE WATER SURFACE ELEVATION
WSP WELDED STEEL PIPE
WV WATER VALVE
WWM WELDED WIRE MESH
EXISTING SUBGRADE (SECTION VIEW)
GROUND, PROPOSED (SECTION VIEW)
FULL DEPTH PCC PAVEMENT REMOVAL
FULL DEPTH AC PAVEMENT REMOVAL
STAGING AREA
BM#1
B-4 x
E
XXXXXXXXXXXXXXX
SD
NATURAL GAS LINE
G
SANITARY SEWER LINE
SS
WATER LINE
W W
SEWER CLEAN OUT
CATCH BASIN
STORM DRAIN MANHOLE
HAUL ROUTE
NEW ASPHALT PAVEMENT
(PLAN VIEW)
NEW ASPHALT PAVEMENT AT
JOIN CONDITION (PLAN VIEW)
NEW PCC PAVEMENT
(SECTION AND PLAN VIEW)
CLIN 1 & 2 AREA
CLIN 3 & 4 AREA
CLIN 5 & 6 AREA
CRUSHED STONE CONSTRUCTION EXIT
FIRE HYDRANT AND VALVE
SEWER CLEAN OUT
CATCH BASIN
STORM DRAIN MANHOLE
SANITARY SEWER
MANHOLE
INLET PROTECTION
(EROSION CONTROL MEASURE)
EXISTING 12.5" PCC PAVEMENT
EXISTING 7.5" PCC PAVEMENT
EXISTING 10.75" PCC PAVEMENT
EXISTING 15.5" PCC PAVEMENT
EXISTING 7.5" PCC PAVEMENT & 2" AC PAVEMENT
EXISTING 12.25" AND 5.25" PCC PAVEMENT
EXISTING 12" PCC PAVEMENT
LINES
PATTERNS
GENERAL ABBREVIATIONS
EXISTING 16" PCC PAVEMENT
GI003
L E
G E
B
R E
V I A
T I O
N S
D P
S
C S
K
D E
S
B
F
H
J
D
THICKENED EDGE ISOLATION
JOINT
DOWELED CONTRACTION JOINT
NON-DOWELED CONTRACTION
JOINT
ASPHALT/CONCRETE EDGE JOINT
DOWELED CONSTRUCTION JOINT
SF
SILT FENCE
ALIGNMENT
INFILTRATION TEST
INF-1
TEMPORARY MARKING REMOVAL
DARB DOBBINS AIR RESERVE BASE
CO CONTRACTING OFFICER
COR CONTRACTING OFFICER REPRESENTATIVE
C DOWELED JOINT AT EXIST. CONC.
NEW ASPHALT PAVEMENT
(SECTION VIEW)
NEW STABILIZED DRAINAGE
LAYER (SECTION VIEW)
NEW UNBOUND CRUSHED
STONE (SECTION VIEW)
WIRE REINFORCEMENT
SUBGRADE COMPACTED TO 100% TO ASTM D1557
MAX DENSITY (SECTION VIEW)
SUBGRADE COMPACTED TO 95% TO ASTM D1557
MAX DENSITY (SECTION VIEW)
FR FLUSHING RISER
NEW LEAN CONCRETE BASE (SECTION VIEW)
X
I
W
Y
G
A
X I W
A
X I W
U
N
W
M
A
M
P
T A
X I W
AIRFIELD
OPERATIONS BUILDING
AIRFIELD ELECTRICAL
VAULT BUILDING
ARFF STATION
PROJECT LIMITS
T
A
I
N
I
E
A
ATCT
REPAIR TRANSIENT
RAMP, 2048
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A
R
S
E R
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
A U
G U
G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
N
T
I N
C
Z
S U
I T
E
D E
N V
E R
C
O
B E
N H
A M
S
K E
L L
C
O M
P A
N Y
N
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
T
Y
O
K
D O
B B
I N
S
A
S
E R
S
E
G
E O
R G
I A
R E
P A
A
N S
I E
R
K I N
G
R
A M
P
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
GC111
P R
O J E
Y O
A
N
D P
S
C S
K
D E
S
0 100' 200'
KEY MAP
NOT TO SCALE
PROJECT
LOCATION
BP: 5+00.00
EP: 25+00.00
PROJECT LIMITS
TAXIWAY A CENTERLINE
T
A
X
I
W
A
X I W
A
X I W
U
N
W
BM#1
BM#2
BM#3
BM#4
T
A
X
I
W
A
P R
O
N
T
A
I
N
I
E
A
DG 1171
REPAIR TRANSIENT
PARKING RAMP, 2048
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A
R
S
E R
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
A U
G U
G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
N
T
I N
C
Z
S U
I T
E
D E
N V
E R
C
O
B E
N H
A M
S
K E
L L
C
O M
P A
N Y
N
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
T
Y
O
K
D O
B B
I N
S
A
S
E R
S
E
G
E O
R G
I A
R E
P A
A
N S
I E
R
K I N
G
R
A M
P
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
GC121
S U
R V
N
T R
O L
P
L A
N
D P
S
C S
K
D E
S
0 100' 200'
BENCHMARKS
NAME NORTHING EASTING ELEVATION DESCRIPTION
BM#1 1424782.19 2192479.21 1015.69' MONUMENT CG 1170
BM#2 1425174.17 2192273.80 1013.92' FIRE HYDRANT BOLT
BM#3 1425554.46 2191993.25 1012.51' FIRE HYDRANT BOLT
BM#4 1425488.57 2191651.16 1016.05' STUD ON POLE
DG 1171 1424817.64 2192529.95 1014.37' MONUMENT DG 171
ALIGNMENT DATA - TAXIWAY A CENTERLINE
NAME NORTHING EASTING BEARING
STA 5+00.00 1423921.49 2192168.31 N 30° 7' 1.71" W
STA 25+00.00 1425651.50 2191164.77 N 30° 7' 1.71" W
VERTICAL DATUM NOTE:
THE ELEVATIONS SHOWN HEREON ARE REFERENCED TO NAVD 1988.
SURVEYOR'S NOTES:
1. NO UNDERGROUND INSTALLATION OR IMPROVEMENTS HAVE BEEN LOCATED EXCEPT THOSE SHOWN HEREON.
2. LOWE ENGINEERS' CERTIFICATE OF AUTHORIZATION NUMBER TO PROVIDE SURVEYING SERVICES IN GEORGIA IS LSF 656.
3. THIS DRAWING NOT VALID WITHOUT THE SIGNATURE AND ORIGINAL SEAL OF A GEORGIA REGISTERED SURVEYOR & MAPPER.
4. AS USED ON THIS DRAWING, CERTIFY MEANS TO STATE OR DECLARE A PROFESSIONAL OPINION OF CONDITIONS REGARDING
THOSE FACTS OR FINDINGS WHICH ARE THE SUBJECT OF THE CERTIFICATION AND DOES NOT CONSTITUTE A WARRANTY OR
GUARANTEE, EITHER EXPRESSED OR IMPLIED. THIS CERTIFICATION IS ONLY FOR THE LANDS AS DESCRIBED. IT IS NOT A
CERTIFICATE OF TITLE, ZONING, EASEMENTS OR FREEDOM OF ENCUMBRANCES.
KEY MAP
NOT TO SCALE
L
A
N
A
T
L A
N
T
R
U
N
W
T A
X I W
A Y
G
T
A
X
I
W
A
Y
A
T
A
X
I
W
A
Y
B
DOBBINS ARB COMMERCIAL GATE 2
CONTRACTOR ACCESS POINT.
SEE CONTRACTOR ACCESS NOTES A AND B, SHEET
GC151 FOR CONTRACTOR STAFFING REQUIREMENTS.
X
X
(E) AIRFIELD ACCESS GATE
SEE CONTRACTOR ACCESS
NOTES A AND B, SHEET
GC151 FOR CONTRACTOR
STAFFING REQUIREMENTS.
REPAIR TRANSIENT
PARKING RAMP, 2048
CONTRACTOR
ACCESS AND
HAUL ROUTE
CONTRACTOR
STAGING AREA
DOBBINS ARB
MAIN ENTRANCE
GATE
VISITOR'S CENTER
& BADGING OFFICE
GENERALS ROAD
C
O
C
O
K
A
T
L
A
N
T
C
M
P
T
A
X
I W
E
F
U
E
L
I
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A
R
S
E R
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
A U
G U
G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
N
T
I N
C
Z
S U
I T
E
D E
N V
E R
C
O
B E
N H
A M
S
K E
L L
C
O M
P A
N Y
N
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
T
Y
O
K
D O
B B
I N
S
A
S
E R
S
E
G
E O
R G
I A
R E
P A
A
N S
I E
R
K I N
G
R
A M
P
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
GC141
C O
N S
T R
U C
T I O
N
O
P E
R A
T I O
A
S I N
G
P
L A
N S
D P
S
C S
K
D E
S
00 500 1000
CONTRACTOR STAGING
AREA
PROJECT LOCATION
HAUL ROUTE
LEGEND
NOTES:
1. SEE SHEETS GC142 TO GC152 FOR
ADDITIONAL INFORMATION AND BARRICADE
PLACEMENTS.
M
O
T
U
S
K
E
E
G
R
M
E
A
T
L
A
N
T
E
S
E
D
O
B
B
I
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXXXXXX
XXXXXXXXXX
X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X X
X X
X
X X
X X
X X
X X
X
X X
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
LOW PROFILE BARRICADES, TYP
SEE DETAIL 1/GC142
COORDINATE WITH CONTRACTING
OFFICER FOR ACCESS POINT INTO
TRANSIENT RAMP FROM CLOSED
TAXIWAY A
CONTRACTOR ACCESS AND HAUL ROUTE.
COORDINATE WITH CONTRACTING
OFFICER FOR ACCESS POINTS ACROSS
TAXIWAY A AND INTO WORK AREA.
CONTRACTOR STAGING AREA (MAX HEIGHT OF EQUIPMENT
OR MATERIAL 100'). AFTER CONSTRUCTION COMPLETION,
CONTRACTOR SHALL RESTORE STAGING AREA TO ITS
ORIGINAL CONDITION PRIOR TO START OF CONSTRUCTION.
ALL REMOVED MATERIAL SHALL BE DISPOSED OFF BASE
PROPERTY, AFTER BASE ENVIRONMENTAL GUIDELINES ARE
MET AND APPROVED BY THE CONTRACTING OFFICER. SEE
SHEET GC143 FOR FURTHER INFORMATION ON
CONTRACTOR STAGING AREA.
AIRFIELD ACCESS GATE
GATE GUARD MAY BE REQUIRED
SEE SHEET GC151 FOR
ADDITIONAL INFORMATION
REFUELING
ROAD
LOW PROFILE BARRICADES, TYP
SEE DETAIL 1/GC142
LOW PROFILE
BARRICADES, TYP.
SEE DETAIL 1/GC142
LOW PROFILE BARRICADES, TYP
SEE DETAIL 1/GC142
LOW PROFILE BARRICADES, TYP
SEE DETAIL 1/GC142
LOW PROFILE BARRICADES, TYP
SEE DETAIL 1/GC142
LOW PROFILE
BARRICADES, TYP.
SEE DETAIL 1/GC142
T A
X I W
A
X
I
W
U
N
W
EXISTING TAXIWAY CENTERLINE
TO BE REMOVED, 1002 LF
(TERMINATE AT CMA LINE).
N: 1424875.07
E: 2191614.65
SEE SHEET GC144
FOR TEMPORARY
MARKINGS ALONG
TAXIWAY B
N: 1425485.04
E: 2191052.21
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A
R
S
E R
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
A U
G U
G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
N
T
I N
C
Z
S U
I T
E
D E
N V
E R
C
O
B E
N H
A M
S
K E
L L
C
O M
P A
N Y
N
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
T
Y
O
K
D O
B B
I N
S
A
S
E R
S
E
G
E O
R G
I A
R E
P A
A
N S
I E
R
K I N
G
R
A M
P
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
GC142
C O
N S
T R
U C
T I O
N
O
P E
R A
T I O
A
S I N
G
P
L A
N S
D P
S
C S
K
D E
S
0 100' 200'
NOTES:
LOW PROFILE BARRICADE
NOT TO SCALE
CLIN 1 & 2
CLIN 3 & 4
CLIN 5 & 6
1. BARRICADES SHALL BE FILLED WITH WATER AND CONSTANTLY MONITORED.
BARRICADES SHALL BE WEIGHTED BY SANDBAGS OR OTHER MEANS TO KEEP
BARRICADES STATIONARY.
2. LOW PROFILE BARRIER AC 150/5370-2G MAX 18" HEIGHT. UV RESISTANT
POLYETHYLENE WATER FILLED, 8' LENGTH, ORANGE AND WHITE, WITH TWO
RED FLASHING BATTERY POWERED LIGHTS. SEE SHEET GC152 SECTION
"HAZARD MARKING AND LIGHTING" FOR REQUIREMENTS.
3. BARRICADES SHALL BE SPACED 4-FT APART MAX. COORDINATE WITH THE
CONTRACTING OFFICER FOR ALL LOCATIONS, LAYOUTS, SPACING AND
POSSIBLE GAPS IN BARRICADES AT EACH LOCATION.
4. FLASHING LIGHTS MUST BE AT LEAST 5 CANDELAS EFFECTIVE INTENSITY AND
FLASH AT A RATE OF 50 TO 160 FLASHES PER MINUTE. NO SOLAR FLASHERS
ARE ALLOWED.
5. BARRICADES SHALL BE PLACED AND MOVED WHERE INDICATED ON DRAWING
FOR ALL THREE PHASES OF WORK.
XXXXXXX
LOW PROFILE
BARRICADE
LOW PROFILE BARRICADE SPACING DETAIL
LEGEND
4' MAX SPACING
M A
X
KEY MAP
NOT TO SCALE
PROJECT
LOCATION
MIN. 6" ORANGE
REFLECTIVE
STRIPES
WATER RELEASE VALVE
RED FLASHING LIGHT
RED FLASHING BATTERY
POWERED LIGHT
8'
W
W
W
W
W
W
W
W
W
W
W
W
W
W
X
XXXXXXXXXXXXXXXXXXXXX
T A
X I W
W W W W W
W
STAGING AREA
74,681 SF
HAUL ROUTE
FIRE HYDRANT AVAILABLE FOR
CONSTRUCTION WATER SOURCE
SEE SPECIFICATIONS FOR REQUIREMENTS
C
H
H
PROVIDE FLAT WATER HOSE OVER PAVEMENT
FOR CONSTRUCTION WATER AND PROTECT THROUGHOUT
C-130 TUGGED ACCESS PATH
N: 1425006.32
E: 2191105.76
N: 1424973.10
E: 2191440.89
CONTRACTOR TO REMAIN CLEAR
OF C-130 WINGTIP CLEARANCE LINE
N: 1425378.46
E: 2191207.10
N: 1425372.20
E: 2191140.91
XX
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
P H
A S
E
L O
W
P
R O
F I
R
R I C
A D
E S
T
Y P
CONSTRUCTION ENTRANCE TO
STAGING AREA
SEE DETAIL 4/CG501
TAXIWAY G CENTER LINE
T
A
X
I
W
10' WINGTIP CLEARANCE TO
BE MAINTAINED AT ALL TIMES
C-130H-30
C-130H-30
77.00
77.00
C-130 TUGGED ACCESS
PATH ALONG TAXIWAY
A, SEE NOTE 2
EXISTING TAXIWAY CENTERLINE
TO BE REMOVED. SEE NOTE 3
**TAXIWAY A TEMPORARY
MARKING MAY BECOME
PERMANENT PENDING REVISED
PARKING PLAN**
N: 1425485.04
E: 2191052.21
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A
R
S
E R
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
A U
G U
G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
N
T
I N
C
Z
S U
I T
E
D E
N V
E R
C
O
B E
N H
A M
S
K E
L L
C
O M
P A
N Y
N
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
T
Y
O
K
D O
B B
I N
S
A
S
E R
S
E
G
E O
R G
I A
R E
P A
A
N S
I E
R
K I N
G
R
A M
P
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
GC143
C O
N S
T R
U C
T I O
N
O
P E
R A
T I O
A
S I N
G
P
L A
N S
D P
S
C S
K
D E
S
0 40' 80'
CLIN 1 & 2
CLIN 3 & 4
CLIN 5 & 6
XXXXXXX
LOW PROFILE
BARRICADE
LEGEND
STAGING AND ACCESS NOTES:
1. TAXIWAYS A AND G WILL BE CLOSED FOR THE
DURATION OF CONSTRUCTION. NO EQUIPMENT
SHALL BE STORED OUTSIDE THE LIMITS OF THE
CONTRACTOR STAGING AREA WITHOUT PRIOR
APPROVAL OF DARB.
2. DARB MAY NEED TO TUG AIRCRAFT TO BUILDING 746
DURING CONSTRUCTION. DARB WILL TEMPORARILY
MOVE AND REPLACE THE BARRICADES SO THIS
OPERATION CAN BE COMPLETED. THE CONTRACTOR
SHALL COORDINATE WITH THE DARB AIRFIELD
MANAGER DAILY SO THAT THE CONTRACTOR IS
AWARE OF WHEN THESE OPERATIONS WILL OCCUR
AND CAN ASSURE HAULING AND SITE ACCESS IS
ADJUSTED APPROPRIATELY. AT ANY POINT SHOULD
BARRICADES BE OUT OF POSITION AND
UNATTENDED ON TAXIWAY A, CONTRACTOR SHALL
REALIGN IMMEDIATELY UNLESS COORDINATED WITH
DARB.
3. TAXIWAY A CENTERLINE TO BE REMOVED AT
BEGINNING OF PROJECT FOR LIMITS SHOWN. THIS
MARKING DOES NOT HAVE TO BE REMARKED AT
CONCLUSION OF PROJECT.
G
S
A
N
S
A
N
S
A
N
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
S
A
N
S
A
N
S
A
N
E
E
E
E
E
E E
E
E
E
EEEEEEEE
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
C
A
P
R
O
N
X
X
X
X
X
X
X
X
X X
X X
X
X X
X X
X X
X X
X
X X
X X
X X
X X
X
X X
X X
X
X X
X X
X X
X X
X
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
T A
X
I W
C-130 ACCESS PATH
C-130 WINGTIP CLEARANCE
LOW PROFILE BARRICADES, TYP
SEE DETAIL 1/GC142
C
L E
A
R
A
N
C
E
TAXIWAY B
TEMPORARY CENTERLINE,
SEE DETAIL 2/CS501
TO BE REMOVED AT CONLUSION
OF PROJECT
EXISTING TAXIWAY CENTERLINE
TO BE REMOVED, 177 LF
CLIN 1 & 2 WORK AREA
EXISTING TAXIWAY CENTERLINE
TO BE REMOVED, 512 LF
EXISTING TAXIWAY CENTERLINE
TO BE REMOVED, 108 LF
TAXIWAY B
TEMPORARY CENTERLINE,
SEE DETAIL 2/CS501
TO BE REMOVED AT CONLUSION
OF PROJECT
R
R
N: 1424429.04
E: 2192558.17
N: 1424611.57
E: 2192369.91
N: 1424608.16
E: 2192362.14
N: 1424344.51
E: 2192152.28
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A
R
S
E R
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
A U
G U
G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
N
T
I N
C
Z
S U
I T
E
D E
N V
E R
C
O
B E
N H
A M
S
K E
L L
C
O M
P A
N Y
N
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
T
Y
O
K
D O
B B
I N
S
A
S
E R
S
E
G
E O
R G
I A
R E
P A
A
N S
I E
R
K I N
G
R
A M
P
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
GC144
C O
N S
T R
U C
T I O
N
O
P E
R A
T I O
A
S I N
G
P
L A
N S
D P
S
C S
K
D E
S
0 30' 60'
NOTES:
TEMPORARY MARKINGS SHOWN ON THIS SHEET TO BE REMOVED UPON COMPLETION OF PROJECT.
EXISTING MARKINGS SHOWN ON THIS SHEET TO BE REPAINTED UPON COMPLETION OF PROJECT.
CLIN 1 & 2
CLIN 3 & 4
CLIN 5 & 6
XXXXXXX
LOW PROFILE
BARRICADE
LEGEND
N
S
A
N
W
W
W
W
W
W
W W W W W W W W W W W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W W W
W
W W W W W W
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
E
E
E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EE
E
E
E
E
EEEEEEE
E E
E E
E E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
X
X
X
X
X
LOW PROFILE BARRICADES, TYP
SEE DETAIL 1/GC142
LOW PROFILE BARRICADES, TYP
SEE DETAIL 1/GC142
CLIN 1 & 2
C
L
T A
X
I W
L
L
X
X
X
X
X
X X
X
X X
X X
X
X X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
XXXXX
X
X
X
X
X
X
X
X
X
X
CLIN 1 & 2 WORK AREA
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
PHASE 1 LOW PROFILE BARRICADES, TYP
SEE DETAIL 1/GC142
N: 1424765.49
E: 2192138.12
N: 1425472.11
E: 2191730.83
N: 1424611.57
E: 2192369.91
N: 1424608.16
E: 2192362.14
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A
R
S
E R
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
A U
G U
G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
N
T
I N
C
Z
S U
I T
E
D E
N V
E R
C
O
B E
N H
A M
S
K E
L L
C
O M
P A
N Y
N
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
T
Y
O
K
D O
B B
I N
S
A
S
E R
S
E
G
E O
R G
I A
R E
P A
A
N S
I E
R
K I N
G
R
A M
P
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
GC145
C O
N S
T R
U C
T I O
N
O
P E
R A
T I O
A
S I N
G
P
L A
N S
C L
P
S
C S
K
D E
S
00 40 80
CLIN 1 & 2
LEGEND
TRANSITIONAL PAVEMENT REQUIRED TO
TIE CLIN 1 & 2 LIMITS TO EXISTING
PAVEMENT
CLIN 1 & 2
XXXXXXXX
LOW PROFILE
BARRICADE
A
A
CLIN 1&2 EXISTING TRANSIENT RAMP PAVEMENT
THICKENED EDGE
EXPANSION JOINT,
SEE NOTE 3
25.5' +/- (SEE NOTE 2)
NEW PAVEMENT
EXISTING JOINT PATTERN
20.0'20.0'
NOTES:
1. TRANSITIONAL PAVEMENT SECTIONS SHOWN ON THIS SHEET
SHALL NOT BE REQUIRED IF ALL CLINS ARE AWARDED AT ONCE.
2. TEMPORARY TRANSITION SLAB TO TIE NEW TRANSIENT RAMP
(CLIN 1&2) INTO EXISTING TRANSIENT RAMP. PLACE TYPE C
JOINT AT EXISTING RAMP TRANSVERSE JOINT. SLAB SHALL BE
REMOVED WITH CLIN 3&4 CONSTRUCTION.
3. THE EXPANSION JOINT BETWEEN CLINS SHALL BE
CONSTRUCTED EVEN IF ALL CLINS ARE AWARDED AS SHOWN
ON SHEET CP121.
4. SEE JOINTING PLANS AND DETAILS FOR FURTHER INFORMATION
ON JOINT TYPES AND SPACING
(TYP.)
25.0'
(TYP.)
NEW JOINT PATTERN
(E) CONCRETE
(E) SUBGRADE
CLIN BOUNDARY LINE
SEE CP301 FOR
PAVEMENT SECTION
SECTION A-A
(SEE ABOVE FOR LOCATION)
(N) 6" UNDERDRAIN PIPE
SEE SHEET CU/523 FOR DETAILS
PLACE DOWELS IN EXISTING
PAVEMENT (TYPE C JOINT,
SEE SHEET CP501)
(SEE BELOW)
W
W
W
W
W
W
W
W
W
W
S
A
N
S
A
N
S
A
N
S
A
N
S
A
N
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
E
C
L
L
L
L
LOW PROFILE BARRICADES, TYP
SEE DETAIL 1/GC142
C
L
L
CLIN 3 & 4 WORK AREA
(E) TAXIWAY LIGHTS
TO REMAIN
CLIN 1 & 2
C
L
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
N: 1424765.49
E: 2192138.12
N: 1424831.67
E: 2191913.36
N: 1425434.48
E: 2191567.83
N: 1425472.12
E: 2191730.83
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
CLIN 3 & 4 LOW PROFILE BARRICADES, TYP
SEE DETAIL 1/GC142
CLIN 3 & 4 LOW PROFILE BARRICADES, TYP
SEE DETAIL 1/GC142
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A
R
S
E R
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
A U
G U
G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
N
T
I N
C
Z
S U
I T
E
D E
N V
E R
C
O
B E
N H
A M
S
K E
L L
C
O M
P A
N Y
N
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
T
Y
O
K
D O
B B
I N
S
A
S
E R
S
E
G
E O
R G
I A
R E
P A
A
N S
I E
R
K I N
G
R
A M
P
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
GC146
C O
N S
T R
U C
T I O
N
O
P E
R A
T I O
A
S I N
G
P
L A
N S
P H
A S
E
C
L
P
S
C S
K
D P
S
00 40 80
CLIN 3 & 4
LEGEND
TRANSITIONAL PAVEMENT REQUIRED TO
TIE CLIN 3 & 4 LIMITS TO EXISTING
PAVEMENT
CLIN 3 & 4
XXXXXXXX
LOW PROFILE
BARRICADE
A
A
B
B
CLIN 3 & 4 EXISTING TRANSIENT RAMP PAVEMENT
THICKENED EDGE
EXPANSION JOINT,
SEE NOTE 5.
15.4' +/- (SEE NOTE 3)
NEW PAVEMENT
EXISTING JOINT PATTERN
20.0'20.0'
(TYP.)
25.0' +/-
(TYP.)
NEW JOINT PATTERN
(E) CONCRETE
(E) SUBGRADE
CLIN BOUNDARY LINE
NOTES:
1. TRANSITIONAL PAVEMENT SECTIONS SHOWN ON THIS SHEET
SHALL NOT BE REQUIRED IF ALL CLINS ARE AWARDED AT ONCE.
2. TRANSITIONAL SLAB INSTALLED UNDER CLIN 1 SHALL BE
REMOVED AND NEW PAVEMENT SHALL BE CONSTRUCTED PER
FINAL JOINT PATTERN.
3. TEMPORARY TRANSITION SLAB TO TIE NEW TRANSIENT RAMP
(CLIN 3&4) INTO EXISTING TRANSIENT RAMP. PLACE TYPE C
JOINT AT EXISTING RAMP TRANSVERSE JOINT. SLAB SHALL BE
REMOVED WITH CLIN 5&6 CONSTRUCTION.
4. SEE JOINTING PLANS AND DETAILS FOR FURTHER INFORMATION
ON JOINT TYPES AND SPACING.
5. THE EXPANSION JOINT BETWEEN CLINS 1/2 & 3/4 SHALL BE
CONSTRUCTED REGARDLESS OF PROJECT AWARD. IF ALL
CLINS ARE AWARDED AT ONCE A TYPE D JOINT SHALL BE
CONSTRUCTED BETWEEN CLINS 3/4 & 5/6 AS SHOWN ON CP121.
CLIN 1&2 CLIN 3&4
THICKENED EDGE EXPANSION JOINT,
SEE NOTE 5
20.0' (SEE NOTE 2)
EXISTING PAVEMENT
NEW JOINT PATTERN
20.0'20.0'
(TYP.)
20.0'
(TYP.)
NEW JOINT PATTERN
CLIN BOUNDARY LINE
NEW PAVEMENT
(E) CONCRETE
(E) SUBGRADE
(E) DRAINAGE LAYER
TRANSITIONAL PAVEMENT CONSTRUCTED
UNDER CLIN 1&2 REQUIRED TO BE
REMOVED TO CONSTRUCT CLIN 3&4
SEE CP301 FOR
PAVEMENT SECTION
SECTION A-A
(SEE ABOVE FOR LOCATION)
SECTION B-B
(SEE ABOVE FOR LOCATION)
SEE CP301 FOR
PAVEMENT SECTION
(N) 6" UNDERDRAIN PIPE
SEE SHEET CU/523 FOR DETAILS
6" UNDERDRAIN PIPE
(INSTALLED UNDER CLIN 1&2)
PLACE DOWELS IN EXISTING
PAVEMENT (TYPE C JOINT,
SEE SHEET CP501)
W
W
W
W
W
W
W
W
W
W
W
E
E
E
E
E
E
E
E
E
E
E
E
E
X X
X X
X X
X X
X
X X
X X
X X
X X
X X
X X
X
W W
W
C
L
L
LOW PROFILE BARRICADES,
TYP. SEE DETAIL 1/GC142
(E) TAXIWAY LIGHTS
TO REMAIN
C
L
L
CLIN 5 & 6 WORK AREA
TAXIWAY A
LOW PROFILE BARRICADES, TYP
SEE DETAIL 1/GC142
X X
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
N: 1424831.67
E: 2191913.36
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
CLIN 5 & 6 LOW PROFILE BARRICADES, TYP
SEE DETAIL 1/GC142
N: 1425434.48
E: 2191567.83
S O
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A
R
S
E R
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
A U
G U
G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
N
T
I N
C
Z
S U
I T
E
D E
N V
E R
C
O
B E
N H
A M
S
K E
L L
C
O M
P A
N Y
N
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
T
Y
O
K
D O
B B
I N
S
A
S
E R
S
E
G
E O
R G
I A
R E
P A
A
N S
I E
R
K I N
G
R
A M
P
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
GC147
C O
N S
T R
U C
T I O
N
O
P E
R A
T I O
A
S I N
G
P
L A
N S
C L
P
S
C S
K
D E
S
00 40 80
CLIN 5 & 6
LEGEND
CLIN 5 & 6
XXXXXXXX
LOW PROFILE
BARRICADE
A
A
CLIN 3&4 CLIN 5&6
THICKENED EDGE EXPANSION JOINT,
SEE NOTE 4
20.0' (SEE NOTE 2)
EXISTING PAVEMENT
NEW JOINT PATTERN
20.0'20.0'
DOWELED CONSTRUCTION JOINT,
SEE DETAIL 3/CP501
(TYP.)
20.0'
(TYP.)
NEW JOINT PATTERN
CLIN BOUNDARY LINE
NEW PAVEMENT
(E) CONCRETE
(E) SUBGRADE
(E) DRAINAGE LAYER
NOTES:
1. TRANSITIONAL PAVEMENT SECTIONS SHOWN ON THIS SHEET
SHALL NOT BE REQUIRED IF ALL CLINS ARE AWARDED AT ONCE.
2. TRANSITIONAL SLAB INSTALLED UNDER CLIN 3&4 SHALL BE
REMOVED AND NEW PAVEMENT SHALL BE CONSTRUCTED PER
FINAL JOINT PATTERN.
3. SEE JOINTING PLANS AND DETAILS FOR FURTHER INFORMATION
ON JOINT TYPES AND SPACING.
4. IF ALL CLINS ARE AWARDED AT ONCE A TYPE D JOINT SHALL BE
CONSTRUCTED IN THIS LOCATION AS SHOWN ON CP121.
TRANSITIONAL PAVEMENT REQUIRED TO BE
REMOVED TO CONSTRUCT CLIN 5&6
SEE CP301 FOR
PAVEMENT SECTION
SECTION A-A
(SEE ABOVE FOR LOCATION)
SEE JOINTING PLAN SHEETS
AND TYPICAL SECTIONS
SHEETS FOR CONTINUATION
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A
R
S
E R
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
A U
G U
G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
N
T
I N
C
Z
S U
I T
E
D E
N V
E R
C
O
B E
N H
A M
S
K E
L L
C
O M
P A
N Y
N
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
T
Y
O
K
D O
B B
I N
S
A
S
E R
S
E
G
E O
R G
I A
R E
P A
A
N S
I E
R
K I N
G
R
A M
P
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
GC151
C O
N S
T R
U C
T I O
N
O
P E
R A
T I O
A
S I N
G
N
O T
E S
D P
S
C S
K
D E
S
CONSTRUCTION PHASING/ SCHEDULING
THE PROJECT IS DIVIDED INTO MULTIPLE PHASES. THESE PHASES ARE AS FOLLOWS:
PHASE 0 (180 CALENDAR DAYS, INCLUDED IN CLIN 1) - THIS PHASE WILL START AFTER THE AWARD TO THE
CONTRACTOR IS GIVEN. THIS PHASE WILL CONSIST OF A TIME PERIOD FOR THE CONTRACTOR TO
CONDUCT ALL NECESSARY REQUIREMENTS IN THE RFP PRIOR TO CONSTRUCTION.
THIS PHASE IS PRIMARILY INTENDED FOR THE CONTRACTOR TO SUBMIT AND GET APPROVAL ON ALL
REQUIRED PRE-CONSTRUCTION SUBMITTALS, PERFORM REQUIRED TESTS ON PROPOSED MATERIALS TO
BE USED IN THE PROJECT, PERFORM REQUIRED MIX DESIGNS & ACHIEVE APPROVAL OF MIX DESIGNS, ISSUE SUBCONTRACTS AND PURCHASE ORDERS, SUBMIT REQUIRED PERMITS FOR APPROVAL, PLACEMENT OF STAGING AREA, CONSTRUCTION OF HAUL ROUTES WITHIN THE BASE PROPERTY, AND
PRODUCTION AND STOCKPILING OF MATERIALS FOR THE PROJECT. INTENT OF THIS PHASE IS TO HAVE
ALL REQUIRED APPROVALS AND REPRESENTATIVE MATERIALS IN PLACE PRIOR TO BEGINNING
DEMOLITION OF THE TRANSIENT RAMP. AT LEAST 75% OF THE AGGREGATES REQUIRED FOR PAVEMENT
SECTION CONSTRUCTION SHALL BE DELIVERED TO THE SITE PRIOR TO PROCEEDING TO THE NEXT
PHASE.
A SUBMITTAL REGISTER HAS BEEN PROVIDED OUTLINING ALL REQUIRED SUBMITTALS DURING THIS
PHASE. ALL SUBMITTALS DEFINED AS “PRECONSTRUCTION SUBMITTALS”, “CERTIFICATES”, “PRODUCT
DATA”, “MANUFACTURER'S FIELD REPORTS”, “TEST REPORTS”, “SHOP DRAWINGS”, OR “MANUFACTURER'S
INSTRUCTIONS” IN THE SUBMITTAL DESCRIPTION COLUMN OF THE SUBMITTAL LOG MUST BE SUBMITTED
AND APPROVED PRIOR TO THE COMPLETION OF THIS PHASE. ADDITIONALLY, AT LEAST 75% OF THE
AGGREGATES REQUIRED FOR PAVEMENT SECTION CONSTRUCTION SHALL BE DELIVERED TO THE SITE
PRIOR TO PROCEEDING TO THE NEXT PHASE.
UPON COMPLETION OF MOBILIZATION (INCLUSIVE IN CLIN 1), THE CONTRACTOR SHALL RECEIVE A
SEPARATE NOTICE TO PROCEED FOR THE ACTUAL CONSTRUCTION ASSOCIATED WITHIN THE TRANSIENT
PARKING RAMP, 2048. CONSTRUCTION IS ANTICIPATED TO OCCUR DURING THE BASE FIVE-DAY WORK
WEEK OF MONDAY THROUGH FRIDAY FROM 0600 TO 1700, WITH SOME PORTIONS OF THE CONSTRUCTION
OCCURRING AT NIGHT DUE TO WEATHER LIMITATIONS OF CONCRETE PAVING AND SAW CUTTING OF NEW
CONCRETE NEEDING TO OCCUR WITHIN SPECIFIC TIME PERIODS IN RELATION TO THE CONCRETE BEING
PLACED. THE TRANSIENT RAMP WILL BE ENTIRELY CLOSED DURING THE CONSTRUCTION OF ANY OF THE
THREE AREAS. NON-MOVEMENT BOUNDARIES WILL BE ADJUSTED SO THAT ALL WORK WILL TAKE PLACE
OUTSIDE OF THE MOVEMENT AREA AND OUTSIDE OF TOWER CONTROL.
DUE TO FUNDING UNCERTAINTY, MULTIPLE CONTRACT LINE ITEMS (CLINS) HAVE BEEN CREATED FOR THE
PROJECT. A DESCRIPTION OF THESE CLINS AND THEIR RESPECTIVE PERFORMANCE PERIODS ARE AS
FOLLOWS:
· CLIN 1 (310 CALENDAR DAYS) - TRANSIENT RAMP 2048 EASTERLY SECTION - THE WORK INCLUDES THE
RECONSTRUCTION OF THE EASTERLY PORTION OF TRANSIENT RAMP 2048, BOUND ON THREE SIDES BY
EXISTING AIRCRAFT APRON AND/OR FACILITIES, CONSISTING OF APPROXIMATELY 34,000 SY OF PORTLAND
CEMENT CONCRETE AIRFIELD PAVEMENTS AS FURTHER DEFINED IN PLANS AND SPECIFICATIONS. THIS
WILL INCLUDE THE CONNECTION TO TAXIWAY B, THE AREA IN FRONT OF BUILDING 731, THE CONNECTION
AND MODIFICATIONS OF THE DRAINAGE INLETS AND MANHOLE AND THE EASTERN AND NORTHERN
PORTION OF THE PERIMETER SERVICE ROAD ON THE TRANSIENT RAMP. A THICKENED EDGE ISOLATION
JOINT AND AN UNDERDRAIN WILL BE INSTALLED ALONG THE EDGE OF CLIN 1 THAT ABUTS TO THE
EXISTING PORTION OF TRANSIENT RAMP. A TRANSITIONAL SLAB WILL BE CONSTRUCTED TO CONNECT
THE NEWLY CONSTRUCTED CONCRETE INTO THE EXISTING TRANSIENT RAMP. THIS WILL BE NECESSARY
TO ACCOUNT FOR THE SMALL GRADE DIFFERENTIAL BETWEEN THE EDGES OF PAVEMENT AS WELL AS
PROVIDE A TRANSITION BETWEEN JOINT PATTERNS AND IS DETAILED ON THE PHASING PLANS.
· CLIN 2 (130 CALENDAR DAYS) - TRANSIENT RAMP 2048 INCLUDES A 6,420 CY ALLOTMENT FOR POTENTIAL
REMOVAL AND REPLACEMENT OF UNSUITABLE SOILS BENEAT THE PROPOSED PAVEMENT SECTION AND
ASSOCIATED SUBGRADE PREPARATION DEFINED UNDER SEPARATE CLIN. PAID ON A COST PER CUBIC
YARD BASIS. IT IS ASSUMED THIS DURATION RUNS CONCURRENTLY WITH CLIN 1.
· CLIN 3 (75 ADDITIONAL CALENDAR DAYS) - TRANSIENT RAMP 2048 MID-APRON SECTION - THE WORK
INCLUDES THE RECONSTRUCTION OF THE MID-APRON PORTION OF TRANSIENT RAMP 2048, BOUND ON
TWO SIDES BY EXISTING AIRCRAFT APRON, CONSISTING OF APPROXIMATELY 16,000 SY OF PAVEMENTS
AS FURTHER DEFINED IN PLANS AND SPECIFICATIONS. A TRANSITIONAL SLAB WILL BE CONSTRUCTED TO
CONNECT THE NEWLY CONSTRUCTED CONCRETE INTO THE EXISTING TRANSIENT RAMP. THIS WILL BE
NECESSARY TO ACCOUNT FOR THE SMALL GRADE DIFFERENTIAL BETWEEN THE EDGES OF PAVEMENT AS
WELL AS PROVIDE A TRANSITION BETWEEN JOINT PATTERNS. THE EASTERN EDGE OF CLIN 3 WILL TIE
INTO THE PAVEMENT CONSTRUCTED IN CLIN 1. THIS WILL REQUIRE REMOVAL OF THE ROW OF
TRANSITIONAL PAVEMENT AS DETAILED ON THE PHASING PLANS.
· CLIN 4 (75 CALENDAR DAYS) - TRANSIENT RAMP 2048 INCLUDES A 3,020 CY ALLOTMENT FOR POTENTIAL
REMOVAL AND REPLACEMENT OF UNSUITABLE SOILS BENEATH THE PROPOSED PAVEMENT SECTION AND
ASSOCIATED SUBGRADE PREPARATION DEFINED UNDER SEPARATE CLIN. PAID ON A COST PER CUBIC
YARD BASIS. IT IS ASSUMED THIS DURATION RUNS CONCURRENTLY WITH CLIN 3.
· CLIN 5 (ADDITIONAL CALENDAR DAYS) - TRANSIENT RAMP 2048 WESTERLY SECTION - THE WORK INCLUDES
THE RECONSTRUCTION OF THE WESTERLY PORTION OF TRANSIENT RAMP 2048, BOUND ON TWO SIDES BY
EXISTING AIRCRAFT TAXIWAY OR APRON, CONSISTING OF APPROXIMATELY 13,600 SY OF PAVEMENTS AS
FURTHER DEFINED IN PLANS AND SPECIFICATIONS. THIS WILL INCLUDE THE CONNECTION AND
MODIFICATIONS TO TAXIWAY A, AND THE NORTHERN PORTION OF THE PERIMETER SERVICE ROAD
INCLUDING THE TRANSIENT RAMP. A THICKENED EDGE ISOLATION JOINT AND AN UNDERDRAIN WILL BE
INSTALLED ALONG THE EDGE OF TAXIWAY A. THE EASTERN EDGE OF CLIN 5 WILL TIE INTO THE PAVEMENT
CONSTRUCTED IN CLIN 3. THIS WILL REQUIRE REMOVAL OF THE TRANSITIONAL PAVEMENT AT THE CLIN 3
INTERFACE AS DETAILED ON THE PHASING PLANS.
· CLIN 6 (75 CALENDAR DAYS) - TRANSIENT RAMP 2048 INCLUDES A 2,560 CY ALLOTMENT FOR POTENTIAL
REMOVAL AND REPLACEMENT OF UNSUITABLE SOILS BENEATH THE PROPOSED PAVEMENT SECTION AND
ASSOCIATED SUBGRADE PREPARATION DEFINED UNDER SEPARATE CLIN. PAID ON A COST PER CUBIC
YARD BASIS. IT IS ASSUMED THIS DURATION RUNS CONCURRENTLY WITH CLIN 5.
SHOULD ALL CLINS BE AWARDED AT A SINGLE TIME, THE ABOVE DURATIONS ARE RECOMMENDED TO
STILL APPLY TO THE CONTRACT TO AVOID DISTURBING THE ENTIRE SITE AT ONCE. THE TRANSITIONAL
SLAB AND SOME OF THE THICKENED EDGE ISOLATION JOINTS AND UNDERDRAINS WILL BE REMOVED
FROM THE PROJECT SHOULD THE ENTIRE TRANSIENT RAMP BE RECONSTRUCTED AT ONCE. THESE
PROVISIONS ARE INCLUDED IN THE CONSTRUCTION OPERATIONS AND PHASING PLANS.
GENERAL CONSIDERATIONS:
COORDINATE THE FOLLOWING AS REQUIRED:
A. CONTRACTORS ARE REQUIRED TO ATTEND WEEKLY COORDINATION MEETINGS AT WHICH OPERATIONAL
SAFETY WILL BE A STANDING AGENDA ITEM DURING EVERY PROGRESS MEETING.
B. ALL CONTRACTOR PERSONNEL SHALL COMPLETE THE BASES BACKGROUND CHECK, BADGING AND
DRIVERS TRAINING REQUIREMENTS PRIOR TO BEING ALLOWED ACCESS TO THE PROJECT.
C. THE CONTRACTOR SHALL NOT INTERFERE WITH THE NORMAL OPERATIONS OF THE BASE FACILITIES THAT
ARE DESIGNATED UNDER THIS CONTRACT TO REMAIN OPEN TO AIR TRAFFIC, AND SHALL IMPLEMENT ALL
SPECIFIED AND OTHER APPROPRIATE MEASURES TO ENSURE THE SAFETY OF ALL USERS OF THE BASE.
PROJECT PHASING
SEE SHEET GC141 THROUGH GC147 "CONSTRUCTION OPERATIONS & PHASING PLAN" FOR ADDITIONAL
INFORMATION.
AREAS AND OPERATIONS AFFECTED BY CONSTRUCTION ACTIVITY:
A. RUNWAYS SHALL REMAIN IN USE BY AIRCRAFT THROUGHOUT THE ENTIRE PROJECT. WHEN ANY AREA IS
REQUIRED TO BE CLOSED TO AIRCRAFT AND BASE VEHICLE TRAFFIC, IT SHALL BE BARRICADED AND
MARKED, WITH ANY NAVAIDS AFFECTED BY THE CLOSURE ADDRESSED PER THE REQUIREMENTS STATED
ON THIS SHEET, SHEET GC141 THROUGH GC147, AND THE SPECIFICATIONS.
B. TAXIWAY CLOSURES:
CLOSURE OF TAXIWAY A WILL BE REQUIRED FOR THIS PROJECT.
C. RUNWAY CLOSURES:
RUNWAY CLOSURES WILL NOT BE REQUIRED FOR THIS PROJECT.
D. APRON PAVEMENT CLOSURES:
CLOSURE OF THE TRANSIENT PARKING RAMP, 2048 WILL BE REQUIRED FOR THIS
PROJECT, AND BARRICADES SHALL BE PLACED AS SHOWN ON SHEET GC142.
E. FLIGHT LINE ROAD CLOSURES:
CLOSURE OF FLIGHT LINE ROAD THROUGH THE TRANSIENT RAMP, 2048 WILL BE
REQUIRED FOR THIS PROJECT.
NAVAIDS:
A. IF THIS PROJECT AFFECTS RUNWAY NAVAIDS, COORDINATION WITH THE CONTRACTING OFFICERS
REPRESENTATIVE (COR) WILL BEGIN AT THE PRECONSTRUCTION MEETING. A LIST OF RESPONSIBLE
PARTY REPRESENTATIVES, INCLUDING PROCEDURES FOR CONTACT AFTER-HOURS, SHOULD BE
OBTAINED PRIOR TO CONSTRUCTION. NAVAIDS ARE NOT ANTICIPATED TO BE AFFECTED BY THIS
PROJECT.
B. BEFORE COMMENCING CONSTRUCTION ACTIVITY, PARKING VEHICLES OR STORING CONSTRUCTION
EQUIPMENT AND MATERIALS NEAR A NAVAID, COORDINATE WITH THE APPROPRIATE OFFICE TO
EVALUATE THE EFFECT OF CONSTRUCTION ACTIVITY AND THE REQUIRED DISTANCE AND DIRECTION
FROM THE NAVAID.
C. INTERFERENCE FROM CONSTRUCTION EQUIPMENT AND ACTIVITIES MAY REQUIRE NAVAID SHUTDOWN OR
ADJUSTMENT OF INSTRUMENT APPROACH MINIMUMS FOR LOW VISIBILITY OPERATIONS. THIS REQUIRES
THAT A NOTAM BE FILED. ALL NOTAM'S TO BE FILED BY THE BASE. THIS IS NOT ANTICIPATED TO OCCUR
FOR THIS PROJECT.
CONTRACTOR ACCESS:
A. THE CONTRACTOR SHALL USE THE DOBBINS ARB COMMERCIAL GATE 2 (OFF ATLANTIC AVENUE SE) TO
GAIN ACCESS ONTO BASE PROPERTY. NORMAL GATE HOURS ARE 0600 TO 1400. FOR ACCESS TO THE
SITE OUTSIDE OF 0600-1400 DOBBINS WILL PROVIDE GATE STAFFING IF NOTIFIED 7 DAYS IN ADVANCE.
SHOULD THE CONTRACTOR WISH TO HAVE MORE EFFICIENT HAULING OPERATIONS (DURING ANY HOUR), TWO OR MORE DARB APPROVED CONTRACTOR PROVIDED PERSONNEL WILL BE REQUIRED TO
SUPPLEMENT BASE STAFF IN CONTRACTOR DELIVERY INSPECTIONS.
B. GATE GUARD IS REQUIRED AT THE AIRFIELD ACCESS GATE WHEN REQUIRED TO REMAIN OPEN. ALL
GATES MUST BE LOCKED WHEN NOT IN USE OR NOT MANNED BY THE GATE GUARD. CONTRACTOR MUST
TAKE CARE TO MAINTAIN A HIGH LEVEL OF SAFETY AND SECURITY DURING CONSTRUCTION.
PROCEDURES SHOULD BE IN PLACE TO ENSURE THAT ONLY AUTHORIZED PERSONS AND VEHICLES HAVE
ACCESS TO THE AIRFIELD OR PROJECT LIMITS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
PROPER OPERATION AND PRESERVATION OF AIRFIELD ACCESS GATES SHOWN ON SHEET GC141.
C. THE CONTRACTOR STAGING AREA WILL BE LOCATED WEST OF TAXIWAY A AND EAST OF TAXIWAY G, AS
SHOWN ON SHEET GC141, GC142 & GC143. THE HAUL ROUTE WILL UTILIZE REFUELING ROAD AS SHOWN
ON SHEET GC141, GC142 & GC143 TO GAIN ACCESS TO THE AIRFIELD.
D. FOR THE PURPOSES OF THIS CONTRACT, ALL FENCING/GATES SHALL BE CONSIDERED PART OF
CONTRACTOR HAUL ROUTES. AS SUCH, ANY DAMAGE TO FENCING/GATES AS A RESULT OF
CONSTRUCTION TRAFFIC SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. IF ANY CONSTRUCTION
GATE IS FOUND OPEN AND UNATTENDED BY THE BASE STAFF, THE CONTRACTOR WILL BE REPRIMANDED
PER OCCURRENCE BY THE GOVERNMENT. SEE "SECURITY AND OPERATIONS ENFORCEMENT" FOR
ADDITIONAL INFO.
E. KEY CONTRACTOR PERSONNEL MAY BE EXPECTED TO TRAVEL ON OR NEAR ACTIVE AOA'S. THESE
INDIVIDUALS MUST COMPLY WITH THE RULES AND REGULATIONS BY PARTICIPATING IN AIRFIELD DRIVER'S
TRAINING PROCEDURES PROVIDED BY THE BASE. THERE IS NO GOVERNMENT FEE FOR THIS TRAINING, BUT THE CONTRACTOR IS REQUIRED TO ATTEND THIS TRAINING AND THEIR COST FOR ATTENDING THIS
TRAINING AND THEIR COST FOR THIS TIME SHALL BE INCLUDED IN THEIR BID.
F. STOCKPILED MATERIALS AND EQUIPMENT STORAGE/PARKING ARE NOT PERMITTED WITHIN 200 FEET OF
AN OPERATIONAL RUNWAY OR TAXIWAY EDGE. IF THE CONTRACTOR WISHES TO STOCKPILE MATERIALS
OR EQUIPMENT ADJACENT TO THIS AREA, HE MUST FIRST COORDINATE WITH THE CONTRACTING
OFFICER AND AIRFIELD MANAGER TO ENSURE THAT:
1) MATERIALS AND EQUIPMENT WILL BE ALLOWED AND BASE ENVIRONMENTAL GUIDELINES ARE MET FOR
REMOVED MATERIAL PROPOSED FOR STOCKPILING.
2) APPROPRIATE LIGHTING AND BARRICADES ARE IN PLACE.
3) THE STOCKPILED MATERIALS DO NOT CREATE A WILDLIFE ATTRACTANT OR FOREIGN OBJECT DEBRIS
(FOD) HAZARD.
4) EXCAVATION AND RESULTANT STOCKPILES ADJACENT TO OTHER SURFACES MUST BE APPROPRIATELY
MARKED W/ BARRICADES, AS DIRECTED BY THE COR.
G. THE CONTRACTORS' EQUIPMENT IS STRICTLY LIMITED TO THE CONSTRUCTION AREAS DURING
CONSTRUCTION AND TO THE CONTRACTOR STORAGE AREA DURING NON-CONSTRUCTION PERIODS,
EXCEPT AS PROVIDED ON THE PLANS, IN THE CONTRACT PROVISIONS, OR AS MAY BE AUTHORIZED BY
THE COR IN WRITING. CONTRACTOR PARKING SHALL BE LIMITED TO THE STAGING AREA, EXCEPT AS
ALLOWED BY THE COR.
H. HAUL ROUTES AND ACCESS TO THE CONSTRUCTION SITE(S) WILL BE AS SHOWN ON SHEET GC141 AND
DISCUSSED AT THE PRE-BID MEETING. THE CONTRACTOR IS RESPONSIBLE FOR RESTORING ALL HAUL
ROADS, PLANT SITES, STAGING AND STORAGE AREAS TO ORIGINAL CONDITION AND TO THE
SATISFACTION OF THE CONTRACTING OFFICER. THIS WILL INCLUDE BUT NOT BE LIMITED TO GRADING
(FILLING IF NECESSARY) AND PLACING NEW SOD ON ALL TURF AREAS USED BY THE CONTRACTOR. ANY
PAVEMENT AREAS USED BY THE CONTRACTOR AS A HAUL ROUTE WHICH ARE DAMAGED WILL BE
REPAVED AS APPROVED BY THE CONTRACTING OFFICER AT THE CONTRACTOR'S EXPENSE. THE
CONTRACTOR SHALL INSPECT ALL HAUL ROUTES PRIOR TO START OF CONSTRUCTION. THE
CONTRACTOR SHALL ALSO BE RESPONSIBLE FOR ANY DOCUMENTATION OF EXISTING HAUL ROUTES, EITHER WITH PICTURES OR VIDEO. COSTS ASSOCIATED WITH DOCUMENTING EXISTING HAUL ROUTE
CONDITIONS, OR RECONSTRUCTING OR RESTORING HAUL ROUTES AND STORAGE AREAS, WILL BE
CONSIDERED INCIDENTAL TO THE PROJECT.
CONSTRUCTION EQUIPMENT:
A. ALL CONSTRUCTION EQUIPMENT MUST BE MARKED WITH A 3 FEET BY 3 FEET ORANGE AND WHITE
CHECKERED FLAG AND/OR AMBER BEACON. FOR NIGHT CONSTRUCTION, ALL EQUIPMENT MUST BE
EQUIPPED WITH AN AMBER BEACON. ALL CONSTRUCTION VEHICLES MUST BE CLEARLY MARKED WITH
THE COMPANY NAME/LOGO AT ALL TIMES.
WILDLIFE MANAGEMENT:
A. CONTRACTORS MUST CAREFULLY CONTROL AND CONTINUOUSLY REMOVE WASTE OR LOOSE MATERIALS
THAT CAN CREATE WILDLIFE HAZARDS OR ATTRACTANTS. THESE INCLUDE TRASH, STANDING WATER, TALL GRASS, SCATTERED SEEDS, POORLY MAINTAINED FENCING, AND DISRUPTION OF EXISTING HABITAT.
HAZARDOUS MATERIALS (HAZMAT) MANAGEMENT:
A. ANY TYPE OF FUELING SUPPORT FACILITY OR DEVICE USED TO REFUEL CONSTRUCTION EQUIPMENT IS
SUBJECT TO LOCAL FIRE INSPECTION. LOCAL FIRE CODES AND SAFETY STANDARDS SHALL BE MET PRIOR
TO COMMENCEMENT OF WORK.
B. CONTRACTORS OPERATING CONSTRUCTION VEHICLES AND EQUIPMENT ON THE BASE MUST BE
PREPARED TO EXPEDITIOUSLY CONTAIN AND CLEAN UP SPILLS RESULTING FROM FUEL OR HYDRAULIC
FLUID LEAKS.
C. TRANSPORT AND HANDLING OF OTHER HAZARDOUS MATERIALS ALSO REQUIRE SPECIAL PROCEDURES
(SEE SPECIFICATION SECTION 01 74 19, CONSTRUCTION AND DEMOLITION WASTE MANAGEMENT).
NOTIFICATION OF CONSTRUCTION ACTIVITIES:
A. THE CONTRACTOR SHALL PREPARE AND SUBMIT TO THE COR THE REQUIRED AIRFIELD CONSTRUCTION
WAIVER DURING PHASE 0. THIS AIRFIELD CONSTRUCTION WAIVER SHALL BE APPROVED PRIOR TO THE
CONTRACTOR COMMENCING ANY CONSTRUCTION ACTIVITIES.
B. THE CONTRACTOR SHALL INCLUDE IN THE CONSTRUCTION OPERATIONS PLAN A PROCEDURE FOR
IMMEDIATE NOTIFICATION OF THE COR OF ANY ADVERSE CONDITIONS AFFECTING SAFETY ON THE
AIRFIELD. THE CONTRACTOR SHALL OBTAIN CONTACT INFORMATION FOR ALL INVOLVED PARTIES AND
PROCEDURES FOR CONTACTING THEM 24 HOURS A DAY, 7 DAYS A WEEK.
C. IF APPLICABLE, A LIST OF AIRFIELD OPERATIONS PERSONNEL AND FIRE DEPARTMENT EMERGENCY
PERSONNEL WILL BE DISTRIBUTED.
D. THE BASE OPERATIONS OFFICE SHALL ISSUE ALL NOTAMS RELEVANT TO THE CONSTRUCTION PROGRESS
AND ANY OTHER REQUIRED NOTAMS OR CONTACT NUMBERS.
E. THE CONTRACTOR SHALL PREPARE AND SUBMIT CONTACT INFORMATION FOR LOCAL MEDICAL, FIRE
FIGHTING, AND POLICE RESPONSE IN CASE OF EMERGENCIES DURING CONSTRUCTION TO ALL
EMPLOYEES.
F. THE CONTRACTOR MAY BE REQUIRED TO COORDINATE WITH BASE AIRCRAFT RESCUE AND FIRE FIGHTING
(ARFF) PERSONNEL EVEN FOR NON-EMERGENCIES.
G. THE CONTRACTOR SHALL SUBMIT TO THE CONTRACTING OFFICER 60 DAYS PRIOR TO THE START OF
WORK, AN APPROVED FAA FORM 7460-1 "NOTICE OF PROPOSED CONSTRUCTION OR ALTERATION." BE
ADVISED, FAA APPROVAL OF THE FORM MAY TAKE UP TO 45 DAYS.
H. THE CONTRACTOR SHALL COORDINATE WITH THE COR ANY SAFETY ORIENTED ASPECT CHANGES TO THE
CONSTRUCTION PLAN ONCE IT IS ISSUED.
INSPECTION REQUIREMENTS:
A. AIRFIELD SAFETY SELF-INSPECTIONS SHOULD BE CONDUCTED BY THE CONTRACTOR AT LEAST DAILY, BUT MORE FREQUENTLY IF NECESSARY.
B. A PRE-FINAL AND FINAL INSPECTION MEETING WILL ALSO BE HELD FOR THIS PROJECT.
UNDERGROUND UTILITIES:
A. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF EXISTING BASE UTILITIES, AND
ELECTRICAL CIRCUITS, WHETHER OWNED BY THE BASE OR OTHER AGENCIES OPERATING AT THE
AIRFIELD. LOCATIONS OF EXISTING UTILITIES SHOWN IN THE PLANS ARE BASED ON AVAILABLE SURVEY
AND AS-BUILT DATA AND ARE APPROXIMATE ONLY. CONTRACTOR IS REQUIRED TO POTHOLE AND
LOCATE EXISTING UNDERGROUND UTILITIES PRIOR TO ANY CONSTRUCTION WORK.
B. WORKING IN CONJUNCTION WITH THE COR, THE CONTRACTOR SHALL COORDINATE THE LOCATION OF
ANY CROSSING OF UNDERGROUND ELECTRICAL CIRCUITS PRIOR TO THE START OF ANY CONSTRUCTION
ACTIVITIES. THE CONTRACTOR SHALL PROVIDE TONING EQUIPMENT CAPABLE OF DETECTING A 60 Hz
SIGNAL FOR LOCATING CABLES IN THE CONSTRUCTION AREA.
CONTINUED ON NEXT SHEET
L I C
I T
A T
I O
N
N
O
D E
S I G
N E
D
B
Y
D E
S C
R I P
T I O
N
A
M A
R K
S I Z
E
S U
B M
I T
T E
D
B
Y
D A
T E
C O
N T
R A
C H
E C
K E
D
B
Y
D R
A W
N
B
Y
I S
S U
E
D
A T
E
SHEET ID
B
C
D
E
F
G
2 3 4 5 6 7 8 9 10
A
R
S
E R
M
M A
N D
AIR FORCE RESERVE
COMMAND
A N
S I
D
A U
G U
G
C
E C
I N
D U
S T
R I A
L
D
R I V
E
D O
B B
I N
S
A
R B
G
A
M E
N
T
I N
C
Z
S U
I T
E
D E
N V
E R
C
O
B E
N H
A M
S
K E
L L
C
O M
P A
N Y
N
B
R O
A D
W A
Y
S
U I T
E
O K
L A
H O
T
Y
O
K
D O
B B
I N
S
A
S
E R
S
E
G
E O
R G
I A
R E
P A
A
N S
I E
R
K I N
G
R
A M
P
P R
O J E
F
G W
B
FINAL DESIGN SUBMITTAL
GC152
C O
N S
T R
U C
T I O
N
O
P E
R A
T I O
A
S I N
G
N
O T
E S
D P
S
C S
K
D E
S
C. CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTION OF EXISTING UNDERGROUND UTILITIES
THROUGHOUT CONSTRUCTION. THE CONTRACTOR SHALL HAVE QUALIFIED PERSONNEL ONSITE IF
ANY EXISTING UNDERGROUND UTILITY IS DAMAGED DURING CONSTRUCTION OPERATIONS. THE ROLE
OF THESE PERSONNEL IS NOT LIMITED TO OVERSEEING THE PROTECTION OF UNDERGROUND
UTILITIES AND MAY HAVE ADDITIONAL RESPONSIBILITIES ON THE PROJECT. DAMAGED UTILITIES SHALL
BE IMMEDIATELY CORRECTED AND APPROVED BY THE COR AT NO ADDITIONAL COST TO THE
GOVERNMENT.
D. PRIOR TO THE START OF CONSTRUCTION ANY ELECTRICAL CIRCUITS TO BE CROSSED SHALL BE
TESTED FOR RESISTANCE TO GROUND BY THE CONTRACTOR UNDER SUPERVISION OF THE COR AND
THE READINGS RECORDED. FOLLOWING CONSTRUCTION, THE CONTRACTOR, UNDER THE
SUPERVISION OF THE COR, SHALL CHECK ALL CIRCUITS CROSSED DURING THE PROJECT. ANY
CIRCUITS SHOWING A DECREASE IN RESISTANCE TO GROUND SHALL BE CORRECTED BY THE
CONTRACTOR TO THE RECORDED PRE-CONSTRUCTION LEVELS OR AT LEAST 50 MEGOHMS. NO
ADDITIONAL COMPENSATION WILL BE MADE FOR ANY CORRECTIVE ELECTRICAL WORK DUE TO
CONTRACTOR'S OPERATIONS.
FOREIGN OBJECT DEBRIS (FOD) MANAGEMENT:
A. THE CONTRACTOR SHALL DEVELOP, IMPLEMENT, AND MONITOR A FOD PREVENTION PLAN. A PERSON
SHALL BE DESIGNATED BY THE CONTRACTOR TO CONTINUOUSLY MONITOR THE PAVEMENTS FOR FOD, INCLUDING THE HAUL ROUTES AND ROADWAYS. THIS PERSON SHALL HAVE THE CAPABILITY TO
ASSIGN PERSONNEL AND EQUIPMENT TO REMOVE DEBRIS OR REPAIR HAUL ROUTES AND ROADWAYS
WHEN REQUIRED IN A TIMELY MANNER. THIS PERSON SHALL BE IN SUPERVISORY ROLE BUT THIS ROLE
IS NOT LIMITED TO OVERSEEING THE FOD PREVENTION PLAN AND MAY HAVE ADDITIONAL
RESPONSIBILITIES ON THE PROJECT.
B. DEBRIS SHALL NOT BE DEPOSITED ON ANY PORTION OF AN OPERATIONAL RUNWAY, TAXIWAY OR
APRON. SHOULD ANY DEBRIS BE ACCIDENTALLY DEPOSITED ON ACTIVE OPERATIONAL AREAS, IT
SHALL BE REMOVED IMMEDIATELY. THE CONTRACTORS SWEEPER SHALL HAVE VACUUMING
CAPABILITIES AND BE ASSIGNED TO THE PROJECT AND BE ON-SITE AT ALL TIMES.
C. PRIOR TO OPENING AIRCRAFT MOVEMENT AREAS CLOSED FOR THIS PROJECT, THE CONTRACTOR IS
RESPONSIBLE FOR ENSURING THAT THE SITE, INCLUDING ADJACENT PAVEMENTS AND HAUL ROUTES, IS CLEAR OF ANY FOREIGN OBJECT DEBRIS (FOD) AND IS ACCEPTABLE TO THE COR.
D. THE CONTRACTOR SHALL CONDUCT DAILY INSPECTIONS OF THE WORK AND ADJACENT AREAS FOR
SAFETY AND CLEANLINESS. THE AIRFIELD OPERATIONS AND COR MAY ALSO PERFORM DAILY
INSPECTIONS OF THIS PROJECT SITE.
E. CONTRACTOR SHALL USE ALL MEANS NECESSARY TO MINIMIZE DUST DURING CONSTRUCTION
OPERATIONS. IF THE COR REQUESTS DUST CONTROL IT SHALL BE APPLIED IMMEDIATELY.
SECURITY AND OPERATIONS ENFORCEMENT:
A. THIS PROJECT INVOLVES WORK NEAR ACTIVE AIRCRAFT OPERATIONAL AREAS INCLUDING RUNWAY, TAXIWAY, OR RESTRICTED AREA LOCATIONS ON THE APRON. INCURSIONS OCCURRING DURING THE
PROJECT, AS DETERMINED BY THE JUDGEMENT OF THE CONTRACTING OFFICER, MAY BE SUBJECT TO
A VIOLATION. A RUNWAY INCURSION IS "ANY OCCURRENCE AT AN AERODROME INVOLVING THE
INCORRECT PRESENCE OF AN AIRCRAFT, VEHICLE OR PERSON ON THE PROTECTED AREA OF A
SURFACE DESIGNATED FOR THE LANDING AND TAKE OFF OF AIRCRAFT."
B. VIOLATIONS TO BOTH THE AIRFIELD AND BASE OPERATIONS, SECURITY, OR THESE RULES AND
REGULATIONS, DEPENDING UPON THE SEVERITY OF THE VIOLATION, MAY RESULT IN ONE OR MORE OF
THE FOLLOWING:
1) A VERBAL AND/OR WRITTEN WARNING
2) REVOCATION OF VEHICLE ACCESS PERMIT
3) THE CONTRACT WORK BEING STOPPED UNTIL CORRECTIVE MEASURES ARE TAKEN TO
PRECLUDE A RECURRENCE OF THE VIOLATIONS. (NO TIME EXTENSION WILL BE ISSUED DUE TO A
VIOLATION.)
4) REMOVAL FROM THE PROJECT
C. THE CONTRACTOR IS RESPONSIBLE FOR ALL VIOLATIONS OF AIRFIELD AND SECURITY REGULATIONS.
D. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING AND MAINTAINING CLEAR ROUTES OF ACCESS TO
ACTIVE AIRPORT OPERATIONS AREAS FOR FIRE FIGHTING AND RESCUE EQUIPMENT AND PERSONNEL.
CONSTRUCTION OCCURS IN AREAS THAT ARE IN PROXIMITY TO EMERGENCY SERVICES' ACCESS TO
THE AIRFIELD. AT NO TIME MAY VEHICLES, EQUIPMENT, OR PERSONNEL BE LEFT PARKED, IDLED, STAGED, OR STATIONARY IN THESE AREAS.
RUNWAY & TAXIWAY MARKING, LIGHTING, SIGNS, AND VISUAL NAVAIDS:
A. AIRFIELD MARKINGS, LIGHTING, SIGNS, AND VISUAL NAVAIDS MUST BE CLEARLY VISIBLE TO PILOTS, NOT MISLEADING, CONFUSING OR DECEPTIVE. ALL MUST BE SECURED IN PLACE TO PREVENT
MOVEMENT BY PROP WASH, JET BLAST, WING VORTICES OR OTHER WIND CURRENTS, BUT FRANGIBLE
AND CONSTRUCTED OF MATERIALS THAT WOULD MINIMIZE DAMAGE TO AN AIRCRAFT IN THE EVENT OF
INADVERTENT CONTACT.
B. THE FOLLOWING ARE APPLICABLE STANDARDS FOR ANY TEMPORARY OR PERMANENT INSTALLATIONS
OF THESE RESPECTIVE ITEMS:
PAVEMENT MARKINGS: UFC 3-260-04
AIRFIELD LIGHTING: UFC 3-535-01
C. CONTRACTOR IS RESPONSIBLE FOR PROTECTING EXISTING MARKINGS, SIGNS, AND VISUAL NAVAIDS.
IF EXISTING MARKINGS, SIGNS, OR VISUAL NAVAIDS ARE DAMAGED BY CONSTRUCTION OPERATIONS, THE CONTRACTOR SHALL IMMEDIATELY CORRECT AS APPROVED BY THE COR AT THE CONTRACTOR'S
EXPENSE.
D. RUNWAY WILL NOT REQUIRE CLOSURES FOR THIS PROJECT. TAXIWAY A WILL REQUIRE CLOSURE FOR
THIS PROJECT.
E. NAVAIDS AND AIRFIELD LIGHTING ARE NOT ANTICIPATED TO BE AFFECTED BY THIS PROJECT.
MARKING AND SIGNS FOR ACCESS ROUTES:
A. PAVEMENT MARKINGS AND SIGNS INTENDED FOR CONSTRUCTION PERSONNEL SHALL CONFORM TO
UFC 3-260-04, AND WITH THE MUTCD AND/OR STATE HIGHWAY SPECIFICATIONS AS PRACTICAL.
B. ACCESS ROUTES USED BY CONTRACTOR MUST BE CLEARLY MARKED TO PREVENT INADVERTENT
ENTRY TO AREAS OPEN TO AIRFIELD OPERATIONS. CONSTRUCTION SIGNS SHALL BE INSTALLED PER
THE MINIMUM REQUIREMENTS OF THE SPECIFICATIONS AND REMOVED AT THE COMPLETION OF THE
PROJECT.
C. CONTRACTOR SHALL PROVIDE "25 MPH SPEED LIMIT" SIGNS AND "HAUL ROUTE" SIGNS WHEN HAULING
ON THE AIRFIELD OR BASE ROADWAYS AND TAXIWAYS. OTHER SPEED LIMITS THAT MUST BE
OBSERVED ARE, 10 MPH ON ANY AIRCRAFT APRON AND 5 MPH WITHIN 50 FEET OF ANY AIRCRAFT.
HAZARD MARKING AND LIGHTING:
A. IF ANY AIRCRAFT MOVEMENT AREA MUST BE CLOSED, THE CONTRACTOR SHALL FURNISH AND PLACE
PORTABLE BARRICADES ACROSS APRONS TO KEEP CONSTRUCTION VEHICLES FROM ENTERING
ACTIVE OPERATION AREAS AND TO KEEP AIRCRAFT FROM TAXIING INTO CONSTRUCTION AREAS.
BARRICADES SHALL BE HIGHLY-REFLECTIVE, MARKED WITH DIAGONAL, ALTERNATING ORANGE AND
WHITE STRIPES AND SUPPLEMENTED WITH EITHER FLASHING OR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .